A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to statutes of repose for certain claims involving the |
|
construction or repair of an improvement to real property or the |
|
attachment of equipment to real property. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Sections 16.008(a) and (c), Civil Practice and |
|
Remedies Code, are amended to read as follows: |
|
(a) A person must bring suit for damages for a claim listed |
|
in Subsection (b) against a registered or licensed architect, |
|
engineer, interior designer, or landscape architect in this state, |
|
who designs, plans, or inspects the construction of an improvement |
|
to real property or equipment attached to real property, not later |
|
than five [10] years after the substantial completion of the |
|
improvement or the beginning of operation of the equipment in an |
|
action arising out of a defective or unsafe condition of the real |
|
property, the improvement, or the equipment. |
|
(c) If the claimant presents a written claim for damages, |
|
contribution, or indemnity to the architect, engineer, interior |
|
designer, or landscape architect within the five-year [10-year] |
|
limitations period, the period is extended for two years from the |
|
day the claim is presented. |
|
SECTION 2. Sections 16.009(a), (c), and (d), Civil Practice |
|
and Remedies Code, are amended to read as follows: |
|
(a) A claimant must bring suit for damages for a claim |
|
listed in Subsection (b) against a person who constructs or repairs |
|
an improvement to real property not later than five [10] years after |
|
the substantial completion of the improvement in an action arising |
|
out of a defective or unsafe condition of the real property or a |
|
deficiency in the construction or repair of the improvement. |
|
(c) If the claimant presents a written claim for damages, |
|
contribution, or indemnity to the person performing or furnishing |
|
the construction or repair work during the five-year [10-year] |
|
limitations period, the period is extended for two years from the |
|
date the claim is presented. |
|
(d) If the damage, injury, or death occurs during the fifth |
|
[10th] year of the limitations period, the claimant may bring suit |
|
not later than two years after the day the cause of action accrues. |
|
SECTION 3. (a) Except as provided by this section, Section |
|
16.008, Property Code, as amended by this Act, applies to a cause of |
|
action arising out of a design, plan, or inspection of the |
|
construction of an improvement to real property or equipment |
|
attached to real property that commences on or after the effective |
|
date of this Act. Section 16.008, Property Code, as amended by this |
|
Act, does not apply to a cause of action arising out of a design, |
|
plan, or inspection that commences on or after the effective date of |
|
this Act under a contract entered into before that date. |
|
(b) A cause of action arising out of a design, plan, or |
|
inspection of the construction of an improvement to real property |
|
or equipment attached to real property that commenced before the |
|
effective date of this Act or arising out of a design, plan, or |
|
inspection of the construction of an improvement to real property |
|
or equipment attached to real property that commences on or after |
|
the effective date of this Act under a contract entered into before |
|
that date is governed by the law applicable to the cause of action |
|
immediately before the effective date of this Act, and that law is |
|
continued in effect for that purpose. |
|
SECTION 4. (a) Except as provided by this section, Section |
|
16.009, Property Code, as amended by this Act, applies to a cause of |
|
action arising out of construction or repair of an improvement to |
|
real property that commences on or after the effective date of this |
|
Act. Section 16.009, Property Code, as amended by this Act, does |
|
not apply to a cause of action arising out of construction or repair |
|
of an improvement to real property that commences on or after the |
|
effective date of this Act under a contract entered into before that |
|
date. |
|
(b) A cause of action arising out of construction or repair |
|
of an improvement to real property that commenced before the |
|
effective date of this Act or arising out of construction or repair |
|
of an improvement to real property that commences on or after the |
|
effective date of this Act under a contract entered into before that |
|
date is governed by the law applicable to the cause of action |
|
immediately before the effective date of this Act, and that law is |
|
continued in effect for that purpose. |
|
SECTION 5. This Act takes effect September 1, 2017. |