Bill Text: CA SB594 | 2011-2012 | Regular Session | Chaptered


Bill Title: Energy: net energy metering.

Spectrum: Moderate Partisan Bill (Democrat 7-2)

Status: (Passed) 2012-09-27 - Chaptered by Secretary of State. Chapter 610, Statutes of 2012. [SB594 Detail]

Download: California-2011-SB594-Chaptered.html
BILL NUMBER: SB 594	CHAPTERED
	BILL TEXT

	CHAPTER  610
	FILED WITH SECRETARY OF STATE  SEPTEMBER 27, 2012
	APPROVED BY GOVERNOR  SEPTEMBER 27, 2012
	PASSED THE SENATE  AUGUST 31, 2012
	PASSED THE ASSEMBLY  AUGUST 30, 2012
	AMENDED IN ASSEMBLY  AUGUST 23, 2012
	AMENDED IN ASSEMBLY  AUGUST 6, 2012
	AMENDED IN ASSEMBLY  MAY 15, 2012
	AMENDED IN ASSEMBLY  MARCH 1, 2012
	AMENDED IN SENATE  MAY 25, 2011
	AMENDED IN SENATE  MAY 11, 2011
	AMENDED IN SENATE  APRIL 28, 2011

INTRODUCED BY   Senators Wolk and Blakeslee
   (Coauthors: Senators Leno and Rubio)
   (Coauthors: Assembly Members Gordon, Hill, Valadao, Williams, and
Yamada)

                        FEBRUARY 17, 2011

   An act to amend Sections 2827 and 2827.10 of the Public Utilities
Code, relating to energy.


	LEGISLATIVE COUNSEL'S DIGEST


   SB 594, Wolk. Energy: net energy metering.
   Existing law relative to private energy producers requires every
electric utility, as defined, to make available to an eligible
customer-generator, as defined, a standard contract or tariff for net
energy metering on a first-come-first-served basis until the time
that the total rated generating capacity used by eligible
customer-generators exceeds 5% of the electric utility's aggregate
customer peak demand. Existing law requires the electric utility,
upon an affirmative election by the eligible customer-generator to
receive service pursuant to this contract or tariff, to either: (1)
provide net surplus electricity compensation for any net surplus
electricity generated in the 12-month period, or (2) allow the
eligible customer-generator to apply the net surplus electricity as a
credit for kilowatthours subsequently supplied by the electric
utility to the surplus customer-generator.
   This bill would authorize an eligible customer-generator with
multiple meters to elect to aggregate the electrical load of the
meters located on the property where the generation facility is
located and on all property adjacent or contiguous to the property on
which the generation facility is located, if those properties are
solely owned, leased, or rented by the eligible customer-generator,
as provided. For an electric utility that is an electrical
corporation, the bill would condition this authorization upon the
commission making a determination that permitting eligible
customer-generators to aggregate their load from multiple meters will
not result in an increase in the expected revenue obligations of
customers who are not eligible customer-generators. For an electric
utility that is a local publicly owned electric utility or electrical
cooperative, the bill would condition this authorization upon the
utility's ratemaking authority, as defined, making a determination
that permitting aggregation will not result in an increase in the
expected revenue obligations of customers who are not eligible
customer-generators. The bill would prohibit an eligible
customer-generator that chooses to aggregate from receiving net
surplus electricity compensation and require the electric utility to
retain kilowatthours, as prescribed.
   Existing law establishes a net energy metering program that is
available to an eligible fuel cell customer-generator, as defined.
Existing law requires that the net metering calculation be made by
measuring the difference between the electricity supplied to the
eligible fuel cell customer-generator and the electricity generated
by the eligible fuel cell customer-generator and fed back to the
electrical grid over a 12-month period. Existing law requires that an
electrical corporation determine if the eligible fuel cell
customer-generator was a net consumer or producer of electricity
during the 12-month period. For purposes of making this
determination, existing law requires that the electrical corporation
aggregate the electrical load of the eligible fuel cell
customer-generator under the same ownership.
   This bill would require that in making the determination whether
the eligible fuel cell customer-generator is a net consumer or
producer of electricity during the 12-month period, the electrical
corporation is to aggregate the electrical load of the meters located
on the property where the eligible fuel cell electrical generation
facility is located and on all property adjacent or contiguous to the
property on which the facility is located, if those properties are
solely owned, leased, or rented by the eligible fuel cell
customer-generator.
   Under existing law, a violation of the Public Utilities Act or any
order, decision, rule, direction, demand, or requirement of the
commission is a crime.
   Because the bill would require an expansion of the above-described
net energy metering programs and would require an order or decision
of the commission to implement, a violation of these provisions would
impose a state-mandated local program by expanding the definition of
a crime.
   The California Constitution requires the state to reimburse local
agencies and school districts for certain costs mandated by the
state. Statutory provisions establish procedures for making that
reimbursement.
   This bill would provide that no reimbursement is required by this
act for a specified reason.
   This bill would incorporate additional changes in Section 2827.10
of the Public Utilities Code, proposed by AB 2165, to be operative
only if AB 2165 and this bill are both chaptered and become effective
on or before January 1, 2013, and this bill is chaptered last.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

  SECTION 1.  Section 2827 of the Public Utilities Code is amended to
read:
   2827.  (a) The Legislature finds and declares that a program to
provide net energy metering combined with net surplus compensation,
co-energy metering, and wind energy co-metering for eligible
customer-generators is one way to encourage substantial private
investment in renewable energy resources, stimulate in-state economic
growth, reduce demand for electricity during peak consumption
periods, help stabilize California's energy supply infrastructure,
enhance the continued diversification of California's energy resource
mix, reduce interconnection and administrative costs for electricity
suppliers, and encourage conservation and efficiency.
   (b) As used in this section, the following terms have the
following meanings:
   (1) "Co-energy metering" means a program that is the same in all
other respects as a net energy metering program, except that the
local publicly owned electric utility has elected to apply a
generation-to-generation energy and time-of-use credit formula as
provided in subdivision (i).
