Bill Text: IL HB0338 | 2009-2010 | 96th General Assembly | Enrolled
Bill Title: Amends the Illinois Renewable Fuels Development Program Act. Provides that a grant recipient must be constructing, modifying, altering, or retrofitting a plant that has annual production capacity of no less than 5,000,000 (now, 30,000,000) gallons of renewable fuel per year.
Spectrum: Moderate Partisan Bill (Democrat 5-1)
Status: (Passed) 2009-08-07 - Public Act . . . . . . . . . 96-0140 [HB0338 Detail]
Download: Illinois-2009-HB0338-Enrolled.html
|
|||||||
| |||||||
| |||||||
1 | AN ACT concerning renewable fuels.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Illinois Renewable Fuels Development | ||||||
5 | Program Act is amended by changing Section 15 as follows:
| ||||||
6 | (20 ILCS 689/15)
| ||||||
7 | Sec. 15. Illinois Renewable Fuels Development Program.
| ||||||
8 | (a) The Department must develop and administer the Illinois | ||||||
9 | Renewable Fuels
Development Program to assist in the | ||||||
10 | construction, modification, alteration, or
retrofitting of | ||||||
11 | renewable fuel plants in Illinois.
The recipient of a grant | ||||||
12 | under
this Section
must:
| ||||||
13 | (1) be constructing, modifying, altering, or | ||||||
14 | retrofitting a plant in the
State
of Illinois;
| ||||||
15 | (2) be constructing, modifying, altering, or | ||||||
16 | retrofitting a plant that has
annual production capacity of | ||||||
17 | no less than 5,000,000
30,000,000 gallons of renewable fuel
| ||||||
18 | per year; and
| ||||||
19 | (3) enter into a project labor agreement as prescribed | ||||||
20 | by Section 25 of
this
Act.
| ||||||
21 | (b) Grant applications must be made on forms provided by | ||||||
22 | and in accordance
with
procedures established by the | ||||||
23 | Department.
|
| |||||||
| |||||||
1 | (c) The Department must give preference to applicants that | ||||||
2 | use Illinois
agricultural products in the production of | ||||||
3 | renewable fuel at the plant for
which the
grant is being | ||||||
4 | requested.
| ||||||
5 | (Source: P.A. 93-15, eff. 6-11-03.)
|