| | 103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024
SB3772 Introduced 2/9/2024, by Sen. Ram Villivalam SYNOPSIS AS INTRODUCED:
| | | Creates the Progressive Design-Build Pilot Program Act. Provides that the Capital Development Board may elect to use the progressive design-build delivery method. Provides that "progressive design-build delivery method" means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project. Sets forth other provisions concerning procedures for selection and submission of qualifications, the award of contracts, pricing, and federal requirements. |
| |
| | A BILL FOR |
|
|
| | SB3772 | | LRB103 39470 HLH 69664 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois, |
3 | | represented in the General Assembly:
|
4 | | Section 1. Short title. This Act may be cited as the |
5 | | Progressive Design-Build Pilot Program Act.
|
6 | | Section 5. Legislative policy. It is the intent of the |
7 | | General Assembly that the State construction agency shall |
8 | | establish a Progressive Design-Build Pilot Program to use the |
9 | | progressive design-build delivery method for up to 3 public |
10 | | projects commencing prior to January 1, 2027 if it is shown to |
11 | | be in the State's best interest for that particular project. |
12 | | It shall be the policy of the State construction agency in the |
13 | | procurement of progressive design-build services to publicly |
14 | | announce all requirements for progressive design-build |
15 | | services and to procure these services on the basis of |
16 | | demonstrated competence and qualifications and with due regard |
17 | | for the principles of competitive selection. |
18 | | The State construction agency shall, prior to issuing |
19 | | requests for qualifications, publish procedures for the |
20 | | solicitation and award of contracts pursuant to this Act. |
21 | | The State construction agency shall, for each public |
22 | | project or projects permitted under this Act, make a written |
23 | | determination, including a description as to the particular |
|
| | SB3772 | - 2 - | LRB103 39470 HLH 69664 b |
|
|
1 | | advantages of the progressive design-build procurement method, |
2 | | that it is in the best interests of this State to enter into a |
3 | | progressive design-build contract for the project or projects. |
4 | | In making that determination, the following factors shall be |
5 | | considered: |
6 | | (1) The probability that the progressive design-build |
7 | | procurement method will be in the best interests of the |
8 | | State by providing a material savings of time or cost over |
9 | | the design-bid-build or other delivery system. |
10 | | (2) The type and size of the project and its |
11 | | suitability to the progressive design-build procurement |
12 | | method. |
13 | | (3) The ability of the State construction agency to |
14 | | define and provide comprehensive scope and performance |
15 | | criteria for the project. |
16 | | No State construction agency may use the progressive |
17 | | design-build procurement method unless the agency determines |
18 | | in writing that the project will comply with the disadvantaged |
19 | | business and equal employment practices of the State as |
20 | | established in the Business Enterprise for Minorities, Women, |
21 | | and Persons with Disabilities Act and Section 2-105 of the |
22 | | Illinois Human Rights Act. |
23 | | The State construction agency shall within 15 days after |
24 | | the initial determination provide an advisory copy to the |
25 | | Procurement Policy Board and maintain the full record of |
26 | | determination for 5 years.
|
|
| | SB3772 | - 3 - | LRB103 39470 HLH 69664 b |
|
|
1 | | Section 10. Definitions. As used in this Act: |
2 | | "Chief procurement office" means the offices to which the |
3 | | chief procurement officers are appointed pursuant to Section |
4 | | 10-20 of the Illinois Procurement Code. |
5 | | "Delivery system" means the design and construction |
6 | | approach used to develop and construct a project. |
7 | | "Design-bid-build" means the traditional delivery system |
8 | | used on public projects in this State that incorporates the |
9 | | Architectural, Engineering, and Land Surveying Qualification |
10 | | Based Selection Act and the principles of competitive |
11 | | selection in the Illinois Procurement Code. |
12 | | "Design professional" means any individual, sole |
13 | | proprietorship, firm, partnership, joint venture, corporation, |
14 | | professional corporation, or other entity that offers services |
15 | | under the Illinois Architecture Practice Act of 1989, the |
16 | | Professional Engineering Practice Act of 1989, the Structural |
17 | | Engineering Licensing Act of 1989, or the Illinois |
18 | | Professional Land Surveyor Act of 1989. |
19 | | "Evaluation criteria" means the requirements for the |
20 | | selection process as defined in this Act and may include the |
21 | | specialized experience, technical qualifications and |
22 | | competence, capacity to perform, past performance, experience |
23 | | with similar projects, assignment of personnel to the project, |
24 | | and other appropriate factors. Price may not be used as a |
25 | | factor in the evaluation of progressive design-build. |
|
| | SB3772 | - 4 - | LRB103 39470 HLH 69664 b |
|
|
1 | | "Progressive design-build" means a project delivery |
2 | | process in which both the design and construction of a project |
3 | | are procured from a single entity that is selected through a |
