Bill Text: HI HB287 | 2024 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-fourth Representative District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2023-12-11 - Carried over to 2024 Regular Session. [HB287 Detail]

Download: Hawaii-2024-HB287-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

287

THIRTY-SECOND LEGISLATURE, 2023

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE Forty-fourth REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $42,292,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of capital improvement projects for the forty-fourth representative district, as follows:

1.   Maili elementary school

     Plans, design, and construction for renovation of the kindergarten restrooms consisting of twelve restrooms/stalls located in A-Building.

     Plans                           $25,000

     Design                          $25,000

     Construction                   $300,000

          Total funding                       $350,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

2.   Nānāikapono elementary school

     Construction for renovations to all of the boys' and girls' restrooms.

     Construction                    $30,000

          Total funding                        $30,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

3.   Nānāikapono elementary school

     Equipment and appurtenances for a small bus to pick up students without transportation to ensure equitable access to education.

     Equipment                      $115,000

          Total funding                       $115,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

4.   Nānāikapono elementary school

     Equipment and appurtenances for installation of four water bottle fill stations located in L-Building corridor (one station); A-Building (three stations--one in the administration wing; one in student support center; one in A-Building corridor).

     Equipment                       $12,000

          Total funding                        $12,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

5.   Nānāikapono elementary school

     Plans and equipment and appurtenances for landscaping for the front and back entrance, including a new sprinkler system for the campus.

     Plans                           $15,000

     Equipment                       $70,000

          Total funding                        $85,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

6.   Nānākuli elementary school

     Construction for exterior and interior painting of the school due to the age of the paint and wear and tear from the external elements such as wind, sea water, heat, and sun.

     Construction                 $1,000,000

          Total funding                     $1,000,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

7.   Nānākuli elementary school

     Equipment and appurtenances for installation of an irrigation system for the upper field.

     Equipment                      $500,000

          Total funding                       $500,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

8.   Nānākuli elementary school

     Equipment and appurtenances for upgrades to the lighting system for the cafeteria, office, and library.

     Equipment                      $200,000

          Total funding                       $200,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

9.   Nānākuli high and intermediate school

     Design, construction, and equipment and appurtenances for a performing arts center at Nānākuli high and intermediate school.

     Design                       $5,000,000

     Construction                $34,000,000

     Equipment                    $1,000,000

          Total funding                    $40,000,000

     The sum appropriated for this capital improvement project shall be expended by the department of education.

     SECTION 2.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date.

     SECTION 3.  This Act shall take effect on July 1, 2023.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; Forty-fourth Representative District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the forty-fourth representative district.

 

 

 