Bill Text: HI HB1426 | 2018 | Regular Session | Introduced
Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-seventh Representative District.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2017-11-30 - Carried over to 2018 Regular Session. [HB1426 Detail]
Download: Hawaii-2018-HB1426-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
1426 |
TWENTY-NINTH LEGISLATURE, 2017 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
RELATING to CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE FORTY-SEVENTH REPRESENTATIVE DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2017-2018:
1. To be expended by the department of education:
A. Haleiwa elementary school, Oahu
Design and construction for grading, seeding or sodding, and irrigation of a grass field; ground and site improvements.
Design $25,000
Construction $225,000
Total funding $250,000
B. Hauula elementary school, Oahu
Design and construction for a security system including video cameras, alarms, and gates to control vehicle access; ground and site improvements.
Design $25,000
Construction $175,000
Total funding $200,000
C. Hauula elementary school, Oahu
Design and construction to install sun shades stretching from the cafeteria to the main office building; ground and site improvements.
Design $25,000
Construction $125,000
Total funding $150,000
D. Kaaawa elementary school, Oahu
Design and construction for a new administration building; ground and site improvements.
Design $250,000
Construction $3,250,000
Total funding $3,500,000
E. Kahuku elementary school, Oahu
Design and construction for lighting in the parking lot; ground and site improvements.
Design $50,000
Construction $250,000
Total funding $300,000
F. Kahuku high and intermediate school, Oahu
Design and construction for drainage improvements and flood mitigation; ground and site improvements.
Design $500,000
Construction $4,500,000
Total funding $5,000,000
G. Kahuku high and intermediate school, Oahu
Design and construction for school heat abatement; ground and site improvements.
Design $600,000
Construction $9,400,000
Total funding $10,000,000
H. Laie elementary school, Oahu
Design and construction for drainage improvements to building B's parking lot; ground and site improvements.
Design $50,000
Construction $225,000
Total funding $275,000
I. Laie elementary school, Oahu
Design and construction for Americans with Disabilities Act transition accessibility; ground and site improvements.
Design $25,000
Construction $350,000
Total funding $375,000
J. Laie elementary school, Oahu
Design and construction for school heat abatement; ground and site improvements.
Design $250,000
Construction $4,250,000
Total funding $4,500,000
K. Sunset Beach elementary school, Oahu
Design and construction of a sidewalk from one side of the portables to the other; ground and site improvements.
Design $25,000
Construction $150,000
Total funding $175,000
L. Sunset Beach elementary school, Oahu
Design and construction to repave and restripe the parking lot; ground and site improvements.
Design $25,000
Construction $450,000
Total funding $475,000
M. Sunset Beach elementary school, Oahu
Design and construction of two sets of stairs and a ramp leading from the campus to the park; ground and site improvements.
Design $25,000
Construction $275,000
Total funding $300,000
N. Waiahole elementary school, Oahu
Design, construction, and equipment for a portable for special education classes; ground and site improvements.
Design $88,000
Construction $600,000
Equipment $12,000
Total funding $700,000
O. Waiahole elementary school, Oahu
Design and construction for school heat abatement; ground and site improvements.
Design $470,000
Construction $4,980,000
Total funding $5,450,000
P. Waialua elementary school, Oahu
Design and construction for improvements to the library building; ground and site improvements.
Design $50,000
Construction $800,000
Total funding $850,000
Q. Waialua elementary school, Oahu
Design and construction for a covered walkway leading to the portable classrooms; ground and site improvements.
Design $50,000
Construction $350,000
Total funding $400,000
R. Waialua high and intermediate school, Oahu
Design and construction for an additional driveway and visitor parking lot; ground and site improvements.
Design $50,000
Construction $800,000
Total funding $850,000
S. Waialua high and intermediate school, Oahu
Design and construction of restrooms; ground and site improvements.
Design $100,000
Construction $1,200,000
Total funding $1,300,000
2. To be expended by the department of transportation:
A. Laniakea highway realignment, Oahu
Design and construction for the realignment of Kamehameha highway at Laniakea beach park; ground and site improvements.
Design $2,000,000
Construction $13,000,000
Total funding $15,000,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2017.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 47th Representative District
Description:
Appropriates funds for capital improvement projects for the benefit of the 47th Representative District.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.