Bill Text: IL HB2756 | 2017-2018 | 100th General Assembly | Engrossed
Bill Title: Amends the Counties Code. Changes the application of provisions concerning allowing management and mitigation of the effects of urbanization on stormwater drainage in metropolitan counties located in the area served by the Northeastern Illinois Planning Commission to those located in the area served by the Chicago Metropolitan Agency for Planning. Authorizes all counties (currently, only specified counties) to adopt stormwater management plans. Provides that counties' minimum standards for floodplain and stormwater management should have an emphasis on the use of cost effective, nature-based solutions and provides examples of such solutions. Provides that the stormwater management plans shall evaluate water quality and flooding problems caused by urban flooding. Defines "urban flooding" as the flooding of public and private land in urban areas that results from stormwater or snowmelt runoff overwhelming the existing drainage infrastructure, unrelated to the overflow of any river or lake, whether or not that land is located in or near a floodplain. Provides that a stormwater management planning committee may make grants to units of local government and landowners under specified conditions.
Spectrum: Slight Partisan Bill (Democrat 5-2)
Status: (Failed) 2019-01-08 - Session Sine Die [HB2756 Detail]
Download: Illinois-2017-HB2756-Engrossed.html
| |||||||
| |||||||
| |||||||
1 | AN ACT concerning local government.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Counties Code is amended by changing | ||||||
5 | Sections 5-1062, 5-1062.2, and 5-1062.3 as follows:
| ||||||
6 | (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
| ||||||
7 | Sec. 5-1062. Stormwater management.
| ||||||
8 | (a) The purpose of this Section is to allow management and | ||||||
9 | mitigation of the
effects of urbanization on stormwater | ||||||
10 | drainage in metropolitan counties located
in the area served by | ||||||
11 | the Chicago Metropolitan Agency for Planning Northeastern | ||||||
12 | Illinois Planning Commission , and
references to "county" in | ||||||
13 | this Section shall apply only to those counties.
This Section | ||||||
14 | shall not apply to any county with a population in excess of
| ||||||
15 | 1,500,000, except as provided in subsection (c). The purpose of | ||||||
16 | this Section
shall be achieved by:
| ||||||
17 | (1) consolidating the existing stormwater management | ||||||
18 | framework into a
united, countywide structure;
| ||||||
19 | (2) setting minimum standards for floodplain and | ||||||
20 | stormwater management with an emphasis on the use of | ||||||
21 | cost-effective, nature-based solutions to flooding | ||||||
22 | problems, including, but not limited to, solutions that | ||||||
23 | restore or enhance the natural hydrologic cycle by |
| |||||||
| |||||||
1 | increasing infiltration, evapotranspiration, and the | ||||||
2 | collection of runoff for reuse as appropriate considering | ||||||
3 | the local conditions that as a byproduct also results in | ||||||
4 | improved water conditions ;
and
| ||||||
5 | (3) preparing a countywide plan for the management of | ||||||
6 | stormwater runoff,
including the management of natural and | ||||||
7 | man-made drainageways. The countywide
plan may incorporate | ||||||
8 | watershed plans and shall evaluate and address flooding | ||||||
9 | problems that exist in urbanized areas that are a result of | ||||||
10 | urban flooding .
| ||||||
11 | (b) A stormwater management planning committee shall be | ||||||
12 | established by
county board resolution, with its membership | ||||||
13 | consisting of equal numbers of
county board and municipal | ||||||
14 | representatives from each county board
district, and such other | ||||||
15 | members as may be determined by the county and
municipal | ||||||
16 | members. However, if the county has more than 6 county board
| ||||||
17 | districts, the county board may by ordinance divide the county | ||||||
18 | into not
less than 6 areas of approximately equal population, | ||||||
19 | to be used instead of
county board districts for the purpose of | ||||||
20 | determining representation on the
stormwater management | ||||||
21 | planning committee.
| ||||||
22 | The county board members shall be appointed by the chairman | ||||||
23 | of the county
board. Municipal members from each county board | ||||||
24 | district or other
represented area shall be appointed by a | ||||||
25 | majority vote of the mayors of
those municipalities which have | ||||||
26 | the greatest percentage of their respective
populations |
| |||||||
| |||||||
1 | residing in such county board district or other represented
| ||||||
2 | area. All municipal and county board representatives shall be | ||||||
3 | entitled
to a vote; the other members shall be nonvoting | ||||||
4 | members, unless authorized
to vote by the unanimous consent of | ||||||
5 | the municipal and county board
representatives. A municipality | ||||||
6 | that is located in more than one county may
choose, at the time | ||||||
7 | of formation of the stormwater management planning
committee | ||||||
8 | and based on watershed boundaries, to participate in the
| ||||||
9 | stormwater management planning program of either or both of the | ||||||
10 | counties.
Subcommittees of the stormwater management planning | ||||||
11 | committee may be
established to serve a portion of the county | ||||||
12 | or a particular drainage basin
that has similar stormwater | ||||||
13 | management needs. The stormwater management
planning committee | ||||||
14 | shall adopt by-laws, by a majority vote of the county and
| ||||||
15 | municipal members, to govern the functions of the committee and | ||||||
16 | its
subcommittees. Officers of the committee shall include a | ||||||
17 | chair and vice chair,
one of whom shall be a county | ||||||
18 | representative and one a municipal
representative.
| ||||||
19 | The principal duties of the committee shall be to develop a | ||||||
20 | stormwater
management plan for presentation to and approval by | ||||||
21 | the county board, and
to direct the plan's implementation and | ||||||
22 | revision. The committee may retain
engineering, legal and | ||||||
23 | financial advisors and inspection personnel. The
committee | ||||||
24 | shall meet at least quarterly and shall hold at least one | ||||||
25 | public
meeting during the preparation of the plan and prior to | ||||||
26 | its submittal to the
county board. The committee may make |
| |||||||
| |||||||
1 | grants to: (1) units of local government; (2) not-for-profit | ||||||
2 | organizations; and (3) landowners. In order for a municipality | ||||||
3 | located partially or wholly within a mapped floodplain to | ||||||
4 | receive grant moneys, the municipality must be a member in the | ||||||
5 | Federal Emergency Management Agency's National Flood Insurance | ||||||
6 | Program. A municipality receiving grant moneys must have | ||||||
7 | adopted an ordinance requiring actions consistent with the | ||||||
8 | stormwater management plan. Use of the grant moneys must be | ||||||
9 | consistent with the stormwater management plan.
| ||||||
10 | (c) In the preparation of a stormwater management plan, a | ||||||
11 | county
stormwater management planning committee shall | ||||||
12 | coordinate the planning
process with each adjoining county to | ||||||
13 | ensure that recommended stormwater
projects will have no | ||||||
14 | significant impact on the levels or flows of
stormwaters in | ||||||
15 | inter-county watersheds or on the capacity of existing and
| ||||||
16 | planned stormwater retention facilities. An adopted stormwater | ||||||
17 | management
plan shall identify steps taken by the county to | ||||||
18 | coordinate the development
of plan recommendations with | ||||||
19 | adjoining counties.
| ||||||
20 | (d) (Blank).
| ||||||
21 | (e) Prior to recommending the plan to the county board, the | ||||||
22 | stormwater
management planning committee shall hold at least | ||||||
23 | one public hearing thereon
and shall afford interested persons | ||||||
24 | an opportunity to be heard. The hearing
shall be held in the | ||||||
25 | county seat. Notice of the hearing shall be published at
least | ||||||
26 | once no less than 15 days in advance thereof in a newspaper of |
| |||||||
| |||||||
1 | general
circulation published in the county. The notice shall | ||||||
2 | state the time and place
of the hearing and the place where | ||||||
3 | copies of the proposed plan will be
accessible for examination | ||||||
4 | by interested parties. If an affected municipality
having a | ||||||
5 | stormwater management plan adopted by ordinance wishes to | ||||||
6 | protest the
proposed county plan provisions, it shall appear at | ||||||
7 | the hearing and submit in
writing specific proposals to the | ||||||
8 | stormwater management planning committee.