   (2) "Electrical cooperative" means an electrical cooperative as
defined in Section 2776.
   (3) "Electric utility" means an electrical corporation, a local
publicly owned electric utility, or an electrical cooperative, or any
other entity, except an electric service provider, that offers
electrical service. This section shall not apply to a local publicly
owned electric utility that serves more than 750,000 customers and
that also conveys water to its customers.
   (4) "Eligible customer-generator" means a residential customer,
small commercial customer as defined in subdivision (h) of Section
331, or commercial, industrial, or agricultural customer of an
electric utility, who uses a renewable electrical generation
facility, or a combination of those facilities, with a total capacity
of not more than one megawatt, that is located on the customer's
owned, leased, or rented premises, and is interconnected and operates
in parallel with the electrical grid, and is intended primarily to
offset part or all of the customer's own electrical requirements.
   (5) "Renewable electrical generation facility" means a facility
that generates electricity from a renewable source listed in
paragraph (1) of subdivision (a) of Section 25741 of the Public
Resources Code. A small hydroelectric generation facility is not an
eligible renewable electrical generation facility if it will cause an
adverse impact on instream beneficial uses or cause a change in the
volume or timing of streamflow.
   (6) "Net energy metering" means measuring the difference between
the electricity supplied through the electrical grid and the
electricity generated by an eligible customer-generator and fed back
to the electrical grid over a 12-month period as described in
subdivisions (c) and (h).
   (7) "Net surplus customer-generator" means an eligible
customer-generator that generates more electricity during a 12-month
period than is supplied by the electric utility to the eligible
customer-generator during the same 12-month period.
   (8) "Net surplus electricity" means all electricity generated by
an eligible customer-generator measured in kilowatthours over a
12-month period that exceeds the amount of electricity consumed by
that eligible customer-generator.
   (9) "Net surplus electricity compensation" means a per
kilowatthour rate offered by the electric utility to the net surplus
customer-generator for net surplus electricity that is set by the
ratemaking authority pursuant to subdivision (h).
   (10) "Ratemaking authority" means, for an electrical corporation,
the commission, for an electrical cooperative, its ratesetting body
selected by its shareholders or members, and for a local publicly
owned electric utility, the local elected body responsible for
setting the rates of the local publicly owned utility.
   (11) "Wind energy co-metering" means any wind energy project
greater than 50 kilowatts, but not exceeding one megawatt, where the
difference between the electricity supplied through the electrical
grid and the electricity generated by an eligible customer-generator
and fed back to the electrical grid over a 12-month period is as
described in subdivision (h). Wind energy co-metering shall be
accomplished pursuant to Section 2827.8.
   (c) (1) Every electric utility shall develop a standard contract
or tariff providing for net energy metering, and shall make this
standard contract or tariff available to eligible
customer-generators, upon request, on a first-come-first-served basis
until the time that the total rated generating capacity used by
eligible customer-generators exceeds 5 percent of the electric
utility's aggregate customer peak demand. Net energy metering shall
be accomplished using a single meter capable of registering the flow
of electricity in two directions. An additional meter or meters to
monitor the flow of electricity in each direction may be installed
with the consent of the eligible customer-generator, at the expense
of the electric utility, and the additional metering shall be used
only to provide the information necessary to accurately bill or
credit the eligible customer-generator pursuant to subdivision (h),
or to collect generating system performance information for research
purposes relative to a renewable electrical generation facility. If
the existing electrical meter of an eligible customer-generator is
not capable of measuring the flow of electricity in two directions,
the eligible customer-generator shall be responsible for all expenses
involved in purchasing and installing a meter that is able to
measure electricity flow in two directions. If an additional meter or
meters are installed, the net energy metering calculation shall
yield a result identical to that of a single meter. An eligible
customer-generator that is receiving service other than through the
standard contract or tariff may elect to receive service through the
standard contract or tariff until the electric utility reaches the
generation limit set forth in this paragraph. Once the generation
limit is reached, only eligible customer-generators that had
previously elected to receive service pursuant to the standard
contract or tariff have a right to continue to receive service
pursuant to the standard contract or tariff. Eligibility for net
energy metering does not limit an eligible customer-generator's
eligibility for any other rebate, incentive, or credit provided by
the electric utility, or pursuant to any governmental program,
including rebates and incentives provided pursuant to the California
Solar Initiative.
   (2) An electrical corporation shall include a provision in the net
energy metering contract or tariff requiring that any customer with
an existing electrical generating facility and meter who enters into
a new net energy metering contract shall provide an inspection report
to the electrical corporation, unless the electrical generating
facility and meter have been installed or inspected within the
previous three years. The inspection report shall be prepared by a
California licensed contractor who is not the owner or operator of
the facility and meter. A California licensed electrician shall
perform the inspection of the electrical portion of the facility and
meter.
   (3) (A) On an annual basis, every electric utility shall make
available to the ratemaking authority information on the total rated
generating capacity used by eligible customer-generators that are
customers of that provider in the provider's service area and the net
surplus electricity purchased by the electric utility pursuant to
this section.
   (B) An electric service provider operating pursuant to Section 394
shall make available to the ratemaking authority the information
required by this paragraph for each eligible customer-generator that
is their customer for each service area of an electrical corporation,
local publicly owned electrical utility, or electrical cooperative,
in which the eligible customer-generator has net energy metering.
   (C) The ratemaking authority shall develop a process for making
the information required by this paragraph available to electric
utilities, and for using that information to determine when, pursuant
to paragraphs (1) and (4), an electric utility is not obligated to
provide net energy metering to additional eligible
customer-generators in its service area.
   (4) An electric utility is not obligated to provide net energy
metering to additional eligible customer-generators in its service
area when the combined total peak demand of all electricity used by
eligible customer-generators served by all the electric utilities in
that service area furnishing net energy metering to eligible
customer-generators exceeds 5 percent of the aggregate customer peak
demand of those electric utilities.
