THE SENATE

S.B. NO.

3169

THIRTIETH LEGISLATURE, 2020

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE third SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $171,917,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2020-2021 for the purpose of capital improvement projects for the third senatorial district, as follows:

1.   Ke Kula O Ehunuikaimalino

     A.   Land acquisition.

          Land                          $2,000,000

          Total funding                         $2,000,000

     B.   Plans, design, and construction for new portables or permanent classrooms for campus relocation; ground and site improvements; equipment and appurtenances.

          Plans                           $400,000

          Design                          $200,000

          Construction                  $2,400,000

          Total funding                         $3,000,000

2.   Ke Kula O Ehunuikaimalino

     A.   Design and construction for electrical system upgrades to cottages.

          Design                           $30,000

          Construction                    $180,000

          Total funding                           $210,000

     B.   Design and construction for fencing on north border.

          Design                           $10,000

          Construction                     $50,000

          Total funding                            $60,000

3.   Konawaena High School

     A.   Track and field improvements for synthetic field and replacement of synthetic track, including storage facility for field maintenance equipment, and consideration for track storage.

          Design                          $600,000

          Construction                  $5,500,000

          Total funding                         $6,100,000

     B.   Design and construction for campus wide repair and maintenance projects, including fixing soffits, renovating interiors, and replacing railings, dust collectors, downspouts, fences, exterior lights, and chill box floors.

          Design                          $131,000

          Construction                  $1,099,000

          Total funding                         $1,230,000

     C.   Equipment for school's agricultural program and six-acre farm, including a tractor, generator, lumber, stock panels, weed mats, and tools.

          Equipment                        $68,000

          Total funding                            $68,000

     D.   Plans, design, and construction for new physical education building.

          Plans                        $14,633,000

          Design                       $14,633,000

          Construction                 $14,634,000

          Total funding                        $43,900,000

     E.   Plans, design, construction, and equipment for conversion of football field's bulbs and ballasts to LED.

          Plans                            $20,000

          Design                           $20,000

          Construction                     $50,000

          Equipment                       $150,000

          Total funding                           $240,000

     F.   Plans, design, construction and equipment for renovation of nine restrooms.

          Plans                            $10,000

          Design                           $15,000

          Construction                    $625,000

          Equipment                        $70,000

          Total funding                                $720,000

     G.   Plans, design, construction, and equipment for replacement of athletic field, including field turf replacement, LED lights conversion.

          Plans                           $925,000

          Design                          $925,000

          Construction                    $925,000

          Equipment                       $925,000

          Total funding                         $3,700,000

4.   Naalehu Elementary School

     A.   Design and construction for repaving of sections of the campus.

          Design                           $75,000

          Construction                    $500,000

          Total funding                           $575,000

     B.   Design and construction for resurfacing the covered walkways.

          Design                           $20,000

          Construction                    $280,000

          Total funding                           $300,000

     C.   Plans, design and construction for new building.

          Plans                         $5,000,000

          Design                        $5,000,000

          Construction                  $5,000,000

          Total funding                        $15,000,000

5.   Hookena Elementary School

     A.   Construction of proper drainage near the north end of the campus by Mamalahoa Highway.

          Construction                     $22,000

          Total funding                            $22,000

     B.   Design and construction for campus repair and maintenance projects, including reroofing buildings, installation of walkways, and repainting.

          Design                           $45,000

          Construction                    $215,000

          Total funding                           $260,000

     C.   Plans, design, and construction for installation of two speed bumps or tables in front of the school on Mamalahoa highway.

          Plans                             $5,000

          Design                           $10,000

          Construction                     $40,000

          Total funding                            $55,000

     D.   Plans, design, and construction for upper campus drainage improvements.

          Plans                            $25,000

          Design                           $25,000

          Construction                     $25,000

          Total funding                            $75,000

     E.   Plans, design, and construction for a covered, multi-purpose structure.

          Plans                             $1,000

          Design                            $1,000

          Construction                     $60,000

          Total funding                            $62,000

6.   Holualoa Elementary School

     A.   Plan, design and construction to complete master plan phase 1.

          Improvements                 $26,200,000

          Total funding                        $26,200,000

7.   Honaunau Elementary School

     A.   Design and construction for replacement of sliding doors.

          Design                           $30,000

          Construction                    $150,000

          Total funding                           $180,000

     B.   Plans, design, and construction for campus repair and maintenance projects, including upgrade of electrical system, Americans with Disabilities Act compliance ramp, parking lot extension, removal of cafeteria dividers, fences and security screens, and replacement of railings.

          Plans                            $20,000

          Design                           $90,000

          Construction                    $460,000

          Total funding                           $570,000

     C.   Plans, design, and construction for installation of drainage systems to address erosion and mitigate surface water runoff.

