Bill Amendment: FL S0360 | 2023 | Regular Session
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: Causes of Action Based on Improvements to Real Property
Status: 2023-04-14 - Chapter No. 2023-22 [S0360 Detail]
Download: Florida-2023-S0360-Senate_Committee_Amendment_337266.html
Bill Title: Causes of Action Based on Improvements to Real Property
Status: 2023-04-14 - Chapter No. 2023-22 [S0360 Detail]
Download: Florida-2023-S0360-Senate_Committee_Amendment_337266.html
Florida Senate - 2023 COMMITTEE AMENDMENT Bill No. SB 360 Ì337266=Î337266 LEGISLATIVE ACTION Senate . House . . . . . ————————————————————————————————————————————————————————————————— ————————————————————————————————————————————————————————————————— The Committee on Judiciary (Hutson) recommended the following: 1 Senate Amendment 2 3 Delete lines 22 - 72 4 and insert: 5 (c) An action founded on the design, planning, or 6 construction of an improvement to real property, with the time 7 running fromthe date of actual possession by the owner,the 8 date the authority having jurisdiction issuesof the issuance of9 a temporary certificate of occupancy, a certificate of 10 occupancy, or a certification of completion, or the date of 11 abandonment of construction if not completed,or the date of12completion of the contract or termination of the contract13between the professional engineer, registered architect, or14licensed contractor and his or her employer,whichever date is 15 earliestlatest; except that, when the action involves a latent 16 defect, the time runs from the time the defect is discovered or 17 should have been discovered with the exercise of due diligence. 18 In any event, the action must be commenced within 710years 19 after the date the authority having jurisdiction issues a 20 temporary certificate of occupancy,of actual possession by the21owner, the date of the issuance ofa certificate of occupancy, 22 or a certificate of completion, or the date of abandonment of 23 construction if not completed,or the date of completion of the24contract or termination of the contract between the professional25engineer, registered architect, or licensed contractor and his26or her employer,whichever date is earliestlatest. However, 27 counterclaims, cross-claims, and third-party claims that arise 28 out of the conduct, transaction, or occurrence set out or 29 attempted to be set out in a pleading may be commenced up to 1 30 year after the pleading to which such claims relate is served, 31 even if such claims would otherwise be time barred. With respect 32 to actions founded on the design, planning, or construction of 33 an improvement to real property, if such construction is 34 performed pursuant to a duly issued building permit and if the 35 authority having jurisdictiona local enforcement agency, state36enforcement agency, or special inspector, as those terms are37defined in s. 553.71,has issued a temporaryfinalcertificate 38 of occupancy, a certificate of occupancy, or a certificate of 39 completion, then as to the construction which is within the 40 scope of such building permit and certificate, the correction of 41 defects to completed work or repair of completed work, whether 42 performed under warranty or otherwise, does not extend the 43 period of time within which an action must be commenced. 44 Notwithstanding any provision of this section to the contrary, 45 if the improvement to real property consists of the design, 46 planning, or construction of multiple buildings, each building 47 must be considered its own improvement for purposes of 48 determining the limitations period set forth in this paragraph 49Completion of the contract means the later of the date of final50performance of all the contracted services or the date that51final payment for such services becomes due without regard to52the date final payment is made.