   (d) Every electric utility shall make all necessary forms and
contracts for net energy metering and net surplus electricity
compensation service available for download from the Internet.
   (e) (1) Every electric utility shall ensure that requests for
establishment of net energy metering and net surplus electricity
compensation are processed in a time period not exceeding that for
similarly situated customers requesting new electric service, but not
to exceed 30 working days from the date it receives a completed
application form for net energy metering service or net surplus
electricity compensation, including a signed interconnection
agreement from an eligible customer-generator and the electric
inspection clearance from the governmental authority having
jurisdiction.
   (2) Every electric utility shall ensure that requests for an
interconnection agreement from an eligible customer-generator are
processed in a time period not to exceed 30 working days from the
date it receives a completed application form from the eligible
customer-generator for an interconnection agreement.
   (3) If an electric utility is unable to process a request within
the allowable timeframe pursuant to paragraph (1) or (2), it shall
notify the eligible customer-generator and the ratemaking authority
of the reason for its inability to process the request and the
expected completion date.
   (f) (1) If a customer participates in direct transactions pursuant
to paragraph (1) of subdivision (b) of Section 365, or Section
365.1, with an electric service provider that does not provide
distribution service for the direct transactions, the electric
utility that provides distribution service for the eligible
customer-generator is not obligated to provide net energy metering or
net surplus electricity compensation to the customer.
   (2) If a customer participates in direct transactions pursuant to
paragraph (1) of subdivision (b) of Section 365 with an electric
service provider, and the customer is an eligible customer-generator,
the electric utility that provides distribution service for the
direct transactions may recover from the customer's electric service
provider the incremental costs of metering and billing service
related to net energy metering and net surplus electricity
compensation in an amount set by the ratemaking authority.
   (g) Except for the time-variant kilowatthour pricing portion of
any tariff adopted by the commission pursuant to paragraph (4) of
subdivision (a) of Section 2851, each net energy metering contract or
tariff shall be identical, with respect to rate structure, all
retail rate components, and any monthly charges, to the contract or
tariff to which the same customer would be assigned if the customer
did not use a renewable electrical generation facility, except that
eligible customer-generators shall not be assessed standby charges on
the electrical generating capacity or the kilowatthour production of
a renewable electrical generation facility. The charges for all
retail rate components for eligible customer-generators shall be
based exclusively on the customer-generator's net kilowatthour
consumption over a 12-month period, without regard to the eligible
customer-generator's choice as to from whom it purchases electricity
that is not self-generated. Any new or additional demand charge,
standby charge, customer charge, minimum monthly charge,
interconnection charge, or any other charge that would increase an
eligible customer-generator's costs beyond those of other customers
who are not eligible customer-generators in the rate class to which
the eligible customer-generator would otherwise be assigned if the
customer did not own, lease, rent, or otherwise operate a renewable
electrical generation facility is contrary to the intent of this
section, and shall not form a part of net energy metering contracts
or tariffs.
   (h) For eligible customer-generators, the net energy metering
calculation shall be made by measuring the difference between the
electricity supplied to the eligible customer-generator and the
electricity generated by the eligible customer-generator and fed back
to the electrical grid over a 12-month period. The following rules
shall apply to the annualized net metering calculation:
   (1) The eligible residential or small commercial
customer-generator, at the end of each 12-month period following the
date of final interconnection of the eligible customer-generator's
system with an electric utility, and at each anniversary date
thereafter, shall be billed for electricity used during that 12-month
period. The electric utility shall determine if the eligible
residential or small commercial customer-generator was a net consumer
or a net surplus customer-generator during that period.
   (2) At the end of each 12-month period, where the electricity
supplied during the period by the electric utility exceeds the
electricity generated by the eligible residential or small commercial
customer-generator during that same period, the eligible residential
or small commercial customer-generator is a net electricity consumer
and the electric utility shall be owed compensation for the eligible
customer-generator's net kilowatthour consumption over that 12-month
period. The compensation owed for the eligible residential or small
commercial customer-generator's consumption shall be calculated as
follows:
   (A) For all eligible customer-generators taking service under
contracts or tariffs employing "baseline" and "over baseline" rates,
any net monthly consumption of electricity shall be calculated
according to the terms of the contract or tariff to which the same
customer would be assigned to, or be eligible for, if the customer
was not an eligible customer-generator. If those same
customer-generators are net generators over a billing period, the net
kilowatthours generated shall be valued at the same price per
kilowatthour as the electric utility would charge for the baseline
quantity of electricity during that billing period, and if the number
of kilowatthours generated exceeds the baseline quantity, the excess
shall be valued at the same price per kilowatthour as the electric
utility would charge for electricity over the baseline quantity
during that billing period.
   (B) For all eligible customer-generators taking service under
contracts or tariffs employing time-of-use rates, any net monthly
consumption of electricity shall be calculated according to the terms
of the contract or tariff to which the same customer would be
assigned, or be eligible for, if the customer was not an eligible
customer-generator. When those same customer-generators are net
generators during any discrete time-of-use period, the net
kilowatthours produced shall be valued at the same price per
kilowatthour as the electric utility would charge for retail
kilowatthour sales during that same time-of-use period. If the
eligible customer-generator's time-of-use electrical meter is unable
to measure the flow of electricity in two directions, paragraph (1)
of subdivision (c) shall apply.
   (C) For all eligible residential and small commercial
customer-generators and for each billing period, the net balance of
moneys owed to the electric utility for net consumption of
electricity or credits owed to the eligible customer-generator for
net generation of electricity shall be carried forward as a monetary
value until the end of each 12-month period. For all eligible
commercial, industrial, and agricultural customer-generators, the net
balance of moneys owed shall be paid in accordance with the electric
utility's normal billing cycle, except that if the eligible
commercial, industrial, or agricultural customer-generator is a net
electricity producer over a normal billing cycle, any excess
kilowatthours generated during the billing cycle shall be carried
over to the following billing period as a monetary value, calculated
according to the procedures set forth in this section, and appear as
a credit on the eligible commercial, industrial, or agricultural
customer-generator's account, until the end of the annual period when
paragraph (3) shall apply.