After consideration | ||||||
9 | of the matters raised at the hearing, the committee may
amend | ||||||
10 | or approve the plan and recommend it to the county board for | ||||||
11 | adoption.
| ||||||
12 | The county board may enact the proposed plan by ordinance. | ||||||
13 | If the
proposals for modification of the plan made by an | ||||||
14 | affected municipality having
a stormwater management plan are | ||||||
15 | not included in the proposed county plan,
and the municipality | ||||||
16 | affected by the plan opposes adoption of the county
plan by | ||||||
17 | resolution of its corporate authorities, approval of
the county | ||||||
18 | plan shall require an affirmative vote of at least two-thirds | ||||||
19 | of the
county board members present and voting. If the county | ||||||
20 | board wishes to
amend the county plan, it shall submit in | ||||||
21 | writing specific proposals to the
stormwater management | ||||||
22 | planning committee. If the proposals are not
approved by the | ||||||
23 | committee, or are opposed by resolution of the corporate
| ||||||
24 | authorities of an affected municipality having a municipal | ||||||
25 | stormwater
management plan, amendment of the plan shall require | ||||||
26 | an affirmative vote of
at least two-thirds of the county board |
| |||||||
| |||||||
1 | members present and voting.
| ||||||
2 | (f) The county board may prescribe by ordinance reasonable | ||||||
3 | rules and
regulations for floodplain or stormwater management | ||||||
4 | and for governing the location,
width, course and release rate | ||||||
5 | of all stormwater runoff channels, streams
and basins in the | ||||||
6 | county, in accordance with the adopted stormwater
management | ||||||
7 | plan. These rules and regulations shall, at a minimum, meet
the | ||||||
8 | standards for floodplain management established by the Office | ||||||
9 | of Water Resources and
the requirements of the Federal | ||||||
10 | Emergency Management Agency for participation
in the National | ||||||
11 | Flood Insurance Program.
| ||||||
12 | (g) In accordance with, and if recommended in, the adopted | ||||||
13 | stormwater
management plan, the county board may adopt a | ||||||
14 | schedule of fees
as may be necessary to mitigate the effects of | ||||||
15 | increased stormwater runoff
resulting from new development. | ||||||
16 | The fees shall not exceed the cost of
satisfying the onsite | ||||||
17 | stormwater retention or detention requirements of the
adopted | ||||||
18 | stormwater management plan. The fees shall be used to finance
| ||||||
19 | activities undertaken by the county or its included | ||||||
20 | municipalities to
mitigate the effects of urban stormwater | ||||||
21 | runoff by providing regional
stormwater retention or detention | ||||||
22 | facilities, as identified in the county
plan. All such fees | ||||||
23 | collected by the county shall be held in a separate fund,
and | ||||||
24 | shall be expended only in the watershed within which they were | ||||||
25 | collected.
| ||||||
26 | (h) For the purpose of implementing this Section and for |
| |||||||
| |||||||
1 | the
development, design, planning, construction, operation and | ||||||
2 | maintenance of
stormwater facilities provided for in the | ||||||
3 | stormwater management plan, a
county board that has established | ||||||
4 | a stormwater management planning
committee pursuant to this | ||||||
5 | Section may cause an annual tax of not to exceed
0.20% of the | ||||||
6 | value, as equalized or assessed by the Department of Revenue,
| ||||||
7 | of all taxable property in the county to be levied upon all the | ||||||
8 | taxable
property in the county. The tax shall be in addition to | ||||||
9 | all other taxes
authorized by law to be levied and collected in | ||||||
10 | the county and shall be in
addition to the maximum tax rate | ||||||
11 | authorized by law for general county
purposes. The 0.20% | ||||||
12 | limitation provided in this Section may be increased
or | ||||||
13 | decreased by referendum in accordance with the provisions of | ||||||
14 | Sections
18-120, 18-125, and 18-130 of the Property Tax Code.
| ||||||
15 | Any revenues generated as a result of ownership or | ||||||
16 | operation of facilities
or land acquired with the tax funds | ||||||
17 | collected pursuant to this subsection
(h) shall be held in a | ||||||
18 | separate fund and be used either to abate such
property tax or | ||||||
19 | for implementing this Section.
| ||||||
20 | However, unless at least part of the county has been | ||||||
21 | declared after
July 1, 1986 by presidential proclamation to be | ||||||
22 | a disaster area as a result
of flooding, the tax authorized by | ||||||
23 | this subsection (h) shall not be levied
until the question of | ||||||
24 | its adoption, either for a specified period or
indefinitely, | ||||||
25 | has been submitted to the electors thereof and approved by a
| ||||||
26 | majority of those voting on the question. This question may be |
| |||||||
| |||||||
1 | submitted
at any election held in the county after the adoption | ||||||
2 | of a resolution by
the county board providing for the | ||||||
3 | submission of the question to the
electors of the county. The | ||||||
4 | county board shall certify the resolution and
proposition to | ||||||
5 | the proper election officials, who shall submit the
proposition | ||||||
6 | at an election in accordance with the general election law. If
| ||||||
7 | a majority of the votes cast on the question is in favor of the | ||||||
8 | levy of
the tax, it may thereafter be levied in the county for | ||||||
9 | the specified
period or indefinitely, as provided in the | ||||||
10 | proposition. The question shall
be put in substantially the | ||||||
11 | following form:
| ||||||
12 | -------------------------------------------------------------
| ||||||
13 | Shall an annual tax be levied
| ||||||
14 | for stormwater management purposes YES
| ||||||
15 | (for a period of not more than
| ||||||
16 | ...... years) at a rate not exceeding ------------------
| ||||||
17 | .....% of the equalized assessed
| ||||||
18 | value of the taxable property of NO
| ||||||
19 | ........ County?
| ||||||
20 | -------------------------------------------------------------
| ||||||
21 | (i) Upon the creation and implementation of a county | ||||||
22 | stormwater management
plan, the county may petition the circuit | ||||||
23 | court to dissolve any or all drainage
districts created | ||||||
24 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
25 | which are located entirely within the area of the county | ||||||
26 | covered by the plan.
|
| |||||||
| |||||||
1 | However, any active drainage district implementing a plan | ||||||
2 | that is
consistent with and at least as stringent as the county | ||||||
3 | stormwater
management plan may petition the stormwater | ||||||
4 | management planning committee
for exception from dissolution. | ||||||
5 | Upon filing of the petition, the committee
shall set a date for | ||||||
6 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
7 | filing thereof, and the committee shall give at least one | ||||||
8 | week's
notice of the hearing in one or more newspapers of | ||||||
9 | general circulation
within the district, and in addition shall | ||||||
10 | cause a copy of the notice to be
personally served upon each of | ||||||
11 | the trustees of the district. At the
hearing, the committee | ||||||
12 | shall hear the district's petition and allow the
district | ||||||
13 | trustees and any interested parties an opportunity to present | ||||||
14 | oral
and written evidence. The committee shall render its | ||||||
15 | decision upon the
petition for exception from dissolution based | ||||||
16 | upon the best interests of
the residents of the district. In | ||||||
17 | the event that the exception is not
allowed, the district may | ||||||
18 | file a petition within 30 days of the decision
with the circuit | ||||||
19 | court. In that case, the notice and hearing requirements
for | ||||||
20 | the court shall be the same as herein provided for the | ||||||
21 | committee.
