Bill Text: HI HB2681 | 2018 | Regular Session | Introduced
Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-seventh Representative District.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2018-01-29 - Referred to FIN, referral sheet 9 [HB2681 Detail]
Download: Hawaii-2018-HB2681-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
2681 |
TWENTY-NINTH LEGISLATURE, 2018 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE FORTY-SEVENTH REPRESENTATIVE DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2018-2019:
1. To be expended by the department of education:
A. Haleiwa elementary school, Oahu
Design and construction to irrigate the grass field.
Design $25,000
Construction $225,000
Total $250,000
B. Hauula elementary school, Oahu
Design and construction for a new security system.
Design $25,000
Construction $175,000
Total $200,000
C. Hauula elementary school, Oahu
Design and construction to install sun shades from the cafeteria to the main office building.
Design $25,000
Construction $125,000
Total $150,000
C. Kaaawa elementary school, Oahu
Design and construction to install air conditioning systems.
Design $250,000
Construction $3,250,000
Total $3,500,000
D. Kaaawa elementary school, Oahu
Design and construction for ADA transition accessibility.
Design $25,000
Construction $350,000
Total $375,000
E. Kahuku elementary school, Oahu
Design and construction to install lighting in the parking lot.
Design $50,000
Construction $250,000
Total $300,000
F. Kahuku high and intermediate school, Oahu
Design and construction to install new a track and field.
Design $500,000
Construction $4,500,000
Total $5,000,000
G. Kahuku high and intermediate school, Oahu
Design and construction for school heat abatement.
Design $250,000
Construction $9,750,000
Total $10,000,000
H. Laie elementary school, Oahu
Design and construction for ADA transition accessibility.
Design $25,000
Construction $350,000
Total $375,000
I. Laie elementary school, Oahu
Design and construction to install air conditioning systems.
Design $250,000
Construction $4,250,000
Total $4,500,000
J. Laie elementary school, Oahu
Design and construction for drainage improvements in the building B parking lot.
Design $50,000
Construction $225,000
Total $275,000
K. Laie elementary school, Oahu
Design and construction to install a handicap ramp for P5.
Design $10,000
Construction $40,000
Total $50,000
L. Sunset beach elementary school, Oahu
Design and construction to install a sidewalk from one side of the portable classrooms to the other.
Design $25,000
Construction $150,000
Total $175,000
M. Sunset beach elementary school, Oahu
Design and construction to repave and restripe the parking lot.
Design $25,000
Construction $450,000
Total $475,000
N. Waiahole elementary school, Oahu
Design and construction for a portable classroom for the special education classes.
Design $88,000
Construction $612,000
Total $700,000
O. Waiahole elementary school, Oahu
Design and construction for heat abatement.
Design $250,000
Construction $5,200,000
Total $5,450,000
P. Waialua elementary school, Oahu
Design and construction for library building improvements.
Design $50,000
Construction $800,000
Total $850,000
Q. Waialua elementary school, Oahu
Design and construction for a covered walkway leading to the portables.
Design $50,000
Construction $350,000
Total $400,000
R. Waialua high and intermediate school, Oahu
Design and construction to relocate the visitor parking area.
Design $2,000
Construction $748,000
Total $750,000
S. Waialua high and intermediate school, Oahu
Design and construction for a new mens and womens restroom at the football stadium.
Design $2,000
Construction $298,000
Total $300,000
T. Waialua high and intermediate school, Oahu
Design and construction for a STEM innovation center.
Design $650,000
Construction $350,000
Total $1,000,000
U. Waialua high and intermediate school, Oahu
Design and construction for a new rubber track for track and field, cross country, and physical education.
Design $2,000
Construction $998,000
Total $1,000,000
2. To be expended by the department of land and natural resources:
A. Kahana valley, Oahu
Design and construction for sewage improvements.
Design $25,000
Construction $275,000
Total funding $300,000
3. To be expended by the department of transportation:
A. Laniakea highway realignment, Oahu
Design and construction to realign Kamehameha highway at Laniakea beach park.
Design $3,000,000
Construction $27,000,000
Total funding $30,000,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2018.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 47th Representative District
Description:
Appropriates funds for capital improvement projects for the benefit of the 47th Representative District.
The summary description
of legislation appearing on this page is for informational purposes only and is
not legislation or evidence of legislative intent.