Bill Text: IL HB4104 | 2009-2010 | 96th General Assembly | Introduced


Bill Title: Amends the Illinois Procurement Code. With respect to a sole source procurement, requires that (i) the notice of the procurement in the Illinois Procurement Bulletin include a justification of the manner in which an absence of other economically feasible sources was determined and (ii) the justification be retained in the procurement's contract file.

Spectrum: Partisan Bill (Republican 2-0)

Status: (Introduced - Dead) 2009-05-20 - Added Chief Co-Sponsor Rep. Patricia R. Bellock [HB4104 Detail]

Download: Illinois-2009-HB4104-Introduced.html


96TH GENERAL ASSEMBLY
State of Illinois
2009 and 2010
HB4104

Introduced 2/27/2009, by Rep. Timothy L. Schmitz

SYNOPSIS AS INTRODUCED:
30 ILCS 500/20-25

Amends the Illinois Procurement Code. With respect to a sole source procurement, requires that (i) the notice of the procurement in the Illinois Procurement Bulletin include a justification of the manner in which an absence of other economically feasible sources was determined and (ii) the justification be retained in the procurement's contract file.
LRB096 08441 JAM 18558 b

A BILL FOR

HB4104 LRB096 08441 JAM 18558 b
1 AN ACT concerning finance.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 Section 5. The Illinois Procurement Code is amended by
5 changing Section 20-25 as follows:
6 (30 ILCS 500/20-25)
7 Sec. 20-25. Sole source procurements. In accordance with
8 standards set by rule, contracts may be awarded without use of
9 the specified method of source selection when there is only one
10 economically feasible source for the item. At least 2 weeks
11 before entering into a sole source contract, the purchasing
12 agency shall publish in the Illinois Procurement Bulletin a
13 notice of intent to do so along with a description of the item
14 to be procured, and the intended sole source contractor, and a
15 justification of the manner in which the absence of any other
16 economically feasible source was determined. A copy of that
17 justification must be retained in that procurement's contract
18 file.
19 (Source: P.A. 90-572, eff. date - See Sec. 99-5.)