Bill Text: HI SB2725 | 2014 | Regular Session | Introduced
Bill Title: CIP; 7th Senatorial District ($)
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2014-01-21 - Referred to WAM. [SB2725 Detail]
Download: Hawaii-2014-SB2725-Introduced.html
THE SENATE |
S.B. NO. |
2725 |
|
||
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE seventh SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The seventh senatorial district encompasses the islands of Moloka‘i, Lāna‘i, and Kaho‘olawe, Hāna, east and upcountry Maui, and Kahului Airport. This is one of the "canoe" districts; as such, each island area has vastly different capital improvement project needs.
The purpose of this Act is to appropriate funds for capital improvement projects in the seventh senatorial district.
SECTION 2. The director of finance is authorized to issue general obligation bonds in the sum of $715,627,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2014-2015 for the purpose of capital improvement projects for the seventh senatorial district, as follows:
1. Kualapu‘u Elementary School, Moloka‘i
Design $1,000
Construction $2,749,000
Total funding $2,750,000
2. Kaunakakai Elementary School, Moloka‘i
A. Central air conditioning for classrooms and cafeteria
Design $400,000
Construction $5,500,000
Total funding $5,900,000
3. Upcountry Maui Watershed Improvements, Maui
Plans $50,000
Land $100,000
Design $200,000
Construction $2,650,000
Total funding $3,000,000
4. Moloka‘i Irrigation System Improvements, Moloka‘i
Plans $1,000
Design $199,000
Construction $1,800,000
Total funding $2,000,000
5. Lāna‘i Community Hospital, Lāna‘i
A. Elevator upgrade
Design $200,000
Construction $700,000
Equipment $600,000
Total funding $1,500,000
B. Facility repair
Design $200,000
Construction $1,500,000
Equipment $300,000
Total funding $2,000,000
C. Generator replacement
Design $10,000
Construction $39,000
Equipment $1,000
Total funding $50,000
6. Kula Hospital, Maui
A. Exterior building renovation
Design $200,000
Construction $2,300,000
Equipment $1,000,000
Total funding $3,500,000
B. Exterior building, room renovation
Design $200,000
Construction $481,000
Equipment $800,000
Total funding $1,481,000
C. Cesspools closure
Design $1,000
Construction $499,000
Equipment $500,000
Total funding $1,000,000
D. Asbestos & lead paint removal
Design $1,000
Construction $298,000
Equipment $1,000
Total funding $300,000
7. Hāna Harbor, Maui
Plans $1,000
Design $1,000
Construction $19,998,000
Total funding $20,000,000
8. Hāna Health Center
A. Expansion
Plans, design, equipment,
and construction $2,860,000
Total funding $2,860,000
B. Realignment of entrance
and parking lot $1,300,000
Total funding $1,300,000
C. Cesspool closure and septic tank system
Plans, design, and
construction $1,000,000
Total funding $1,000,000
9. Kahului Airport, Maui
A. Terminal improvements
Design $905,000
Construction $33,495,000
Total funding $34,400,000
B. Re-roof terminal buildings
Design $1,501,000
Construction $5,999,000
Total funding $7,500,000
C. Passenger information system
Construction $2,500,000
Total funding $2,500,000
D. Access road
Design $1,335,000
Construction $128,648,000
Total funding $129,983,000
E. Elevator & escalator
Design $1,005,000
Construction $12,925,000
Total funding $13,930,000
F. Fire sprinkler system
Design $400,000
Construction $4,000,000
Total funding $4,400,000
G. Replacement loading bridge
Construction $9,620,000
Total funding $9,620,000
H. Land acquisition
Land $85,500,000
Total funding $85,500,000
I. Parking lot expansion
Design $1,005,000
Construction $33,100,000
Total funding $34,105,000
J. Runway improvements
Construction $150,000,000
Total funding $150,000,000