   (3) At the end of each 12-month period, where the electricity
generated by the eligible customer-generator during the 12-month
period exceeds the electricity supplied by the electric utility
during that same period, the eligible customer-generator is a net
surplus customer-generator and the electric utility, upon an
affirmative election by the net surplus customer-generator, shall
either (A) provide net surplus electricity compensation for any net
surplus electricity generated during the prior 12-month period, or
(B) allow the net surplus customer-generator to apply the net surplus
electricity as a credit for kilowatthours subsequently supplied by
the electric utility to the net surplus customer-generator. For an
eligible customer-generator that does not affirmatively elect to
receive service pursuant to net surplus electricity compensation, the
electric utility shall retain any excess kilowatthours generated
during the prior 12-month period. The eligible customer-generator not
affirmatively electing to receive service pursuant to net surplus
electricity compensation shall not be owed any compensation for the
net surplus electricity unless the electric utility enters into a
purchase agreement with the eligible customer-generator for those
excess kilowatthours. Every electric utility shall provide notice to
eligible customer-generators that they are eligible to receive net
surplus electricity compensation for net surplus electricity, that
they must elect to receive net surplus electricity compensation, and
that the 12-month period commences when the electric utility receives
the eligible customer-generator's election. For an electric utility
that is an electrical corporation or electrical cooperative, the
commission may adopt requirements for providing notice and the manner
by which eligible customer-generators may elect to receive net
surplus electricity compensation.
   (4) (A) An eligible customer-generator with multiple meters may
elect to aggregate the electrical load of the meters located on the
property where the renewable electrical generation facility is
located and on all property adjacent or contiguous to the property on
which the renewable electrical generation facility is located, if
those properties are solely owned, leased, or rented by the eligible
customer-generator. If the eligible customer-generator elects to
aggregate the electric load pursuant to this paragraph, the electric
utility shall use the aggregated load for the purpose of determining
whether an eligible customer-generator is a net consumer or a net
surplus customer-generator during a 12-month period.
   (B) If an eligible customer-generator chooses to aggregate
pursuant to subparagraph (A), the eligible customer-generator shall
be permanently ineligible to receive net surplus electricity
compensation, and the electric utility shall retain any kilowatthours
in excess of the eligible customer-generator's aggregated electrical
load generated during the 12-month period.
   (C) If an eligible customer-generator with multiple meters elects
to aggregate the electrical load of those meters pursuant to
subparagraph (A), and different rate schedules are applicable to
service at any of those meters, the electricity generated by the
renewable electrical generation facility shall be allocated to each
of the meters in proportion to the electrical load served by those
meters. For example, if the eligible customer-generator receives
electric service through three meters, two meters being at an
agricultural rate that each provide service to 25 percent of the
customer's total load, and a third meter, at a commercial rate, that
provides service to 50 percent of the customer's total load, then 50
percent of the electrical generation of the eligible renewable
generation facility shall be allocated to the third meter that
provides service at the commercial rate and 25 percent of the
generation shall be allocated to each of the two meters providing
service at the agricultural rate. This proportionate allocation shall
be computed each billing period.
   (D) This paragraph shall not become operative for an electrical
corporation unless the commission determines that allowing eligible
customer-generators to aggregate their load from multiple meters will
not result in an increase in the expected revenue obligations of
customers who are not eligible customer-generators. The commission
shall make this determination by September 30, 2013. In making this
determination, the commission shall determine if there are any public
purpose or other noncommodity charges that the eligible
customer-generators would pay pursuant to the net energy metering
program as it exists prior to aggregation, that the eligible
customer-generator would not pay if permitted to aggregate the
electrical load of multiple meters pursuant to this paragraph.
   (E) A local publicly owned electric utility or electrical
cooperative shall only allow eligible customer-generators to
aggregate their load if the utility's ratemaking authority determines
that allowing eligible customer-generators to aggregate their load
from multiple meters will not result in an increase in the expected
revenue obligations of customers that are not eligible
customer-generators. The ratemaking authority of a local publicly
owned electric utility or electrical cooperative shall make this
determination within 180 days of the first request made by an
eligible customer-generator to aggregate their load. In making the
determination, the ratemaking authority shall determine if there are
any public purpose or other noncommodity charges that the eligible
customer-generator would pay pursuant to the net energy metering or
co-energy metering program of the utility as it exists prior to
aggregation, that the eligible customer-generator would not pay if
permitted to aggregate the electrical load of multiple meters
pursuant to this paragraph. If the ratemaking authority determines
that load aggregation will not cause an incremental rate impact on
the utility's customers that are not eligible customer-generators,
the local publicly owned electric utility or electrical cooperative
shall permit an eligible customer-generator to elect to aggregate the
electrical load of multiple meters pursuant to this paragraph. The
ratemaking authority may reconsider any determination made pursuant
to this subparagraph in a subsequent public proceeding.
   (F) For purposes of this paragraph, parcels that are divided by a
street, highway, or public thoroughfare are considered contiguous,
provided they are otherwise contiguous and under the same ownership.
   (G) An eligible customer-generator may only elect to aggregate the
electrical load of multiple meters if the renewable electrical
generation facility, or a combination of those facilities, has a
total generating capacity of not more than one megawatt.
   (H) Notwithstanding subdivision (g), an eligible
customer-generator electing to aggregate the electrical load of
multiple meters pursuant to this subdivision shall remit service
charges for the cost of providing billing services to the electric
utility that provides service to the meters.
   (5) (A) The ratemaking authority shall establish a net surplus
electricity compensation valuation to compensate the net surplus
customer-generator for the value of net surplus electricity generated
by the net surplus customer-generator. The commission shall
establish the valuation in a ratemaking proceeding. The ratemaking
authority for a local publicly owned electric utility shall establish
the valuation in a public proceeding. The net surplus electricity
compensation valuation shall be established so as to provide the net
surplus customer-generator just and reasonable compensation for the
value of net surplus electricity, while leaving other ratepayers
unaffected. The ratemaking authority shall determine whether the
compensation will include, where appropriate justification exists,
either or both of the following components:
   (i) The value of the electricity itself.
