Bill Text: IL HB2721 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Amends the Public Utilities Act. In provisions concerning water and sewer surcharges, removes language allowing the Illinois Commerce Commission to authorize a water or sewer utility to file a surcharge which adjusts rates and charges to provide for recovery of costs associated with an investment in qualifying infrastructure plant. Makes a corresponding change.
Spectrum: Partisan Bill (Democrat 4-0)
Status: (Introduced) 2023-07-17 - Added Co-Sponsor Rep. Diane Blair-Sherlock [HB2721 Detail]
Download: Illinois-2023-HB2721-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning regulation.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Public Utilities Act is amended by changing | |||||||||||||||||||
5 | Section 9-220.2 as follows:
| |||||||||||||||||||
6 | (220 ILCS 5/9-220.2)
| |||||||||||||||||||
7 | Sec. 9-220.2. Water and sewer surcharges authorized.
| |||||||||||||||||||
8 | (a) The Commission may authorize a water or sewer utility | |||||||||||||||||||
9 | to file a
surcharge which adjusts rates and charges to provide | |||||||||||||||||||
10 | for recovery of (i) the
cost of purchased water, (ii) the cost | |||||||||||||||||||
11 | of purchased sewage treatment service,
or (iii) other costs | |||||||||||||||||||
12 | which fluctuate for reasons beyond the utility's control or
| |||||||||||||||||||
13 | are difficult to predict , or (iv) costs associated with an | |||||||||||||||||||
14 | investment in
qualifying infrastructure plant, independent of | |||||||||||||||||||
15 | any other matters related to
the utility's revenue | |||||||||||||||||||
16 | requirement. A surcharge approved under this Section can
| |||||||||||||||||||
17 | operate on an historical or a prospective basis.
| |||||||||||||||||||
18 | (b) (Blank). For purposes of this Section, "costs | |||||||||||||||||||
19 | associated with an investment in
qualifying infrastructure | |||||||||||||||||||
20 | plant" include a return on the investment in and
depreciation | |||||||||||||||||||
21 | expense related to plant items or facilities (including, but | |||||||||||||||||||
22 | not
limited to, replacement mains, meters, services, and | |||||||||||||||||||
23 | hydrants) which (i) are
not reflected in the rate base used to |
| |||||||
| |||||||
1 | establish the utility's base rates and
(ii) are non-revenue | ||||||
2 | producing. For purposes
of this Section, a "non-revenue | ||||||
3 | producing facility" is one that is not
constructed or | ||||||
4 | installed for the purpose of serving a new customer.
| ||||||
5 | (c) On a periodic basis, the Commission shall initiate | ||||||
6 | hearings to reconcile
amounts collected under each surcharge | ||||||
7 | authorized pursuant to this Section with
the actual prudently | ||||||
8 | incurred costs recoverable for each annual period during
which | ||||||
9 | the surcharge was in effect.
| ||||||
10 | (Source: P.A. 91-638, eff. 1-1-00.)
|