The court shall likewise render its decision of | ||||||
22 | whether to dissolve the
district based upon the best interests | ||||||
23 | of residents of the district.
| ||||||
24 | The dissolution of any drainage district shall not affect | ||||||
25 | the obligation
of any bonds issued or contracts entered into by | ||||||
26 | the district nor
invalidate the levy, extension or collection |
| |||||||
| |||||||
1 | of any taxes or special
assessments upon the property in the | ||||||
2 | former drainage district. All property
and obligations of the | ||||||
3 | former drainage district shall be assumed and
managed by the | ||||||
4 | county, and the debts of the former drainage district shall
be | ||||||
5 | discharged as soon as practicable.
| ||||||
6 | If a drainage district lies only partly within a county | ||||||
7 | that adopts a
county stormwater management plan, the county may | ||||||
8 | petition the circuit
court to disconnect from the drainage | ||||||
9 | district that portion of the district
that lies within that | ||||||
10 | county. The property of the drainage district within the
| ||||||
11 | disconnected area shall be assumed and managed by the county. | ||||||
12 | The county shall
also assume a portion of the drainage | ||||||
13 | district's debt at the time of
disconnection, based on the | ||||||
14 | portion of the value of the taxable property of the
drainage | ||||||
15 | district which is located within the area being disconnected.
| ||||||
16 | The operations of any drainage district that continues to | ||||||
17 | exist in a
county that has adopted a stormwater management plan | ||||||
18 | in accordance with
this Section shall be in accordance with the | ||||||
19 | adopted plan.
| ||||||
20 | (j) Any county that has adopted a county stormwater | ||||||
21 | management plan
under this Section may, after 10 days written | ||||||
22 | notice to the owner or
occupant, enter upon any lands or waters | ||||||
23 | within the county for the purpose
of inspecting stormwater | ||||||
24 | facilities or causing the removal of any
obstruction to an | ||||||
25 | affected watercourse. The county shall be responsible
for any | ||||||
26 | damages occasioned thereby.
|
| |||||||
| |||||||
1 | (k) Upon petition of the municipality, and based on a | ||||||
2 | finding of the
stormwater management planning committee, the | ||||||
3 | county shall not enforce
rules and regulations adopted by the | ||||||
4 | county in any municipality located
wholly or partly within the | ||||||
5 | county that has a municipal stormwater
management ordinance | ||||||
6 | that is consistent with and at least as stringent as
the county | ||||||
7 | plan and ordinance, and is being enforced by the municipal
| ||||||
8 | authorities.
| ||||||
9 | (l) A county may issue general obligation bonds for | ||||||
10 | implementing any
stormwater plan adopted under this Section in | ||||||
11 | the manner prescribed in
Section 5-1012; except that the | ||||||
12 | referendum requirement of Section 5-1012 shall
not apply to | ||||||
13 | bonds issued pursuant to this Section on which the principal | ||||||
14 | and
interest are to be paid entirely out of funds generated by | ||||||
15 | the taxes and fees
authorized by this Section.
| ||||||
16 | (m) The powers authorized by this Section may be | ||||||
17 | implemented by the
county board for a portion of the county | ||||||
18 | subject to similar stormwater
management needs.
| ||||||
19 | (n) The powers and taxes authorized by this Section are in | ||||||
20 | addition to the
powers and taxes authorized by Division 5-15; | ||||||
21 | in exercising its powers
under this Section, a county shall not | ||||||
22 | be subject to the restrictions and
requirements of that | ||||||
23 | Division.
| ||||||
24 | (o) Pursuant to paragraphs (g) and (i) of Section 6 of | ||||||
25 | Article VII of
the Illinois Constitution, this Section | ||||||
26 | specifically denies and limits the
exercise of any power which |
| |||||||
| |||||||
1 | is inconsistent herewith by home rule units in
any county with | ||||||
2 | a population of less than 1,500,000 in the area served by
the | ||||||
3 | Chicago Metropolitan Agency for Planning Northeastern Illinois | ||||||
4 | Planning Commission . This Section does not
prohibit the | ||||||
5 | concurrent exercise of powers consistent herewith. | ||||||
6 | (p) As used in this Section: | ||||||
7 | "Urban flooding" means the flooding of public and private | ||||||
8 | land in urban communities that results from stormwater or | ||||||
9 | snowmelt runoff overwhelming the existing drainage | ||||||
10 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
11 | whether or not that land is located in or near a floodplain. | ||||||
12 | "Urbanized areas" means a statistical geographic entity | ||||||
13 | consisting of a densely settled core created from census tracts | ||||||
14 | or blocks and contiguous qualifying territory that together | ||||||
15 | have a minimum population of at least 50,000 persons and has | ||||||
16 | been delineated as an urbanized area by the United States | ||||||
17 | Census Bureau after the most recent decennial census.
| ||||||
18 | (Source: P.A. 97-916, eff. 8-9-12.)
| ||||||
19 | (55 ILCS 5/5-1062.2) | ||||||
20 | Sec. 5-1062.2. Stormwater management. | ||||||
21 | (a) The purpose of this Section is to allow management and | ||||||
22 | mitigation of the effects of urbanization on stormwater | ||||||
23 | drainage in the metropolitan counties of Madison, St. Clair, | ||||||
24 | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone | ||||||
25 | as well as all counties containing all or a part of an |
| |||||||
| |||||||
1 | urbanized area and references to "county" in this Section apply | ||||||
2 | only to those counties. This Section does not apply to counties | ||||||
3 | in the Chicago Metropolitan Agency for Planning Northeastern | ||||||
4 | Illinois Planning Commission that are granted authorities in | ||||||
5 | Section 5-1062. The purpose of this Section shall be achieved | ||||||
6 | by: | ||||||
7 | (1) Consolidating the existing stormwater management
| ||||||
8 | framework into a united, countywide structure. | ||||||
9 | (2) Setting minimum standards for floodplain and
| ||||||
10 | stormwater management , with an emphasis on the use of cost | ||||||
11 | effective, nature-based solutions to flooding problems, | ||||||
12 | including, but not limited to, solutions that restore or | ||||||
13 | enhance the natural hydrologic cycle by increasing | ||||||
14 | infiltration, evapotranspiration, and the collection of | ||||||
15 | runoff for reuse as appropriate considering the local | ||||||
16 | conditions that as a byproduct also results in improved | ||||||
17 | water conditions . | ||||||
18 | (3) Preparing a countywide plan for the management
of | ||||||
19 | stormwater runoff, including the management of natural and | ||||||
20 | man-made drainageways. The countywide plan may incorporate | ||||||
21 | watershed plans and shall evaluate and address flooding | ||||||
22 | problems that exist in urbanized areas that are a result of | ||||||
23 | urban flooding . | ||||||
24 | (a-5) This Section also applies to all counties not | ||||||
25 | otherwise covered in Section 5-1062, 5-1062.2, or 5-1062.3 if | ||||||
26 | the question of allowing the county board to establish a |
| |||||||
| |||||||
1 | stormwater management planning council has been submitted to | ||||||
2 | the electors of the county and approved by a majority of those | ||||||
3 | voting on the question. | ||||||
4 | (b) A stormwater management planning committee may be | ||||||
5 | established by county board resolution, with its membership | ||||||
6 | consisting of equal numbers of county board and municipal | ||||||
7 | representatives from each county board district, drainage | ||||||
8 | district, and soil and water conservation district and such | ||||||
9 | other members as may be determined by the county and municipal | ||||||
10 | members. If the county has more than 6 county board districts, | ||||||
11 | however, the county board may by ordinance divide the county | ||||||
12 | into not less than 6 areas of approximately equal population, | ||||||
13 | to be used instead of county board districts for the purpose of | ||||||
14 | determining representation on the stormwater management | ||||||
15 | planning committee. | ||||||
16 | The county board members shall be appointed by the chairman | ||||||
17 | of the county board. Municipal members from each county board | ||||||
18 | district or other represented area shall be appointed by a | ||||||
19 | majority vote of the mayors of those municipalities that have | ||||||
20 | the greatest percentage of their respective populations | ||||||
21 | residing in that county board district or other represented | ||||||
22 | area. All municipal , and county board , drainage district, and | ||||||
23 | soil and water conservation district representatives shall be | ||||||
24 | entitled to a vote; the other members shall be nonvoting | ||||||
25 | members, unless authorized to vote by the unanimous consent of | ||||||
26 | the voting member of the committee; however, Madison, St. |
| |||||||
| |||||||
1 | Clair, Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and | ||||||
2 | Boone counties shall not have drainage district or soil and | ||||||
3 | water conservation the municipal and county board | ||||||
4 | representatives. A municipality that is located in more than | ||||||
5 | one county may choose, at the time of formation of the | ||||||
6 | stormwater management planning committee and based on | ||||||
7 | watershed boundaries, to participate in the stormwater | ||||||
8 | management planning program of either or both of the counties. | ||||||
9 | Subcommittees of the stormwater management planning committee | ||||||
10 | may be established to serve a portion of the county or a | ||||||
11 | particular drainage basin that has similar stormwater | ||||||
12 | management needs. The stormwater management planning committee | ||||||
13 | shall adopt bylaws, by a majority vote of the county and | ||||||
14 | municipal members, to govern the functions of the committee and | ||||||
15 | its subcommittees. Officers of the committee shall include a | ||||||
16 | chair and vice chair, one of whom shall be a county | ||||||
17 | representative and one a municipal representative. | ||||||
18 | The principal duties of the committee shall be to develop a | ||||||
19 | stormwater management plan for presentation to and approval by | ||||||
20 | the county board, and to direct the plan's implementation and | ||||||
21 | revision. The committee may retain engineering, legal, and | ||||||
22 | financial advisors and inspection personnel. The committee | ||||||
23 | shall meet at least quarterly and shall hold at least one | ||||||
24 | public meeting during the preparation of the plan and prior to | ||||||
25 | its submittal to the county board. The committee may make | ||||||
26 | grants to : (1) units of local government ; (2) not-for-profit |
| |||||||
| |||||||
1 | organizations; and (3) landowners. In order for a municipality | ||||||
2 | located partially or wholly within a mapped floodplain to | ||||||
3 | receive grant moneys, the municipality must be a member in the | ||||||
4 | Federal Emergency Management Agency's National Flood Insurance | ||||||
5 | Program. A municipality receiving grant moneys must that have | ||||||
6 | adopted an ordinance requiring actions consistent with the | ||||||
7 | stormwater management plan . Use and to landowners for the | ||||||
8 | purposes of stormwater management, including special projects; | ||||||
9 | use of the grant money must be consistent with the stormwater | ||||||
10 | management plan. | ||||||
11 | The committee shall not have or exercise any power of | ||||||
12 | eminent domain.