4 | | qualifications-based selection at the earliest feasible stage |
5 | | of the project. |
6 | | "Progressive design-build contract" means a contract for a |
7 | | public project under this Act between the State construction |
8 | | agency and a progressive design-build entity to furnish |
9 | | architecture, engineering, land surveying, and related |
10 | | services as required, and to furnish the labor, materials, |
11 | | equipment, and other construction services for the project. A |
12 | | progressive design-build contract may be conditioned upon |
13 | | subsequent refinements in scope and price and may allow the |
14 | | State construction agency to make modifications in the project |
15 | | scope without invalidating the progressive design-build |
16 | | contract. |
17 | | "Progressive design-build entity" means any individual, |
18 | | sole proprietorship, firm, partnership, joint venture, |
19 | | corporation, professional corporation, or other entity that |
20 | | proposes to design and construct any public project under this |
21 | | Act. A progressive design-build entity and associated |
22 | | progressive design-build professionals shall conduct |
23 | | themselves in accordance with the laws of this State and the |
24 | | related provisions of the Illinois Administrative Code, as |
25 | | referenced by the licensed design professionals Acts of this |
26 | | State. |
|
| | SB3772 | - 5 - | LRB103 39470 HLH 69664 b |
|
|
1 | | "Qualification" means a statement of qualifications |
2 | | submitted by a proposer in response to a request for |
3 | | qualifications. |
4 | | "Request for qualifications" means a document issued by |
5 | | the State construction agency to solicit qualifications from |
6 | | proposers in accordance with the progressive design-build |
7 | | project delivery method. |
8 | | "Scope and performance criteria" means the requirements |
9 | | for the public project, including but not limited to, the |
10 | | intended usage, capacity, size, scope, quality and performance |
11 | | standards, and other programmatic criteria that are expressed |
12 | | in performance-oriented requirements that can be reasonably |
13 | | inferred and are suited to allow a progressive design-build |
14 | | entity to develop a proposal. |
15 | | "State construction agency" means the Capital Development |
16 | | Board.
|
17 | | Section 15. Solicitation of qualifications. |
18 | | (a) When the State construction agency elects to use the |
19 | | progressive design-build delivery method, it must issue a |
20 | | notice of intent to receive requests for qualifications for |
21 | | the project at least 14 days before issuing the request for |
22 | | qualifications. The State construction agency must publish the |
23 | | advance notice in the official procurement bulletin of the |
24 | | State or the professional services bulletin of the State |
25 | | construction agency, if any. The agency is encouraged to use |
|
| | SB3772 | - 6 - | LRB103 39470 HLH 69664 b |
|
|
1 | | publication of the notice in related construction industry |
2 | | service publications. A brief description of the proposed |
3 | | procurement must be included in the notice. The State |
4 | | construction agency must provide a copy of the request for |
5 | | qualifications to any party requesting a copy. |
6 | | (b) The request for qualifications shall be prepared for |
7 | | each project and must contain, without limitation, the |
8 | | following information: |
9 | | (1) The name of the State construction agency. |
10 | | (2) A preliminary schedule for the completion of the |
11 | | contract. |
12 | | (3) The proposed budget for the project, the source of |
13 | | funds, and the currently available funds at the time the |
14 | | request for qualifications is submitted. |
15 | | (4) Prequalification criteria for progressive |
16 | | design-build entities wishing to submit proposals. The |
17 | | State construction agency shall include, at a minimum, its |
18 | | normal prequalification, licensing, registration, and |
19 | | other requirements, but nothing contained herein precludes |
20 | | the use of additional prequalification criteria by the |
21 | | State construction agency. |
22 | | (5) Material requirements of the contract, including |
23 | | but not limited to, the proposed terms and conditions, |
24 | | required performance and payment bonds, insurance, and the |
25 | | entity's plan to comply with the utilization goals for |
26 | | business enterprises established in the Business |
|
| | SB3772 | - 7 - | LRB103 39470 HLH 69664 b |
|
|
1 | | Enterprise for Minorities, Women, and Persons with |
2 | | Disabilities Act, and with Section 2-105 of the Illinois |
3 | | Human Rights Act. |
4 | | (6) The performance criteria. |
5 | | (7) The evaluation criteria for the solicitation. |
6 | | (c) The State construction agency may include any other |
7 | | relevant information that it chooses to supply. The |
8 | | progressive design-build entity shall be entitled to rely upon |
9 | | the accuracy of this documentation in the development of its |
10 | | qualifications. |
11 | | (d) The date that qualifications are due must be at least |
12 | | 21 calendar days after the date of the issuance of the request |
13 | | for qualifications. In the event the cost of the project is |
14 | | estimated to exceed $10,000,000, then the qualifications due |
15 | | date must be at least 28 calendar days after the date of the |
16 | | issuance of the request for qualifications.