K. Environmental impact statement
Plans $5,000,000
Total funding $5,000,000
10. Hāna Airport
Design $1,000,000
Construction $18,000,000
Total funding $19,000,000
11. Moloka‘i Airport, Moloka‘i
A. Electrical upgrades
Design $150,000
Total funding $150,000
12. Lāna‘i Airport, Lāna‘i
A. Runway safety area
Construction $35,111,000
Total funding $35,111,000
13. Maui State Highways, Maui
A. Kīhei-Upcountry Highway, Maui
Land $3,600,000
Design $5,762,000
Total funding $9,362,000
B. Kahului Airport access road
Design $500,000
Construction $73,525,000
Total funding $74,025,000
C. Hāna Highway rockfall mitigation
Plans $45,000
Design $735,000
Construction $12,632,000
Total funding $13,412,000
D. Hāna Highway improvements, Huelo to Hāna
Design $360,000
Construction $6,770,000
Total funding $7,130,000
E. Hāna Highway improvements, Uakea Road
Design $160,000
Construction $3,055,000
Total funding $3,215,000
F. Hāna Highway, drainage improvements, Maui
Design $80,000
Construction $1,200,000
Total funding $1,280,000
G. Hāna Highway improvements, milepost 28.1, Maui
Land $50,000
Design $105,000
Construction $675,000
Total funding $830,000
H. Hāna Highway Bridge preservation plan, Maui
Plans $1,600,000
Total funding $1,600,000
I. Hāna Highway, Kailua Stream Bridge, Maui
Design $600,000
Total funding $600,000
J. Hāna Highway, Puohokamoa Stream Bridge, Maui
Land $180,000
Design $730,000
Total funding $910,000
K. Hāna Highway, Kopiliula Stream Bridge
Land $235,000
Design $870,000
Total funding $1,105,000
L. Hāna Highway, Makanali Stream Bridge, Maui
Design $615,000
Total funding $615,000
M. Hāna Highway, Mokulehua Stream Bridge, Maui
Land $200,000
Design $800,000
Total funding $1,000,000
N. Hāna Highway, ‘Ula‘ino Stream Bridge, Maui
Land $195,000
Design $755,000
Total funding $950,000
O. Hāna Highway, guardrails, Maui
Design $1,000
Construction $3,999,000
Total funding $4,000,000
P. Haleakalā Highway, intersection improvements, Kula Highway, Maui
Construction $1,650,000
Total funding $1,650,000
Q. Haleakalā Highway, intersection improvements, Makawao Avenue, Maui
Land $1,000
Design $1,000
Construction $5,748,000
Total funding $5,750,000
14. Moloka‘i State Highways
A. Guardrail and shoulder improvements
Design $333,000
Construction $6,100,000
Total funding $6,433,000
B. Kamehameha V Highway, drainage improvements
Land $50,000
Design $40,000
Construction $900,000
Total funding $990,000
15. Kalaupapa Settlement Improvements, Moloka‘i
Design $1,000
Construction $929,000
Total funding $930,000
SECTION 3. The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2016, shall lapse as of that date.
SECTION 4. The sums appropriated for the respective capital improvement projects set forth in section 2 shall be expended for the purposes of this Act as follows:
(1) The sums appropriated in items 1 and 2 shall be expended by the department of education;
(2) The sums appropriated in item 3 shall be expended by the department of land and natural resources;
(3) The sum appropriated in item 4 shall be expended by the department of agriculture;
(4) The sums appropriated in items 5 and 6 shall be expended by the Hawaii health systems corporation;
(5) The sums appropriated in items 7, 9, 10, 11, 12, 13, and 14 shall be expended by the department of transportation; and
(6) The sums appropriated in items 8 and 15 shall be expended by the department of health.
SECTION 5. This Act shall take effect on July 1, 2014.
INTRODUCED BY: |
_____________________________ |
|
|
|
|
Report Title:
CIP; 7th Senatorial District
Description:
Appropriates funds for capital improvement projects in the 7th senatorial district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.