| ||||||
13 | (c) In the preparation of a stormwater management plan, a | ||||||
14 | county stormwater management planning committee shall | ||||||
15 | coordinate the planning process with each adjoining county to | ||||||
16 | ensure that recommended stormwater projects will have no | ||||||
17 | significant impact on the levels or flows of stormwaters in | ||||||
18 | inter-county watersheds or on the capacity of existing and | ||||||
19 | planned stormwater retention facilities. An adopted stormwater | ||||||
20 | management plan shall identify steps taken by the county to | ||||||
21 | coordinate the development of plan recommendations with | ||||||
22 | adjoining counties. | ||||||
23 | (d) The stormwater management committee may not enforce any | ||||||
24 | rules or regulations that would interfere with (i) any power | ||||||
25 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
26 | operate, construct, maintain, or improve drainage systems or |
| |||||||
| |||||||
1 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
2 | systems used on or by land or a facility used for production | ||||||
3 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
4 | 105/), except newly constructed buildings and newly installed | ||||||
5 | impervious paved surfaces. Disputes regarding an exception | ||||||
6 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
7 | by the disputing party or parties. | ||||||
8 | (e) Before the stormwater management planning committee | ||||||
9 | recommends to the county board a stormwater management plan for | ||||||
10 | the county or a portion thereof, it shall submit the plan to | ||||||
11 | the Office of Water Resources of the Department of Natural | ||||||
12 | Resources for review and recommendations. The Office, in | ||||||
13 | reviewing the plan, shall consider such factors as impacts on | ||||||
14 | the levels or flows in rivers and streams and the cumulative | ||||||
15 | effects of stormwater discharges on flood levels. The Office of | ||||||
16 | Water Resources shall determine whether the plan or ordinances | ||||||
17 | enacted to implement the plan complies with the requirements of | ||||||
18 | subsection (f). Within a period not to exceed 60 days, the | ||||||
19 | review comments and recommendations shall be submitted to the | ||||||
20 | stormwater management planning committee for consideration. | ||||||
21 | Any amendments to the plan shall be submitted to the Office for | ||||||
22 | review. | ||||||
23 | (f) Prior to recommending the plan to the county board, the | ||||||
24 | stormwater management planning committee shall hold at least | ||||||
25 | one public hearing thereon and shall afford interested persons | ||||||
26 | an opportunity to be heard. The hearing shall be held in the |
| |||||||
| |||||||
1 | county seat. Notice of the hearing shall be published at least | ||||||
2 | once no less than 15 days in advance of the hearing in a | ||||||
3 | newspaper of general circulation published in the county. The | ||||||
4 | notice shall state the time and place of the hearing and the | ||||||
5 | place where copies of the proposed plan will be accessible for | ||||||
6 | examination by interested parties. If an affected municipality | ||||||
7 | having a stormwater management plan adopted by ordinance wishes | ||||||
8 | to protest the proposed county plan provisions, it shall appear | ||||||
9 | at the hearing and submit in writing specific proposals to the | ||||||
10 | stormwater management planning committee. After consideration | ||||||
11 | of the matters raised at the hearing, the committee may amend | ||||||
12 | or approve the plan and recommend it to the county board for | ||||||
13 | adoption. | ||||||
14 | The county board may enact the proposed plan by ordinance. | ||||||
15 | If the proposals for modification of the plan made by an | ||||||
16 | affected municipality having a stormwater management plan are | ||||||
17 | not included in the proposed county plan, and the municipality | ||||||
18 | affected by the plan opposes adoption of the county plan by | ||||||
19 | resolution of its corporate authorities, approval of the county | ||||||
20 | plan shall require an affirmative vote of at least two-thirds | ||||||
21 | of the county board members present and voting. If the county | ||||||
22 | board wishes to amend the county plan, it shall submit in | ||||||
23 | writing specific proposals to the stormwater management | ||||||
24 | planning committee. If the proposals are not approved by the | ||||||
25 | committee, or are opposed by resolution of the corporate | ||||||
26 | authorities of an affected municipality having a municipal |
| |||||||
| |||||||
1 | stormwater management plan, amendment of the plan shall require | ||||||
2 | an affirmative vote of at least two-thirds of the county board | ||||||
3 | members present and voting. | ||||||
4 | (g) The county board may prescribe by ordinance reasonable | ||||||
5 | rules and regulations for floodplain or stormwater management | ||||||
6 | and for governing the location, width, course, and release rate | ||||||
7 | of all stormwater runoff channels, streams, and basins in the | ||||||
8 | county, in accordance with the adopted stormwater management | ||||||
9 | plan. Land, facilities, and drainage district facilities used | ||||||
10 | for production agriculture as defined in subsection (d) shall | ||||||
11 | not be subjected to regulation by the county board or | ||||||
12 | stormwater management committee under this Section for | ||||||
13 | floodplain management and for governing location, width, | ||||||
14 | course, maintenance, and release rate of stormwater runoff | ||||||
15 | channels, streams and basins, or water discharged from a | ||||||
16 | drainage district. These rules and regulations shall, at a | ||||||
17 | minimum, meet the standards for floodplain management | ||||||
18 | established by the Office of Water Resources and the | ||||||
19 | requirements of the Federal Emergency Management Agency for | ||||||
20 | participation in the National Flood Insurance Program. The | ||||||
21 | Commission may not impose more stringent regulations regarding | ||||||
22 | water quality on entities discharging in accordance with a | ||||||
23 | valid National Pollution Discharge Elimination System permit | ||||||
24 | issued under the Environmental Protection Act. | ||||||
25 | (h) In accordance with, and if recommended in, the adopted | ||||||
26 | stormwater management plan, the county board may adopt a |
| |||||||
| |||||||
1 | schedule of fees as may be necessary to mitigate the effects of | ||||||
2 | increased stormwater runoff resulting from new development | ||||||
3 | based on actual costs. The fees shall not exceed the cost of | ||||||
4 | satisfying the onsite stormwater retention or detention | ||||||
5 | requirements of the adopted stormwater management plan. The | ||||||
6 | fees shall be used to finance activities undertaken by the | ||||||
7 | county or its included municipalities to mitigate the effects | ||||||
8 | of urban stormwater runoff by providing regional stormwater | ||||||
9 | retention or detention facilities, as identified in the county | ||||||
10 | plan. The county board shall provide for a credit or reduction | ||||||
11 | in fees for any onsite retention, detention, drainage district | ||||||
12 | assessments, or other similar stormwater facility that the | ||||||
13 | developer is required to construct consistent with the | ||||||
14 | stormwater management ordinance. All these fees collected by | ||||||
15 | the county shall be held in a separate fund, and shall be | ||||||
16 | expended only in the watershed within which they were | ||||||
17 | collected. | ||||||
18 | (i) For the purpose of implementing this Section and for | ||||||
19 | the development, design, planning, construction, operation, | ||||||
20 | and maintenance of stormwater facilities provided for in the | ||||||
21 | stormwater management plan, a county board that has established | ||||||