|
17 | | Section 20. Development of scope and performance criteria. |
18 | | The State construction agency shall develop a request for |
19 | | qualifications, which shall include preliminary scopes, |
20 | | descriptions of the areas of technical expertise needed, and |
21 | | requirements for experience. The request must be in sufficient |
22 | | detail and contain adequate information to reasonably apprise |
23 | | the qualified progressive design-build entities of the State |
24 | | construction agency's overall programmatic needs and goals, |
25 | | including criteria, general budget parameters, schedule, and |
|
| | SB3772 | - 8 - | LRB103 39470 HLH 69664 b |
|
|
1 | | delivery requirements.
|
2 | | Section 25. Selection committee. |
3 | | (a) When the State construction agency elects to use the |
4 | | progressive design-build delivery method, it shall establish a |
5 | | committee to evaluate and select the progressive design-build |
6 | | entity. The committee, under the discretion of the State |
7 | | construction agency, shall consist of at least 5 but no more |
8 | | than 7 members and shall include at least one licensed design |
9 | | professional and 2 members of the public. Public members may |
10 | | not be employed or associated with any firm holding a contract |
11 | | with the State construction agency. Within 30 days of |
12 | | receiving notice, one public member shall be nominated by |
13 | | associations representing the general design or construction |
14 | | industry and one member shall be nominated by associations |
15 | | that represent minority or woman-owned design or construction |
16 | | industry businesses. If either group fails to nominate a |
17 | | suitable candidate within the 30-day period, the State |
18 | | construction agency shall nominate an appropriate public |
19 | | member. |
20 | | (b) The members of the selection committee must certify |
21 | | for each request for qualifications that no conflict of |
22 | | interest exists between the members and the progressive |
23 | | design-build entities submitting qualifications. |
24 | | If a conflict is discovered before qualifications are |
25 | | reviewed, the member must be replaced before any review of |
|
| | SB3772 | - 9 - | LRB103 39470 HLH 69664 b |
|
|
1 | | qualifications. If a conflict is discovered after |
2 | | qualifications are reviewed, the member with the conflict |
3 | | shall be removed and the committee may continue with only one |
4 | | public member. |
5 | | If at least 5 members remain, the remaining committee |
6 | | members may complete the selection process.
|
7 | | Section 30. Procedures for selection. |
8 | | (a) The State construction agency must use a 2-phase |
9 | | procedure for the selection of the successful progressive |
10 | | design-build entity. Phase I of the procedure will evaluate |
11 | | and shortlist for interviews the progressive design-build |
12 | | entities based on qualifications, and Phase II will evaluate |
13 | | shortlisted teams based on scoring of specific criteria |
14 | | addressed in their presentations and interviews. |
15 | | (b) The State construction agency shall include in the |
16 | | request for qualifications the evaluating factors to be used |
17 | | in Phase I. These factors are in addition to any |
18 | | prequalification requirements of progressive design-build |
19 | | entities that the agency has set forth. Each request for |
20 | | qualifications shall establish the relative importance |
21 | | assigned to each evaluation factor and subfactor, including |
22 | | any weighting of criteria to be employed by the State |
23 | | construction agency. The State construction agency must |
24 | | maintain a record of the evaluation scoring to be disclosed in |
25 | | event of a protest regarding the solicitation. |
|
| | SB3772 | - 10 - | LRB103 39470 HLH 69664 b |
|
|
1 | | The State construction agency shall include the following |
2 | | criteria in every Phase I evaluation of progressive |
3 | | design-build entities: (1) experience of personnel; (2) |
4 | | successful experience with similar project types; (3) |
5 | | financial capability; (4) timeliness of past performance; (5) |
6 | | experience with similarly sized projects; (6) successful |
7 | | reference checks of the firm; (7) commitment to assign |
8 | | personnel for the duration of the project and qualifications |
9 | | of the entity's consultants; and (8) ability or past |
10 | | performance in meeting or exhausting good faith efforts to |
11 | | meet the utilization goals for business enterprises |
12 | | established in the Business Enterprise for Minorities, Women, |
13 | | and Persons with Disabilities Act and with Section 2-105 of |
14 | | the Illinois Human Rights Act. The State construction agency |
15 | | may include any additional relevant criteria in Phase I that |
16 | | it deems necessary for a proper qualification review. |
17 | | The State construction agency may not consider any |
18 | | progressive design-build entity for evaluation or award if the |
19 | | entity has any pecuniary interest in the project or has other |
20 | | relationships or circumstances, including but not limited to, |
21 | | long-term leasehold, mutual performance, or development |
22 | | contracts with the State construction agency, that may give |
23 | | the progressive design-build entity a financial or tangible |
