Amended  IN  Senate  March 18, 2024

CALIFORNIA LEGISLATURE— 2023–2024 REGULAR SESSION

Senate Bill
No. 1221


Introduced by Senator Min

February 15, 2024


An act to amend Section 25665.7 of the Public Resources Code, relating to climate change. An act to amend Section 451 of, to add Sections 451.6 and 739.16 to, and to add Article 11 (commencing with Section 660) to Chapter 3 of Part 1 of Division 1 of, the Public Utilities Code, relating to gas corporations.


LEGISLATIVE COUNSEL'S DIGEST


SB 1221, as amended, Min. Equitable Building Decarbonization Program: report. Gas corporations: gas distribution infrastructure: zero-emission alternatives.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. Existing law requires every public utility to furnish and maintain adequate, efficient, just and reasonable service, instrumentalities, equipment, and facilities as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public.
This bill would require each gas corporation, by July 1, 2025, to annually file a map containing certain information, including the location of all potential gas distribution line replacement projects identified in its distribution integrity management plan and other foreseeable gas distribution pipeline replacements. The bill would require the commission, by January 1, 2026, to do various things, including the establishment of criteria and methodology for determining the cost-effectiveness of zero-emission alternatives, as defined, the determination of the appropriate rate of return and recovery period that a gas corporation is eligible to receive their costs to implement zero-emission alternatives, the designation of priority neighborhood decarbonization zones taking into consideration certain factors, and the adoption of a long-term gas distribution system planning process to evaluate and implement zero-emission alternatives for gas distribution line replacement projects and other capital investments in the gas distribution system. The bill would require the commission to evaluate the costs and benefits of thermal energy networks and identify potential implementation barriers. The bill would prohibit a gas corporation from involuntarily laying off employees as a result of the implementation of zero-emission alternatives.
This bill would authorize a gas corporation to cease providing service if adequate substitute energy service is reasonably available to support the energy end use of the affected gas corporation customers.
This bill would require the commission, by January 1, 2026, to direct each electrical corporation to offer incremental discounts or other rate adjustments, if needed, to enable the adoption of building electrification technologies by participants in the California Alternate Rates for Energy (CARE) program or the Family Electric Rate Assistance (FERA) program, as provided.
Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above requirements are codified in the act and a violation of those requirements or a commission’s action implementing those requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.

Existing law requires the State Energy Resources Conservation and Development Commission to establish the Equitable Building Decarbonization Program, which includes establishing a statewide incentive program for low-carbon building technologies and the direct install program to fund certain projects, including installation of energy efficient electric appliances, energy efficiency measures, demand flexibility measures, wiring and panel upgrades, building infrastructure upgrades, efficient air-conditioning systems, ceiling fans, and other measures to protect against extreme heat, where appropriate, and remediation and safety measures to facilitate the installation of new technologies. Existing law authorizes the commission to administer the direct install program through regional direct install third-party implementers, as specified. Existing law requires that the direct install program give preference to projects in buildings that meet specified criteria. The Budget Act of 2022 appropriated $112,000,000 from the General Fund for purposes of the Equitable Building Decarbonization Program.

Existing law requires the commission, on or before September 1, 2024, and annually thereafter until the moneys described above have been expended, to submit a report to the relevant policy committees of the Legislature that includes information about the progress of the direct install program, including the selected administrators and implementers and implementation progress, as specified.

This bill would make nonsubstantive changes to the above-described provision involving this report.

Vote: MAJORITY   Appropriation: NO   Fiscal Committee: YES   Local Program: NOYES  

The people of the State of California do enact as follows:


SECTION 1.

 This act shall be known, and may be cited, as the Affordable Energy Transition and Workforce Protection Act.

SEC. 2.

