Bill Text: IL HB5544 | 2023-2024 | 103rd General Assembly | Introduced


Bill Title: Amends the Illinois Power Agency Act. Makes legislative declarations and findings concerning the deployment of energy storage systems. Provides that the Illinois Power Agency has the power to conduct competitive solicitations to procure energy storage resources and conduct procurement events by which electric utilities execute contracts to purchase energy storage resources. Provides that the Agency shall develop a storage procurement plan that results in the electric utilities contracting for energy storage capacity from contracted energy storage systems. Provides that the Agency shall develop a storage procurement plan that results in the electric utilities contracting for energy storage resources from contracted energy storage systems in specified amounts. Provides that within 180 days of the effective date of the amendatory Act, the Agency shall develop an energy storage procurement plan. Provides that for all procurements of energy storage resources, the Agency shall direct respondents to offer a strike price. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Provides that no later than December 31, 2026 and every 2 years thereafter, the Agency shall conduct an analysis to determine whether the contracted quantity of energy storage in energy storage capacity and energy storage duration is sufficient to support the State's renewable energy standards and carbon emission standards. Defines terms. Makes corresponding changes in the Public Utilities Act. Effective immediately.

Spectrum: Slight Partisan Bill (Democrat 3-1)

Status: (Introduced) 2024-04-05 - House Committee Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee [HB5544 Detail]

Download: Illinois-2023-HB5544-Introduced.html

103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024
HB5544

Introduced , by Rep. Lawrence "Larry" Walsh, Jr.

SYNOPSIS AS INTRODUCED:
20 ILCS 3855/1-5
20 ILCS 3855/1-10
20 ILCS 3855/1-20
20 ILCS 3855/1-75
20 ILCS 3855/1-93 new
20 ILCS 3855/1-94 new
220 ILCS 5/16-108
220 ILCS 5/16-111.5

Amends the Illinois Power Agency Act. Makes legislative declarations and findings concerning the deployment of energy storage systems. Provides that the Illinois Power Agency has the power to conduct competitive solicitations to procure energy storage resources and conduct procurement events by which electric utilities execute contracts to purchase energy storage resources. Provides that the Agency shall develop a storage procurement plan that results in the electric utilities contracting for energy storage capacity from contracted energy storage systems. Provides that the Agency shall develop a storage procurement plan that results in the electric utilities contracting for energy storage resources from contracted energy storage systems in specified amounts. Provides that within 180 days of the effective date of the amendatory Act, the Agency shall develop an energy storage procurement plan. Provides that for all procurements of energy storage resources, the Agency shall direct respondents to offer a strike price. Authorizes the Agency to develop and implement a firm energy resource procurement plan. Provides that no later than December 31, 2026 and every 2 years thereafter, the Agency shall conduct an analysis to determine whether the contracted quantity of energy storage in energy storage capacity and energy storage duration is sufficient to support the State's renewable energy standards and carbon emission standards. Defines terms. Makes corresponding changes in the Public Utilities Act. Effective immediately.
LRB103 38715 CES 69699 b

A BILL FOR

HB5544LRB103 38715 CES 69699 b
1 AN ACT concerning regulation.
2 Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
4 Section 5. The Illinois Power Agency Act is amended by
5changing Sections 1-5, 1-10, 1-20, and 1-75 and by adding
6Section 1-93 and 1-94 as follows:
7 (20 ILCS 3855/1-5)
8 Sec. 1-5. Legislative declarations and findings. The
9General Assembly finds and declares:
10 (1) The health, welfare, and prosperity of all
11 Illinois residents require the provision of adequate,
12 reliable, affordable, efficient, and environmentally
13 sustainable electric service at the lowest total cost over
14 time, taking into account any benefits of price stability.
15 (1.5) To provide the highest quality of life for the
16 residents of Illinois and to provide for a clean and
17 healthy environment, it is the policy of this State to
18 rapidly transition to 100% clean energy by 2050.
19 (2) (Blank).
20 (3) (Blank).
21 (4) It is necessary to improve the process of
22 procuring electricity to serve Illinois residents, to
23 promote investment in energy efficiency and

HB5544- 2 -LRB103 38715 CES 69699 b
1 demand-response measures, and to maintain and support
2 development of clean coal technologies, generation
3 resources that operate at all hours of the day and under
4 all weather conditions, zero emission facilities, and
5 renewable resources.
6 (5) Procuring a diverse electricity supply portfolio
7 will ensure the lowest total cost over time for adequate,
8 reliable, efficient, and environmentally sustainable
9 electric service.
10 (6) Including renewable resources and zero emission
11 credits from zero emission facilities in that portfolio
12 will reduce long-term direct and indirect costs to
13 consumers by decreasing environmental impacts and by
14 avoiding or delaying the need for new generation,
15 transmission, and distribution infrastructure. Developing
16 new renewable energy resources in Illinois, including
17 brownfield solar projects and community solar projects,
18 will help to diversify Illinois electricity supply, avoid
19 and reduce pollution, reduce peak demand, and enhance
20 public health and well-being of Illinois residents.
21 (7) Developing community solar projects in Illinois
22 will help to expand access to renewable energy resources
23 to more Illinois residents.
24 (8) Developing brownfield solar projects in Illinois
25 will help return blighted or contaminated land to
26 productive use while enhancing public health and the

