Bill Text: WV SB633 | 2016 | Regular Session | Introduced
Bill Title: Relating generally to Public Service Commission
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2016-02-19 - To Government Organization [SB633 Detail]
Download: West_Virginia-2016-SB633-Introduced.html
WEST virginia Legislature
2016 regular session
Introduced
Senate Bill 633
By Senator Snyder
[Introduced February
19, 2016;
Referred to the Committee on Government Organization; and then to the Committee
on Finance.]
A BILL to amend and reenact §24-2-1 and §24-2-2 of the Code of West Virginia, 1931, as amended, all relating generally to the Public Service Commission; clarifying certain responsibilities regarding those larger public service districts no longer under the commission’s control; and clarifying use of certain equitable rate-setting policies.
Be it enacted by the Legislature of West Virginia:
That §24-2-1 and §24-2-2 of the Code of West Virginia, 1931, as amended, be amended and reenacted, all to read as follows:
ARTICLE 2. POWERS AND DUTIES OF PUBLIC SERVICE COMMISSION.
'24-2-1. Jurisdiction of commission; waiver of jurisdiction.
(a) The jurisdiction of the commission shall extend to all public utilities in this state and shall include any utility engaged in any of the following public services:
Common carriage of passengers or goods, whether by air, railroad, street railroad, motor or otherwise, by express or otherwise, by land, water or air, whether wholly or partly by land, water or air; transportation of oil, gas or water by pipeline; transportation of coal and its derivatives and all mixtures and combinations thereof with other substances by pipeline; sleeping car or parlor car services; transmission of messages by telephone, telegraph or radio; generation and transmission of electrical energy by hydroelectric or other utilities for service to the public, whether directly or through a distributing utility; supplying water, gas or electricity by municipalities or others; sewer systems servicing twenty-five or more persons or firms other than the owner of the sewer systems: Provided, That if a public utility other than a political subdivision intends to provide sewer service by an innovative, alternative method, as defined by the federal Environmental Protection Agency, the innovative, alternative method is a public utility function and subject to the jurisdiction of the Public Service Commission regardless of the number of customers served by the innovative, alternative method; any public service district created under the provisions of article thirteen-a, chapter sixteen of this code; toll bridges, wharves, ferries; solid waste facilities; and any other public service: Provided, however, That natural gas producers who provide natural gas service to not more than twenty-five residential customers are exempt from the jurisdiction of the commission with regard to the provisions of such residential service: Provided further, That upon request of any of the customers of such natural gas producers, the commission may, upon good cause being shown, exercise such authority as the commission may deem appropriate over the operation, rates and charges of such producer and for such length of time as the commission may consider to be proper.
(b) The jurisdiction of the commission over political subdivisions of this state providing separate or combined services and having at least four thousand five hundred customers and annual combined gross revenues of $3 million or more that are political subdivisions of the state is limited to:
(1) General supervision of public utilities, as granted and described in section five of this article;
(2) Regulation of measurements, practices, acts or services, as granted and described in section seven of this article;
(3) Regulation of a system of accounts to be kept by a public utility that is a political subdivision of the state, as granted and described in section eight of this article;
(4) Submission of information to the commission regarding rates, tolls, charges or practices, as granted and described in section nine of this article;
(5) Authority to subpoena witnesses, take testimony and administer oaths to any witness in any proceeding before or conducted by the commission, as granted and described in section ten of this article; and
(6) Investigation and resolution of disputes involving political subdivisions of the state regarding inter-utility agreements, rates, fees and charges, service areas and contested utility combinations.
(7) Customers of water and sewer utilities operated by a political subdivision of the state and customers of stormwater utilities operated by a public service district may bring formal or informal complaints regarding the commission=s exercise of the powers enumerated in this section and the commission shall resolve these complaints.
(8) In the event that a political subdivision has a deficiency in either its bond revenue or bond reserve accounts, or is otherwise in breach of a bond covenant, the bond holder may petition the Public Service Commission for such redress as will bring the accounts to current status or otherwise resolve the breached covenant, and the commission shall have jurisdiction to fully resolve the alleged deficiency or breach.
(c) The commission may, upon application, waive its jurisdiction and allow a utility operating in an adjoining state to provide service in West Virginia when:
(1) An area of West Virginia cannot be practicably and economically served by a utility licensed to operate within the State of West Virginia;
(2) Said area can be provided with utility service by a utility which operates in a state adjoining West Virginia;
(3) The utility operating in the adjoining state is regulated by a regulatory agency or commission of the adjoining state; and
(4) The number of customers to be served is not substantial. The rates the out-of-state utility charges West Virginia customers shall be the same as the rate the utility is duly authorized to charge in the adjoining jurisdiction. The commission, in the case of any such utility, may revoke its waiver of jurisdiction for good cause.
