Bill Text: HI HB1343 | 2012 | Regular Session | Introduced


Bill Title: CIP; 32nd Representative District

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2011-12-01 - Carried over to 2012 Regular Session. [HB1343 Detail]

Download: Hawaii-2012-HB1343-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

1343

TWENTY-SIXTH LEGISLATURE, 2011

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE thirty-second REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $         or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2011-2012 for the purpose of financing the capital improvement projects listed in this Act.

     I.   To be expended by the Department of Education:

          A.   Aiea Elementary School, Oahu

(1)  Design and construction for air conditioning for 6 classrooms in Building A, and 8 classrooms in Building B.

              Plans                                    $1,000

              Design                                    $1,000

              Construction                           $998,000

              Total Funding                         $1,000,000

          B.   Aiea High School, Oahu

(1)  Design, construction, furniture and equipment to complete expansion and renovation of the administration building; ground and site improvements; equipment and appurtenances.

              Plans                                     $1,000

              Design                                   $1,000

              Construction                            $228,000

              Total Funding                           $230,000

(2)  Plans, design, and construction for campus-wide erosion control, drainage improvements and exterior commons, Phase 1; ground and site improvements; equipment and appurtenances.

Plans                                    $1,000

Design                                   $1,000

              Construction/materials               $2,498,000

              Total Funding                         $2,500,000

          C.   Aliamanu Elementary School, Oahu

(1)  Design, construction, and equipment for administration building for clerical, administrative and support staff.

Design                                   $1,000

Construction                          $5,999,000

Total Funding                         $6,000,000

(2)  Design, construction, and equipment for new media center/library for students and staff.

Design                                   $1,000

Construction                          $7,499,000

Total Funding                         $7,500,000

          D.   Alvah Scott Elementary School, Oahu

(1)  Expansion of main parking lot.

Plans                                    $1,000

Design                                    $1,000

              Construction                         $1,998,000

              Total Funding                        $2,000,000

(2)  Repair of basketball courts.

              Plans                                     $1,000

              Design                                   $1,000

              Construction                            $198,000

              Total Funding                          $200,000

          E.   Moanalua Elementary School, Oahu

(1)  Plans, design, and construction for 8 classrooms to replace existing portable classrooms.

Plans                                    $1,000

Design                                   $1,000

Construction                          $3,998,000

Total Funding                         $4,000,000

(2)  Plans, design, and construction to expand library building to accommodate technology center for students.

Plans                                    $1,000

Design                                   $1,000

Construction                          $298,000

Total Funding                         $300,000

(3)  Construction of roofing over existing walkways.

Construction                            $30,000

Total Funding                           $30,000

(4)  Resurface, repaint, and repair existing basketball and volleyball courts to meet the wellness initiative implemented by the Department of Education.

Construction                          $132,000

Total Funding                         $132,000

          F.   Moanalua Middle School, Oahu

(1)  Construction of ramp for P3 to comply with the ADA.

Construction                            $60,000

Total Funding                           $60,000

(2)  Air conditioning for buildings B & F.

Construction                            $60,000

Total Funding                           $60,000

(3)  Renovation of restrooms to comply with the ADA.

Design                                    $1,000

Construction                          $1,999,000

Total Funding                         $2,000,000

          G.   Moanalua High School, Oahu

(1)  Plans, design, and construction of a new performing arts center for school and community use for music, arts, drama, and other educational and community events.

Plans                                    $1,000

Design                                   $1,000

Construction                         $28,998,000

Total Funding                        $29,000,000

          H.   Mokulele Elementary School, Oahu

(1)  Design and construction of roofing for walkway from Building F to offices.

Design                                   $1,000

Construction                            $49,000

Total Funding                           $50,000

(2)  Design and construction of an ADA-compliant elevator for Building F.

Plans                                    $1,000

Design                                   $1,000

Construction                          $998,000

Total Funding                         $1,000,000

          I.   Nimitz Elementary School, Oahu

(1)  Design and construction for campus-wide air conditioning; ground and site improvements; equipment and appurtenances.

Plans                                    $1,000

Design                                   $1,000

Construction                          $7,221,000

Total Funding                         $7,223,000

(2)  Design, construction, and equipment for a new library building; ground and site improvements; equipment and appurtenances.

Plans                                    $1,000

Design                                    $1,000

Construction & Equipment                  $7,154,000

Total Funding                         $7,156,000

          J.   Pearl Harbor Elementary School, Oahu

(1)  Plans, design, construction, and equipment for a new library building; ground and site improvements; equipment and appurtenances.

Plans                                   $1,000

Design                                  $1,000

Construction                         $7,154,000

Total Funding                        $7,156,000

(2)  Design and construction for parking lot expansion and improvements.

Design                                   $1,000

Construction                          $739,000

Total Funding                         $740,000

          K.   Pearl Harbor Kai Elementary School, Oahu

(1)  Replace sliding doors in building C.

Construction                          $158,000

Total Funding                         $158,000

(2)  Drainage improvement for playcourt.

Construction                            $47,000

Total Funding                           $47,000

(3)  Renovate restrooms in buildings B and C to comply with the ADA.

Design                                   $2,000

Construction                          $474,000

Total Funding                         $476,000

          L.   Radford High School, Oahu

              (1)  Replacement of gymnasium floor.

              Construction                          $200,000

              Total Funding                         $200,000

              (2)  Restoration of the rubberized track.

              Construction                          $1,400,000

              Total Funding                         $1,400,000

     II. To be expended by the Department of Transportation:

          A.   Honolulu International Airport, Oahu

(1)  Plans, design, and construction of improvements for runway 4R.

Plans                                    $1,000

Design                                   $1,000

Construction                         $21,398,000

Total Funding                        $21,400,000

(2)  Design and construction of improvements for the runway 22 culvert.

Plans                                    $1,000

Design                                   $1,000

Construction                         $14,398,000

Total Funding                        $14,400,000

(3)  Design and construction of structural improvements for Taxiway Z.

Design                                   $1,000

Construction                         $58,499,000

Total Funding                        $58,500,000

(4)  Roadway improvements.

Construction                          $7,740,000

Total Funding                         $7,740,000

          B.   Airport system, statewide

(1)  Plans, design, and construction of airfield improvements.

              Plans                                    $1,000

              Design                                   $1,000

              Construction                         $23,998,000

              Total Funding                        $24,000,000

III. To be expended by the Department of Accounting and General Services.

          A.   Aloha Stadium, Oahu

              (1)  Health and safety improvements.

              Construction                         $12,900,000

              Total Funding                        $12,900,000

          B.   Field upgrade and replacement.

              Construction                        $12,900,000

              Total Funding                        $12,900,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2014, shall lapse as of that date.

     SECTION 4.  This Act shall take effect on July 1, 2011.

 

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 32nd Representative District

 

Description:

Appropriates funds for capital improvement projects for the benefit of the 32nd representative district

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback