1 | AMENDMENT TO SENATE BILL 3073
| ||||||
2 | AMENDMENT NO. ______. Amend Senate Bill 3073 by replacing | ||||||
3 | everything after the enacting clause with the following:
| ||||||
4 | "Section 5. The Environmental Protection Act is amended by | ||||||
5 | changing Section 22.59 and by adding Section 22.59a as | ||||||
6 | follows:
| ||||||
7 | (415 ILCS 5/22.59) | ||||||
8 | Sec. 22.59. CCR surface impoundments. | ||||||
9 | (a) The General Assembly finds that: | ||||||
10 | (1) the State of Illinois has a long-standing policy | ||||||
11 | to restore, protect, and enhance the environment, | ||||||
12 | including the purity of the air, land, and waters, | ||||||
13 | including groundwaters, of this State; | ||||||
14 | (2) a clean environment is essential to the growth and | ||||||
15 | well-being of this State; | ||||||
16 | (3) CCR generated by the electric generating industry |
| |||||||
| |||||||
1 | has caused groundwater contamination and other forms of | ||||||
2 | pollution at active and inactive plants throughout this | ||||||
3 | State; | ||||||
4 | (4) environmental laws should be supplemented to | ||||||
5 | ensure consistent, responsible regulation of all existing | ||||||
6 | CCR surface impoundments; and | ||||||
7 | (5) meaningful participation of State residents, | ||||||
8 | especially vulnerable populations who may be affected by | ||||||
9 | regulatory actions, is critical to ensure that | ||||||
10 | environmental justice considerations are incorporated in | ||||||
11 | the development of, decision-making related to, and | ||||||
12 | implementation of environmental laws and rulemaking that | ||||||
13 | protects and improves the well-being of communities in | ||||||
14 | this State that bear disproportionate burdens imposed by | ||||||
15 | environmental pollution ; and . | ||||||
16 | (6) the State has a particular interest in preserving | ||||||
17 | the quality of Lake Michigan, which serves as a drinking | ||||||
18 | water source for millions of State residents and provides | ||||||
19 | irreplaceable recreational, ecological, and economic value | ||||||
20 | to Illinois. | ||||||
21 | Therefore, the purpose of this Section is to promote a | ||||||
22 | healthful environment, including clean water, air, and land, | ||||||
23 | meaningful public involvement, and the responsible disposal | ||||||
24 | and storage of coal combustion residuals, so as to protect | ||||||
25 | public health and to prevent pollution of the environment of | ||||||
26 | this State. |
| |||||||
| |||||||
1 | The provisions of this Section shall be liberally | ||||||
2 | construed to carry out the purposes of this Section. | ||||||
3 | (b) No person shall: | ||||||
4 | (1) cause or allow the discharge of any contaminants | ||||||
5 | from a CCR surface impoundment into the environment so as | ||||||
6 | to cause, directly or indirectly, a violation of this | ||||||
7 | Section or any regulations or standards adopted by the | ||||||
8 | Board under this Section, either alone or in combination | ||||||
9 | with contaminants from other sources; | ||||||
10 | (2) construct, install, modify, operate, or close any | ||||||
11 | CCR surface impoundment without a permit granted by the | ||||||
12 | Agency, or so as to violate any conditions imposed by such | ||||||
13 | permit, any provision of this Section or any regulations | ||||||
14 | or standards adopted by the Board under this Section; | ||||||
15 | (3) cause or allow, directly or indirectly, the | ||||||
16 | discharge, deposit, injection, dumping, spilling, leaking, | ||||||
17 | or placing of any CCR upon the land in a place and manner | ||||||
18 | so as to cause or tend to cause a violation of this Section | ||||||
19 | or any regulations or standards adopted by the Board under | ||||||
20 | this Section; or | ||||||
21 | (4) construct, install, modify, or close a CCR surface
| ||||||
22 | impoundment in accordance with a permit issued under this
| ||||||
23 | Act without certifying to the Agency that all contractors, | ||||||
24 | subcontractors, and installers utilized to construct, | ||||||
25 | install, modify, or close a CCR surface impoundment are | ||||||
26 | participants in: |
| |||||||
| |||||||
1 | (A) a training program that is approved by and
| ||||||
2 | registered with the United States Department of
| ||||||
3 | Labor's Employment and Training Administration and
| ||||||
4 | that includes instruction in erosion control and
| ||||||
5 | environmental remediation; and | ||||||
6 | (B) a training program that is approved by and
| ||||||
