Bill Text: HI HB2499 | 2010 | Regular Session | Introduced


Bill Title: CIP; 19TH Representative District

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced - Dead) 2010-01-27 - (H) Referred to FIN, referral sheet 7 [HB2499 Detail]

Download: Hawaii-2010-HB2499-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

2499

TWENTY-FIFTH LEGISLATURE, 2010

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the nineteenth representative district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $      or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2010-2011 for the purpose of capital improvement projects for the nineteenth representative district, as follows:

I.   To be expended by the Department of Education:

     A.   19th District Schools, Oahu

          (1)  Installation of photovoltaic panels in select                schools within the 19th representative district

     Plans                                              $5,000

     Design                                             $5,000

     Construction and equipment                        $90,000

     Total Funding                                    $100,000

          (2)  Installation of air conditioning or solar                ventilators

     Plans                                             $25,000

     Design                                            $25,000

     Construction and equipment                       $450,000

     Total Funding                                    $500,000

     B.   Kahala Elementary School, Oahu

(1)  Reroofing of all buildings except the administration, library, and cafeteria.

          Design                                       $50,000

          Construction                                $100,000

          Total Funding                               $150,000

(2)  Removal and replacement of K playground

Design                                        $7,500

Construction                                 $67,500

Total Funding                                $75,000

(3)  Reroofing of walkway between A building and

     cafeteria.

Design                                       $15,000

Construction                                $135,000

Total Funding                              $150,000

     C.   Kalani High School, Oahu

          (1)  Plans, design and construction for improvements               to athletic track; ground and site improvements;                equipment and appurtenances

     Plans                                           $30,000

Design                                           $300,000

     Construction                                   $3,770,000

     Total Funding                                  $4,100,000

(2)  Plans, design, construction, and equipment for   

girls locker room/shower building per Title IX

requirements; ground and site improvements;   equipment and appurtenances.

     Plans                                          $10,000

     Design                                          $600,000

     Construction                                  $7,490,000

     Equipment                                       $100,000

     Total Funding                                 $8,200,000

     D.   Liholiho Elementary School, Oahu

          (1)  Plans, design and construction for 8th Avenue                parking lot expansion

     Plans                                           $5,000

     Design                                        $15,000

     Construction                                    $125,000

     Total Funding                                   $145,000

          (2)  Plans, design, and construction for 3 lights for                the field area

     Plans and design                                 $35,000

     Equipment                                         $1,000

     Construction                                    $222,000

     Total Funding                                   $258,000

     E.   Queen Lili`uokalani Elementary School, Oahu

          (1)  Elevated walkway from administration                              building (Building E) to Building B for ADA                    compliance and to service special education pre-                         school.

     Planning                                          $5,000

     Design                                           $50,000

     Construction                                    $500,000

     Total Funding                                   $555,000

     F.  Waialae Elementary PCS, Oahu

          (1)  Classrooms for special education and special

              education preschool.

     Planning                                       $50,000

     Design                                        $150,000

     Construction                                  $800,000

     Total Funding                                 $1,000,000

II.  To be expended by the University of Hawaii, Manoa

     A.   Kapiolani Community College, Oahu

          (1)  Renovation of the chapel on the Kapiolani

              Community College Campus

     Plans                                           $25,000

     Design                                          $50,000

     Construction                                   $500,000

     Total Funding                                  $575,000

III. To be expended by the Hawaii Health Systems Corporation

     A.   Leahi Hospital, Oahu

          (1)  Renovate patient rooms to provide homelike

              atmosphere.

     Planning/Design                               $50,000

     Construction                                   $150,000

     Total Funding                                  $200,000

          (2)  Security renovations on each patient floor.

     Design                                          $50,000

     Construction                                   $250,000

     Total Funding                                  $300,000

          (2)  Renovate patient bathrooms.

     Design                                         $140,000

     Construction                                   $960,000

     Total Funding                                $1,100,000

 

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2012, shall lapse as of that date.

     SECTION 4.  This Act shall take effect on July 1, 2010.

 

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 19TH Representative District

 

Description:

Appropriates funds for capital improvement projects for the benefit of the 19TH representative district.

 

 

 