Bill Amendment: IL SB0584 | 2015-2016 | 99th General Assembly
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: STATE GOVERNMENT-TECH
Status: 2017-01-09 - Senate Floor Amendment No. 4 Be Approved for Consideration Assignments [SB0584 Detail]
Download: Illinois-2015-SB0584-Senate_Amendment_002.html
Bill Title: STATE GOVERNMENT-TECH
Status: 2017-01-09 - Senate Floor Amendment No. 4 Be Approved for Consideration Assignments [SB0584 Detail]
Download: Illinois-2015-SB0584-Senate_Amendment_002.html
| |||||||
| |||||||
| |||||||
1 | AMENDMENT TO SENATE BILL 584
| ||||||
2 | AMENDMENT NO. ______. Amend Senate Bill 584, AS AMENDED, | ||||||
3 | with reference to page and line numbers of Senate Amendment No. | ||||||
4 | 1, as follows:
| ||||||
5 | on page 7, line 15, by deleting "35-5, 35-30,"; and
| ||||||
6 | on page 7, line 17, by deleting "20-51,"; and
| ||||||
7 | on page 25, line 16, after " program. ", by inserting | ||||||
8 | " "Construction support" does not include construction-related | ||||||
9 | services. "; and
| ||||||
10 | on page 30, line 3, by replacing " 15 " with " 14 "; and
| ||||||
11 | on page 30, line 16, by replacing " 15-day " with " 14-day "; and
| ||||||
12 | on page 43, line 21, after " agency ", by inserting " as needs are |
| |||||||
| |||||||
1 | determined by the State agency "; and
| ||||||
2 | on page 43, line 22, after " pool ", by inserting " following the | ||||||
3 | procedures in this subsection (h) "; and
| ||||||
4 | on page 48, line 21, after " agency ", by inserting " as needs are | ||||||
5 | determined by the State agency "; and
| ||||||
6 | on page 48, line 22, after " pool ", by inserting " following the | ||||||
7 | procedures in this subsection (h) "; and
| ||||||
8 | on page 53, line 4, after " pool ", by inserting " following the | ||||||
9 | procedures in this subsection (h) "; and
| ||||||
10 | on page 53, line 15, after "Section.", by inserting " Any | ||||||
11 | procurement of construction not exceeding $100,000 may be made | ||||||
12 | by an alternative competitive source selection. The | ||||||
13 | construction agency shall establish rules for an alternative | ||||||
14 | competitive source selection process. This Section does not | ||||||
15 | apply to construction-related professional services contracts | ||||||
16 | awarded in accordance with the provisions of the Architectural, | ||||||
17 | Engineering, and Land Surveying Qualifications Based Selection | ||||||
18 | Act. "; and
| ||||||
19 | on page 57, lines 11 and 12, by deleting " or requiring the | ||||||
20 | purchasing agency to file "; and
|
| |||||||
| |||||||
1 | on page 58, line 19, after " proposal .", by inserting " This | ||||||
2 | Section shall not apply to construction contracts that are | ||||||
3 | subject to the requirements of Sections 30-20 and 33-10 of this | ||||||
4 | Code. The pre-qualification requirements of Sections 30-20 and | ||||||
5 | 33-10 of this Code shall include the requirement that the | ||||||
6 | bidder be registered with the Secretary of State. "; and
| ||||||
7 | by deleting line 21 on page 58 through line 26 on page 59; and
| ||||||
8 | on page 67, line 2, after " Board ", by inserting " or his or her | ||||||
9 | designee "; and
| ||||||
10 | by replacing line 19 on page 68 through line 9 on page 71 with | ||||||
11 | the following:
| ||||||
12 | "(30 ILCS 500/25-85 new) | ||||||
13 | Sec. 25-85. Best value procurement. | ||||||
14 | (a) This Section shall apply only to purchases of heavy | ||||||
15 | mobile fleet vehicles and off-road construction equipment | ||||||
16 | procured by or on behalf of: | ||||||
17 | (1) institutions of higher education; | ||||||
18 | (2) the Department of Agriculture; | ||||||
19 | (3) the Department of Transportation; and | ||||||
20 | (4) the Department of Natural Resources. | ||||||
21 | (b) As used in this Section, "best value procurement" means |
| |||||||
| |||||||
1 | a contract award determined by objective criteria related to | ||||||
2 | price, features, functions, and life-cycle costs that may | ||||||
3 | include the following: | ||||||
4 | (1) total cost of ownership, including warranty, under | ||||||
5 | which all repair costs are borne solely by the warranty | ||||||
6 | provider; repair costs; maintenance costs; fuel | ||||||
7 | consumption; and salvage value; | ||||||
8 | (2) product performance, productivity, and safety | ||||||
9 | standards; | ||||||
10 | (3) the supplier's ability to perform to the contract | ||||||
11 | requirements; and | ||||||
12 | (4) environmental benefits, including reduction of | ||||||
13 | greenhouse gas emissions, reduction of air pollutant | ||||||
14 | emissions, or reduction of toxic or hazardous materials. | ||||||
15 | (c) The department or institution may enter into a contract | ||||||
16 | for heavy mobile fleet vehicles and off-road construction | ||||||
17 | equipment for use by the department or institution by means of | ||||||
18 | best value procurement, using specifications and criteria | ||||||
19 | developed in consultation with the Chief Procurement Officer of | ||||||
20 | each designated department or institution and conducted in | ||||||
21 | accordance with Section 20-15 of this Code. | ||||||
22 | (d) In addition to disclosure of the minimum requirements | ||||||
23 | for qualification, the solicitation document shall specify | ||||||
24 | which business performance measures, in addition to price, | ||||||
25 | shall be given a weighted value. The solicitation shall include | ||||||
26 | a scoring method based on those factors and price in |
| |||||||
| |||||||
1 | determining the successful offeror. Any evaluation and scoring | ||||||
2 | method shall ensure substantial weight is given to the contract | ||||||
3 | price. | ||||||
4 | (e) Upon written request of any person who has submitted an | ||||||
5 | offer, notice of the award shall be posted in a public place in | ||||||
6 | the offices of the department or institution at least 24 hours | ||||||
7 | before executing the contract or purchase order. If, before | ||||||
8 | making an award, any offeror who has submitted a bid files a | ||||||
9 | protest with the department or institution against the awarding | ||||||
10 | of the contract or purchase order on the ground that his or her | ||||||
11 | offer should have been selected in accordance with the | ||||||
12 | selection criteria in the solicitation document, the contract | ||||||
13 | or purchase order shall not be awarded until either the protest | ||||||
14 | has been withdrawn or the appropriate Chief Procurement Officer | ||||||
15 | has made a final decision as to the action to be taken relative | ||||||
16 | to the protest. Within 10 days after filing a protest, the | ||||||
17 | protesting offeror shall file with the Chief Procurement | ||||||
18 | Officer a full and complete written statement specifying in | ||||||
19 | detail the ground of the protest and the facts in support | ||||||
20 | thereof. | ||||||
21 | (f) The total annual value of vehicles and equipment | ||||||
22 | purchased through best value procurement pursuant to this | ||||||
23 | Section shall be limited to $20,000,000 per each department of | ||||||
24 | institution. | ||||||
25 | (g) Best value procurement shall only be used on | ||||||
26 | procurements first solicited on or before June 30, 2019. |
| |||||||
| |||||||
1 | (h) On or before January 1, 2020, the Chief Procurement | ||||||
2 | Officer of each designated department or institution shall | ||||||
3 | prepare an evaluation of the best value procurement pilot | ||||||
4 | program authorized by this Section, including a recommendation | ||||||
5 | on whether or not the process should be continued. The | ||||||
6 | evaluation shall be posted in the applicable volume or volumes | ||||||
7 | of the Illinois Procurement Bulletin on or before January 1, | ||||||
8 | 2020. | ||||||
9 | (i) This Section is repealed on January 1, 2020. "; and
| ||||||
10 | by deleting line 10 on page 71 through line 2 on page 75; and
| ||||||
11 | on page 101, line 20, after " award ", by inserting " or prior to | ||||||
12 | bid opening for State contracts for construction or | ||||||
13 | construction-related services ".
|