Bill Amendment: FL S1308 | 2018 | Regular Session
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: Environmental Regulation
Status: 2018-03-09 - Laid on Table, refer to CS/CS/HB 1149 [S1308 Detail]
Download: Florida-2018-S1308-Senate_Floor_Amendment_522482_to_Amendment_721942_.html
Bill Title: Environmental Regulation
Status: 2018-03-09 - Laid on Table, refer to CS/CS/HB 1149 [S1308 Detail]
Download: Florida-2018-S1308-Senate_Floor_Amendment_522482_to_Amendment_721942_.html
Florida Senate - 2018 SENATOR AMENDMENT Bill No. CS for CS for CS for SB 1308 Ì522482(Î522482 LEGISLATIVE ACTION Senate . House . . . . . ————————————————————————————————————————————————————————————————— ————————————————————————————————————————————————————————————————— Senator Farmer moved the following: 1 Senate Amendment to Amendment (721942) (with title 2 amendment) 3 4 Between lines 1002 and 1003 5 insert: 6 Section 13. Subsection (11) is added to section 403.086, 7 Florida Statutes, to read: 8 403.086 Sewage disposal facilities; advanced and secondary 9 waste treatment.— 10 (11) The Legislature finds that the artificial recharge by 11 the direct pumping of reclaimed water into any geologic 12 formation of the Floridan Aquifer or the Biscayne Aquifer 13 containing total dissolved solids of 500 milligrams per liter or 14 more poses a risk to those resources. The Legislature declares 15 that more stringent treatment and management requirements for 16 the discharge of reclaimed water for artificial aquifer recharge 17 are in the public interest. Reclaimed water for artificial 18 aquifer recharge must meet advanced waste treatment 19 requirements, as defined in subsection (4), and may not exceed a 20 maximum concentration of 0.35 mg/l Total Nitrogen, expressed as 21 N. 22 Section 14. Subsection (7) of section 403.859, Florida 23 Statutes, is amended to read: 24 403.859 Prohibited acts.—The following acts and the causing 25 thereof are prohibited and are violations of this act: 26 (7) The artificial recharge by the direct pumping of 27 treated or untreated waste into any geologic formation of the 28 Floridan Aquifer or the Biscayne Aquifer containing total 29 dissolved solids of 500 milligrams per liter or less, except 30 such injection of reclaimed water from domestic wastewater 31 treatment reuse facilities if the effluent quality does not 32 exceed 0.35 mg/l Total Nitrogen, expressed as N, and meets the 33 water quality standards established by the Department of 34 Environmental Protection as part of the operation permit to 35 construct the treatment facility. 36 (a) By January 1, 1995, the Department of Environmental 37 Protection shall adoptpromulgateby rule effluent standards and 38 conditions for any project proposing wastewater reuse of 39 reclaimed water, for injection of the reclaimed water into the 40 Floridan Aquifer or Biscayne Aquifer. Any injection into a 41 geologic formation of the Floridan Aquifer or Biscayne Aquifer 42 containing total dissolved solids of 500 milligrams per liter or 43 less must meet the requirements of these rules. 44 (b) In the event a facility does not receive, as a part of 45 its operation permit, permission for injection which assures 46 compliance with department rules promulgated pursuant to this 47 subsection, the treated or untreated effluent shall be returned 48 to the wastewater treatment plant from which the effluent was 49 diverted during any testing period required by department rules 50 or to another legally acceptable reuse or disposal alternative. 51 52 The provisions of this subsection do not apply to treated or 53 untreated effluent currently discharging into the Floridan 54 Aquifer or Biscayne Aquifer on June 22, 1983. However, any 55 expansion of existing facilities on or after the effective date 56 of this act are subject to the requirements of this subsection. 57 58 ================= T I T L E A M E N D M E N T ================ 59 And the title is amended as follows: 60 Between lines 1083 and 1084 61 insert: 62 amending s. 403.086, F.S.; providing a legislative 63 finding and declaration; requiring reclaimed water 64 used for artificial aquifer recharge to meet waste 65 treatment requirements; amending s. 403.859, F.S.; 66 revising effluent quality standards for reclaimed 67 water that may be directly pumped into geologic 68 formations of the Floridan or Biscayne Aquifers;