Bill Text: IL HB1058 | 2025-2026 | 104th General Assembly | Introduced


Bill Title: Amends the Prevailing Wage Act. Provides that all penalties imposed shall be remitted to the Department of Labor and shall be used for the administration and enforcement of the Act.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced) 2025-01-09 - Referred to Rules Committee [HB1058 Detail]

Download: Illinois-2025-HB1058-Introduced.html

104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
HB1058

Introduced , by Rep. Dave Vella

SYNOPSIS AS INTRODUCED:
820 ILCS 130/11 from Ch. 48, par. 39s-11

Amends the Prevailing Wage Act. Provides that all penalties imposed shall be remitted to the Department of Labor and shall be used for the administration and enforcement of the Act.
LRB104 03158 SPS 13179 b

A BILL FOR

HB1058LRB104 03158 SPS 13179 b
1 AN ACT concerning employment.
2 Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
4 Section 5. The Prevailing Wage Act is amended by changing
5Section 11 as follows:
6 (820 ILCS 130/11) (from Ch. 48, par. 39s-11)
7 Sec. 11. No public works project shall be instituted
8unless the provisions of this Act have been complied with. The
9provisions of this Act shall not be applicable to Federal
10construction projects which require a prevailing wage
11determination by the United States Secretary of Labor. The
12Illinois Department of Labor represented by the Attorney
13General is empowered to sue for injunctive relief against the
14awarding of any contract or the continuation of work under any
15contract for public works at a time when the prevailing wage
16prerequisites have not been met. Any contract for public works
17awarded at a time when the prevailing wage prerequisites had
18not been met shall be void as against public policy and the
19contractor is prohibited from recovering any damages for the
20voiding of the contract or pursuant to the terms of the
21contract. The contractor is limited to a claim for amounts
22actually paid for labor and materials supplied to the public
23body. Where objections to a determination of the prevailing

HB1058- 2 -LRB104 03158 SPS 13179 b
1rate of wages or a court action relative thereto is pending,
2the public body shall not continue work on the project unless
3sufficient funds are available to pay increased wages if such
4are finally determined or unless the Department of Labor
5certifies such determination of the prevailing rate of wages
6as correct.
7 Any laborer, worker or mechanic employed by the contractor
8or by any sub-contractor under him who is paid for his services
9in a sum less than the prevailing rates for work done under
10such contract, shall have a right of action for whatever
11difference there may be between the amount so paid, and the
12rates provided by the contract together with costs and such
13reasonable attorney's fees as shall be allowed by the court.
14Such contractor or subcontractor shall also be liable to the
15Department of Labor for 20% of such underpayments and shall be
16additionally liable to the laborer, worker or mechanic for
17punitive damages in the amount of 2% of the amount of any such
18penalty to the State for underpayments for each month
19following the date of payment during which such underpayments
20remain unpaid. Where a second or subsequent action to recover
21underpayments is brought against a contractor or subcontractor
22and the contractor or subcontractor is found liable for
23underpayments to any laborer, worker, or mechanic, the
24contractor or subcontractor shall also be liable to the
25Department of Labor for 50% of the underpayments payable as a
26result of the second or subsequent action, and shall be