(d) Any other provisions of this chapter to the contrary notwithstanding:
(1) An owner or operator of an electric generating facility located or to be located in this state that has been designated as an exempt wholesale generator under applicable federal law, or will be so designated prior to commercial operation of the facility, and for which such facility the owner or operator holds a certificate of public convenience and necessity issued by the commission on or before July 1, 2003, shall be subject to subsections (e), (f), (g), (h), (i) and (j), section eleven-c of this article as if the certificate of public convenience and necessity for such facility were a siting certificate issued under said section and shall not otherwise be subject to the jurisdiction of the commission or to the provisions of this chapter with respect to such facility except for the making or constructing of a material modification thereof as provided in subdivision (5) of this subsection.
(2) Any person, corporation or other entity that intends to construct or construct and operate an electric generating facility to be located in this state that has been designated as an exempt wholesale generator under applicable federal law, or will be so designated prior to commercial operation of the facility, and for which facility the owner or operator does not hold a certificate of public convenience and necessity issued by the commission on or before July 1, 2003, shall, prior to commencement of construction of the facility, obtain a siting certificate from the commission pursuant to the provisions of section eleven-c of this article in lieu of a certificate of public convenience and necessity pursuant to the provisions of section eleven of this article. An owner or operator of an electric generating facility as is described in this subdivision for which a siting certificate has been issued by the commission shall be subject to subsections (e), (f), (g), (h), (i) and (j), section eleven-c of this article and shall not otherwise be subject to the jurisdiction of the commission or to the provisions of this chapter with respect to such facility except for the making or constructing of a material modification thereof as provided in subdivision (5) of this subsection.
(3) An owner or operator of an electric generating facility located in this state that had not been designated as an exempt wholesale generator under applicable federal law prior to commercial operation of the facility that generates electric energy solely for sale at retail outside this state or solely for sale at wholesale in accordance with any applicable federal law that preempts state law or solely for both such sales at retail and such sales at wholesale and that had been constructed and had engaged in commercial operation on or before July 1, 2003, shall not be subject to the jurisdiction of the commission or to the provisions of this chapter with respect to such facility, regardless of whether such facility subsequent to its construction has been or will be designated as an exempt wholesale generator under applicable federal law: Provided, That such owner or operator shall be subject to subdivision (5) of this subsection if a material modification of such facility is made or constructed.
(4) Any person, corporation or other entity that intends to construct or construct and operate an electric generating facility to be located in this state that has not been or will not be designated as an exempt wholesale generator under applicable federal law prior to commercial operation of the facility that will generate electric energy solely for sale at retail outside this state or solely for sale at wholesale in accordance with any applicable federal law that preempts state law or solely for both such sales at retail and such sales at wholesale and that had not been constructed and had not been engaged in commercial operation on or before July 1, 2003, shall, prior to commencement of construction of the facility, obtain a siting certificate from the commission pursuant to the provisions of section eleven-c of this article in lieu of a certificate of public convenience and necessity pursuant to the provisions of section eleven of this article. An owner or operator of an electric generating facility as is described in this subdivision for which a siting certificate has been issued by the commission shall be subject to subsections (e), (f), (g), (h), (i) and (j), section eleven-c of this article and shall not otherwise be subject to the jurisdiction of the commission or to the provisions of this chapter with respect to such facility except for the making or constructing of a material modification thereof as provided in subdivision (5) of this subsection.
(5) An owner or operator of an electric generating facility described in this subsection shall, before making or constructing a material modification of the facility that is not within the terms of any certificate of public convenience and necessity or siting certificate previously issued for the facility or an earlier material modification thereof, obtain a siting certificate for the modification from the commission pursuant to the provisions of section eleven-c of this article in lieu of a certificate of public convenience and necessity for the modification pursuant to the provisions of section eleven of this article and, except for the provisions of section eleven-c of this article, shall not otherwise be subject to the jurisdiction of the commission or to the provisions of this chapter with respect to such modification.
(6) The commission shall consider an application for a certificate of public convenience and necessity filed pursuant to section eleven of this article to construct an electric generating facility described in this subsection or to make or construct a material modification of such electric generating facility as an application for a siting certificate pursuant to section eleven-c of this article if the application for the certificate of public convenience and necessity was filed with the commission prior to July 1, 2003, and if the commission has not issued a final order thereon as of that date.
(7) The limitations on the jurisdiction of the commission over, and on the applicability of the provisions of this chapter to, the owner or operator of an electric generating facility as imposed by and described in this subsection shall not be deemed to affect or limit the commission=s jurisdiction over contracts or arrangements between the owner or operator of such facility and any affiliated public utility subject to the provisions of this chapter.