7 | registered with the United States Department of
| ||||||
8 | Labor's Employment and Training Administration and
| ||||||
9 | that includes instruction in the operation of heavy
| ||||||
10 | equipment and excavation. | ||||||
11 | Nothing in this paragraph (4) shall be construed to | ||||||
12 | require providers of construction-related professional | ||||||
13 | services to participate in a training program approved by | ||||||
14 | and registered with the United States Department of | ||||||
15 | Labor's Employment and Training Administration. | ||||||
16 | In this paragraph (4), "construction-related | ||||||
17 | professional services" includes, but is
not limited to, | ||||||
18 | those services within the scope of: (i) the
practice of | ||||||
19 | architecture as regulated under the
Illinois Architecture | ||||||
20 | Practice Act of 1989; (ii) professional
engineering as | ||||||
21 | defined in Section 4 of the Professional
Engineering | ||||||
22 | Practice Act of 1989; (iii) the practice of a structural
| ||||||
23 | engineer as defined in Section 4 of the Structural | ||||||
24 | Engineering Practice Act of
1989; or (iv) land surveying | ||||||
25 | under the Illinois Professional Land
Surveyor Act of 1989. | ||||||
26 | (c) (Blank). |
| |||||||
| |||||||
1 | (d) Before commencing closure of a CCR surface | ||||||
2 | impoundment, in accordance with Board rules, the owner of a | ||||||
3 | CCR surface impoundment must submit to the Agency for approval | ||||||
4 | a closure alternatives analysis that analyzes all closure | ||||||
5 | methods being considered and that otherwise satisfies all | ||||||
6 | closure requirements adopted by the Board under this Act. | ||||||
7 | Complete removal of CCR, as specified by the Board's rules, | ||||||
8 | from the CCR surface impoundment must be considered and | ||||||
9 | analyzed. Section 3.405 does not apply to the Board's rules | ||||||
10 | specifying complete removal of CCR. The selected closure | ||||||
11 | method must ensure compliance with regulations adopted by the | ||||||
12 | Board pursuant to this Section. | ||||||
13 | (e) Owners or operators of CCR surface impoundments who | ||||||
14 | have submitted a closure plan to the Agency before May 1, 2019, | ||||||
15 | and who have completed closure prior to 24 months after July | ||||||
16 | 30, 2019 (the effective date of Public Act 101-171) shall not | ||||||
17 | be required to obtain a construction permit for the surface | ||||||
18 | impoundment closure under this Section. | ||||||
19 | (f) Except for the State, its agencies and institutions, a | ||||||
20 | unit of local government, or not-for-profit electric | ||||||
21 | cooperative as defined in Section 3.4 of the Electric Supplier | ||||||
22 | Act, any person who owns or operates a CCR surface impoundment | ||||||
23 | in this State shall post with the Agency a performance bond or | ||||||
24 | other security for the purpose of: (i) ensuring closure of the | ||||||
25 | CCR surface impoundment and post-closure care in accordance | ||||||
26 | with this Act and its rules; and (ii) ensuring remediation of |
| |||||||
| |||||||
1 | releases from the CCR surface impoundment. The only acceptable | ||||||
2 | forms of financial assurance are: a trust fund, a surety bond | ||||||
3 | guaranteeing payment, a surety bond guaranteeing performance, | ||||||
4 | or an irrevocable letter of credit. | ||||||
5 | (1) The cost estimate for the post-closure care of a | ||||||
6 | CCR surface impoundment shall be calculated using a | ||||||
7 | 30-year post-closure care period or such longer period as | ||||||
8 | may be approved by the Agency under Board or federal | ||||||
9 | rules. | ||||||
10 | (2) The Agency is authorized to enter into such | ||||||
11 | contracts and agreements as it may deem necessary to carry | ||||||
12 | out the purposes of this Section. Neither the State, nor | ||||||
13 | the Director, nor any State employee shall be liable for | ||||||
14 | any damages or injuries arising out of or resulting from | ||||||
15 | any action taken under this Section. | ||||||
16 | (3) The Agency shall have the authority to approve or | ||||||
17 | disapprove any performance bond or other security posted | ||||||
18 | under this subsection. Any person whose performance bond | ||||||
19 | or other security is disapproved by the Agency may contest | ||||||
20 | the disapproval as a permit denial appeal pursuant to | ||||||
21 | Section 40. | ||||||
22 | (g) The Board shall adopt rules establishing construction | ||||||
