1 | AMENDMENT TO HOUSE BILL 3146
| ||||||
2 | AMENDMENT NO. ______. Amend House Bill 3146 by replacing | ||||||
3 | line 20 on page 15 through line 25 of page 16 with the | ||||||
4 | following:
| ||||||
5 | "(t) A Notwithstanding any other provision of law, a | ||||||
6 | facility owner with siting approval from a county to construct | ||||||
7 | a commercial wind energy facility or a commercial solar energy | ||||||
8 | facility must reach an agreement with a drainage district | ||||||
9 | under the Illinois Drainage Code is authorized to cross or | ||||||
10 | impact a drainage system, including, but not limited to, | ||||||
11 | drainage tiles, open drainage districts, culverts, and water | ||||||
12 | gathering vaults, owned or under the control of a drainage | ||||||
13 | district . The under the Illinois Drainage Code without | ||||||
14 | obtaining prior agreement or approval from the drainage | ||||||
15 | district, except that the facility owner shall repair or pay | ||||||
16 | for the repair of all damage to the drainage system caused by | ||||||
17 | the construction of the commercial wind energy facility or the | ||||||
18 | commercial solar energy facility in accordance with the |
| |||||||
| |||||||
1 | agricultural impact mitigation agreement requirements for | ||||||
2 | repair of drainage. The facility owner shall also compensate | ||||||
3 | landowners within the drainage district for crop losses or | ||||||
4 | other agricultural damages resulting from damage to the | ||||||
5 | drainage system cause by the construction of the commercial | ||||||
6 | wind energy facility or the commercial solar energy facility | ||||||
7 | within a reasonable time after construction of the commercial | ||||||
8 | wind energy facility or the commercial solar energy facility | ||||||
9 | is complete .".
|