 (a) The Legislature finds and declares all of the following:
(1) California is leading the nation in moving toward clean, renewable forms of energy to fight climate change and improve the health and well-being of residents.
(2) Gas demand is already declining as California transitions away from fossil gas to achieve the state’s climate and air quality objectives.
(3) Without active planning and management, reduced demand for fossil gas will result in higher gas rates, with a disproportionate burden on customers unable to afford to transition away from dependence on gas appliances.
(4) A longer term planning process is necessary to evaluate zero-emission alternatives, including neighborhood electrification and thermal energy networks, that could avoid new capital investment in the gas system that may become stranded assets and to reduce upward pressure on gas rates.
(5) Installation of electric heat pump space conditioning systems, which provide both efficient heating and cooling, is particularly valuable in frontline communities to improve occupant comfort and increase resilience to heat waves because members of those communities are more likely to lack access to air conditioning.
(6) Cost-effective, zero-emission alternatives both reduce gas system costs and further California’s efforts to reduce greenhouse gas pollution and improve air quality.
(7) Cost-effective, zero-emission alternatives to pipeline replacement projects both reduce gas system costs and further California’s efforts to reduce greenhouse gas pollution and improve air quality.
(8) Deployment of zero-emission alternatives should prioritize high road jobs for workers.
(9) Deployment of zero-emission alternatives should prioritize benefits to disadvantaged and low-income communities and include tenant and bill protections.
(b) It is the intent of the Legislature to provide direction for purposes of the Public Utilities Commission’s ongoing long-term gas planning rulemaking (R.20-01-007) to ensure affordability and to provide protections for communities and workers.

SEC. 3.

 Section 451 of the Public Utilities Code is amended to read:

451.
 (a) (1)  All charges demanded or received by any a public utility, or by any two or more public utilities, for any a product or commodity furnished or to be furnished or any a service rendered or to be rendered shall be just and reasonable. Every unjust or unreasonable charge demanded or received for such that product or commodity or service is unlawful.

Every

(2) Every public utility shall furnish and maintain such adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, including telephone facilities, as defined in Section 54.1 of the Civil Code, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public.

All

(3) All rules made by a public utility affecting or pertaining to its charges or service to the public shall be just and reasonable.
(b) (1) This section does not apply to the provision of gas service at premises that have ceased gas service pursuant to Section 451.6.
(2) Notwithstanding any other law, the gas corporation that previously served those premises described in paragraph (1) shall have no further obligation to provide gas service to those premises. The gas corporation shall continue to have an obligation to serve all other customers in its service territory.

SEC. 4.

 Section 451.6 is added to the Public Utilities Code, to read:

451.6.
 Notwithstanding any other law, a gas corporation may cease providing service if adequate substitute energy service is reasonably available to support the energy end uses of the affected gas corporation customers.

SEC. 5.

 Article 11 (commencing with Section 660) is added to Chapter 3 of Part 1 of Division 1 of the Public Utilities Code, to read:
Article  11. Gas Distribution Infrastructure Plan

660.
 For purposes of this article, the following definitions apply:
(a) “Disadvantaged community” means a community identified pursuant to Section 39711 of the Health and Safety Code.
(b) “Distribution integrity management plan” means a plan developed pursuant to Part 192 (commencing with Section 192.1) of Title 49 of the Code of Federal Regulations.
(c) “Gas distribution line” means either gas distribution main lines or gas distribution service lines.
(d) “Gas distribution main line” has the same meaning as “main” set forth in Section 192.3 of Title 49 of the Code of Federal Regulations.
(e) “Gas distribution service line” has the same meaning as “service line” set forth in Section 192.3 of Title 49 of the Code of Federal Regulations.
(f) “Low-income” means having a household income no greater than 80 percent of area median income or qualifying for participation in the California Alternate Rates for Energy (CARE) program or Family Electric Rate Assistance (FERA) program.
(g) “Priority neighborhood decarbonization zone” means a zone identified pursuant to Section 663.
(h) “Thermal energy network” means a network of piped noncombustible fluids used for transferring heat into and out of buildings for purposes of providing zero-emission heating and cooling services.
(i) “Zero-emission alternatives” means methods of providing gas customers with suitable replacement energy service that does not require new investment in gas distribution lines, including, but not limited to, electrification of gas end uses and energy efficiency, thermal energy networks, and demand flexibility measures to alter energy needs.

