Bill Amendment: AZ SB1132 | 2014 | Fifty-first Legislature 2nd Regular

NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: Mobile homes; relocation expenses

Status: 2014-04-23 - Chapter 183 [SB1132 Detail]

Download: Arizona-2014-SB1132-SENATE_PROPOSED_AMENDMENT_Commerce_Energy_and_Military.html

Fifty-first Legislature                             Commerce, Energy and Military

Second Regular Session                                                  S.B. 1132

 

PROPOSED AMENDMENT

 

SENATE AMENDMENTS TO S.B. 1132

 

(Reference to printed bill)

 

 


Page 2, line 25, after the period insert:

i. if the contract is approved,

Line 26, after “made” strike remainder of line

Strike line 27, insert “to the installer or contractor when both of the following have been completed:

1. the installer or contractor has obtained valid permits to move the mobile or manufactured HOME TO A NEW lOCATION.

2. THE INSTALLER OR CONTRACTOR PROVIDES DOCUMENTATION TO THE DEPARTMENT THAT THE INSTALLATION OF THE MOBILE OR MANUFACTURED HOME AT THE NEW LOCATION IS COMPLETE AND HAS BEEN INSPECTED BY THE DEPARTMENT OR ITS DESIGNEE AND IS APPROVED FOR OCCUPANCY.

J.

Reletter to conform

Page 4, line 16, strike “relocate the mobile home or”

Line 17, strike “moving company” insert “INSTALLER OR CONTRACTOR

Line 22, after the period insert:

 “4. IF THE CONTRACT IS APPROVED,

Line 24, strike “ON COMPLETION OF THE RELOCATED MOBILE OR MANUFACTURED HOME

Line 25, strike “INSTALLATION as provided in rules OR POLICIES adopted by the director.” insert “TO THE INSTALLER OR CONTRACTOR WHEN BOTH OF THE FOLLOWING HAVE BEEN COMPLETED:

(a) THE INSTALLER OR CONTRACTOR HAS OBTAINED VALID PERMITS TO MOVE THE MOBILE OR MANUFACTURED HOME TO A NEW LOCATION.

(b) THE INSTALLER OR CONTRACTOR PROVIDES DOCUMENTATION TO THE DEPARTMENT THAT THE INSTALLATION OF THE MOBILE OR MANUFACTURED HOME AT THE NEW LOCATION IS COMPLETE AND HAS BEEN INSPECTED BY THE DEPARTMENT OR ITS DESIGNEE AND IS APPROVED FOR OCCUPANCY.

5.”

Renumber to conform

Page 5, line 38, after “shall” strike remainder of line

Line 39, strike “home or”; strike “moving company” insert “INSTALLER OR CONTRACTOR

Page 6, line 1, after the period insert:

4. IF THE CONTRACT IS APPROVED,

Line 2, strike “ON COMPLETION OF THE RELOCATED MOBILE OR MANUFACTURED HOME

Line 3, strike “INSTALLATION as provided in rules OR POLICIES adopted by the director.” insert “TO THE INSTALLER OR CONTRACTOR WHEN BOTH OF THE FOLLOWING HAVE BEEN COMPLETED:

(a)  THE INSTALLER OR CONTRACTOR HAS OBTAINED VALID PERMITS TO MOVE THE MOBILE OR MANUFACTURED HOME TO A NEW LOCATION.

(b) THE INSTALLER OR CONTRACTOR PROVIDES DOCUMENTATION TO THE DEPARTMENT THAT THE INSTALLATION OF THE MOBILE OR MANUFACTURED HOME AT THE NEW LOCATION IS COMPLETE AND HAS BEEN INSPECTED BY THE DEPARTMENT OR ITS DESIGNEE AND IS APPROVED FOR OCCUPANCY.

5.

Renumber to conform

Amend title to conform


 

 

AL MELVIN

 

 

1/28/14

3:06 PM

S:JT/tf

feedback