Bill Text: AZ SB1309 | 2025 | Fifty-seventh Legislature 1st Regular | Introduced


Bill Title: Public utilities; electric grid improvements

Spectrum: Partisan Bill (Republican 2-0)

Status: (Introduced) 2025-02-03 - Senate read second time [SB1309 Detail]

Download: Arizona-2025-SB1309-Introduced.html

 

 

 

REFERENCE TITLE: public utilities; electric grid improvements

 

 

 

 

State of Arizona

Senate

Fifty-seventh Legislature

First Regular Session

2025

 

 

 

SB 1309

 

Introduced by

Senators Carroll: Angius

 

 

 

 

 

 

 

 

AN ACT

 

amending title 40, chapter 2, article 1, arizona revised statutes, by adding section 40-207; relating to public service corporations.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 


Be it enacted by the Legislature of the State of Arizona:

Section 1. Title 40, chapter 2, article 1, Arizona Revised Statutes, is amended by adding section 40-207, to read:

START_STATUTE40-207. Electric generation plant; modifications; definitions

A. The commission shall ensure that any changes to maintain or improve an electric power grid:

1. Are capable of producing enough electricity to meet the demand for electric service in the summer and winter months.

2. Contain a generation resource mix that avoids both:

(a) Nonmomentary electric service interruptions that are unrelated to severe weather conditions.

(b) power quality incidents. 

B. On the retirement of an electric generation plant, the commission shall ensure that a replacement electric generation plant is capable of providing equally dispatchable load following generation.

C. For the purposes of this section:

1. "Dispatchable load following generation" means a power source that quickly adjusts to fluctuations in the demand for electricity. 

2. "Generation resource mix" means the combination of different energy sources that are used to produce electricity in a specific region and the relative contributions of each source, including coal, natural gas, solar, wind and nuclear power. END_STATUTE

feedback