Bill Text: NY S09113 | 2023-2024 | General Assembly | Introduced


Bill Title: Enacts the "build to need act" to meet the state's electrification and climate related policy mandates; directs the public service commission to implement a grid planning process; makes related provisions.

Spectrum: Partisan Bill (Democrat 2-0)

Status: (Introduced) 2024-04-26 - REFERRED TO ENERGY AND TELECOMMUNICATIONS [S09113 Detail]

Download: New_York-2023-S09113-Introduced.html



                STATE OF NEW YORK
        ________________________________________________________________________

                                          9113

                    IN SENATE

                                     April 26, 2024
                                       ___________

        Introduced  by  Sen.  COMRIE -- read twice and ordered printed, and when
          printed to be committed to the Committee on  Energy  and  Telecommuni-
          cations

        AN  ACT  to  amend  the  public service law, in relation to enacting the
          "build to need act"

          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:

     1    Section 1. Short title. This act shall be known as and may be cited as
     2  the "build to need act".
     3    §  2.  Legislative  findings  and intent. The legislature hereby finds
     4  that in order to achieve the targets set forth in the climate leadership
     5  and community protection act, zero-emissions vehicle sales targets,  and
     6  regulations,  including the advanced clean truck and advanced clean cars
     7  II rules, zero-emissions school bus mandate, and other  relevant  goals,
     8  the interests of the people of the state would be served by:
     9    (a) expediting electric grid infrastructure upgrades to facilitate the
    10  charging of light-duty, medium-duty, and heavy-duty electric vehicles;
    11    (b)  aligning a proactive planning process for beneficial electrifica-
    12  tion with the current coordinated grid  planning  process  for  electric
    13  corporations;
    14    (c)  ensuring  the  full range of feasible distributed energy resource
    15  technologies, load management opportunities,  and  expected  electrified
    16  end uses are incorporated into electric utility investment plans;
    17    (d)  lowering costs to customers through efficient planning, including
    18  consideration and deployment of non-wires solutions that reduce or elim-
    19  inate the need for distribution system upgrades;
    20    (e) ensuring meaningful  benefits  to  communities  most  affected  by
    21  large-scale  proactive  utility projects developed under this framework;
    22  and
    23    (f) enhancing speed,  flexibility,  and  ease  of  customer  intercon-
    24  nections (including both loads and distributed generation).
    25    § 3. The public service law is amended by adding a new section 77-a to
    26  read as follows:

         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD14561-02-4

        S. 9113                             2

     1    §  77-a. Build to need act. 1. Within sixty days of the effective date
     2  of this section, the commission shall commence a proceeding to implement
     3  a grid planning process that shall direct electric corporations to:
     4    (a)  align  planning  under  this section with existing planning proc-
     5  esses, including  the  coordinated  grid  planning  process  implemented
     6  pursuant  to the climate leadership and community protection act, to the
     7  extent feasible;
     8    (b) provide annually to  the  New  York  independent  system  operator
     9  updated load projections consistent with the state's electrification and
    10  climate related policy mandates;
    11    (c)  use  a  planning  horizon  of at least ten years for transmission
    12  through substation-level investments and a planning horizon of at  least
    13  five years for other distribution investments;
    14    (d)  proactively  gather and incorporate data relevant to future elec-
    15  tric loads from sources including but not limited to customers operating
    16  fleets, state and  municipal  departments  of  transportation  or  their
    17  equivalents,  other  entities  that  may  reasonably be expected to have
    18  relevant information concerning location, type, magnitude, or timing  of
    19  major future loads, available vehicle telematics data, and other sources
    20  of information as directed by the commission;
    21    (e)  consider  customers' activities that may reduce, defer, or other-
    22  wise affect the need or extent of  grid  upgrades,  such  as  customers'
    23  reasonably  foreseeable  load  management  activities, including but not
    24  limited to implementation of automated load management technologies, and
    25  deployments of distributed energy resources and ability  to  enter  into
    26  flexible interconnections;
    27    (f)  identify system needs where the electric corporation, planning in
    28  accordance with the state's electrification and climate  related  policy
    29  mandates,  finds  (i) a reasonable expectation of new load in a specific
    30  area based on inputs including fleet electrification commitments,  prox-
    31  imity  to  transportation  corridors,  ports,  airports,  other existing
    32  transportation or freight hubs and  other  relevant  data  sources  that
    33  would  substantiate the projections of new load and the associated time-
    34  line; and (ii) a reasonable likelihood of grid  constraints  that  shall
    35  impair  the  electric  corporations  ability  to serve the load absent a
    36  solution to address the system need in a timely manner; and
    37    (g) where an electric  corporation  identifies  a  system  need,  such
    38  corporation shall develop solutions that proactively address such system
    39  need, and consider advanced technologies where appropriate and feasible.
    40    2.  (a)  The  commission shall develop a test for defining larger tier
    41  one solutions and smaller tier two solutions. Such test shall:
    42    (i) be applied uniformly to all electric  corporations,  except  where
    43  the  commission  determines  such  different  criteria should apply to a
    44  given electric corporation because unique circumstances or hardships, or
    45  impracticability of applying the uniform test to  such  electric  corpo-
    46  ration exist;
    47    (ii) prohibit electric corporations from segmenting solutions to avoid
    48  a tier one designation; and
    49    (iii) specify criteria such as, but not limited to, solution cost as a
    50  percentage  of  the  electric  corporation's rate base, solution nominal
    51  voltage, solution wattage and solution type.
    52    (b) The commission may update such test as appropriate to  ensure  the
    53  timely  achievement  of state electrification mandates and the efficient
    54  consideration of solutions development pursuant to this section.

