Existing law, the Sustainable Groundwater Management Act, authorizes the State Water Resources Control Board to designate a groundwater basin as a probationary basin if the state board makes a certain determination and to develop an interim plan for the probationary basin. The act requires that a local agency or groundwater sustainability agency have 180 days to remedy the deficiency if the board designates the basin as a probationary basin.
This bill would make nonsubstantive changes to the latter provision.