23 | permit requirements, operating permit requirements, design | ||||||
24 | standards, reporting, financial assurance, and closure and | ||||||
25 | post-closure care requirements for CCR surface impoundments. | ||||||
26 | Not later than 8 months after July 30, 2019 (the effective date |
| |||||||
| |||||||
1 | of Public Act 101-171) the Agency shall propose, and not later | ||||||
2 | than one year after receipt of the Agency's proposal the Board | ||||||
3 | shall adopt, rules under this Section. The Board shall not be | ||||||
4 | deemed in noncompliance with the rulemaking deadline due to | ||||||
5 | delays in adopting rules as a result of the Joint Commission on | ||||||
6 | Administrative Rules oversight process. The rules must, at a | ||||||
7 | minimum: | ||||||
8 | (1) be at least as protective and comprehensive as the | ||||||
9 | federal regulations or amendments thereto promulgated by | ||||||
10 | the Administrator of the United States Environmental | ||||||
11 | Protection Agency in Subpart D of 40 CFR 257 governing CCR | ||||||
12 | surface impoundments; | ||||||
13 | (2) specify the minimum contents of CCR surface | ||||||
14 | impoundment construction and operating permit | ||||||
15 | applications, including the closure alternatives analysis | ||||||
16 | required under subsection (d); | ||||||
17 | (3) specify which types of permits include | ||||||
18 | requirements for closure, post-closure, remediation and | ||||||
19 | all other requirements applicable to CCR surface | ||||||
20 | impoundments; | ||||||
21 | (4) specify when permit applications for existing CCR | ||||||
22 | surface impoundments must be submitted, taking into | ||||||
23 | consideration whether the CCR surface impoundment must | ||||||
24 | close under the RCRA; | ||||||
25 | (5) specify standards for review and approval by the | ||||||
26 | Agency of CCR surface impoundment permit applications; |
| |||||||
| |||||||
1 | (6) specify meaningful public participation procedures | ||||||
2 | for the issuance of CCR surface impoundment construction | ||||||
3 | and operating permits, including, but not limited to, | ||||||
4 | public notice of the submission of permit applications, an | ||||||
5 | opportunity for the submission of public comments, an | ||||||
6 | opportunity for a public hearing prior to permit issuance, | ||||||
7 | and a summary and response of the comments prepared by the | ||||||
8 | Agency; | ||||||
9 | (7) prescribe the type and amount of the performance | ||||||
10 | bonds or other securities required under subsection (f), | ||||||
11 | and the conditions under which the State is entitled to | ||||||
12 | collect moneys from such performance bonds or other | ||||||
13 | securities; | ||||||
14 | (8) specify a procedure to identify areas of | ||||||
15 | environmental justice concern in relation to CCR surface | ||||||
16 | impoundments; | ||||||
17 | (9) specify a method to prioritize CCR surface | ||||||
18 | impoundments required to close under RCRA if not otherwise | ||||||
19 | specified by the United States Environmental Protection | ||||||
20 | Agency, so that the CCR surface impoundments with the | ||||||
21 | highest risk to public health and the environment, and | ||||||
22 | areas of environmental justice concern are given first | ||||||
23 | priority; | ||||||
24 | (10) define when complete removal of CCR is achieved | ||||||
25 | and specify the standards for responsible removal of CCR | ||||||
26 | from CCR surface impoundments, including, but not limited |
| |||||||
| |||||||
1 | to, dust controls and the protection of adjacent surface | ||||||
2 | water and groundwater; and | ||||||
3 | (11) describe the process and standards for | ||||||
4 | identifying a specific alternative source of groundwater | ||||||
5 | pollution when the owner or operator of the CCR surface | ||||||
6 | impoundment believes that groundwater contamination on the | ||||||
7 | site is not from the CCR surface impoundment. | ||||||
8 | (h) Any owner of a CCR surface impoundment that generates | ||||||
9 | CCR and sells or otherwise provides coal combustion byproducts | ||||||
10 | pursuant to Section 3.135 shall, every 12 months, post on its | ||||||
11 | publicly available website a report specifying the volume or | ||||||
12 | weight of CCR, in cubic yards or tons, that it sold or provided | ||||||
13 | during the past 12 months. | ||||||
14 | (i) The owner of a CCR surface impoundment shall post all | ||||||
15 | closure plans, permit applications, and supporting | ||||||
16 | documentation, as well as any Agency approval of the plans or | ||||||