   (ii) The value of the renewable attributes of the electricity.
   (B) In establishing the rate pursuant to subparagraph (A), the
ratemaking authority shall ensure that the rate does not result in a
shifting of costs between eligible customer-generators and other
bundled service customers.
   (6) (A) Upon adoption of the net surplus electricity compensation
rate by the ratemaking authority, any renewable energy credit, as
defined in Section 399.12, for net surplus electricity purchased by
the electric utility shall belong to the electric utility. Any
renewable energy credit associated with electricity generated by the
eligible customer-generator that is utilized by the eligible
customer-generator shall remain the property of the eligible
customer-generator.
   (B) Upon adoption of the net surplus electricity compensation rate
by the ratemaking authority, the net surplus electricity purchased
by the electric utility shall count toward the electric utility's
renewables portfolio standard annual procurement targets for the
purposes of paragraph (1) of subdivision (b) of Section 399.15, or
for a local publicly owned electric utility, the renewables portfolio
standard annual procurement targets established pursuant to Section
387.
   (7) The electric utility shall provide every eligible residential
or small commercial customer-generator with net electricity
consumption and net surplus electricity generation information with
each regular bill. That information shall include the current
monetary balance owed the electric utility for net electricity
consumed, or the net surplus electricity generated, since the last
12-month period ended. Notwithstanding this subdivision, an electric
utility shall permit that customer to pay monthly for net energy
consumed.
                                                   (8) If an eligible
residential or small commercial customer-generator terminates the
customer relationship with the electric utility, the electric utility
shall reconcile the eligible customer-generator's consumption and
production of electricity during any part of a 12-month period
following the last reconciliation, according to the requirements set
forth in this subdivision, except that those requirements shall apply
only to the months since the most recent 12-month bill.
   (9) If an electric service provider or electric utility providing
net energy metering to a residential or small commercial
customer-generator ceases providing that electric service to that
customer during any 12-month period, and the customer-generator
enters into a new net energy metering contract or tariff with a new
electric service provider or electric utility, the 12-month period,
with respect to that new electric service provider or electric
utility, shall commence on the date on which the new electric service
provider or electric utility first supplies electric service to the
customer-generator.
   (i) Notwithstanding any other provisions of this section,
paragraphs (1), (2), and (3) shall apply to an eligible
customer-generator with a capacity of more than 10 kilowatts, but not
exceeding one megawatt, that receives electric service from a local
publicly owned electric utility that has elected to utilize a
co-energy metering program unless the local publicly owned electric
utility chooses to provide service for eligible customer-generators
with a capacity of more than 10 kilowatts in accordance with
subdivisions (g) and (h):
   (1) The eligible customer-generator shall be required to utilize a
meter, or multiple meters, capable of separately measuring
electricity flow in both directions. All meters shall provide
time-of-use measurements of electricity flow, and the customer shall
take service on a time-of-use rate schedule. If the existing meter of
the eligible customer-generator is not a time-of-use meter or is not
capable of measuring total flow of electricity in both directions,
the eligible customer-generator shall be responsible for all expenses
involved in purchasing and installing a meter that is both
time-of-use and able to measure total electricity flow in both
directions. This subdivision shall not restrict the ability of an
eligible customer-generator to utilize any economic incentives
provided by a governmental agency or an electric utility to reduce
its costs for purchasing and installing a time-of-use meter.
   (2) The consumption of electricity from the local publicly owned
electric utility shall result in a cost to the eligible
customer-generator to be priced in accordance with the standard rate
charged to the eligible customer-generator in accordance with the
rate structure to which the customer would be assigned if the
customer did not use a renewable electrical generation facility. The
generation of electricity provided to the local publicly owned
electric utility shall result in a credit to the eligible
customer-generator and shall be priced in accordance with the
generation component, established under the applicable structure to
which the customer would be assigned if the customer did not use a
renewable electrical generation facility.
   (3) All costs and credits shall be shown on the eligible
customer-generator's bill for each billing period. In any months in
which the eligible customer-generator has been a net consumer of
electricity calculated on the basis of value determined pursuant to
paragraph (2), the customer-generator shall owe to the local publicly
owned electric utility the balance of electricity costs and credits
during that billing period. In any billing period in which the
eligible customer-generator has been a net producer of electricity
calculated on the basis of value determined pursuant to paragraph
(2), the local publicly owned electric utility shall owe to the
eligible customer-generator the balance of electricity costs and
credits during that billing period. Any net credit to the eligible
customer-generator of electricity costs may be carried forward to
subsequent billing periods, provided that a local publicly owned
electric utility may choose to carry the credit over as a
kilowatthour credit consistent with the provisions of any applicable
contract or tariff, including any differences attributable to the
time of generation of the electricity. At the end of each 12-month
period, the local publicly owned electric utility may reduce any net
credit due to the eligible customer-generator to zero.
   (j) A renewable electrical generation facility used by an eligible
customer-generator shall meet all applicable safety and performance
standards established by the National Electrical Code, the Institute
of Electrical and Electronics Engineers, and accredited testing
laboratories, including Underwriters Laboratories Incorporated and,
where applicable, rules of the commission regarding safety and
reliability. A customer-generator whose renewable electrical
generation facility meets those standards and rules shall not be
required to install additional controls, perform or pay for
additional tests, or purchase additional liability insurance.
   (k) If the commission determines that there are cost or revenue
obligations for an electrical corporation that may not be recovered
from customer-generators acting pursuant to this section, those
obligations shall remain within the customer class from which any
shortfall occurred and shall not be shifted to any other customer
class. Net energy metering and co-energy metering customers shall not
be exempt from the public goods charges imposed pursuant to Article
7 (commencing with Section 381), Article 8 (commencing with Section
385), or Article 15 (commencing with Section 399) of Chapter 2.3 of
Part 1.