          Plans                             $1,000

          Design                           $99,000

          Construction                    $900,000

          Total funding                         $1,000,000

     D.   Plans, design, and construction for upgrading and maintaining existing electrical infrastructure.

          Plans                             $1,000

          Design                           $89,000

          Construction                    $810,000

          Total funding                           $900,000

8.   Kahakai Elementary School

     A.   Access road safety improvements; extension of sidewalk to Royal Poinciana Drive.

          Improvements                    $325,000

          Total funding                           $325,000

9.   Kahakai Intermediate School

     A.   Design and construction for air conditioning system in classroom buildings F, G and H.

          Design and construction         $750,000

          Total funding                           $750,000

     B.   Design and construction of a sound system, including Americans with Disabilities Act hard of hearing listening devices for cafeteria and outdoor assembly area.

          Design and construction         $240,000

          Total funding                           $240,000

     C.   Design and construction for ceiling-mounted projectors, including Americans with Disabilities Act hard of hearing listening devices in all classroom buildings; equipment and appurtenances.

          Design and construction         $450,000

          Total funding                           $450,000

10.  Kealakehe High School

     A.   Design and construction for a performing arts center.

          Design and construction      $38,500,000

          Total funding                        $38,500,000

11.  Kona Pacific Public Charter School

     A.   Construction for building G classroom.

          Construction                    $340,000

          Total funding       $340,000

12.  Konawaena Elementary School

     A.   Design and construction for new whiteboards across campus.

          Design                           $20,000

          Construction                     $80,000

          Total funding                           $100,000

13.  Konawaena Middle School

     A.   Design and construction for campus repair and maintenance projects, including installation of power poles, stabilizing covered walkways, adding circuits, reroofing buildings, and constructing landings.

          Design                           $35,000

          Construction                    $380,000

          Total funding                           $415,000

     B.   Plans, design and construction for stabilization of F building.

          Plans                             $1,000

          Design                           $39,000

          Construction                    $360,000

          Total funding                           $400,000

     C.   Construction for campus electrical upgrades, including drop downs in the computer lab to adhere with fire codes.

          Construction                    $500,000

          Total funding                           $500,000

     D.   Design and construction for a solar exhaust system to keep portable building classrooms cool.

          Design                            $1,000

          Construction                     $79,000

          Total funding                            $80,000

     E.   Plans, design and construction for repaving parking lot.

          Plans                             $1,000

          Design                            $1,000

          Construction                    $288,000

          Total funding                           $290,000

14.  Kealakehe Wastewater Treatment Facility

     A.   Detailed survey on the recommendations to replace the existing force main collection.

          Survey                          $450,000

          Total funding                           $450,000

15.  Kealealani Building

     A.   Renovations and improvements to repurpose the space to be suitable for use as a residential treatment facility for individuals needing substance abuse or behavioral health treatment.

          Total funding                           $750,000

16.  Honokohau Harbor

     A.   Wastewater system

          Improvements                  $4,300,000

          Total funding                         $4,300,000

     B.   Fender repairs

          Repairs                       $3,300,000

          Total funding                         $3,300,000

     C.   Electrical system

          Improvements                  $5,000,000

          Total funding                         $5,000,000

     D.   Ground and site to complete phase 3.

          Improvements                  $2,800,000

          Total funding                         $2,800,000

17.  Hulihee Palace

     A.   Ground and site improvements.

          Improvements                  $2,500,000

          Total funding                         $2,500,000

18.  Kona Community Hospital

     A.   Replace cancer center building in Kona.

          Construction                  $1,500,000

          Total funding                         $1,500,000

     B.   Upgrades to mechanical, electrical and air conditioning units throughout the facility; ground and site improvements; and equipment and appurtenances.

          Improvements                  $2,000,000

          Total funding                         $2,000,000

19.  Natural Energy Laboratory of Hawaii Authority (NELHA)

     A.   Plan and design for the development of a non-potable water well to supply agricultural uses.

          Plan and design                 $500,000

          Total funding                           $500,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2022, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items (1) through (13) shall be expended by the department of education;

     (2)  The sums appropriated in items (14) and (15) shall be expended by the department of health;

     (3)  The sums appropriated in items (16) and (17) shall be expended by the department land and natural resources;

     (4)  The sums appropriated in item (18) shall be expended by the Hawaii health systems corporation; and

     (5)  The sum appropriated in item (19) shall be expended by the department of business, economic development and tourism.

     SECTION 4.  This Act shall take effect on July 1, 2020.

 

INTRODUCED BY:

_____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 


 

Report Title:

CIP; Third Senatorial District; Appropriations

 

Description:

Appropriates funds for capital improvement projects in the third senatorial district.

 

 

 