17 | applications on its publicly available website. | ||||||
18 | (j) The owner or operator of a CCR surface impoundment | ||||||
19 | shall pay the following fees: | ||||||
20 | (1) An initial fee to the Agency within 6 months after | ||||||
21 | July 30, 2019 (the effective date of Public Act 101-171) | ||||||
22 | of: | ||||||
23 | $50,000 for each closed CCR surface impoundment; | ||||||
24 | and | ||||||
25 | $75,000 for each CCR surface impoundment that have | ||||||
26 | not completed closure. |
| |||||||
| |||||||
1 | (2) Annual fees to the Agency, beginning on July 1, | ||||||
2 | 2020, of: | ||||||
3 | $25,000 for each CCR surface impoundment that has | ||||||
4 | not completed closure; and | ||||||
5 | $15,000 for each CCR surface impoundment that has | ||||||
6 | completed closure, but has not completed post-closure | ||||||
7 | care. | ||||||
8 | (k) All fees collected by the Agency under subsection (j) | ||||||
9 | shall be deposited into the Environmental Protection Permit | ||||||
10 | and Inspection Fund. | ||||||
11 | (l) The Coal Combustion Residual Surface Impoundment | ||||||
12 | Financial Assurance Fund is created as a special fund in the | ||||||
13 | State treasury. Any moneys forfeited to the State of Illinois | ||||||
14 | from any performance bond or other security required under | ||||||
15 | this Section shall be placed in the Coal Combustion Residual | ||||||
16 | Surface Impoundment Financial Assurance Fund and shall, upon | ||||||
17 | approval by the Governor and the Director, be used by the | ||||||
18 | Agency for the purposes for which such performance bond or | ||||||
19 | other security was issued. The Coal Combustion Residual | ||||||
20 | Surface Impoundment Financial Assurance Fund is not subject to | ||||||
21 | the provisions of subsection (c) of Section 5 of the State | ||||||
22 | Finance Act. | ||||||
23 | (m) The provisions of this Section shall apply, without | ||||||
24 | limitation, to all existing CCR surface impoundments and any | ||||||
25 | CCR surface impoundments constructed after July 30, 2019 (the | ||||||
26 | effective date of Public Act 101-171), except to the extent |
| |||||||
| |||||||
1 | prohibited by the Illinois or United States Constitutions. | ||||||
2 | (n) This subsection applies to owners and operators of CCR | ||||||
3 | surface impoundments at electric generating plants that are | ||||||
4 | bordering Lake Michigan. | ||||||
5 | CCR in all CCR surface impoundments subject to this | ||||||
6 | subsection, including those for which an adjusted standard has | ||||||
7 | been sought pursuant to Section 28.1, shall be closed by | ||||||
8 | removal by off-site disposal, pursuant to this Section, | ||||||
9 | applicable Illinois Pollution Control Board regulations, and | ||||||
10 | the following provisions: | ||||||
11 | (1) CCR surface impoundments under this subsection are | ||||||
12 | not subject to the closure alternative analysis required | ||||||
13 | under subsection (d). | ||||||
14 | (2) Notwithstanding any other requirements of this | ||||||
15 | Section or Board rules or regulations, applications for | ||||||
16 | closure construction subject to this subsection shall be | ||||||
17 | submitted to the Agency within one year after the | ||||||
18 | effective date of this amendatory Act of the 102nd General | ||||||
19 | Assembly. Application requirements and permit issuance | ||||||
20 | procedures shall follow those adopted by the Illinois | ||||||
21 | Pollution Control Board under this Section. | ||||||
22 | (3) If the owner or operator of any CCR surface | ||||||
23 | impoundment subject to this subsection has submitted a | ||||||
24 | construction permit application to the Agency to close a | ||||||
25 | subject CCR surface impoundment by any method other than | ||||||
26 | removal under Part 845 of Title 35 of the Illinois |
| |||||||
| |||||||
1 | Administrative Code, the owner or operator shall submit an | ||||||
2 | amended construction permit application that complies with | ||||||
3 | the requirements of this Section within one year after the | ||||||
4 | effective date of this amendatory Act of 102nd General | ||||||
5 | Assembly. | ||||||
6 | (4) Any permit issued by the Agency allowing a CCR | ||||||
7 | surface impoundment subject to this subsection to close in | ||||||
8 | place shall be declared void. The Agency shall not issue | ||||||
9 | any operating permit or construction permit allowing | ||||||
10 | closure in place to the owner or operator of any CCR | ||||||
11 | surface impoundment subject to this subsection.
