Bill Text: MO SB940 | 2024 | Regular Session | Introduced


Bill Title: Requires publication of a cost estimate and project completion date for any work on the state highway system at the time bidding for a contract on the work first closes

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced) 2024-01-25 - Second Read and Referred S Transportation, Infrastructure and Public Safety Committee [SB940 Detail]

Download: Missouri-2024-SB940-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback