10 LC
21 0677
Senate
Bill 462
By:
Senators Butterworth of the 50th, Smith of the 52nd, Mullis of the 53rd, Hooks
of the 14th, Chapman of the 3rd and others
A
BILL TO BE ENTITLED
AN ACT
To
amend Chapter 5 of Title 12 of the Official Code of Georgia Annotated, relating
to water resources, so as to provide a short title; to provide a statement of
policy; to define certain terms; to provide for applicability; to provide for
the permitting of interbasin transfers of water; to provide considerations; to
provide for procedures; to provide for emergencies; to provide for prohibitions;
to repeal conflicting laws; and for other purposes.
BE
IT ENACTED BY THE GENERAL ASSEMBLY OF GEORGIA:
SECTION
1.
Chapter
5 of Title 12 of the Official Code of Georgia Annotated, relating to water
resources, is amended by adding a new article to read as follows:
"ARTICLE
11
12-5-600.
This
article shall be known and may be cited as the 'River Basin Protection
Act.'
12-5-601.
Georgia's
river systems and aquifers support communities, local and regional economies,
and diverse ecosystems. Maintaining natural flows throughout Georgia to the
maximum extent practicable, while ensuring a safe yield, is essential for the
overall health of its water resources and the economies that depend on them. It
is therefore declared to be the policy of the State of Georgia to approximate
natural flow levels and rates in all waters of the state to the maximum extent
practicable, to protect against over-allocations and under-allocations of water
in all river systems and aquifers or portions thereof in the state to the
maximum extent practicable, and to minimize consumptive uses of water to the
maximum extent practicable.
12-5-602.
As
used in this article, the term:
(1)
'Basin' means the Altamaha, Chattahoochee, Coosa, Flint, Ochlockonee, Ocmulgee,
Oconee, Ogeechee, St. Marys, Satilla, Savannah, Suwannee, Tallapoosa, or
Tennessee River Basin.
(2)
'Biological integrity' means the maintenance of water in a water source in the
volume necessary to support and maintain wetlands and wildlife, including fish,
flora, and fauna, insofar as protection of such is required by federal or state
laws or regulations.
(3)
'Chemical integrity' means the maintenance of water in a water source in the
volume necessary to enable such water source to achieve the water quality
standards prescribed for the water source by federal or state laws or
regulations in light of authorized effluent discharges and other expected
impacts on the water source.
(4)
'Consumptive use' means any use of water that is not a nonconsumptive use,
including, but not limited to, evaporation or the incorporation of water into a
product or crop.
(5)
'Department' means the Department of Natural Resources.
(6)
'Director' means the director of the division.
(7)
'Division' means the Environmental Protection Division of the
department.
(8)
'Donor basin' means a river basin from which a withdrawal or diversion of water
occurs in an interbasin transfer.
(9)
'Ground water' shall be defined as in paragraph (6) of Code Section
12-5-92.
(10)
'Interbasin transfer' means the withdrawal, diversion, or pumping of surface
water from one river basin, or the withdrawal or pumping of ground water from a
point located within or beneath one river basin, and discharge of all or any
part of the water in or beneath a river basin different from the basin of
origin.
(11)
'Nonconsumptive use' means a use of withdrawn water in such a manner that it is
returned to its waters of origin at or near its point of withdrawal without
substantial diminution in quality or quantity and without resulting in or
exacerbating a low flow condition.
(12)
'Physical integrity' means the volume of water in a water source necessary
to:
(A)
Support commercial navigation of the water source as required by federal or
state law or regulation;
(B)
Preserve natural, cultural, or historic resources as determined by or as
required by federal or state law or regulation;
(C)
Provide adequate recreational opportunities to the people of Georgia;
and
(D)
Prevent serious depletion or exhaustion of the water source.
(13)
'Receiving basin' means a river basin to which all or a portion of water from
another river basin is diverted in an interbasin transfer.
(14)
'Safe yield' means the amount of water in a water source available for
withdrawal without impairing the long-term utility of the water source,
including the biological integrity, chemical integrity, and physical integrity
of the source, as determined by comparing the natural and artificial
replenishment of the water source to existing or planned consumptive and
nonconsumptive uses.
