Bill Text: CA AB13 | 2025-2026 | Regular Session | Introduced
Bill Title: Public Utilities Commission: reports.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced) 2024-12-03 - From printer. May be heard in committee January 2. [AB13 Detail]
Download: California-2025-AB13-Introduced.html
CALIFORNIA LEGISLATURE—
2025–2026 REGULAR SESSION
Assembly Bill
No. 13
Introduced by Assembly Member Ransom |
December 02, 2024 |
An act to amend Section 913 of the Public Utilities Code, relating to the Public Utilities Commission.
LEGISLATIVE COUNSEL'S DIGEST
AB 13, as introduced, Ransom.
Public Utilities Commission: reports.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the commission to annually prepare a written report on the costs of programs and activities conducted by certain electrical corporations and gas corporations. Existing law requires the report to identify specified information, including, among other information, each program mandated by statute or by the commission and its annual cost to ratepayers. Existing law requires the commission to complete the report on an annual basis before April 1 of each year, and to submit the report to the Governor and the Legislature on an annual basis no later than April 1 of each year.
This bill would require the commission to instead complete and submit the above-described report on a
biannual basis.
Digest Key
Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NOBill Text
The people of the State of California do enact as follows:
SECTION 1.
Section 913 of the Public Utilities Code is amended to read:913.
(a) The reporting requirements of this section apply to electrical corporations with at least 1,000,000 retail customers in California and gas corporations with at least 500,000 retail customers in California.(b) The commission shall prepare a written report on the costs of programs and activities conducted by each electrical corporation and gas corporation that is subject to this section, including activities conducted to comply with their duty to serve. The report shall be completed on an annual basis before April 1 of each year, a biannual basis and shall identify, clearly
and concisely, all of the following:
(1) Each program mandated by statute and its annual cost to ratepayers.
(2) Each program mandated by the commission and its annual cost to ratepayers.
(3) Energy purchase contract costs and bond-related costs incurred pursuant to Division 27 (commencing with Section 80000) of the Water Code.
(4) All other aggregated categories of costs currently recovered in retail rates as determined by the commission.
(c) The report required by subdivision (b) shall be submitted to the Governor and the Legislature no later than April 1 of each year.
on a biannual basis.
(d) The commission shall post the report required by subdivision (b) in a conspicuous area of its Internet Web site.
internet website.