Bill Text: IL HB5127 | 2015-2016 | 99th General Assembly | Introduced
Bill Title: Amends the Energy Conservation and Coal Development Act. Makes a technical change in a Section concerning the evaluation of loan applications.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2016-04-08 - Rule 19(a) / Re-referred to Rules Committee [HB5127 Detail]
Download: Illinois-2015-HB5127-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning State government.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Energy Conservation and Coal Development Act | |||||||||||||||||||
5 | is amended by changing Section 10 as follows:
| |||||||||||||||||||
6 | (20 ILCS 1105/10) (from Ch. 96 1/2, par. 7410)
| |||||||||||||||||||
7 | Sec. 10. Evaluation of loan applications.
The
The | |||||||||||||||||||
8 | Department shall evaluate applications for loans and make
such | |||||||||||||||||||
9 | evaluations available to the Illinois Coal
Development Board. | |||||||||||||||||||
10 | Evaluation of the loan applications
shall be based on, but not | |||||||||||||||||||
11 | limited to, the following
criteria: | |||||||||||||||||||
12 | (a) The length of time applicants will commit to using | |||||||||||||||||||
13 | Illinois coal in
the facility which is modified,
acquired or | |||||||||||||||||||
14 | constructed as a result of the project. The applicant must
| |||||||||||||||||||
15 | agree to use Illinois coal for at least the life of the loan as | |||||||||||||||||||
16 | a condition
of such loan. Weight shall be given for longer | |||||||||||||||||||
17 | commitments.
| |||||||||||||||||||
18 | (b) The total amount of Illinois coal used. Weight
shall be | |||||||||||||||||||
19 | given
to projects using larger amounts of Illinois coal over | |||||||||||||||||||
20 | the life of the loan.
| |||||||||||||||||||
21 | (c) The percentage of the total project costs the
State is | |||||||||||||||||||
22 | asked to finance. Weight shall be given to projects which
| |||||||||||||||||||
23 | maximize the use of private funds or funds from other public |
| |||||||
| |||||||
1 | sources.
| ||||||
2 | (d) The technical merits of the project, including but not | ||||||
3 | limited to,
the effectiveness of the prepared coal-use system | ||||||
4 | in controlling emissions
of sulfur dioxide and other | ||||||
5 | pollutants.
| ||||||
6 | (Source: P.A. 84-111; 84-1070.)
|