        S. 9113                             3

     1    (c) The commission shall establish separate requirements for tier  one
     2  projects  for which the electric corporation seeks approval under subdi-
     3  vision four of this section and tier two projects.
     4    3.  The  commission  shall  develop  a  framework governing the use of
     5  advanced technologies as part of the solutions for  which  the  electric
     6  corporation  seeks approval under subdivision four of this section. Such
     7  framework shall: (a) define  advanced  technologies  to  include  energy
     8  storage,  demand  response, automated load management, other distributed
     9  energy resources, and any other categories as determined by the  commis-
    10  sion.    Such  framework  shall direct electric corporations to consider
    11  where appropriate and feasible at least one  alternative  technology  to
    12  address the identified system need fully or partially; and
    13    (b) such electric corporation shall demonstrate why advanced technolo-
    14  gies  were  or  were not included as part of the project. The commission
    15  may establish mandatory targets for deployment of advanced technologies,
    16  provide for earnings adjustment mechanisms  associated  with  utilities'
    17  deployment of advanced technologies, and include other metrics and guid-
    18  ance as appropriate.
    19    4.  In  approving tier one projects for which the electric corporation
    20  seeks approval under this subdivision, the commission shall require:
    21    (a) electric corporations file with  the  commission  a  petition  for
    22  approval.  Such  petition  shall  include  a description of project need
    23  including data sources to substantiate need, explanation of alternatives
    24  considered, description of its community benefit  plan  as  required  in
    25  subdivision  six  of  this  section,  projected  costs  and  benefits, a
    26  proposed cost recovery method, and any other requirements as established
    27  by the commission. Further, such petition shall include  an  explanation
    28  of  an  electric  corporation's  reasonable  efforts  to obtain state or
    29  federal funding sources to offset electric corporation customer costs of
    30  the project. If the electric corporation does not seek state or  federal
    31  funding sources, it shall explain why it did not seek such funding.
    32    (b) render a decision on such petition within one hundred twenty days,
    33  or  within the one hundred twenty day period, extend such time to render
    34  a decision by sixty days. Failure to render a decision within such time-
    35  line prescribed, shall deem such petition approved by operation of  law;
    36  and
    37    (c)  to the extent an electric corporation's infrastructure deployment
    38  or other costs attributable to this section  are  not  included  in  its
    39  current  rate  plan as of the effective date of this section, such elec-
    40  tric corporation may recover the incremental revenue requirement associ-
    41  ated with such costs through a surcharge mechanism until its base  rates
    42  are  reset.  A surcharge mechanism may only be used to the extent neces-
    43  sary between the effective date of this section and  the  conclusion  of
    44  the electric corporation's next rate case.
    45    5.  (a) All tier one projects for which the electric corporation seeks
    46  approval under subdivision four of this section shall include a communi-
    47  ty benefit plan. The commission shall develop a community  benefit  plan
    48  framework which shall:
    49    (i) define the term "affected communities," which shall include commu-
    50  nities  in  the vicinity of a tier one project as well as other criteria
    51  defined by the commission;
    52    (ii) consider separate requirements applicable to disadvantaged commu-
    53  nities within affected communities;
    54    (iii) specify criteria that a reasonable percentage of solution  bene-
    55  fits are demonstrated to be delivered to affected communities;