24 | | advantage over other progressive design-build entities in the |
25 | | preparation, evaluation, or performance of the progressive |
26 | | design-build contract or that create the appearance of |
|
| | SB3772 | - 11 - | LRB103 39470 HLH 69664 b |
|
|
1 | | impropriety. No proposal shall be considered that does not |
2 | | include an entity's plan to comply with the requirements |
3 | | established in the Business Enterprise for Minorities, Women, |
4 | | and Persons with Disabilities Act, for both the design and |
5 | | construction areas of performance, and with Section 2-105 of |
6 | | the Illinois Human Rights Act. |
7 | | Upon completion of the qualifications evaluation, the |
8 | | State construction agency shall create a shortlist of the most |
9 | | highly qualified progressive design-build entities. The State |
10 | | construction agency, in its discretion, is not required to |
11 | | shortlist the maximum number of entities as identified for |
12 | | Phase II evaluation, provided however, no less than 2 |
13 | | progressive design-build entities nor more than 6 are selected |
14 | | to present to the selection committee in an interview. |
15 | | The State construction agency shall notify the entities |
16 | | selected for the shortlist in writing. This notification shall |
17 | | commence the period for the preparation for presentations and |
18 | | interviews. The State construction agency must allow |
19 | | sufficient time, no less than 28 calendar days, for the |
20 | | shortlist entities to prepare their presentations. |
21 | | (c) The State construction agency shall include in the |
22 | | project advertisement the evaluating factors to be used in the |
23 | | presentations and interviews. Each request for qualifications |
24 | | shall establish the relative importance assigned to each |
25 | | evaluation factor and subfactor, including any weighting of |
26 | | criteria to be employed by the State construction agency. The |
|
| | SB3772 | - 12 - | LRB103 39470 HLH 69664 b |
|
|
1 | | State construction agency must maintain a record of the |
2 | | evaluation scoring to be disclosed in event of a protest |
3 | | regarding the solicitation. |
4 | | The State construction agency shall include the following |
5 | | criteria in every Phase II evaluation of progressive |
6 | | design-build entities: (1) experience with successful |
7 | | completion of similar projects; (2) the design team's approach |
8 | | to program analysis and schematic design; (3) record of budget |
9 | | adherence on recently completed projects; (4) demonstration of |
10 | | past innovation in meeting the scope and performance criteria |
11 | | on past design-build projects; (5) completeness of the overall |
12 | | project team; (6) collaborative experience of the team |
13 | | members; and (7) their plan for achieving project goals for |
14 | | participation. The State construction agency may include any |
15 | | additional relevant technical evaluation factors it deems |
16 | | necessary for proper selection. |
17 | | Upon completion of the evaluation, the State construction |
18 | | agency may award the progressive design-build contract to the |
19 | | highest overall ranked entity. After qualifications have been |
20 | | submitted, a progressive design-build entity shall not |
21 | | replace, remove, or otherwise modify any firm identified as a |
22 | | member of the proposer team unless authorized to do so by the |
23 | | State construction agency.
|
24 | | Section 40. Submission of qualifications. Qualifications |
25 | | must be properly identified and sealed. Qualifications may not |
|
| | SB3772 | - 13 - | LRB103 39470 HLH 69664 b |
|
|
1 | | be reviewed until after the deadline for submission has passed |
2 | | as set forth in the request for qualifications. All |
3 | | progressive design-build entities submitting qualifications |
4 | | shall be disclosed after the deadline for submission, and all |
5 | | progressive design-build entities who are shortlisted for |
6 | | interviews shall also be disclosed at the time of that |
7 | | determination. |
8 | | Qualifications shall include representative projects to |
9 | | demonstrate past experience of the team members on similar |
10 | | progressive design-build projects. Qualifications shall |
11 | | include a list of all design professionals and other entities |
12 | | as defined in Section 30-30 of the Illinois Procurement Code |
13 | | to which any work may be subcontracted during the performance |
14 | | of the contract. Any entity that will perform any of the 5 |
15 | | subdivisions of work defined in Section 30-30 of the Illinois |
16 | | Procurement Code must meet prequalification standards of the |
17 | | State construction agency. |
18 | | Qualifications must meet all material requirements of the |
19 | | request for qualifications, or they may be rejected as |
20 | | nonresponsive. The State construction agency shall have the |
21 | | right to reject any and all qualifications. |
22 | | The State construction agency shall review the |
23 | | qualifications for compliance with the performance criteria |
24 | | and evaluation factors. |
25 | | Qualifications may be withdrawn prior to evaluation for |
26 | | any cause. After evaluation begins by the State construction |
|
| | SB3772 | - 14 - | LRB103 39470 HLH 69664 b |
|
|
1 | | agency, clear and convincing evidence of error is required for |
2 | | withdrawal.
