Bill Text: FL S0094 | 2021 | Regular Session | Introduced


Bill Title: Water Storage North of Lake Okeechobee

Spectrum: Partisan Bill (Republican 1-0)

Status: (Failed) 2021-04-30 - Died in Appropriations, companion bill(s) passed, see SB 2516 (Ch. 2021-40) [S0094 Detail]

Download: Florida-2021-S0094-Introduced.html
       Florida Senate - 2021                                      SB 94
       
       
        
       By Senator Brodeur
       
       
       
       
       
       9-02212-21                                              202194__
    1                        A bill to be entitled                      
    2         An act relating to water storage north of Lake
    3         Okeechobee; creating s. 373.4599, F.S.; defining
    4         terms; requiring the South Florida Water Management
    5         District to request that the United States Army Corps
    6         of Engineers seek congressional approval of a project
    7         implementation report for the Lake Okeechobee
    8         Watershed Restoration Project by a specified date;
    9         requiring the district to seek a project partnership
   10         agreement with the corps upon such approval; requiring
   11         the district, in partnership with the corps, to
   12         expedite the development and implementation of aquifer
   13         storage and recovery wells; requiring the district to
   14         perform necessary scientific investigation and
   15         monitoring with implementation of such storage and
   16         recovery; requiring the district to expedite
   17         implementation of the aquifer storage and recovery
   18         science plan developed by the district and the corps;
   19         providing an implementation schedule for project
   20         sites; requiring the district, in partnership with the
   21         corps, to pursue expeditious implementation of certain
   22         wetland restoration projects; requiring the district
   23         to submit a report to the Legislature by a specified
   24         date; providing requirements for the report; providing
   25         a directive to the Division of Law Revision; providing
   26         an effective date.
   27          
   28  Be It Enacted by the Legislature of the State of Florida:
   29  
   30         Section 1. Section 373.4599, Florida Statutes, is created
   31  to read:
   32         373.4599 Water storage north of Lake Okeechobee.—
   33         (1)DEFINITIONS.—As used in this section, the term:
   34         (a)“Corps” means the United States Army Corps of
   35  Engineers.
   36         (b)“District” means the South Florida Water Management
   37  District.
   38         (c)“Lake Okeechobee Watershed Restoration Project” or
   39  “LOWRP” means the recommended plan contained within the Lake
   40  Okeechobee Watershed Restoration Project Final Integrated
   41  Project Implementation Report and Environmental Impact Statement
   42  dated August 2020 or as amended by the district and corps.
   43         (2)PROJECT IMPLEMENTATION REPORT.—Upon the effective date
   44  of this act, the district shall request that the corps seek
   45  congressional approval of a project implementation report for
   46  the LOWRP before passage of the Water Resources Development Act
   47  of 2022.
   48         (3)AGREEMENTS.—Immediately following congressional
   49  approval of the LOWRP, the district shall seek to execute with
   50  the corps a project partnership agreement for the LOWRP. The
   51  project partnership agreement must be consistent with this
   52  section.
   53         (4)PROJECT IMPLEMENTATION.
   54         (a)Projects, locations, or structures.—Projects,
   55  locations, or structures referred to in this subsection shall
   56  mean those described in the Lake Okeechobee Watershed
   57  Restoration Project Final Integrated Project Implementation
   58  Report and Environmental Impact Statement dated August 2020 or
   59  as amended by the district and the corps.
   60         (b)Aquifer storage and recovery.
   61         1.Expedition of the LOWRP.—The district, in partnership
   62  with the corps, shall expedite the development and
   63  implementation of the LOWRP aquifer storage and recovery wells.
   64  Implementation of this subsection must comply with all
   65  applicable federal and state laws and rules, including the
   66  department’s underground injection control program.
   67         2.Investigation and monitoring.—The district shall perform
   68  any necessary scientific investigation and monitoring
   69  concurrently with the implementation of the LOWRP aquifer
   70  storage and recovery wells. To ensure public health and safety,
   71  technical feasibility, and achievement of environmental
   72  benefits, implementation of the LOWRP aquifer storage and
   73  recovery wells must use a phased approach that confirms
   74  feasibility and site suitability and addresses uncertainties
   75  identified in the aquifer storage and recovery science plan
   76  developed by the district and the corps.
   77         3.Aquifer storage and recovery science plan.—The district
   78  shall expedite implementation of the aquifer storage and
   79  recovery science plan developed by the district and the corps.
   80         4.LOWRP watershed aquifer storage and recovery wells.
   81         a.For the Kissimmee River Basin site with the existing
   82  Kissimmee River Aquifer Storage and Recovery Pilot Project
   83  system, the district shall, by January 30, 2022, reactivate the
   84  existing aquifer storage and recovery system on the site,
   85  including any necessary testing. By March 30, 2027, the district
   86  shall ensure that all other feasible aquifer storage and
   87  recovery wells on the site are operational.
   88         b.For all remaining feasible cluster sites in the
   89  Kissimmee River Basin and Taylor Creek/Nubbin Slough Basin, the
   90  district shall, by August 1, 2021, construct or execute
   91  contracts for any necessary exploratory and monitoring wells on
   92  each site, in addition to any other necessary evaluations, to
   93  evaluate or confirm site suitability for well clusters. By March
   94  30, 2027, the district shall ensure that all feasible aquifer
   95  storage and recovery wells on those sites with suitable
   96  locations are operational.
   97         c.For all other feasible LOWRP watershed aquifer storage
   98  and recovery cluster sites not colocated with the wetland
   99  attenuation feature, the district shall, by December 31, 2022,
  100  for any other currently or subsequently proposed site for LOWRP
  101  watershed aquifer storage and recovery, execute contracts for
  102  the construction of any necessary exploratory and monitoring
  103  wells on each site, in addition to any other necessary
  104  evaluations, to evaluate site suitability for well clusters. By
  105  March 30, 2027, the district shall ensure that all feasible
  106  aquifer storage and recovery wells on those sites with suitable
  107  locations are operational.
  108         (c)Wetland restoration.—The district, in partnership with
  109  the corps, shall pursue expeditious implementation of the
  110  Paradise Run wetland restoration project and Kissimmee River
  111  Center wetland restoration project.
  112         (5)REPORT.By November 1, 2021, the district shall submit
  113  to the Legislature a report describing the district’s compliance
  114  with this section, including steps taken and any plans necessary
  115  for ongoing compliance. The report must include updates on
  116  congressional approval for the LOWRP project implementation
  117  report; the aquifer storage and recovery science plan; any
  118  scientific investigations; and designs, construction, and
  119  operations.
  120         Section 2. The Division of Law Revision is directed to
  121  replace the phrase “the effective date of this act” wherever it
  122  occurs in this act with the date this act becomes a law.
  123         Section 3. This act shall take effect upon becoming a law.

feedback