(15)
'Waters of the state' shall be defined as in paragraph (13) of Code Section
12-5-22.
12-5-603.
(a)
The provisions of this article shall apply to:
(1)
Any proposed new interbasin transfer permits; and
(2)
Any modifications or renewals of existing water withdrawal or discharge permits
that include an interbasin transfer.
(b)
The provisions of this article shall not apply to permits for the withdrawal of
water for agricultural purposes if the contiguous permitted area falls within
two basins.
12-5-604.
No
interbasin transfer shall be allowed without a permit from the division. Any
person seeking to make an interbasin transfer of more than 100,000 gallons of
water per day shall apply to the director for a permit for such transfer. When
feasible, the nonconsumptive portion of the interbasin transfer shall be
returned to the basin of origin. Water users receiving water as the result of
the proposed interbasin transfer shall implement water conservation procedures
in accordance with the state water conservation implementation plan or other
conservation measures recommended by the department, and must demonstrate that
there are no cost-effective alternatives to the interbasin
transfer.
12-5-605.
(a)
The director shall issue or deny any interbasin transfer permit applied for in
accordance with the provisions of this article. Any such interbasin transfer
permit shall be issued for a term of no more than ten years; provided, however,
that the director shall review each plan at the end of the fifth year after its
issuance or renewal and may make modifications as provided in this Code
section.
(b)
The regulation of interbasin transfers shall be informed by scientific
knowledge, must respect natural systems, and must protect the basins of origin
and the receiving basins. When modifying an existing interbasin transfer permit
or issuing a new interbasin transfer permit, the director shall indicate in the
permit the following provisions, terms, and conditions:
(1)
Donor basin considerations, including but not limited to:
(A)
The safe yield of the proposed withdrawal and the stream flow of the donor
basin, with special consideration for dry years and low-flow
conditions;
(B)
The current and reasonably foreseeable future water needs of the donor basin,
with special consideration for dry years and low-flow conditions;
(C)
Protection of water quality in the donor basin, with special consideration for
dry years and low-flow conditions;
(D)
The number of downstream river miles from which water will be diverted as a
result of the transfer; and
(E)
The connection between surface water and ground water in the donor basin and the
effect of the proposed transfer on either or both;
(2)
Receiving basin considerations, including but not limited to:
(A)
Determination of whether or not the applicant's proposed use is reasonable,
including consideration of whether the applicant has previously implemented
vigorous water conservation practices and achieved reasonable water conservation
goals;
(B)
Assessment of the waste-water treatment capacity of the receiving
basin;
(C)
The supply of water presently available to the receiving basin as well as the
estimates of overall current water demand and the reasonable foreseeable future
water needs of the receiving basin;
(D)
The beneficial impact of any proposed transfer and the demonstrated capability
of the applicant to effectively implement its responsibilities under the
requested permit;
(E)
The impact of the proposed transfer on water conservation;
(F)
The applicant's efforts to explore all reasonable options for use of reclaimed
water and recycling of available resources to meet the needs of the receiving
basin; and
(G)
Assessment of the adequacy of treatment capacity and current water quality
conditions;
(3)
Considerations affecting both basins, including but not limited to:
(A)
The economic feasibility, cost effectiveness, and environmental effects of the
proposed transfer in relation to alternative sources of water
supply;
(B)
The cumulative effects of the current and proposed interbasin transfers in each
basin;
(C)
The requirements of the state and federal agencies with authority related to
water resources;
(D)
The availability of water for responding to emergencies, including but not
limited to drought, in the donor basin and the receiving basin;
(E)
The effects, whether beneficial or detrimental, on off stream and in stream
uses;
(F)
The quantity, quality, location, and timing of water returned to the donor
basin, receiving basin, and basins downstream;
(G)
Effects on interstate water use;
(H)
The cumulative effect on the donor basin and the receiving basin of any water
transfer or consumptive use that is authorized or forecast; and
(I)
Such other factors as are reasonably necessary to carry out the purposes of this
chapter; and
(4)
Other considerations, including but not limited to:
(A)
The location of the withdrawal;
(B)
The authorized amount of the withdrawal and the level of consumptive use, if
any, and required conservation measures, if any;
(C)
The dates during which water is to be withdrawn, including any seasonal or
shorter variations in the authorized withdrawals or level of consumptive
use;
(D)
The uses for which the water is authorized to be withdrawn;
(E)
The transfer of water shall be governed by any applicable in-stream flow
protection requirements of the division;
(F)
The amount of return flow required, if any, and the required place of discharge,
if any;
(G)
Any special provisions necessary to promote an adequate water supply for the
state or to mitigate any future adverse conditions resulting from the
transfer;
(H)
The installation, maintenance, and use of stream flow monitoring
equipment;
(I)
Any requirements for metering, surveillance, and reporting the director
determines to be necessary to ensure compliance with other conditions,
limitations, or restrictions of the permit, including consent to inspections or
investigations;
(J)
The establishment and reporting of transfer activities by the
permittee;
(K)
The time within which all necessary construction authorized by the permit must
be completed or within which the withdrawal or use of water must begin to be
made, with the delay not to exceed five years from the date of issuance of the
permit, subject to extension by order of the director upon showing that all due
efforts and diligence toward the completion of the work have been
made;
(L)
Any extraordinary withdrawals of the waters of the state necessary for the
construction of any facilities necessary to withdraw or use water;
(M)
Any obligation to restore the lands or waters of the state to their condition
prior to the issuance of the permit;
(N)
The date on which the permit expires; and
(O)
Any other conditions, limitations, and restrictions the director determines to
be necessary to protect the public interest, the environment and ecosystems, and
the public health, safety, and welfare, and to ensure the conservation, proper
management, and aesthetic enhancement of the waters of the state.
12-5-606.
After
receipt of a completed application and at least 30 days prior to acting on the
application, the director shall notify city and county governments and public
utilities in each county located entirely or partially within the river basin
that is the source of the proposed transfer and the receiving basin and to all
persons who have filed a written request with the director that their names be
placed on a mailing list for receipt of such notice. Any person desiring to be
placed on such mailing list must so request in writing and renew such request in
December of each year. The name of any person who has not renewed such request
shall be removed from the list. The director shall cause a notice of the
proposed interbasin transfer which shall include a nontechnical description of
the applicant's request and a conspicuous statement in bold type as to the
effects of the water transfer on the basin of origin and receiving basin to be
published in the legal organ or a newspaper of general circulation in each
potentially affected community in the basin of origin and the receiving basin.
The director shall call a public hearing if requested by a city or county
government or public utility located entirely or partially within a river basin
being affected by an interbasin transfer or if requested by 20 or more public
citizens. Notice shall be given of the public hearing at least 30 days prior to
the hearing.
12-5-607.
In
the event an emergency period of water shortage exists within an area of the
state, the director may modify or revoke and reissue any interbasin transfer
permit subject to the terms of a state drought management plan. The director
shall give public notice of any emergency action taken with respect to an
interbasin transfer permit to the maximum extent practicable.
12-5-608.
Interbasin
transfers of water that occur in connection with mining, conveying, processing,
sale, or shipment of minerals or other products transported for further
processing or sale shall be exempt from limitations on interbasin transfers
provided by this subsection.
12-5-609.
Surface
water contained in any intermediate or product shipped or transported for
further processing or for sale shall be exempt from limitations on interbasin
transfers provided by this subsection.
12-5-610.
Nothing
in this article shall modify or in any way affect the provisions of subsection
(f) of Code Section 12-5-84, which provides that the Metropolitan North Georgia
Water Planning District shall neither study nor include in any plan any
interbasin transfer of water from outside the district area, and such provisions
shall remain in full force and effect.
12-5-611.
Any
person who receives in one county an interbasin or intrabasin transfer of water
which originated in a second county is prohibited from transferring any or all
of such water by means of pipes, pipelines, conduits, ditches, or canals into a
third county, except to satisfy critical
needs."
SECTION
2.
All
laws and parts of laws in conflict with this Act are repealed.