Bill Text: HI SB2725 | 2014 | Regular Session | Introduced


Bill Title: CIP; 7th Senatorial District ($)

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2014-01-21 - Referred to WAM. [SB2725 Detail]

Download: Hawaii-2014-SB2725-Introduced.html

THE SENATE

S.B. NO.

2725

TWENTY-SEVENTH LEGISLATURE, 2014

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE seventh SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The seventh senatorial district encompasses the islands of Molokai, Lānai, and Kahoolawe, Hāna, east and upcountry Maui, and Kahului Airport.  This is one of the "canoe" districts; as such, each island area has vastly different capital improvement project needs.

     The purpose of this Act is to appropriate funds for capital improvement projects in the seventh senatorial district.

     SECTION 2.  The director of finance is authorized to issue general obligation bonds in the sum of $715,627,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2014-2015 for the purpose of capital improvement projects for the seventh senatorial district, as follows:

1.   Kualapuu Elementary School, Molokai

          Design                          $1,000

          Construction                $2,749,000

          Total funding                              $2,750,000

2.   Kaunakakai Elementary School, Molokai

     A.   Central air conditioning for classrooms and cafeteria

          Design                        $400,000

          Construction                $5,500,000

          Total funding                              $5,900,000

3.   Upcountry Maui Watershed Improvements, Maui

          Plans                          $50,000

          Land                          $100,000

          Design                        $200,000

          Construction                $2,650,000

          Total funding                              $3,000,000

4.   Molokai Irrigation System Improvements, Molokai

          Plans                           $1,000

          Design                        $199,000

          Construction                $1,800,000

          Total funding                              $2,000,000

5.   Lānai Community Hospital, Lānai

     A.   Elevator upgrade

          Design                        $200,000

          Construction                  $700,000

          Equipment                     $600,000

          Total funding                              $1,500,000

     B.   Facility repair

          Design                        $200,000

          Construction                $1,500,000

          Equipment                     $300,000

          Total funding                              $2,000,000

     C.   Generator replacement

          Design                         $10,000

          Construction                   $39,000

          Equipment                       $1,000

          Total funding                                 $50,000

6.   Kula Hospital, Maui

     A.   Exterior building renovation

          Design                        $200,000

          Construction                $2,300,000

          Equipment                   $1,000,000

          Total funding                              $3,500,000

     B.   Exterior building, room renovation

          Design                        $200,000

          Construction                  $481,000

          Equipment                     $800,000

          Total funding                              $1,481,000

     C.   Cesspools closure

          Design                          $1,000

          Construction                  $499,000

          Equipment                     $500,000

          Total funding                              $1,000,000

     D.   Asbestos & lead paint removal

          Design                          $1,000

          Construction                  $298,000

          Equipment                       $1,000

          Total funding                                $300,000

7.   Hāna Harbor, Maui

          Plans                           $1,000

          Design                          $1,000

          Construction               $19,998,000

          Total funding                             $20,000,000

8.   Hāna Health Center

     A.   Expansion

          Plans, design, equipment,

            and construction          $2,860,000

          Total funding                              $2,860,000

     B.   Realignment of entrance

            and parking lot           $1,300,000

          Total funding                              $1,300,000

     C.   Cesspool closure and septic tank system

          Plans, design, and

            construction              $1,000,000

          Total funding                       $1,000,000

9.   Kahului Airport, Maui

     A.   Terminal improvements

          Design                        $905,000

          Construction               $33,495,000

          Total funding                             $34,400,000

     B.   Re-roof terminal buildings

          Design                      $1,501,000

          Construction                $5,999,000

          Total funding                              $7,500,000

     C.   Passenger information system

          Construction                $2,500,000

          Total funding                              $2,500,000

     D.   Access road

          Design                      $1,335,000

          Construction              $128,648,000

          Total funding                            $129,983,000

     E.   Elevator & escalator

          Design                      $1,005,000

          Construction               $12,925,000

          Total funding                             $13,930,000

     F.   Fire sprinkler system

          Design                        $400,000

          Construction                $4,000,000

          Total funding                              $4,400,000

     G.   Replacement loading bridge

          Construction                $9,620,000

          Total funding                              $9,620,000

     H.   Land acquisition

          Land                       $85,500,000

          Total funding                             $85,500,000

     I.   Parking lot expansion

          Design                      $1,005,000

          Construction               $33,100,000

          Total funding                             $34,105,000