   (l) A net energy metering, co-energy metering, or wind energy
co-metering customer shall reimburse the Department of Water
Resources for all charges that would otherwise be imposed on the
customer by the commission to recover bond-related costs pursuant to
an agreement between the commission and the Department of Water
Resources pursuant to Section 80110 of the Water Code, as well as the
costs of the department equal to the share of the department's
estimated net unavoidable power purchase contract costs attributable
to the customer. The commission shall incorporate the determination
into an existing proceeding before the commission, and shall ensure
that the charges are nonbypassable. Until the commission has made a
determination regarding the nonbypassable charges, net energy
metering, co-energy metering, and wind energy co-metering shall
continue under the same rules, procedures, terms, and conditions as
were applicable on December 31, 2002.
   (m) In implementing the requirements of subdivisions (k) and (
 l  ), an eligible customer-generator shall not be required
to replace its existing meter except as set forth in paragraph (1) of
subdivision (c), nor shall the electric utility require additional
measurement of usage beyond that which is necessary for customers in
the same rate class as the eligible customer-generator.
   (n) It is the intent of the Legislature that the Treasurer
incorporate net energy metering, including net surplus electricity
compensation, co-energy metering, and wind energy co-metering
projects undertaken pursuant to this section as sustainable building
methods or distributive energy technologies for purposes of
evaluating low-income housing projects.
  SEC. 2.  Section 2827.10 of the Public Utilities Code is amended to
read:
   2827.10.  (a) As used in this section, the following terms have
the following meanings:
   (1) "Electrical corporation" means an electrical corporation, as
defined in Section 218.
   (2) "Eligible fuel cell electrical generating facility" means a
facility that includes the following:
   (A) Integrated powerplant systems containing a stack, tubular
array, or other functionally similar configuration used to
electrochemically convert fuel to electric energy.
   (B) An inverter and fuel processing system where necessary.
   (C) Other plant equipment, including heat recovery equipment,
necessary to support the plant's operation or its energy conversion.
   (3) "Eligible fuel cell customer-generator" means a customer of an
electrical corporation that meets all the following criteria:
   (A) Uses a fuel cell electrical generating facility with a
capacity of not more than one megawatt that is located on or adjacent
to the customer's owned, leased, or rented premises, is
interconnected and operates in parallel with the electrical grid
while the grid is operational or in a grid independent mode when the
grid is nonoperational, and is sized to offset part or all of the
eligible fuel cell customer-generator's own electrical requirements.
   (B) Is the recipient of local, state, or federal funds, or who
self-finances projects designed to encourage the development of
eligible fuel cell electrical generating facilities.
   (C) Uses technology the commission has determined will achieve
reductions in emissions of greenhouse gases pursuant to subdivision
(b), and meets the emission requirements for eligibility for funding
set forth in subdivision (c), of Section 379.6.
   (4) "Net energy metering" means measuring the difference between
the electricity supplied through the electrical grid and the
difference between the electricity generated by an eligible fuel cell
electrical generating facility and fed back to the electrical grid
over a 12-month period as described in subdivision (e). Net energy
metering shall be accomplished using a time-of-use meter capable of
registering the flow of electricity in two directions. If the
existing electrical meter of an eligible fuel cell customer-generator
is not capable of measuring the flow of electricity in two
directions, the eligible fuel cell customer-generator shall be
responsible for all expenses involved in purchasing and installing a
meter that is able to measure electricity flow in two directions. If
an additional meter or meters are installed, the net energy metering
calculation shall yield a result identical to that of a time-of-use
meter.
   (b) Every electrical corporation shall, not later than March 1,
2004, file with the commission a standard tariff providing for net
energy metering for eligible fuel cell customer-generators,
consistent with this section. Every electrical corporation shall make
this tariff available to eligible fuel cell customer-generators upon
request, on a first-come-first-served basis, until the total
cumulative rated generating capacity used by the eligible fuel cell
customer-generators equals 45 megawatts within the service territory
of the electrical corporation for an electrical corporation with a
peak demand above 10,000 megawatts, or equals 22.5 megawatts within
the service territory of the electrical corporation for an electrical
corporation with a peak demand of 10,000 megawatts or below. The
combined statewide cumulative rated generating capacity used by the
eligible fuel cell customer-generators in the service territories of
all electrical corporations in the state may not exceed 112.5
megawatts.
   (c) In determining the eligibility for the cumulative rated
generating capacity within an electrical service area, preference
shall be given to facilities which, at the time of installation, are
located in a community with significant exposure to air contaminants
or localized air contaminants, or both, including, but not limited
to, communities of minority populations or low-income populations, or
both, based on the ambient air quality standards established
pursuant to Section 39607 of the Health and Safety Code.
   (d) Each net energy metering contract or tariff shall be
identical, with respect to rate structure, all retail rate
components, and any monthly charges, to the contract or tariff to
which the customer would be assigned if the customer was not an
eligible fuel cell customer-generator. Any new or additional demand
charge, standby charge, customer charge, minimum monthly charge,
interconnection charge, or other charge that would increase an
eligible fuel cell customer-generator's costs beyond those of other
customers in the rate class to which the eligible fuel cell
customer-generator would otherwise be assigned are contrary to the
intent of the Legislature in enacting the act adding this section,
and may not form a part of net energy metering tariffs.
   (e) The net metering calculation shall be made by measuring the
difference between the electricity supplied to the eligible
customer-generator and the electricity generated by the eligible
customer-generator and fed back to the electrical grid over a
12-month period. The following rules shall apply to the annualized
metering calculation:
   (1) The eligible fuel cell customer-generator shall, at the end of
each 12-month period following the date of final interconnection of
the eligible fuel cell electrical generating facility with an
electrical corporation, and at each anniversary date thereafter, be
billed for electricity used during that period. The electrical
corporation shall determine if the eligible fuel cell
customer-generator was a net consumer or a net producer of
electricity during that period. For purposes of determining if the
eligible fuel cell customer-generator was a net consumer or a net
producer of electricity during that period, the electrical
corporation shall aggregate the electrical load of the meters located
on the property where the eligible fuel cell electrical generation
facility is located and on all property adjacent or contiguous to the
property on which the facility is located, if those properties are
solely owned, leased, or rented by the eligible fuel cell
customer-generator. Each aggregated account shall be billed and
measured according to a time-of-use rate schedule.
   (2) At the end of each 12-month period, where the electricity
supplied during the period by the electrical corporation exceeds the
electricity generated by the eligible fuel cell customer-generator
during that same period, the eligible fuel cell customer-generator is
a net electricity consumer and the electrical corporation shall be
owed compensation for the eligible fuel cell customer-generator's net
kilowatthour consumption over that same period. The compensation
owed for the eligible fuel cell customer-generator's consumption
shall be calculated as follows:
   (A) The generation charges for any net monthly consumption of
electricity shall be calculated according to the terms of the tariff
to which the same customer would be assigned to or be eligible for if
the customer was not an eligible fuel cell customer-generator. When
the eligible fuel cell customer-generators is a net generator during
any discrete time-of-use period, the net kilowatthours produced shall
be valued at the same price per kilowatthour as the electrical
corporation would charge for retail kilowatthour sales for
generation, exclusive of any surcharges, during that same time-of-use
period. If the eligible fuel cell customer-generator's time-of-use
electrical meter is unable to measure the flow of electricity in two
directions, paragraph (4) of subdivision (a) shall apply. All other
charges, other than generation charges, shall be calculated in
accordance with the eligible fuel cell customer-generator's
applicable tariff and based on the total kilowatthours delivered by
the electrical corporation to the eligible fuel cell
customer-generator. To the extent that charges for transmission and
distribution services are recovered through demand charges in any
particular month, no standby reservation charges shall apply in that
monthly billing cycle.
   (B) The net balance of moneys owed shall be paid in accordance
with the electrical corporation's normal billing cycle.
   (3) At the end of each 12-month period, where the electricity
generated by the eligible fuel cell customer-generator during the
12-month period exceeds the electricity supplied by the electrical
corporation during that same period, the eligible fuel cell
customer-generator is a net electricity producer and the electrical
corporation shall retain any excess kilowatthours generated during
the prior 12-month period. The eligible fuel cell customer-generator
shall not be owed any compensation for those excess kilowatthours.
   (4) If an eligible fuel cell customer-generator terminates service
with the electrical corporation, the electrical corporation shall
reconcile the eligible fuel cell customer-generator's consumption and
production of electricity during any 12-month period.
   (f) A fuel cell electrical generating facility shall not be
eligible for participation in the tariff established pursuant to this
section unless it commenced operation before January 1, 2014. A fuel
cell customer-generator shall be eligible for the tariff established
pursuant to this section only for the operating life of the eligible
fuel cell electrical generating facility.
  SEC. 2.5.  Section 2827.10 of the Public Utilities Code is amended
to read:
   2827.10.  (a) As used in this section, the following terms have
the following meanings:
   (1) "Electrical corporation" means an electrical corporation, as
defined in Section 218.
   (2) "Eligible fuel cell electrical generating facility" means a
facility that includes the following:
   (A) Integrated powerplant systems containing a stack, tubular
array, or other functionally similar configuration used to
electrochemically convert fuel to electric energy.
   (B) An inverter and fuel processing system where necessary.
   (C) Other plant equipment, including heat recovery equipment,
necessary to support the plant's operation or its energy conversion.
   (3) (A) "Eligible fuel cell customer-generator" means a customer
of an electrical corporation that meets all the following criteria:
   (i) Uses a fuel cell electrical generating facility with a
capacity of not more than one megawatt that is located on or adjacent
to the customer's owned, leased, or rented premises, is
interconnected and operates in parallel with the electrical grid
while the grid is operational or in a grid independent mode when the
grid is nonoperational, and is sized to offset part or all of the
eligible fuel cell customer-generator's own electrical requirements.
   (ii) Is the recipient of local, state, or federal funds, or who
self-finances projects designed to encourage the development of
eligible fuel cell electrical generating facilities.
   (iii) Uses technology the commission has determined will achieve
reductions in emissions of greenhouse gases pursuant to subdivision
(b), and meets the emission requirements for eligibility for funding
set forth in subdivision (c), of Section 379.6.
   (B) For purposes of this paragraph, a person or entity is a
customer of the electrical corporation if the customer is physically
located within the service territory of the electrical corporation
and receives bundled service, distribution service, or transmission
service from the electrical corporation.
   (4) "Net energy metering" means measuring the difference between
the electricity supplied through the electrical grid and the
difference between the electricity generated by an eligible fuel cell
electrical generating facility and fed back to the electrical grid
over a 12-month period as described in subdivision (e). Net energy
metering shall be accomplished using a time-of-use meter capable of
registering the flow of electricity in two directions. If the
existing electrical meter of an eligible fuel cell customer-generator
is not capable of measuring the flow of electricity in two
directions, the eligible fuel cell customer-generator shall be
responsible for all expenses involved in purchasing and installing a
meter that is able to measure electricity flow in two directions. If
an additional meter or meters are installed, the net energy metering
calculation shall yield a result identical to that of a time-of-use
meter.
   (b) (1) Every electrical corporation, not later than March 1,
2004, shall file with the commission a standard tariff providing for
net energy metering for eligible fuel cell customer-generators,
consistent with this section. Subject to the limitation in
subdivision (f), every electrical corporation shall make this tariff
available to eligible fuel cell customer-generators upon request, on
a first-come-first-served basis, until the total cumulative rated
generating capacity of the eligible fuel cell electrical generating
facilities receiving service pursuant to the tariff reaches a level
equal to its proportionate share of a statewide limitation of 500
megawatts cumulative rated generation capacity served under this
section. The proportionate share shall be calculated based on the
ratio of the electrical corporation's peak demand compared to the
total statewide peak demand.