661.
 On or before July 1, 2025, and each year thereafter, each gas corporation shall submit to the commission a map that includes all of the following:
(a) The location of all potential gas distribution line replacement projects identified in its distribution integrity management plan and any foreseeable gas distribution pipeline replacements.
(b) The city, county, and census tract boundaries within the gas corporation’s service territory.
(c) Locations of disadvantaged communities and priority neighborhood decarbonization zones, if designated by the commission pursuant to Section 663, that are within the gas corporation’s service territory.
(d) Any additional information required by the commission.

662.
 On or before January 1, 2026, in a new or existing proceeding, the commission shall establish all of the following:
(a) Criteria and methodology for determining the cost-effectiveness of a zero-emission alternative. The commission shall consider nonenergy benefits in determining the cost-effectiveness of zero-emission alternatives.
(b) Requirements and programs to ensure that a substitute for gas service for low-income customers is affordable, adequate, efficient, and just and reasonable, including, but not limited to, bill and renter protections.
(c) Notice requirements for customers if a zero-emission alternative would be implemented. Notice shall include information about the climate and health benefits of zero-emission buildings and the potential impact of declining gas demand on gas rates, and the notice shall be made available in the area’s prevailing languages.
(d) The appropriate rate of return and recovery period that a gas corporation is eligible to receive for their costs to implement a zero-emission alternative. A gas corporation shall not receive ratepayer funding for the costs of a zero-emission alternative that are covered by incentives under federal, state, or local laws.

663.
 (a) On or before January 1, 2026, in a new or existing proceeding and following the opportunity for public comment, the commission shall designate priority neighborhood decarbonization zones. In designating the zones, the commission shall consider factors that include, but are not limited to, all of the following:
(1) Presence of disadvantaged and low-income communities in high-temperature climate zones that disproportionately lack cooling.
(2) Presence of environmental and social justice communities as defined in the commission’s Environmental and Social Justice Action Plan.
(3) Availability of supportive local government or community partners.
(4) Concentration of gas distribution line replacement projects identified in the map submitted pursuant to Section 661.
(b) The commission shall coordinate with relevant agencies to identify third-party funding, such as state and federal funds, that may be used to execute projects in priority neighborhood decarbonization zones that would be cost effective with supplemental nonratepayer funding.
(c) If zero-emission alternatives are implemented in a priority neighborhood decarbonization zone, the commission shall direct gas corporations and electrical corporations, if appropriate, to leverage other available programs, including, but not limited to, energy efficiency, low-income weatherization, and distributed generation programs.
(d) The commission may, after providing an opportunity for public comment, update the priority neighborhood decarbonization zones as necessary.

664.
 (a) On or before July 1, 2026, the commission shall adopt a long-term gas distribution system planning process to evaluate and implement zero-emission alternatives for gas distribution line replacement projects and any other capital investments in the gas distribution system the commission deems necessary.
(b) The commission may establish a separate process to routinize review, communication, and execution of zero-emission alternatives for gas distribution service line replacements.
(c) This section does not prevent a gas corporation from seeking commission approval of pilot projects to implement zero-emission alternatives before establishment of a long-term gas distribution system planning process, if the cost to gas ratepayers of the zero-emission alternative is less than, or equal to, the cost of the gas distribution pipeline replacement project and adequate substitution of service has been provided. A gas corporation may replace no more than 3 percent of its gas distribution pipelines with zero-emission alternatives before the commission adopts a long-term gas distribution system planning process.

665.
 In a new or existing proceeding, the commission shall evaluate the costs and benefits of thermal energy networks and identify potential implementation barriers.

666.
 (a) The commission shall require that all construction work undertaken to implement a zero-emission alternative, other than decommissioning a gas corporation’s plant and property by employees of the gas corporation or front-of-meter work performed by an electrical corporation or local publicly owned electric utility, as appropriate, shall be constructed using a skilled and trained workforce as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code, and all of the following conditions shall apply:
(1) (A) Except as provided in paragraph (3), every contractor and subcontractor performing work paid for in whole or in part by the program implementing the zero-emission alternative shall use a skilled and trained workforce to construct any portion of the program.
(B) Contractors and subcontractors that violate subparagraph (A) are subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractor’s or subcontractor’s failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of any portion of the program using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(2) (A) Except as provided in paragraph (3), every contractor and subcontractor shall pay to all construction workers employed in the construction of any portion of the program implementing the zero-emission alternative at least the general prevailing rate of per diem wages, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(B) The obligation of contractors and subcontractors to pay prevailing wages may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of any portion of the program, or by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee through a civil action under Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(3) Paragraphs (1) and (2) do not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement as defined in Section 2500 of the Public Contract Code. The project labor agreement shall also include, but not be limited to, all of the following:
(A) Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B) Provisions requiring payment of prevailing wages to all construction workers employed in the construction of any portion of the program and for enforcement of that obligation through an arbitration procedure.
(C) Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(D) Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(E) Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum referenced in subdivision (t) of Section 14005 of the Unemployment Insurance Code.
(b) This section does not apply to behind-the meter work for zero-emission alternatives to individual gas distribution line replacement projects serving no more than three customers.
(c) A gas corporation shall not involuntarily lay off any employee as a result of the implementation of zero-emission alternatives.

667.
 This article does not prohibit a gas corporation from seeking commission approval of cost-effective zero-emission alternatives before the filing of a gas distribution infrastructure plan.

SEC. 6.

 Section 739.16 is added to the Public Utilities Code, to read:

739.16.
 (a) On or before January 1, 2026, the commission shall direct each electrical corporation to offer an incremental discount or other rate adjustment, if needed, to enable the adoption of building electrification technologies by participants in the California Alternate Rates for Energy (CARE) program or Family Electric Rate Assistance (FERA) program, who shall be eligible to take service under an optional electrification tariff designed to promote the adoption of building and transportation electrification. The incremental discount or other rate adjustments shall promote accelerated payback periods for electric space heating and water heating investments by reducing the operational costs of those technologies.
(b) An incremental discount shall satisfy both of the following requirements:
(1) The incremental discount shall be in addition to any discount authorized pursuant to Sections 739.1 and 739.12 and shall be excluded from any determination of the average effective CARE program discount in paragraph (1) of subdivision (c) of Section 739.1.
(2) The cost of the incremental discount shall be recovered from customers in the same manner as specified under paragraph (7) of subdivision (a) of Section 327.

SEC. 7.

 No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.
SECTION 1.Section 25665.7 of the Public Resources Code is amended to read:
25665.7.

(a)Notwithstanding Section 10231.5 of the Government Code, on or before September 1, 2024, and annually thereafter until all moneys appropriated in Items 3360-002-0001 and 3360-102-0001 of Section 2.00 of the Budget Act of 2022, as amended by Chapter 249 of the Statutes of 2022, for the Equitable Building Decarbonization Program are expended, the commission shall submit a report to the relevant policy committees of the Legislature that includes information about the progress of the direct install program, including the selected administrators and implementers and implementation progress, including, but not limited to, the number of residents and buildings provided low- and zero-cost projects, the number of each project type implemented, the estimated reduction of greenhouse gas emissions, and the locational distribution of the expenditures by county and region.

(b)(1)Upon the complete expenditure of all moneys described in subdivision (a), the commission shall notify the Secretary of State contemporaneously with the submission of the report required by subdivision (a) that includes information regarding the last expended moneys.

(2)This section shall become inoperative on the date the commission notifies the Secretary of State pursuant to paragraph (1) and is repealed on January 1 of the following year.