| ||||||
12 | (Source: P.A. 101-171, eff. 7-30-19; 102-16, eff. 6-17-21; | ||||||
13 | 102-137, eff. 7-23-21; 102-309, eff. 8-6-21; 102-558, eff. | ||||||
14 | 8-20-21; 102-662, eff. 9-15-21; revised 10-14-21.)
| ||||||
15 | (415 ILCS 5/22.59a new) | ||||||
16 | Sec. 22.59a. Great Lakes CCR protection. | ||||||
17 | (a) The General Assembly finds that: | ||||||
18 | (1) The State has a long-standing policy to restore, | ||||||
19 | protect, and enhance the environment, and has a particular | ||||||
20 | interest in preserving the quality of Lake Michigan, which | ||||||
21 | serves as a drinking water source for millions of State | ||||||
22 | residents and provides irreplaceable recreational, | ||||||
23 | ecological, and economic value to Illinois. | ||||||
24 | (2) CCR generated by the electric generating industry | ||||||
25 | has contaminated, and continues to contaminate, Lake |
| |||||||
| |||||||
1 | Michigan, and CCR placed in unlined deposits, including | ||||||
2 | deposits outside of CCR surface impoundments as well as in | ||||||
3 | CCR surface impoundments, continues to threaten the | ||||||
4 | quality of Lake Michigan's water. | ||||||
5 | (3) The purpose of this Section is to protect Lake | ||||||
6 | Michigan against further contamination from CCR. | ||||||
7 | (b) This Section applies to owners and operators of CCR | ||||||
8 | surface impoundments at electric generating plants that are | ||||||
9 | bordering Lake Michigan. This section shall not apply to CCR | ||||||
10 | surface impoundments subject to Section 22.59, except for | ||||||
11 | subsection (n) of that Section. | ||||||
12 | (c) An owner or operator shall remove from their site, for | ||||||
13 | off-site disposal, all CCR generated by the facility and | ||||||
14 | remediate all soil and groundwater impacted by the CCR, in | ||||||
15 | accordance with the following: | ||||||
16 | (1) Within one year after the effective date of this | ||||||
17 | amendatory Act of the 102nd General Assembly, the owner or | ||||||
18 | operator shall conduct a site investigation and submit to | ||||||
19 | the Agency a site investigation report that identifies the | ||||||
20 | full extent of CCR at the site. The investigation and | ||||||
21 | report shall also identify the full extent of soil and | ||||||
22 | groundwater that, as a result of the CCR, exceeds the most | ||||||
23 | stringent remediation objectives adopted under Title XVII | ||||||
24 | of this Act. | ||||||
25 | (A) Within 5 days after submitting the report to | ||||||
26 | the Agency, the owner or operator shall post public |
| |||||||
| |||||||
1 | notice of the report's submission (i) on the owner or | ||||||
2 | operator's website, along with a copy of the report | ||||||
3 | for public viewing, and (ii) in a newspaper of general | ||||||
4 | distribution in the municipality. The notice shall be | ||||||
5 | provided in English and Spanish and shall inform the | ||||||
6 | public of their right to submit comments on the report | ||||||
7 | to the Agency within 30 days after the date the notice | ||||||
8 | is published in the newspaper. The owner or operator | ||||||
9 | shall also maintain a copy of the report in a public | ||||||
10 | repository in the municipality for public viewing, | ||||||
11 | which shall be identified in the public notice. | ||||||
12 | (B) Within 90 days after receipt of the site | ||||||
13 | investigation report, the Agency shall determine | ||||||
14 | whether the investigation and report complies with | ||||||
15 | this paragraph (1). In making its determination, the | ||||||
16 | Agency shall consider all public comments submitted | ||||||
17 | within 30 days after the date of the newspaper notice | ||||||
18 | required under subparagraph (A). | ||||||
19 | (C) If the Agency determines the investigation and | ||||||
20 | report complies with this paragraph (1) it shall | ||||||
21 | notify the owner or operator in writing of its | ||||||
22 | determination. The owner or operator shall then submit | ||||||
23 | a CCR removal and remediation plan in accordance with | ||||||
24 | paragraph (2). | ||||||