22 | a stormwater management planning committee pursuant to this | ||||||
23 | Section may cause an annual tax of not to exceed 0.20% of the | ||||||
24 | value, as equalized or assessed by the Department of Revenue, | ||||||
25 | of all taxable property in the county to be levied upon all the | ||||||
26 | taxable property in the county or occupation and use taxes of |
| |||||||
| |||||||
1 | 1/10 of one cent. The property tax shall be in addition to all | ||||||
2 | other taxes authorized by law to be levied and collected in the | ||||||
3 | county and shall be in addition to the maximum tax rate | ||||||
4 | authorized by law for general county purposes. The 0.20% | ||||||
5 | limitation provided in this Section may be increased or | ||||||
6 | decreased by referendum at a general election in accordance | ||||||
7 | with the provisions of Sections 18-120, 18-125, and 18-130 of | ||||||
8 | the Property Tax Code (35 ILCS 200/). | ||||||
9 | Any revenues generated as a result of ownership or | ||||||
10 | operation of facilities or land acquired with the tax funds | ||||||
11 | collected pursuant to this subsection shall be held in a | ||||||
12 | separate fund and be used either to abate such property tax or | ||||||
13 | for implementing this Section. | ||||||
14 | However, the tax authorized by this subsection shall not be | ||||||
15 | levied until the question of its adoption, either for a | ||||||
16 | specified period or indefinitely, has been submitted to the | ||||||
17 | electors thereof and approved by a majority of those voting on | ||||||
18 | the question. This question may be submitted at any general | ||||||
19 | election held in the county after the adoption of a resolution | ||||||
20 | by the county board providing for the submission of the | ||||||
21 | question to the electors of the county. The county board shall | ||||||
22 | certify the resolution and proposition to the proper election | ||||||
23 | officials, who shall submit the proposition at an election in | ||||||
24 | accordance with the general election law. If a majority of the | ||||||
25 | votes cast on the question is in favor of the levy of the tax, | ||||||
26 | it may thereafter be levied in the county for the specified |
| |||||||
| |||||||
1 | period or indefinitely, as provided in the proposition. The | ||||||
2 | question shall be put in substantially the following form: | ||||||
3 | Shall an annual tax be levied
for stormwater management | ||||||
4 | purposes (for a period of not more than ..... years) at a | ||||||
5 | rate not exceeding
.....% of the equalized assessed
value | ||||||
6 | of the taxable property of ..... County?
| ||||||
7 | Or this question may be submitted at any general election held | ||||||
8 | in the county after the adoption of a resolution by the county | ||||||
9 | board providing for the submission of the question to the | ||||||
10 | electors of the county to authorize use and occupation taxes of | ||||||
11 | 1/10 of one cent: | ||||||
12 | Shall use and occupation taxes be raised for stormwater | ||||||
13 | management purposes (for a period of not more than ..... | ||||||
14 | years) at a rate of 1/10 of one cent for taxable goods in | ||||||
15 | ..... County? | ||||||
16 | Votes shall be recorded as Yes or No.
| ||||||
17 | (j) For those counties that adopt a property tax in | ||||||
18 | accordance with the provisions in this Section, the stormwater | ||||||
19 | management committee shall offer property tax abatements or | ||||||
20 | incentive payments to property owners who construct, maintain, | ||||||
21 | and use approved stormwater management devices. For those | ||||||
22 | counties that adopt use and occupation taxes in accordance with | ||||||
23 | the provisions of this Section, the stormwater management | ||||||
24 | committee may offer tax rebates or incentive payments to | ||||||
25 | property owners who construct, maintain, and use approved | ||||||
26 | stormwater management devices.
The stormwater management |
| |||||||
| |||||||
1 | committee is authorized to offer credits to the property tax, | ||||||
2 | if applicable, based on authorized practices consistent with | ||||||
3 | the stormwater management plan and approved by the committee. | ||||||
4 | Expenses of staff of a stormwater management committee that are | ||||||
5 | expended on regulatory project review may be no more than 20% | ||||||
6 | of the annual budget of the committee, including funds raised | ||||||
7 | under subsections (h) and (i). | ||||||
8 | (k) Any county that has adopted a county stormwater | ||||||
9 | management plan under this Section may, after 10 days written | ||||||
10 | notice receiving consent of the owner or occupant, enter upon | ||||||
11 | any lands or waters within the county for the purpose of | ||||||
12 | inspecting stormwater facilities or causing the removal of any | ||||||
13 | obstruction to an affected watercourse. If consent is denied or | ||||||
14 | cannot be reasonably obtained, the county ordinance shall | ||||||
15 | provide a process or procedure for an administrative warrant to | ||||||
16 | be obtained. The county shall be responsible for any damages | ||||||
17 | occasioned thereby. | ||||||
18 | (l) Upon petition of the municipality, and based on a | ||||||
19 | finding of the stormwater management planning committee, the | ||||||
20 | county shall not enforce rules and regulations adopted by the | ||||||
21 | county in any municipality located wholly or partly within the | ||||||
22 | county that has a municipal stormwater management ordinance | ||||||
23 | that is consistent with and at least as stringent as the county | ||||||
24 | plan and ordinance, and is being enforced by the municipal | ||||||
25 | authorities. On issues that the county ordinance is more | ||||||
26 | stringent as deemed by the committee, the county shall only |
| |||||||
| |||||||
1 | enforce rules and regulations adopted by the county on the more | ||||||
2 | stringent issues and accept municipal permits. The county shall | ||||||
3 | have no more than 60 days to review permits or the permits | ||||||
4 | shall be deemed approved. | ||||||
5 | (m) A county may issue general obligation bonds for | ||||||
6 | implementing any stormwater plan adopted under this Section in | ||||||
7 | the manner prescribed in Section 5-1012; except that the | ||||||
8 | referendum requirement of Section 5-1012 does not apply to | ||||||
9 | bonds issued pursuant to this Section on which the principal | ||||||
10 | and interest are to be paid entirely out of funds generated by | ||||||
11 | the taxes and fees authorized by this Section. | ||||||
12 | (n) The powers authorized by this Section may be | ||||||
13 | implemented by the county board for a portion of the county | ||||||
14 | subject to similar stormwater management needs. | ||||||
15 | (o) The powers and taxes authorized by this Section are in | ||||||
16 | addition to the powers and taxes authorized by Division 5-15; | ||||||
17 | in exercising its powers under this Section, a county shall not | ||||||
18 | be subject to the restrictions and requirements of that | ||||||
19 | Division.
| ||||||
20 | (p) As used in this Section: | ||||||
21 | "Urban flooding" means the flooding of public and private | ||||||
22 | land in urban communities that results from stormwater or | ||||||
23 | snowmelt runoff overwhelming the existing drainage | ||||||
24 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
25 | whether or not that land is located in or near a floodplain. | ||||||
26 | "Urbanized areas" means a statistical geographic entity |
| |||||||
| |||||||
1 | consisting of a densely settled core created from census tracts | ||||||
2 | or blocks and contiguous qualifying territory that together | ||||||
3 | have a minimum population of at least 50,000 persons and has | ||||||
4 | been delineated as an urbanized area by the United States | ||||||
5 | Census Bureau after the most recent decennial census. | ||||||
6 | (Source: P.A. 94-675, eff. 8-23-05.)
