Bill Text: HI HB1419 | 2018 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Thirty-seventh Representative District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2017-11-30 - Carried over to 2018 Regular Session. [HB1419 Detail]

Download: Hawaii-2018-HB1419-Introduced.html

 

HOUSE OF REPRESENTATIVES

H.B. NO.

1419

TWENTY-NINTH LEGISLATURE, 2017

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING to CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE THIRTY-SEVENTH REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2017-2018:

     1.   To be expended by the department of education:

     A.   Highlands intermediate school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $300,000

          Construction                          $2,700,000

          Total funding                         $3,000,000

     B.   Kanoelani elementary school, Oahu

          Plans, design, and construction of a portable classroom with a fire lane and hydrant; ground and site improvements.

          Plans                                   $250,000

          Design                                  $250,000

          Construction                          $3,500,000

          Total funding                         $4,000,000

     C.   Kipapa elementary school, Oahu

          Design and construction to renovate the cafeteria stage.

          Design                                    $1,000

          Construction                             $35,000

          Total funding                            $36,000

     D.   Kipapa elementary school, Oahu

          Design and construction to upgrade the cafeteria stage lighting.

          Design                                    $1,000

          Construction                             $20,000

          Total funding                            $21,000

     E.   Kipapa elementary school, Oahu

          Construction to install air conditioning systems in buildings A, D, H, I, and L, and portable classrooms.

          Construction                          $1,000,000

          Total funding                         $1,000,000

     F.   Mililani high school, Oahu

          Design and construction to enclose building A's courtyard and extend building A at the school's entrance.

          Design                                    $1,000

          Construction                          $2,999,000

          Total funding                         $3,000,000

     G.   Mililani high school, Oahu

          Construction and equipment for improvements to the athletic field including replacing the wooden bleachers with aluminum bleachers; ground and site improvements; and equipment and appurtenances.

          Construction                          $1,100,000

          Equipment                               $100,000

          Total funding                         $1,200,000

     H.   Mililani high school, Oahu

          Construction for a new performing arts facility; ground and site improvements.

          Construction                         $12,000,000

          Total funding                        $12,000,000

     I.   Mililani Waena elementary school, Oahu

          Plans, design, and construction to widen the driveway between the main parking lot and the cafeteria parking lot to create a turnaround area; ground and site improvements.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                            $990,000

          Total funding                         $1,000,000

     J.   Mililani Waena elementary school, Oahu

          Plans, design, and construction for a covered walkway over the parking lot sidewalk; ground and site improvements.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                            $190,000

          Total funding                           $200,000

     K.   Mililani Waena elementary school, Oahu

          Plans, design, and construction for a covered walkway over the driveway sidewalk; ground and site improvements.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                            $190,000

          Total funding                           $200,000

     L.   Mililani Waena elementary school, Oahu

          Plans, design, and construction for a covered lanai between the administration and library buildings; ground and site improvements.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                            $340,000

          Total funding                           $350,000

     M.   Mililani Waena elementary school, Oahu

          Plans, design, and construction for a covered lanai between the library and cafeteria buildings; ground and site improvements.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                            $340,000

          Total funding                           $350,000

     N.   Mililani Waena elementary school, Oahu

          Plans, design, and construction of a second floor for the library.

          Plans                                     $5,000

          Design                                    $5,000

          Construction                          $4,990,000

          Total funding                         $5,000,000

     O.   Mililani Waena elementary school, Oahu

          Construction to install air conditioning systems in the remaining classrooms in building D.

          Construction                            $500,000

          Total funding                           $500,000

     P.   Pearl City high school, Oahu

          Design and construction to clear drains and improve drainage along the stadium access road.

          Design                                  $100,000

          Construction                            $900,000

          Total funding                         $1,000,000

     Q.   Pearl City high school, Oahu

          Plans, design, and construction for campus-wide electrical upgrades.

          Plans                                   $250,000

          Design                                  $250,000

          Construction                          $4,500,000

          Total funding                         $5,000,000

     R.   Pearl City high school, Oahu

          Plans, design, and construction to repave the KLM parking lot, cafeteria parking lot, and road to the band room.

          Plans                                   $100,000

          Design                                  $100,000

          Construction                          $1,800,000

          Total funding                         $2,000,000

     S.   Pearl City high school, Oahu

          Design and construction to replace the auditorium's downspouts and improve drainage.

          Design                                   $25,000

          Construction                             $75,000

          Total funding                           $100,000

     T.   Waipahu high school, Oahu

          Design and construction for a new classroom building; ground and site improvements.

          Design                                    $1,000

          Construction                         $14,999,000

          Total funding                        $15,000,000

     U.   Waipahu intermediate school, Oahu

          Design and construction for a new classroom building; ground and site improvements.

          Design                                    $1,000

          Construction                         $21,999,000

          Total funding                        $22,000,000

     V.   Waipahu intermediate school, Oahu

          Design and construction for additional multi-purpose play courts; ground and site improvements.

          Design                                    $1,000

          Construction                          $2,999,000

          Total funding                         $3,000,000

     W.   Waikele elementary school, Oahu

          Design and construction for a new building with six classrooms to accommodate the growing student body; ground and site improvements.

          Design                                    $5,000

          Construction                          $6,995,000

          Total funding                         $7,000,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  This Act shall take effect on July 1, 2017.

 

INTRODUCED BY:

_____________________________

 

 


 


Report Title:

CIP; 37th Representative District

 

Description:

Appropriates funds for capital improvement projects for the benefit of the 37th Representative District.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

 

feedback