25 | (D) If the Agency determines the investigation or | ||||||
26 | report does not comply with this paragraph (1) it |
| |||||||
| |||||||
1 | shall notify the owner or operator in writing of its | ||||||
2 | determination and the reasons for the determination. | ||||||
3 | The owner or operator shall then have 6 months to (i) | ||||||
4 | perform additional investigation or correct any | ||||||
5 | deficiencies and (ii) submit an amended site | ||||||
6 | investigation report to the Agency, which shall be | ||||||
7 | subject to the same submission and review procedures | ||||||
8 | set forth in this paragraph (1). | ||||||
9 | (2) Within 6 months after the Agency's approval of the | ||||||
10 | site investigation report, the owner or operator shall | ||||||
11 | submit to the Agency a CCR removal and remediation plan | ||||||
12 | that will achieve the removal of all CCR at the site and | ||||||
13 | the remediation of all soil and groundwater that, as a | ||||||
14 | result of the CCR, exceeds the most stringent remediation | ||||||
15 | objectives adopted under Title XVII of this Act. The plan | ||||||
16 | shall include a schedule for completion of its major | ||||||
17 | milestones, along with the following: | ||||||
18 | (A) An analysis of the modes for transporting the | ||||||
19 | removed CCR off-site, including by rail, barge, | ||||||
20 | low-polluting trucks, or a combination of these | ||||||
21 | transportation modes. | ||||||
22 | (B) Removal of CCR consistent with 35 Ill. Adm. | ||||||
23 | Code 845.740 and 845.760. | ||||||
24 | (C) Within 5 days after submitting the plan to the | ||||||
25 | Agency, the owner or operator shall post public notice | ||||||
26 | of the plan's submission (i) on the owner or |
| |||||||
| |||||||
1 | operator's website, along with a copy of the plan for | ||||||
2 | public viewing, and (ii) in a newspaper of general | ||||||
3 | distribution in the municipality. The notice shall be | ||||||
4 | provided in English and Spanish and shall inform the | ||||||
5 | public of their right to submit comments on the plan to | ||||||
6 | the Agency within 30 days after the date the notice is | ||||||
7 | published in the newspaper. The owner or operator | ||||||
8 | shall also maintain a copy of the report in a public | ||||||
9 | repository in the municipality for public viewing, | ||||||
10 | which shall be identified in the public notice. | ||||||
11 | (D) Within 90 days after receipt of the plan, the | ||||||
12 | Agency shall determine whether the plan complies with | ||||||
13 | this paragraph (2). In making its determination, the | ||||||
14 | Agency shall consider all public comments submitted | ||||||
15 | within 30 days after the date of the newspaper notice | ||||||
16 | required under subparagraph (C). | ||||||
17 | (E) If the Agency determines the plan, with or | ||||||
18 | without Agency modifications, complies with paragraph | ||||||
19 | (2), it shall notify the owner or operator in writing | ||||||
20 | of its determination. The owner or operator shall then | ||||||
21 | proceed with implementation of the plan, including any | ||||||
22 | modifications by the Agency, and submission of a | ||||||
23 | removal and remediation report in accordance with | ||||||
24 | paragraph (3). | ||||||
25 | (F) If the Agency determines the investigation or | ||||||
26 | report does not comply with paragraph (2), it shall |
| |||||||
| |||||||
1 | notify the owner or operator in writing of its | ||||||
2 | determination and the reasons for the determination. | ||||||
3 | The owner or operator shall then have 60 days to submit | ||||||
4 | an amended plan to the Agency, which shall be subject | ||||||
5 | to the same submission and review procedures set forth | ||||||
6 | in subparagraphs (C) and (D). | ||||||
7 | (3) In accordance with a schedule approved by the | ||||||
8 | Agency, the owner or operator shall implement the | ||||||
9 | remediation plan and provide the Agency with updates on | ||||||
10 | the plan's implementation. Upon completion of the plan, | ||||||
11 | the owner or operator shall submit a completion report to | ||||||
12 | the Agency. | ||||||