        S. 9113                             4

     1    (iv)  consider  achievable,  measurable workforce development programs
     2  and goals designed to expand high-quality job opportunities in  affected
     3  communities;
     4    (v)  require  such  electric  corporation provide benefits to affected
     5  communities; and
     6    (vi) require a description of such  electric  corporation's  past  and
     7  planned  efforts  concerning  community  engagement  and  its history of
     8  incorporating an affected communities feedback into its solution or  its
     9  willingness to incorporate an affected communities feedback.
    10    (b)  Reasonable  and prudently incurred costs in the implementation of
    11  the community benefit plan shall be recoverable by such electric  corpo-
    12  ration as part of solution costs.
    13    6.  The  commission  is authorized to promulgate rules and regulations
    14  necessary  to  determine  record  keeping  requirements  for  tier   two
    15  projects, including:
    16    (a) records demonstrating project need;
    17    (b) analysis of the chosen solution by the electric corporation;
    18    (c) alternatives considered;
    19    (d) project costs and benefits; and
    20    (e) any other requirements determined by the commission.
    21    7.  Within  two  hundred  eighty  days  of  the effective date of this
    22  section, electric corporations shall  offer  to  customers,  and  update
    23  tariffs  as  necessary  to  enable  both  hybrid  and flexible intercon-
    24  nections. For the purposes of this subdivision, hybrid  interconnections
    25  include  an  interconnection,  through  a  single application, of hybrid
    26  facilities.  Such hybrid facilities shall include those composed of more
    27  than one device of different technology types for such production, stor-
    28  age, and consumption of electricity that are located on  the  same  site
    29  and have a single point of interconnection. Further, for the purposes of
    30  this subdivision, flexible interconnections include electric corporation
    31  requirements  to  enable  expeditiously energizing new load or intercon-
    32  necting a distributed  energy  resource  to  an  electric  corporation's
    33  distribution  system,  including  an  agreement, supported by the use of
    34  software or hardware solutions such as automated  load  management,  for
    35  curtailing the import and export of electricity from and to the distrib-
    36  ution system.
    37    8.  Within one year of the effective date of this section, the commis-
    38  sion shall establish average and maximum target time  periods  for  load
    39  energizations  and  distributed generation interconnections. The commis-
    40  sion may establish targets that vary depending on the size and complexi-
    41  ty of such work, as well as factors beyond such  electric  corporation's
    42  control.    Further,  the  commission  shall  establish  a procedure for
    43  customers to  report  energization  or  interconnection  delays  to  the
    44  commission.  The  commission shall establish an enforcement mechanism to
    45  ensure timely interconnection and energization, including but not limit-
    46  ed to, earnings adjustment mechanisms with incentives and penalties.
    47    9. The commission, in consultation with  the  New  York  state  energy
    48  research  and  development  authority,  the  department of environmental
    49  conservation, the department of transportation, the power  authority  of
    50  New  York  state,  the  Long  Island power authority, and other agencies
    51  charged with administering electric  vehicle  programs,  incentives,  or
    52  procurements  may  include  provisions  for  the  use  of automated load
    53  management in such programs, incentives, and procurements when they  are
    54  determined  to be cost effective. For purposes of this subdivision auto-
    55  mated load management shall include any required hardware  and  software
    56  and also installation costs.

        S. 9113                             5

     1    10.  (a)  Within  one  year of the effective date of this section, the
     2  commission shall adopt reporting requirements under this section  for  a
     3  time  period  determined  by  the commission but no less than five years
     4  from the effective date of  this  section.  The  reporting  requirements
     5  shall include at a minimum:
     6    (i)  a  summary  of tier one and tier two projects deployed, including
     7  but not limited to a general categorization of projects, project  costs,
     8  and for projects that entered service between the effective date of this
     9  section  and the effective date of the electric corporation's subsequent
    10  rate plan, an identification of those projects not included in the elec-
    11  tric corporation's prior rate plan;
    12    (ii) a comparison of projected and actual loads,  including  projected
    13  loads  attributable  to electrification and a summary of projected elec-
    14  tric corporation system upgrades and costs to serve such loads;
    15    (iii) actual and estimated,  as  practicable,  incremental  costs  and
    16  revenues attributable to tier one and two projects;
    17    (iv)  a summary of community benefit plan implementations and results,
    18  as applicable; and
    19    (v) energization and interconnection timelines.
    20    (b) To the extent an electric corporation's performance fails to  meet
    21  corresponding  target time periods, such report shall explain such fail-
    22  ures and shall provide a strategy for meeting the targets in the future.
    23  The commission shall  monitor  each  electric  corporation's  activities
    24  related to this section and take appropriate action as needed to address
    25  any deficiencies.
    26    § 4. This act shall take effect immediately.