| ||||||
7 | (55 ILCS 5/5-1062.3) | ||||||
8 | Sec. 5-1062.3. Stormwater management; DuPage and Peoria | ||||||
9 | Counties. | ||||||
10 | (a) The purpose of this Section is to allow management and | ||||||
11 | mitigation of the effects of urbanization on stormwater | ||||||
12 | drainage in the metropolitan counties of DuPage and Peoria, and | ||||||
13 | references to "county" in this Section apply only to those | ||||||
14 | counties. This Section does not apply to a municipality that | ||||||
15 | only partially lies within one of these counties and, on the | ||||||
16 | effective date of this amendatory Act of the 98th General | ||||||
17 | Assembly, is served by an existing Section in the Counties Code | ||||||
18 | regarding stormwater management. The purpose of this Section | ||||||
19 | shall be achieved by: | ||||||
20 | (1) consolidating the existing stormwater management | ||||||
21 | framework into a
united, countywide structure; | ||||||
22 | (2) setting minimum standards for floodplain and | ||||||
23 | stormwater management;
and | ||||||
24 | (3) preparing a countywide plan for the management of | ||||||
25 | stormwater runoff,
including the management of natural and |
| |||||||
| |||||||
1 | man-made drainageways. The countywide
plan may incorporate | ||||||
2 | watershed plans. | ||||||
3 | (b) A stormwater management planning committee may be | ||||||
4 | established by county board resolution, with its membership | ||||||
5 | consisting of equal numbers of county board and municipal | ||||||
6 | representatives from each county board district, and such other | ||||||
7 | members as may be determined by the county and municipal | ||||||
8 | members. If the county has more than 6 county board districts, | ||||||
9 | however, the county board may by ordinance divide the county | ||||||
10 | into not less than 6 areas of approximately equal population, | ||||||
11 | to be used instead of county board districts for the purpose of | ||||||
12 | determining representation on the stormwater management | ||||||
13 | planning committee. | ||||||
14 | The county board members shall be appointed by the chairman | ||||||
15 | of the county board. Municipal members from each county board | ||||||
16 | district or other represented area shall be appointed by a | ||||||
17 | majority vote of the mayors of those municipalities that have | ||||||
18 | the greatest percentage of their respective populations | ||||||
19 | residing in that county board district or other represented | ||||||
20 | area. All municipal and county board representatives shall be | ||||||
21 | entitled to a vote; the other members shall be nonvoting | ||||||
22 | members, unless authorized to vote by the unanimous consent of | ||||||
23 | the municipal and county board representatives. A municipality | ||||||
24 | that is located in more than one county may choose, at the time | ||||||
25 | of formation of the stormwater management planning committee | ||||||
26 | and based on watershed boundaries, to participate in the |
| |||||||
| |||||||
1 | stormwater management planning program of either county. | ||||||
2 | Subcommittees of the stormwater management planning committee | ||||||
3 | may be established to serve a portion of the county or a | ||||||
4 | particular drainage basin that has similar stormwater | ||||||
5 | management needs. The stormwater management planning committee | ||||||
6 | shall adopt bylaws, by a majority vote of the county and | ||||||
7 | municipal members, to govern the functions of the committee and | ||||||
8 | its subcommittees. Officers of the committee shall include a | ||||||
9 | chair and vice chair, one of whom shall be a county | ||||||
10 | representative and one a municipal representative. | ||||||
11 | The principal duties of the committee shall be to develop a | ||||||
12 | stormwater management plan for presentation to and approval by | ||||||
13 | the county board, and to direct the plan's implementation and | ||||||
14 | revision. The committee may retain engineering, legal, and | ||||||
15 | financial advisors and inspection personnel. The committee | ||||||
16 | shall meet at least quarterly and shall hold at least one | ||||||
17 | public meeting during the preparation of the plan and prior to | ||||||
18 | its submittal to the county board. The committee may make | ||||||
19 | grants to : (1) units of local government ; (2) not-for-profit | ||||||
20 | organizations; and (3) landowners. In order for a municipality | ||||||
21 | located partially or wholly within a mapped floodplain to | ||||||
22 | receive grant moneys, the municipality must be a member in the | ||||||
23 | Federal Emergency Management Agency's National Flood Insurance | ||||||
24 | Program. A municipality receiving grant moneys must that have | ||||||
25 | adopted an ordinance requiring actions consistent with the | ||||||
26 | stormwater management plan . Use and to landowners for the |
| |||||||
| |||||||
1 | purposes of stormwater management, including special projects; | ||||||
2 | use of the grant money must be consistent with the stormwater | ||||||
3 | management plan. | ||||||
4 | The committee shall not have or exercise any power of | ||||||
5 | eminent domain. | ||||||
6 | (c) In the preparation of a stormwater management plan, a | ||||||
7 | county stormwater management planning committee shall | ||||||
8 | coordinate the planning process with each adjoining county to | ||||||
9 | ensure that recommended stormwater projects will have no | ||||||
10 | significant impact on the levels or flows of stormwaters in | ||||||
11 | inter-county watersheds or on the capacity of existing and | ||||||
12 | planned stormwater retention facilities. An adopted stormwater | ||||||
13 | management plan shall identify steps taken by the county to | ||||||
14 | coordinate the development of plan recommendations with | ||||||
15 | adjoining counties. | ||||||
16 | (d) The stormwater management committee may not enforce any | ||||||
17 | rules or regulations that would interfere with (i) any power | ||||||
18 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
19 | operate, construct, maintain, or improve drainage systems or | ||||||
20 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
21 | systems used on or by land or a facility used for production | ||||||
22 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
23 | 105/), except newly constructed buildings and newly installed | ||||||
24 | impervious paved surfaces. Disputes regarding an exception | ||||||
25 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
26 | by the disputing party or parties. |
| |||||||
| |||||||
1 | (e) Before the stormwater management planning committee | ||||||
2 | recommends to the county board a stormwater management plan for | ||||||
3 | the county or a portion thereof, it shall submit the plan to | ||||||
4 | the Office of Water Resources of the Department of Natural | ||||||
5 | Resources for review and recommendations. The Office, in | ||||||
6 | reviewing the plan, shall consider such factors as impacts on | ||||||
7 | the levels or flows in rivers and streams and the cumulative | ||||||
8 | effects of stormwater discharges on flood levels. The Office of | ||||||
9 | Water Resources shall determine whether the plan or ordinances | ||||||
10 | enacted to implement the plan complies with the requirements of | ||||||
11 | subsection (f). Within a period not to exceed 60 days, the | ||||||
12 | review comments and recommendations shall be submitted to the | ||||||
13 | stormwater management planning committee for consideration. | ||||||
14 | Any amendments to the plan shall be submitted to the Office for | ||||||
15 | review. | ||||||
16 | (f) Prior to recommending the plan to the county board, the | ||||||
17 | stormwater management planning committee shall hold at least | ||||||
18 | one public hearing thereon and shall afford interested persons | ||||||
19 | an opportunity to be heard. The hearing shall be held in the | ||||||
20 | county seat. Notice of the hearing shall be published at least | ||||||
21 | once and no less than 15 days in advance of the hearing in a | ||||||
22 | newspaper of general circulation published in the county. The | ||||||
23 | notice shall state the time and place of the hearing and the | ||||||
24 | place where copies of the proposed plan will be accessible for | ||||||
25 | examination by interested parties. If an affected municipality | ||||||
26 | having a stormwater management plan adopted by ordinance wishes |
| |||||||
| |||||||
1 | to protest the proposed county plan provisions, it shall appear | ||||||
2 | at the hearing and submit in writing specific proposals to the | ||||||
3 | stormwater management planning committee. After consideration | ||||||
4 | of the matters raised at the hearing, the committee may amend | ||||||
5 | or approve the plan and recommend it to the county board for | ||||||
6 | adoption. | ||||||
7 | The county board may enact the proposed plan by ordinance. | ||||||
8 | If the proposals for modification of the plan made by an | ||||||
9 | affected municipality having a stormwater management plan are | ||||||
10 | not included in the proposed county plan, and the municipality | ||||||
11 | affected by the plan opposes adoption of the county plan by | ||||||
12 | resolution of its corporate authorities, approval of the county | ||||||
13 | plan shall require an affirmative vote of at least two-thirds | ||||||