13 | (A) Within 5 days after submitting an update or | ||||||
14 | the completion report to the Agency on plan | ||||||
15 | implementation, the owner or operator shall post | ||||||
16 | public notice of the report's submission (i) on the | ||||||
17 | owner or operator's website, along with a copy of the | ||||||
18 | report for public viewing, and (ii) in a newspaper of | ||||||
19 | general distribution in the municipality. The notice | ||||||
20 | shall be provided in English and Spanish and shall | ||||||
21 | inform the public of their right to submit comments on | ||||||
22 | the report to the Agency within 30 days after the date | ||||||
23 | the notice is published in the newspaper. The owner or | ||||||
24 | operator shall also maintain a copy of the report in a | ||||||
25 | public repository in the municipality for public | ||||||
26 | viewing, which shall be identified in the public |
| |||||||
| |||||||
1 | notice. | ||||||
2 | (B) Within 90 days after receipt of the completion | ||||||
3 | report, the Agency shall determine whether the removal | ||||||
4 | and remediation has resulted in (i) the removal of all | ||||||
5 | CCR at the site and (ii) the remediation of all soil | ||||||
6 | and groundwater that, as a result of the CCR, exceeds | ||||||
7 | the most stringent remediation objectives adopted | ||||||
8 | under Title XVII of this Act. In making its | ||||||
9 | determination, the Agency shall consider all public | ||||||
10 | comments submitted within 30 days after the date of | ||||||
11 | the newspaper notice required under subparagraph (A). | ||||||
12 | (C) If the Agency determines that the required | ||||||
13 | removal and remediation is complete, it shall notify | ||||||
14 | the owner or operator in writing of its determination. | ||||||
15 | (D) If the Agency determines that the required | ||||||
16 | removal and remediation is not complete, it shall | ||||||
17 | notify the owner or operator in writing of its | ||||||
18 | determination and the reasons for the determination. | ||||||
19 | The owner or operator shall then continue removal or | ||||||
20 | remediation, and submit reports to the Agency, in | ||||||
21 | accordance with a schedule established by the Agency. | ||||||
22 | Reports shall be subject to the same submission and | ||||||
23 | review procedures set forth in subparagraphs (A) and | ||||||
24 | (B). If necessary, the owner or operator may amend the | ||||||
25 | plan and submit it for review and approval in | ||||||
26 | accordance with paragraph (2). |
| |||||||
| |||||||
1 | (d) Except for the State, its agencies and institutions, a | ||||||
2 | unit of local government, or not-for-profit electric | ||||||
3 | cooperative as defined in Section 3.4 of the Electric Supplier | ||||||
4 | Act, an owner or operator shall post with the Agency a | ||||||
5 | performance bond or other security for the purpose of ensuring | ||||||
6 | removal and remediation in accordance with this Section. The | ||||||
7 | only acceptable forms of financial assurance are the forms of | ||||||
8 | financial assurance that are acceptable for CCR surface | ||||||
9 | impoundments under Section 22.59. | ||||||
10 | (e) The Agency may enter into such contracts and | ||||||
11 | agreements as it deems necessary to carry out the purposes of | ||||||
12 | this Section. Neither the State, nor the Director of the | ||||||
13 | Agency, nor any State employee shall be liable for any damages | ||||||
14 | or injuries arising out of or resulting from any action taken | ||||||
15 | under this Section. | ||||||
16 | (f) The Agency may approve or disapprove any performance | ||||||
17 | bond or other security posted under this Section. Any person | ||||||
18 | whose performance bond or other security is disapproved by the | ||||||
19 | Agency may contest the disapproval as a permit denial appeal | ||||||
20 | pursuant to Section 40.
| ||||||
21 | Section 97. Severability. The provisions of this Act are | ||||||
22 | severable under Section 1.31 of the Statute on Statutes.
| ||||||
23 | Section 99. Effective date. This Act takes effect upon | ||||||
24 | becoming law.".
|