|
3 | | Section 45. Award. The State construction agency may |
4 | | award the contract to the highest overall ranked entity. |
5 | | Notice of award shall be made in writing. Unsuccessful |
6 | | entities shall also be notified in writing. The State |
7 | | construction agency may not request a best and final offer |
8 | | after the receipt of qualifications. The State construction |
9 | | agency may negotiate with the selected progressive |
10 | | design-build entity after award but prior to contract |
11 | | execution for the purpose of securing better terms than |
12 | | originally proposed, provided that the salient features of the |
13 | | request for qualifications are not diminished.
|
14 | | Section 50. Labor. |
15 | | (a) A contract or agreement under this Act shall require |
16 | | the progressive design-build entity, or the construction |
17 | | manager or general contractor of the progressive design-build |
18 | | entity, and all subcontractors of the progressive design-build |
19 | | entity to comply with Section 30-22 of the Illinois |
20 | | Procurement Code as it applies to responsible bidders and to |
21 | | present satisfactory evidence of that compliance to the State |
22 | | construction agency. |
23 | | (b) A contract or agreement under this Act shall require |
24 | | the progressive design-build entity or the construction |
|
| | SB3772 | - 15 - | LRB103 39470 HLH 69664 b |
|
|
1 | | manager or general contractor of the progressive design-build |
2 | | entity to enter into a project labor agreement used by the |
3 | | State construction agency. |
4 | | (c) This Section does not apply to construction-related |
5 | | professional services. As used in this Section, "professional |
6 | | services" means those services within the scope of the |
7 | | practice of architecture, professional engineering, structural |
8 | | engineering, or registered land surveying, as defined by the |
9 | | laws of this State.
|
10 | | Section 55. Transition to design-bid-build. At the |
11 | | completion of design development, the progressive design-build |
12 | | entity must provide a firm fixed price. The State construction |
13 | | agency reserves the right to transition the project to the |
14 | | design-bid-build method if the fixed price exceeds the project |
15 | | budget, the progressive design-build entity's proposed |
16 | | schedule is unreasonable, or if transitioning to the |
17 | | design-bid-build method is in the best interests of the State. |
18 | | The State construction agency will retain ownership of any |
19 | | design documents completed by the progressive design-build |
20 | | entity.
|
21 | | Section 60. Reports and evaluation. At the end of every 6 |
22 | | month period following the contract award, and again prior to |
23 | | final contract payout and closure, a selected progressive |
24 | | design-build entity shall detail, in a written report |
|
| | SB3772 | - 16 - | LRB103 39470 HLH 69664 b |
|
|
1 | | submitted to the State agency, its efforts and success in |
2 | | implementing the entity's plan to comply with the utilization |
3 | | goals for business enterprises established in the Business |
4 | | Enterprise for Minorities, Women, and Persons with |
5 | | Disabilities Act and the provisions of Section 2-105 of the |
6 | | Illinois Human Rights Act. If the entity's performance in |
7 | | implementing the plan falls short of the performance measures |
8 | | and outcomes set forth in the plans submitted by the entity |
9 | | during the qualifications process, the entity shall, in a |
10 | | detailed written report, inform the General Assembly and the |
11 | | Governor whether and to what degree each progressive |
12 | | design-build contract authorized under this Act promoted the |
13 | | utilization goals for business enterprises established in the |
14 | | Business Enterprise for Minorities, Women, and Persons with |
15 | | Disabilities Act and the provisions of Section 2-105 of the |
16 | | Illinois Human Rights Act.
|
17 | | Section 65. Federal requirements. In the procurement of |
18 | | progressive design-build contracts, the State construction |
19 | | agency shall comply with federal law and regulations and take |
20 | | all necessary steps to adapt their rules, policies, and |
21 | | procedures to remain eligible for federal aid.
|
22 | | Section 70. Capital Development Board consultation. The |
23 | | Capital Development Board shall consult with the applicable |
24 | | chief procurement office to determine which procedures to |