14 | of the county board members present and voting. If the county | ||||||
15 | board wishes to amend the county plan, it shall submit in | ||||||
16 | writing specific proposals to the stormwater management | ||||||
17 | planning committee. If the proposals are not approved by the | ||||||
18 | committee, or are opposed by resolution of the corporate | ||||||
19 | authorities of an affected municipality having a municipal | ||||||
20 | stormwater management plan, amendment of the plan shall require | ||||||
21 | an affirmative vote of at least two-thirds of the county board | ||||||
22 | members present and voting. | ||||||
23 | (g) The county board may prescribe by ordinance reasonable | ||||||
24 | rules and regulations for floodplain management and for | ||||||
25 | governing the location, width, course, and release rate of all | ||||||
26 | stormwater runoff channels, streams, and basins in the county, |
| |||||||
| |||||||
1 | in accordance with the adopted stormwater management plan. | ||||||
2 | Land, facilities, and drainage district facilities used for | ||||||
3 | production agriculture as defined in subsection (d) shall not | ||||||
4 | be subjected to regulation by the county board or stormwater | ||||||
5 | management committee under this Section for floodplain | ||||||
6 | management and for governing location, width, course, | ||||||
7 | maintenance, and release rate of stormwater runoff channels, | ||||||
8 | streams and basins, or water discharged from a drainage | ||||||
9 | district. These rules and regulations shall, at a minimum, meet | ||||||
10 | the standards for floodplain management established by the | ||||||
11 | Office of Water Resources and the requirements of the Federal | ||||||
12 | Emergency Management Agency for participation in the National | ||||||
13 | Flood Insurance Program. With respect to DuPage County only, | ||||||
14 | the Chicago Metropolitan Agency for Planning may not impose | ||||||
15 | more stringent regulations regarding water quality on entities | ||||||
16 | discharging in accordance with a valid National Pollution | ||||||
17 | Discharge Elimination System permit issued under the | ||||||
18 | Environmental Protection Act. | ||||||
19 | (h) For the purpose of implementing this Section and for | ||||||
20 | the development, design, planning, construction, operation, | ||||||
21 | and maintenance of stormwater facilities provided for in the | ||||||
22 | adopted stormwater management plan, a county board that has | ||||||
23 | established a stormwater management planning committee | ||||||
24 | pursuant to this Section or has participated in a stormwater | ||||||
25 | management planning process may adopt a schedule of fees | ||||||
26 | applicable to all real property within the county which |
| |||||||
| |||||||
1 | benefits from the county's stormwater management facilities | ||||||
2 | and activities, and as may be necessary to mitigate the effects | ||||||
3 | of increased stormwater runoff resulting from development. The | ||||||
4 | total amount of the fees assessed must be specifically and | ||||||
5 | uniquely attributable to the actual costs of the county in the | ||||||
6 | preparation, administration, and implementation of the adopted | ||||||
7 | stormwater management plan, construction and maintenance of | ||||||
8 | stormwater facilities, and other activities related to the | ||||||
9 | management of the runoff from the property. The individual fees | ||||||
10 | must be specifically and uniquely attributable to the portion | ||||||
11 | of the actual cost to the county of managing the runoff from | ||||||
12 | the property. The fees shall be used to finance activities | ||||||
13 | undertaken by the county or its included municipalities to | ||||||
14 | mitigate the effects of urban stormwater runoff by providing | ||||||
15 | and maintaining stormwater collection, retention, detention, | ||||||
16 | and particulate treatment facilities, and improving water | ||||||
17 | bodies impacted by stormwater runoff, as identified in the | ||||||
18 | county plan. In establishing, maintaining, or replacing such | ||||||
19 | facilities, the county shall not duplicate facilities operated | ||||||
20 | by other governmental bodies within its corporate boundaries. | ||||||
21 | The schedule of fees established by the county board shall | ||||||
22 | include a procedure for a full or partial fee waiver for | ||||||
23 | property owners who have taken actions or put in place | ||||||
24 | facilities that reduce or eliminate the cost to the county of | ||||||
25 | providing stormwater management services to their property. | ||||||
26 | The county board may also offer tax or fee rebates or incentive |
| |||||||
| |||||||
1 | payments to property owners who construct, maintain, and use | ||||||
2 | approved green infrastructure stormwater management devices or | ||||||
3 | any other methods that reduce or eliminate the cost to the | ||||||
4 | county of providing stormwater management services to the | ||||||
5 | property, including but not limited to facilities that reduce | ||||||
6 | the volume, temperature, velocity, and pollutant load of the | ||||||
7 | stormwater managed by the county, such as systems that | ||||||
8 | infiltrate, evapotranspirate, or harvest stormwater for reuse, | ||||||
9 | known as "green infrastructure". In exercising this authority, | ||||||
10 | the county shall provide notice to the municipalities within | ||||||
11 | its jurisdiction of any fees proposed under this Section and | ||||||
12 | seek the input of each municipality with respect to the | ||||||
13 | calculation of the fees. The county shall also give property | ||||||
14 | owners at least 2 years' notice of the fee, during which time | ||||||
15 | the county shall provide education on green infrastructure | ||||||
16 | practices and an opportunity to take action to reduce or | ||||||
17 | eliminate the fee. All these fees collected by the county shall | ||||||
18 | be held in a separate fund, and shall be expended only in the | ||||||
19 | watershed within which they were collected. The county may | ||||||
20 | enter into intergovernmental agreements with other government | ||||||
21 | bodies for the joint administration of stormwater management | ||||||
22 | and the collection of the fees authorized in this Section. | ||||||
23 | A fee schedule authorized by this subsection must have the | ||||||
24 | same limit as the authorized stormwater tax. In Peoria County | ||||||
25 | only, the fee schedule shall not be adopted unless (i) a | ||||||
26 | referendum has been passed approving a stormwater tax as |
| |||||||
| |||||||
1 | provided in subsection (i) of this Section; or (ii) the | ||||||
2 | question of the adoption of a fee schedule with the same limit | ||||||
3 | as the authorized stormwater tax has been approved in a | ||||||
4 | referendum by a majority of those voting on the question. | ||||||
5 | (i) In the alternative to a fee imposed under subsection | ||||||
6 | (h), the county board may cause an annual tax of not to exceed | ||||||
7 | 0.20% of the value, as equalized or assessed by the Department | ||||||
8 | of Revenue, of all taxable property in the county to be levied | ||||||
9 | upon all the taxable property in the county. The property tax | ||||||
10 | shall be in addition to all other taxes authorized by law to be | ||||||
11 | levied and collected in the county and shall be in addition to | ||||||
12 | the maximum tax rate authorized by law for general county | ||||||
13 | purposes. The 0.20% limitation provided in this Section may be | ||||||
14 | increased or decreased by referendum in accordance with the | ||||||
15 | provisions of Sections 18-120, 18-125, and 18-130 of the | ||||||
16 | Property Tax Code (35 ILCS 200/). | ||||||
17 | Any revenues generated as a result of ownership or | ||||||
18 | operation of facilities or land acquired with the tax funds | ||||||
19 | collected pursuant to this subsection shall be held in a | ||||||
20 | separate fund and be used either to abate such property tax or | ||||||
21 | for implementing this Section. | ||||||
22 | If at least part of the county has been declared by a | ||||||
23 | presidential proclamation after July 1, 1986 and before | ||||||
24 | December 31, 1987, to be a disaster area as a result of | ||||||
25 | flooding, the tax authorized by this subsection does not | ||||||
26 | require approval by referendum. However, in Peoria County, the |
| |||||||
| |||||||
1 | tax authorized by this subsection shall not be levied until the | ||||||
2 | question of its adoption, either for a specified period or | ||||||
3 | indefinitely, has been submitted to the electors thereof and | ||||||
4 | approved by a majority of those voting on the question. This | ||||||
5 | question may be submitted at any election held in the county | ||||||
6 | after the adoption of a resolution by the county board | ||||||
7 | providing for the submission of the question to the electors of | ||||||
8 | the county. The county board shall certify the resolution and | ||||||
9 | proposition to the proper election officials, who shall submit | ||||||
10 | the proposition at an election in accordance with the general | ||||||
11 | election law. If a majority of the votes cast on the question | ||||||
12 | is in favor of the levy of the tax, it may thereafter be levied | ||||||
13 | in the county for the specified period or indefinitely, as | ||||||