HB5544- 3 -LRB103 38715 CES 69699 b
1 well-being of Illinois residents, including those in
2 environmental justice communities.
3 (9) Energy efficiency, demand-response measures, zero
4 emission energy, and renewable energy are resources
5 currently underused in Illinois. These resources should be
6 used, when cost effective, to reduce costs to consumers,
7 improve reliability, and improve environmental quality and
8 public health.
9 (10) The State should encourage the use of advanced
10 clean coal technologies that capture and sequester carbon
11 dioxide emissions to advance environmental protection
12 goals and to demonstrate the viability of coal and
13 coal-derived fuels in a carbon-constrained economy.
14 (10.5) The State should encourage the development of
15 interregional high voltage direct current (HVDC)
16 transmission lines that benefit Illinois. All ratepayers
17 in the State served by the regional transmission
18 organization where the HVDC converter station is
19 interconnected benefit from the long-term price stability
20 and market access provided by interregional HVDC
21 transmission facilities. The benefits to Illinois include:
22 reduction in wholesale power prices; access to lower-cost
23 markets; enabling the integration of additional renewable
24 generating units within the State through near
25 instantaneous dispatchability and the provision of
26 ancillary services; creating good-paying union jobs in

HB5544- 4 -LRB103 38715 CES 69699 b
1 Illinois; and, enhancing grid reliability and climate
2 resilience via HVDC facilities that are installed
3 underground.
4 (10.6) The health, welfare, and safety of the people
5 of the State are advanced by developing new HVDC
6 transmission lines predominantly along transportation
7 rights-of-way, with an HVDC converter station that is
8 located in the service territory of a public utility as
9 defined in Section 3-105 of the Public Utilities Act
10 serving more than 3,000,000 retail customers, and with a
11 project labor agreement as defined in Section 1-10 of this
12 Act.
13 (11) The General Assembly enacted Public Act 96-0795
14 to reform the State's purchasing processes, recognizing
15 that government procurement is susceptible to abuse if
16 structural and procedural safeguards are not in place to
17 ensure independence, insulation, oversight, and
18 transparency.
19 (12) The principles that underlie the procurement
20 reform legislation apply also in the context of power
21 purchasing.
22 (13) To ensure that the benefits of installing
23 renewable resources are available to all Illinois
24 residents and located across the State, subject to
25 appropriation, it is necessary for the Agency to provide
26 public information and educational resources on how

HB5544- 5 -LRB103 38715 CES 69699 b
1 residents can benefit from the expansion of renewable
2 energy in Illinois and participate in the Illinois Solar
3 for All Program established in Section 1-56, the
4 Adjustable Block program established in Section 1-75, the
5 job training programs established by paragraph (1) of
6 subsection (a) of Section 16-108.12 of the Public
7 Utilities Act, and the programs and resources established
8 by the Energy Transition Act.
9 (14) The deployment of energy storage systems is
10 necessary to achieve high levels of renewable energy, to
11 avoid the use of peaking fossil fuel plants, and to
12 maintain an efficient, reliable, and resilient electric
13 grid.
14 The General Assembly therefore finds that it is necessary
15to create the Illinois Power Agency and that the goals and
16objectives of that Agency are to accomplish each of the
17following:
18 (A) Develop electricity procurement plans to ensure
19 adequate, reliable, affordable, efficient, and
20 environmentally sustainable electric service at the lowest
21 total cost over time, taking into account any benefits of
22 price stability, for electric utilities that on December
23 31, 2005 provided electric service to at least 100,000
24 customers in Illinois and for small multi-jurisdictional
25 electric utilities that (i) on December 31, 2005 served
26 less than 100,000 customers in Illinois and (ii) request a

HB5544- 6 -LRB103 38715 CES 69699 b
1 procurement plan for their Illinois jurisdictional load.
2 The procurement plan shall be updated on an annual basis
3 and shall include renewable energy resources and,
4 beginning with the delivery year commencing June 1, 2017,
5 zero emission credits from zero emission facilities
6 sufficient to achieve the standards specified in this Act.
7 (B) Conduct the competitive procurement processes
8 identified in this Act.
9 (C) Develop electric generation and co-generation
10 facilities that use indigenous coal or renewable
11 resources, or both, financed with bonds issued by the
12 Illinois Finance Authority.
13 (D) Supply electricity from the Agency's facilities at
14 cost to one or more of the following: municipal electric
15 systems, governmental aggregators, or rural electric
16 cooperatives in Illinois.
17 (E) Ensure that the process of power procurement is
18 conducted in an ethical and transparent fashion, immune
19 from improper influence.
20 (F) Continue to review its policies and practices to
21 determine how best to meet its mission of providing the
22 lowest cost power to the greatest number of people, at any
23 given point in time, in accordance with applicable law.
24 (G) Operate in a structurally insulated, independent,
25 and transparent fashion so that nothing impedes the
26 Agency's mission to secure power at the best prices the