     J.   Runway improvements

          Construction              $150,000,000

          Total funding                            $150,000,000

     K.   Environmental impact statement

          Plans                       $5,000,000

          Total funding                              $5,000,000

10.  Hāna Airport

          Design                      $1,000,000

          Construction               $18,000,000

          Total funding                             $19,000,000

11.  Molokai Airport, Molokai

     A.   Electrical upgrades

          Design                        $150,000

          Total funding                                $150,000

12.  Lānai Airport, Lānai

     A.   Runway safety area

          Construction               $35,111,000

          Total funding                             $35,111,000

13.  Maui State Highways, Maui

     A.   Kīhei-Upcountry Highway, Maui

          Land                        $3,600,000

          Design                      $5,762,000

          Total funding                              $9,362,000

     B.   Kahului Airport access road

          Design                        $500,000

          Construction               $73,525,000

          Total funding                             $74,025,000

     C.   Hāna Highway rockfall mitigation

          Plans                          $45,000

          Design                        $735,000

          Construction               $12,632,000

          Total funding                             $13,412,000

     D.   Hāna Highway improvements, Huelo to Hāna

          Design                        $360,000

          Construction                $6,770,000

          Total funding                              $7,130,000

     E.   Hāna Highway improvements, Uakea Road

          Design                        $160,000

          Construction                $3,055,000

          Total funding                              $3,215,000

     F.   Hāna Highway, drainage improvements, Maui

          Design                         $80,000

          Construction                $1,200,000

          Total funding                              $1,280,000

     G.   Hāna Highway improvements, milepost 28.1, Maui

          Land                           $50,000

          Design                        $105,000

          Construction                  $675,000

          Total funding                                $830,000

     H.   Hāna Highway Bridge preservation plan, Maui

          Plans                       $1,600,000

          Total funding                              $1,600,000

     I.   Hāna Highway, Kailua Stream Bridge, Maui

          Design                        $600,000

          Total funding                                $600,000

     J.   Hāna Highway, Puohokamoa Stream Bridge, Maui

          Land                          $180,000

          Design                        $730,000

          Total funding                                $910,000

     K.   Hāna Highway, Kopiliula Stream Bridge

          Land                          $235,000

          Design                        $870,000

          Total funding                              $1,105,000

     L.   Hāna Highway, Makanali Stream Bridge, Maui

          Design                        $615,000

          Total funding                                $615,000

     M.   Hāna Highway, Mokulehua Stream Bridge, Maui

          Land                          $200,000

          Design                        $800,000

          Total funding                              $1,000,000

     N.   Hāna Highway, Ulaino Stream Bridge, Maui

          Land                          $195,000

          Design                        $755,000

          Total funding                                $950,000

     O.   Hāna Highway, guardrails, Maui

          Design                          $1,000

          Construction                $3,999,000

          Total funding                              $4,000,000

     P.   Haleakalā Highway, intersection improvements, Kula Highway, Maui

          Construction                $1,650,000

          Total funding                              $1,650,000

     Q.   Haleakalā Highway, intersection improvements, Makawao Avenue, Maui

          Land                            $1,000

          Design                          $1,000

          Construction                $5,748,000

          Total funding                              $5,750,000

14.  Molokai State Highways

     A.   Guardrail and shoulder improvements

          Design                        $333,000

          Construction                $6,100,000

          Total funding                              $6,433,000

     B.   Kamehameha V Highway, drainage improvements

          Land                           $50,000

          Design                         $40,000

          Construction                  $900,000

          Total funding                                $990,000

15.  Kalaupapa Settlement Improvements, Molokai

          Design                          $1,000

          Construction                  $929,000

          Total funding                                $930,000

     SECTION 3.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2016, shall lapse as of that date.

     SECTION 4.  The sums appropriated for the respective capital improvement projects set forth in section 2 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items 1 and 2 shall be expended by the department of education;

     (2)  The sums appropriated in item 3 shall be expended by the department of land and natural resources;

     (3)  The sum appropriated in item 4 shall be expended by the department of agriculture;

     (4)  The sums appropriated in items 5 and 6 shall be expended by the Hawaii health systems corporation;

     (5)  The sums appropriated in items 7, 9, 10, 11, 12, 13, and 14 shall be expended by the department of transportation; and

     (6)  The sums appropriated in items 8 and 15 shall be expended by the department of health.

     SECTION 5.  This Act shall take effect on July 1, 2014.

 

INTRODUCED BY:

_____________________________

 

 

 

 


 


 

Report Title:

CIP; 7th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the 7th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback