Bill Text: CT SB00392 | 2013 | General Assembly | Introduced
Bill Title: An Act Concerning The School Building Project At The Vernon E. Cleaves Vocational Agriculture Center In Wallingford.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2013-01-23 - Referred to Joint Committee on Education [SB00392 Detail]
Download: Connecticut-2013-SB00392-Introduced.html
General Assembly |
Proposed Bill No. 392 |
||||
January Session, 2013 |
LCO No. 921 | ||||
Referred to Committee on EDUCATION |
|||||
Introduced by: |
|||||
SEN. FASANO, 34th Dist. |
AN ACT CONCERNING THE SCHOOL BUILDING PROJECT AT THE VERNON E. CLEAVES VOCATIONAL AGRICULTURE CENTER IN WALLINGFORD.
Be it enacted by the Senate and House of Representatives in General Assembly convened:
That, notwithstanding the provisions of subsection (d) of section 10-286 of the general statutes or any regulations adopted by the State Board of Education or the Department of Construction Services pursuant to said section 10-286 requiring change orders to be submitted not later than six months after the date such change order is issued, the town of Wallingford may submit a change order after such six-month time limit for the new regional vocational agricultural construction project at Lyman Hall High School (Project Number 148-0147 VA/N).
Statement of Purpose:
To permit Wallingford to submit a change order for a school construction project later than six months after such change order was issued.