   (2) To continue the growth of the market for onsite electric
generation using fuel cells, the commission may review and
incrementally raise the limitation established in paragraph (1) on
the total cumulative rated generating capacity of the eligible fuel
cell electrical generating facilities receiving service pursuant to
the tariff in paragraph (1).
   (c) In determining the eligibility for the cumulative rated
generating capacity within an electrical corporation's service
territory, preference shall be given to facilities that, at the time
of installation, are located in a community with significant exposure
to air contaminants or localized air contaminants, or both,
including, but not limited to, communities of minority populations or
low-income populations, or both, based on the ambient air quality
standards established pursuant to Section 39607 of the Health and
Safety Code.
   (d) (1) Each net energy metering contract or tariff shall be
identical, with respect to rate structure, all retail rate
components, and any monthly charges, to the contract or tariff to
which the customer would be assigned if the customer was not an
eligible fuel cell customer-generator. Any new or additional demand
charge, standby charge, customer charge, minimum monthly charge,
interconnection charge, or other charge that would increase an
eligible fuel cell customer-generator's costs beyond those of other
customers in the rate class to which the eligible fuel cell
customer-generator would otherwise be assigned are contrary to the
intent of the Legislature in enacting this section, and may not form
a part of net energy metering tariffs.
   (2) The commission shall authorize an electrical corporation to
charge a fuel cell customer-generator a fee based on the cost to the
utility associated with providing interconnection inspection services
for that fuel cell customer-generator.
   (e) The net metering calculation shall be made by measuring the
difference between the electricity supplied to the eligible fuel cell
customer-generator and the electricity generated by the eligible
fuel cell customer-generator and fed back to the electrical grid over
a 12-month period. The following rules shall apply to the annualized
metering calculation:
   (1) The eligible fuel cell customer-generator shall, at the end of
each 12-month period following the date of final interconnection of
the eligible fuel cell electrical generating facility with an
electrical corporation, and at each anniversary date thereafter, be
billed for electricity used during that period. The electrical
corporation shall determine if the eligible fuel cell
customer-generator was a net consumer or a net producer of
electricity during that period. For purposes of determining if the
eligible fuel cell customer-generator was a net consumer or a net
producer of electricity during that period, the electrical
corporation shall aggregate the electrical load of the meters located
on the property where the eligible fuel cell electrical generation
facility is located and on all property adjacent or contiguous to the
property on which the facility is located, if those properties are
solely owned, leased, or rented by the eligible fuel cell
customer-generator. Each aggregated account shall be billed and
measured according to a time-of-use rate schedule.
   (2) At the end of each 12-month period, where the electricity
supplied during the period by the electrical corporation exceeds the
electricity generated by the eligible fuel cell customer-generator
during that same period, the eligible fuel cell customer-generator is
a net electricity consumer and the electrical corporation shall be
owed compensation for the eligible fuel cell customer-generator's net
kilowatthour consumption over that same period. The compensation
owed for the eligible fuel cell customer-generator's consumption
shall be calculated as follows:
   (A) The generation charges for any net monthly consumption of
electricity shall be calculated according to the terms of the tariff
to which the same customer would be assigned to or be eligible for if
the customer was not an eligible fuel cell customer-generator. When
the eligible fuel cell customer-generator is a net generator during
any discrete time-of-use period, the net kilowatthours produced shall
be valued at the same price per kilowatthour as the electrical
corporation would charge for retail kilowatthour sales for
generation, exclusive of any surcharges, during that same time-of-use
period. If the eligible fuel cell customer-generator's time-of-use
electrical meter is unable to measure the flow of electricity in two
directions, paragraph (4) of subdivision (a) shall apply. All other
charges, other than generation charges, shall be calculated in
accordance with the eligible fuel cell customer-generator's
applicable tariff and based on the total kilowatthours delivered by
the electrical corporation to the eligible fuel cell
customer-generator. To the extent that charges for transmission and
distribution services are recovered through demand charges in any
particular month, no standby reservation charges shall apply in that
monthly billing cycle.
   (B) The net balance of moneys owed shall be paid in accordance
with the electrical corporation's normal billing cycle.
   (3) At the end of each 12-month period, where the electricity
generated by the eligible fuel cell customer-generator during the
12-month period exceeds the electricity supplied by the electrical
corporation during that same period, the eligible fuel cell
customer-generator is a net electricity producer and the electrical
corporation shall retain any excess kilowatthours generated during
the prior 12-month period. The eligible fuel cell customer-generator
shall not be owed any compensation for those excess kilowatthours.
                                (4) If an eligible fuel cell
customer-generator terminates service with the electrical
corporation, the electrical corporation shall reconcile the eligible
fuel cell customer-generator's consumption and production of
electricity during any 12-month period.
   (f) No fuel cell electrical generating facility shall be eligible
for the tariff unless it commences operation prior to January 1,
2015, unless a later enacted statute, that is chaptered before
January 1, 2015, extends this eligibility commencement date. The
tariff shall remain in effect for an eligible fuel cell electrical
generating facility that commences operation pursuant to the tariff
prior to January 1, 2015. A fuel cell customer-generator shall be
eligible for the tariff established pursuant to this section only for
the operating life of the eligible fuel cell electrical generating
facility.
  SEC. 3.  Section 2.5 of this bill incorporates amendments to
Section 2827.10 of the Public Utilities Code proposed by both this
bill and Assembly Bill 2165. It shall only become operative if (1)
both bills are enacted and become effective on or before January 1,
2013, (2) each bill amends Section 2827.10 of the Public Utilities
Code, and (3) this bill is enacted after Assembly Bill 2165, in which
case Section 2 of this bill shall not become operative.
  SEC. 4.  No reimbursement is required by this act pursuant to
Section 6 of Article XIII B of the California Constitution because
the only costs that may be incurred by a local agency or school
district will be incurred because this act creates a new crime or
infraction, eliminates a crime or infraction, or changes the penalty
for a crime or infraction, within the meaning of Section 17556 of the
Government Code, or changes the definition of a crime within the
meaning of Section 6 of Article XIII B of the California
Constitution.

feedback