THIRTY-SECOND LEGISLATURE, 2024

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the nineteenth senatorial district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $275,165,589 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2024-2025 for the purpose of capital improvement projects for the nineteenth senatorial district, as follows:

1.   Pearl City High School

     A.   Construction of an integrated academy, multi-use facility shared between Pearl City high school and Momilani elementary school.

          Plans                         $2,500,000

          Construction                 $40,000,000

          Equipment                     $2,000,000

          Total funding                        $44,500,000

     B.   Resurfacing of tennis courts.

          Design                           $50,000

          Construction                    $600,000

          Total funding                           $650,000

     C.   Retrofitting and renovation of A/B, C/D, and KLM elevators.

          Plans                            $50,000

          Design                          $200,000

          Construction                  $1,000,000

          Equipment                       $100,000

          Total funding                         $1,350,000

     D.   Stadium lighting retrofit.

          Design                           $50,000

          Construction                    $300,000

          Equipment                       $150,000

          Total funding                           $500,000

2.   Honowai Elementary School

     A.   Design and construction of covered multi-purpose outdoor spaces for learning and dining.

          Design                          $125,000

          Construction                  $5,075,000

          Total funding                         $5,200,000

     B.   Oahu-Con.

          Total funding                           $403,300

3.   Waipahu Elementary School

     A.   Classroom air conditioning.

          Total funding                            $14,000

4.   East Kapolei High School

     A.   Plans for a new East Kapolei high school, ground and site improvements, equipment and appurtenances.

          Total funding                           $500,000

5.   Highlands Intermediate School

     A.   Oahu-Con.

          Total funding                         $3,283,085

6.   August Ahrens Elementary School

     A.   Design and construction for new classroom building, ground and site improvements, equipment and appurtenances.

          Total funding                        $22,540,000

     B.   Oahu-Con.

          Total funding                           $470,800

     C.   Design and construction for phase two of the whole school renovation and improvements, ground and site improvements, equipment and appurtenances.

          Total funding                         $1,089,000

7.   Waipahu High School

     A.   Construction for the integrated academy facility, renovations and relocation for the academic health center, ground and site improvements, equipment and appurtenances.

          Total funding                        $14,775,404

8.   James Campbell High School

     A.   Updates to locker rooms.

          Design                          $160,000

          Construction                  $7,940,000

          Total funding                         $8,100,000

9.   Ewa Elementary School

     A.   Construction of portables to absorb the overflow of Hoopili.

          Design                          $250,000

          Construction                  $2,500,000

          Total funding                         $2,750,000

10.  Kapolei High School

     A.   Design and construction of auditorium and performing arts building.

          Design                        $7,750,000

          Construction                 $47,250,000

          Total funding                        $55,000,000

     B.   Design and construction of an integrated academy, fourteen-classroom building.

          Design                       $10,000,000

          Construction                 $48,000,000

          Total funding                        $58,000,000

11.  Ilima Intermediate School

     A.   Renovation of shop classrooms.

          Design                          $450,000

          Construction                  $2,470,000

          Equipment                        $80,000

          Total funding                         $3,000,000

     B.   Installation of a safety security fence.

          Design                          $150,000

          Construction                    $850,000

          Total funding                         $1,000,000

12.  Holomua Elementary School

     A.   New three-story building.

          Design                        $7,050,000

          Construction                 $39,550,000

          Equipment                       $400,000

          Total funding                        $47,000,000

     B.   Parking lot expansion.

          Design                          $225,000

          Construction                  $1,275,000

          Total funding                         $1,500,000

13.  Pearl City Elementary

     A.   Replacement of campus waterlines.

          Plans                            $10,000

          Design                           $10,000

          Construction                  $2,500,000

          Equipment                        $20,000

          Total funding                         $2,540,000

14.  Department of Accounting and General Services

     A.   Connection of Waipahu district park to Waipahu town core.

          Planning and Design           $1,000,000

          Total funding                         $1,000,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2026, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items 1 through 13 shall be expended by the department of education; and

     (2)  The sum appropriated in item 14 shall be expended by the department of accounting and general services.

     SECTION 4.  This Act shall take effect on July 1, 2024.

 

INTRODUCED BY:

_____________________________

 

 


 


 


 

Report Title:

CIP; 19th Senatorial District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the 19th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.