Bill Text: IL HB1563 | 2019-2020 | 101st General Assembly | Introduced
Bill Title: Amends the Illinois Municipal Code. Defines "underground" and "undergrounding". Provides that public utilities shall underground specified electric transmission lines under certain conditions. Provides that the Illinois Commerce Commission shall allow a public utility to recover from all retail customers in its service territory all reasonable and prudent costs that it incurs related to the undergrounding of such transmission lines. Provides that a public utility shall record and defer such costs as a regulatory asset to be included in the public utility's total rate base and amortized over a reasonable period that is equal to the expected life of such transmission line. Effective immediately.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2019-03-29 - Rule 19(a) / Re-referred to Rules Committee [HB1563 Detail]
Download: Illinois-2019-HB1563-Introduced.html
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
1 | AN ACT concerning local government.
| ||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||
4 | Section 5. The Illinois Municipal Code is amended by adding | ||||||||||||||||||||||||||
5 | Division 15.5 to Article 11 as follows:
| ||||||||||||||||||||||||||
6 | (65 ILCS 5/Art. 11 Div. 15.5 heading new) | ||||||||||||||||||||||||||
7 | DIVISION 15.5. UNDERGROUNDING UTILITY FACILITIES | ||||||||||||||||||||||||||
8 | (65 ILCS 5/11-15.5-5 new) | ||||||||||||||||||||||||||
9 | Sec. 11-15.5-5. Undergrounding utility facilities. | ||||||||||||||||||||||||||
10 | (a) As used in this Division and unless the context | ||||||||||||||||||||||||||
11 | requires otherwise, "underground" or "undergrounding" means | ||||||||||||||||||||||||||
12 | routing and constructing electric transmission lines and their | ||||||||||||||||||||||||||
13 | associated components below ground, consistent with sound | ||||||||||||||||||||||||||
14 | engineering and utility practices. | ||||||||||||||||||||||||||
15 | (b) In the interest of public health and safety, | ||||||||||||||||||||||||||
16 | reliability, and electric grid security, a public utility, as | ||||||||||||||||||||||||||
17 | defined by Section 3-105 of the Public Utilities Act, shall | ||||||||||||||||||||||||||
18 | underground any 138 kilowatt or greater electric transmission | ||||||||||||||||||||||||||
19 | line constructed after the effective date of this amendatory | ||||||||||||||||||||||||||
20 | Act of the 101st General Assembly where: | ||||||||||||||||||||||||||
21 | (1) such transmission line or any portion thereof is to | ||||||||||||||||||||||||||
22 | be located within 26,000 feet of an airport that is located |
| |||||||
| |||||||
1 | in and owned by a municipality with a population greater | ||||||
2 | than 70,000 and less than 80,000 located in or contiguous | ||||||
3 | to a county with a population in excess of 1,000,000 | ||||||
4 | inhabitants; or | ||||||
5 | (2) such transmission line is to be located in 4 or | ||||||
6 | more contiguous municipalities with a population density | ||||||
7 | of 1,000 per square mile or more as of the most recent | ||||||
8 | federal decennial census. | ||||||
9 | (c) The costs for undergrounding a new transmission line | ||||||
10 | shall not be allocated solely to the municipality or | ||||||
11 | municipalities in which it is underground; instead, the | ||||||
12 | Illinois Commerce Commission shall allow a public utility to | ||||||
13 | fully recover from all retail customers in its service | ||||||
14 | territory all reasonable and prudent costs that it incurs | ||||||
15 | related to the undergrounding of transmission lines. The public | ||||||
16 | utility shall record and defer such costs as a regulatory asset | ||||||
17 | to be included in the public utility's total rate base and | ||||||
18 | amortized over a reasonable period that is equal to the | ||||||
19 | expected life of the transmission line. Such regulatory assets | ||||||
20 | shall be collected from all ratepayers system-wide, and not | ||||||
21 | only from ratepayers in the corporate limits of the | ||||||
22 | municipality or municipalities within which the transmission | ||||||
23 | line is constructed.
| ||||||
24 | Section 99. Effective date. This Act takes effect upon | ||||||
25 | becoming law.
|