(e) The jurisdiction of the commission over political subdivisions of this state providing separate or combined services and having at least four thousand five hundred customers and annual combined gross revenues of $3 million or more that are political subdivisions of the state is limited to:
(1) General supervision of public utilities, as granted and described in section five of this article;
(2) Regulation of measurements, practices, acts or services, as granted and described in section seven of this article;
(3) Regulation of a system of accounts to be kept by a public utility that is a political subdivision of the state, as granted and described in section eight of this article;
(4) Submission of information to the commission regarding rates, tolls, charges or practices, as granted and described in section nine of this article;
(5) Authority to subpoena witnesses, take testimony and administer oaths to any witness in any proceeding before or conducted by the commission, as granted and described in section ten of this article;
(6) Investigation and resolution of disputes involving political subdivisions of the state regarding inter-utility agreements, rates, fees and charges, service areas and contested utility combinations;
(7) Customers of water and sewer utilities operated by a political subdivision of the state and customers of stormwater utilities operated by a public service district may bring formal or informal complaints regarding the commission’s exercise of the powers enumerated in this section and the commission shall resolve these complaints; and
(8) In the event that a political subdivision has a deficiency in either its bond revenue or bond reserve accounts, or is otherwise in breach of a bond covenant, the bond holder may petition the Public Service Commission for such redress as will bring the accounts to current status or otherwise resolve the breached covenant, and the commission shall have jurisdiction to fully resolve the alleged deficiency or breach.
§24-2-2. General power of commission to regulate public utilities.
(a) The commission is hereby given power to investigate all rates, methods and practices of public utilities subject to the provisions of this chapter; to require them to conform to the laws of this state and to all rules, regulations and orders of the commission not contrary to law; and to require copies of all reports, rates, classifications, schedules and timetables in effect and used by the public utility or other person to be filed with the commission, and all other information desired by the commission relating to the investigation and requirements, including inventories of all property in such form and detail as the commission may prescribe. The commission may compel obedience to its lawful orders by mandamus or injunction or other proper proceedings in the name of the state in any circuit court having jurisdiction of the parties or of the subject matter, or the Supreme Court of Appeals directly, and the proceedings shall have priority over all pending cases. The commission shall consider equity to existing rate-paying customers in all matters before the commission, including, but not limited to, projects, debt service and rates. The commission may change any intrastate rate, charge or toll which is unjust or unreasonable or any interstate charge with respect to matters of a purely local nature which have not been regulated by or pursuant to an act of Congress and may prescribe a rate, charge or toll that is just and reasonable, and change or prohibit any practice, device or method of service in order to prevent undue discrimination or favoritism between persons and between localities and between commodities for a like and contemporaneous service. But in no case shall the rate, toll or charge be more than the service is reasonably worth, considering the cost of the service. The commission may establish and approve connection charges, proffers and/or developer construction agreements for new water and sewer utility expansions and new connections to water and sewer utilities, upon application by the utility. Every order entered by the commission shall continue in force until the expiration of the time, if any, named by the commission in the order, or until revoked or modified by the commission, unless the order is suspended, modified or revoked by order or decree of a court of competent jurisdiction: Provided, That in the case of utilities used by emergency shelter providers, the commission shall prescribe such rates, charges or tolls that are the lowest available. “Emergency shelter provider” means any nonprofit entity which provides temporary emergency housing and services to the homeless or to victims of domestic violence or other abuse.
(b) Notwithstanding any other provision of this code to the contrary, rates are not discriminatory if, when considering the debt costs associated with a future water or sewer project which would not have immediate benefit to existing rate-paying customers, the commission establishes rates which ensure that the future customers to be served by the new project are solely responsible for the debt costs associated with the project. Rates likewise are not discriminatory if the commission establishes rates which ensure that future customers to be served by such a future water or sewer project are responsible for development costs associated with that project, including reasonable engineering costs.
(c) Notwithstanding any
other provision of this code to the contrary, the jurisdiction of the
commission over water and/or sewer utilities that are political subdivisions of
the state providing a separate or combined services and having at least
four thousand five hundred customers and annual combined gross revenues of $3
million or more shall be limited to those powers enumerated in subsection (b),
section one of this article.
NOTE: The purpose of this bill is to clarify the responsibilities of the Public Service Commission for limited Issues regarding those larger public service districts that are no longer under the PSC’s control, and provide for equitable rates for existing and new customers.
Strike-throughs indicate language that would be stricken from a heading or the present law, and underscoring indicates new language that would be added.