14 | provided in the proposition. The question shall be put in | ||||||
15 | substantially the following form: | ||||||
16 | Shall an annual tax be levied
for stormwater management | ||||||
17 | purposes (for a period of not more than ..... years) at a | ||||||
18 | rate not exceeding
.....% of the equalized assessed
value | ||||||
19 | of the taxable property of ..... County? | ||||||
20 | Votes shall be recorded as Yes or No. | ||||||
21 | The following question may be submitted at any election | ||||||
22 | held in the county after the adoption of a resolution by the | ||||||
23 | county board providing for the submission of the question to | ||||||
24 | the electors of the county to authorize adoption of a schedule | ||||||
25 | of fees applicable to all real property within the county: | ||||||
26 | Shall the county board be authorized to adopt a |
| |||||||
| |||||||
1 | schedule of fees, at a rate not exceeding that of the | ||||||
2 | stormwater management tax, applicable to all real property | ||||||
3 | for preparation, administration, and implementation of an | ||||||
4 | adopted stormwater management plan, construction and | ||||||
5 | maintenance of related facilities, and management of the | ||||||
6 | runoff from the property? | ||||||
7 | Votes shall be recorded as Yes or No. | ||||||
8 | If these questions have been approved by a majority of | ||||||
9 | those voting prior to the effective date of this amendatory Act | ||||||
10 | of the 98th General Assembly, this subsection does not apply. | ||||||
11 | (j) For those counties that adopt a property tax in | ||||||
12 | accordance with the provisions in this Section, the stormwater | ||||||
13 | management committee shall offer property tax abatements or | ||||||
14 | incentive payments to property owners who construct, maintain, | ||||||
15 | and use approved stormwater management devices. The stormwater | ||||||
16 | management committee is authorized to offer credits to the | ||||||
17 | property tax, if applicable, based on authorized practices | ||||||
18 | consistent with the stormwater management plan and approved by | ||||||
19 | the committee. Expenses of staff of a stormwater management | ||||||
20 | committee that are expended on regulatory project review may be | ||||||
21 | no more than 20% of the annual budget of the committee, | ||||||
22 | including funds raised under subsections (h) and (i). | ||||||
23 | (k) Upon the creation and implementation of a county | ||||||
24 | stormwater management
plan, the county may petition the circuit | ||||||
25 | court to dissolve any or all drainage
districts created | ||||||
26 | pursuant to the Illinois Drainage Code or predecessor Acts
|
| |||||||
| |||||||
1 | which are located entirely within the area of the county | ||||||
2 | covered by the plan. | ||||||
3 | However, any active drainage district implementing a plan | ||||||
4 | that is
consistent with and at least as stringent as the county | ||||||
5 | stormwater
management plan may petition the stormwater | ||||||
6 | management planning committee
for exception from dissolution. | ||||||
7 | Upon filing of the petition, the committee
shall set a date for | ||||||
8 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
9 | filing thereof, and the committee shall give at least one | ||||||
10 | week's
notice of the hearing in one or more newspapers of | ||||||
11 | general circulation
within the district, and in addition shall | ||||||
12 | cause a copy of the notice to be
personally served upon each of | ||||||
13 | the trustees of the district. At the
hearing, the committee | ||||||
14 | shall hear the district's petition and allow the
district | ||||||
15 | trustees and any interested parties an opportunity to present | ||||||
16 | oral
and written evidence. The committee shall render its | ||||||
17 | decision upon the
petition for exception from dissolution based | ||||||
18 | upon the best interests of
the residents of the district. In | ||||||
19 | the event that the exception is not
allowed, the district may | ||||||
20 | file a petition within 30 days of the decision
with the circuit | ||||||
21 | court. In that case, the notice and hearing requirements
for | ||||||
22 | the court shall be the same as herein provided for the | ||||||
23 | committee.
The court shall likewise render its decision of | ||||||
24 | whether to dissolve the
district based upon the best interests | ||||||
25 | of residents of the district. | ||||||
26 | The dissolution of any drainage district shall not affect |
| |||||||
| |||||||
1 | the obligation
of any bonds issued or contracts entered into by | ||||||
2 | the district nor
invalidate the levy, extension or collection | ||||||
3 | of any taxes or special
assessments upon the property in the | ||||||
4 | former drainage district. All property
and obligations of the | ||||||
5 | former drainage district shall be assumed and
managed by the | ||||||
6 | county, and the debts of the former drainage district shall
be | ||||||
7 | discharged as soon as practicable. | ||||||
8 | If a drainage district lies only partly within a county | ||||||
9 | that adopts a
county stormwater management plan, the county may | ||||||
10 | petition the circuit
court to disconnect from the drainage | ||||||
11 | district that portion of the district
that lies within that | ||||||
12 | county. The property of the drainage district within the
| ||||||
13 | disconnected area shall be assumed and managed by the county. | ||||||
14 | The county shall
also assume a portion of the drainage | ||||||
15 | district's debt at the time of
disconnection, based on the | ||||||
16 | portion of the value of the taxable property of the
drainage | ||||||
17 | district which is located within the area being disconnected. | ||||||
18 | The operations of any drainage district that continues to | ||||||
19 | exist in a
county that has adopted a stormwater management plan | ||||||
20 | in accordance with
this Section shall be in accordance with the | ||||||
21 | adopted plan. | ||||||
22 | (l) Any county that has adopted a county stormwater | ||||||
23 | management plan under this Section may, after 10 days' written | ||||||
24 | notice receiving consent of the owner or occupant, enter upon | ||||||
25 | any lands or waters within the county for the purpose of | ||||||
26 | inspecting stormwater facilities or causing the removal of any |
| |||||||
| |||||||
1 | obstruction to an affected watercourse. If consent is denied or | ||||||
2 | cannot be reasonably obtained, the county ordinance shall | ||||||
3 | provide a process or procedure for an administrative warrant to | ||||||
4 | be obtained. The county shall be responsible for any damages | ||||||
5 | occasioned thereby. | ||||||
6 | (m) Except as otherwise provided in subsection (a) of this | ||||||
7 | Section, upon petition of the municipality, and based on a | ||||||
8 | finding of the stormwater management planning committee, the | ||||||
9 | county shall not enforce rules and regulations adopted by the | ||||||
10 | county in any municipality located wholly or partly within the | ||||||
11 | county that has a municipal stormwater management ordinance | ||||||
12 | that is consistent with and at least as stringent as the county | ||||||
13 | plan and ordinance, and is being enforced by the municipal | ||||||
14 | authorities. On issues that the county ordinance is more | ||||||
15 | stringent as deemed by the committee, the county shall only | ||||||
16 | enforce rules and regulations adopted by the county on the more | ||||||
17 | stringent issues and accept municipal permits. The county shall | ||||||
18 | have no more than 60 days to review permits or the permits | ||||||
19 | shall be deemed approved. | ||||||
20 | (n) A county may issue general obligation bonds for | ||||||
21 | implementing any stormwater plan adopted under this Section in | ||||||
22 | the manner prescribed in Section 5-1012; except that the | ||||||
23 | referendum requirement of Section 5-1012 does not apply to | ||||||
24 | bonds issued pursuant to this Section on which the principal | ||||||
25 | and interest are to be paid entirely out of funds generated by | ||||||
26 | the taxes and fees authorized by this Section. |
| |||||||
| |||||||
1 | (o) A county that has adopted a fee schedule pursuant to | ||||||
2 | this Section may not thereafter issue any bond extensions | ||||||
3 | related to implementing a stormwater management plan. | ||||||
4 | (p) The powers authorized by this Section may be | ||||||
5 | implemented by the county board for a portion of the county | ||||||
6 | subject to similar stormwater management needs. | ||||||
7 | (q) The powers and taxes authorized by this Section are in | ||||||
8 | addition to the powers and taxes authorized by Division 5-15; | ||||||
9 | in exercising its powers under this Section, a county shall not | ||||||
10 | be subject to the restrictions and requirements of that | ||||||
11 | Division. | ||||||
12 | (r) Stormwater management projects and actions related to | ||||||
13 | stormwater management in a county that has adopted a fee | ||||||
14 | schedule or tax pursuant to this Section prior to the effective | ||||||
15 | date of this amendatory Act of the 98th General Assembly are | ||||||
16 | not altered by this amendatory Act of the 98th General | ||||||
17 | Assembly.
| ||||||
18 | (Source: P.A. 98-335, eff. 8-13-13; 98-756, eff. 7-16-14.)
|