HB5544- 7 -LRB103 38715 CES 69699 b
1 market will bear, provided that the Agency meets all
2 applicable legal requirements.
3 (H) Implement renewable energy procurement and
4 training programs throughout the State to diversify
5 Illinois electricity supply, improve reliability, avoid
6 and reduce pollution, reduce peak demand, and enhance
7 public health and well-being of Illinois residents,
8 including low-income residents.
9 (I) Implement procurements to cost-effectively deploy
10 contracted energy storage systems.
11(Source: P.A. 102-662, eff. 9-15-21.)
12 (20 ILCS 3855/1-10)
13 Sec. 1-10. Definitions.
14 "Agency" means the Illinois Power Agency.
15 "Agency loan agreement" means any agreement pursuant to
16which the Illinois Finance Authority agrees to loan the
17proceeds of revenue bonds issued with respect to a project to
18the Agency upon terms providing for loan repayment
19installments at least sufficient to pay when due all principal
20of, interest and premium, if any, on those revenue bonds, and
21providing for maintenance, insurance, and other matters in
22respect of the project.
23 "Authority" means the Illinois Finance Authority.
24 "Brownfield site photovoltaic project" means photovoltaics
25that are either:

HB5544- 8 -LRB103 38715 CES 69699 b
1 (1) interconnected to an electric utility as defined
2 in this Section, a municipal utility as defined in this
3 Section, a public utility as defined in Section 3-105 of
4 the Public Utilities Act, or an electric cooperative as
5 defined in Section 3-119 of the Public Utilities Act and
6 located at a site that is regulated by any of the following
7 entities under the following programs:
8 (A) the United States Environmental Protection
9 Agency under the federal Comprehensive Environmental
10 Response, Compensation, and Liability Act of 1980, as
11 amended;
12 (B) the United States Environmental Protection
13 Agency under the Corrective Action Program of the
14 federal Resource Conservation and Recovery Act, as
15 amended;
16 (C) the Illinois Environmental Protection Agency
17 under the Illinois Site Remediation Program; or
18 (D) the Illinois Environmental Protection Agency
19 under the Illinois Solid Waste Program; or
20 (2) located at the site of a coal mine that has
21 permanently ceased coal production, permanently halted any
22 re-mining operations, and is no longer accepting any coal
23 combustion residues; has both completed all clean-up and
24 remediation obligations under the federal Surface Mining
25 and Reclamation Act of 1977 and all applicable Illinois
26 rules and any other clean-up, remediation, or ongoing

HB5544- 9 -LRB103 38715 CES 69699 b
1 monitoring to safeguard the health and well-being of the
2 people of the State of Illinois, as well as demonstrated
3 compliance with all applicable federal and State
4 environmental rules and regulations, including, but not
5 limited, to 35 Ill. Adm. Code Part 845 and any rules for
6 historic fill of coal combustion residuals, including any
7 rules finalized in Subdocket A of Illinois Pollution
8 Control Board docket R2020-019.
9 "Clean coal facility" means an electric generating
10facility that uses primarily coal as a feedstock and that
11captures and sequesters carbon dioxide emissions at the
12following levels: at least 50% of the total carbon dioxide
13emissions that the facility would otherwise emit if, at the
14time construction commences, the facility is scheduled to
15commence operation before 2016, at least 70% of the total
16carbon dioxide emissions that the facility would otherwise
17emit if, at the time construction commences, the facility is
18scheduled to commence operation during 2016 or 2017, and at
19least 90% of the total carbon dioxide emissions that the
20facility would otherwise emit if, at the time construction
21commences, the facility is scheduled to commence operation
22after 2017. The power block of the clean coal facility shall
23not exceed allowable emission rates for sulfur dioxide,
24nitrogen oxides, carbon monoxide, particulates and mercury for
25a natural gas-fired combined-cycle facility the same size as
26and in the same location as the clean coal facility at the time

HB5544- 10 -LRB103 38715 CES 69699 b
1the clean coal facility obtains an approved air permit. All
2coal used by a clean coal facility shall have high volatile
3bituminous rank and greater than 1.7 pounds of sulfur per
4million Btu content, unless the clean coal facility does not
5use gasification technology and was operating as a
6conventional coal-fired electric generating facility on June
71, 2009 (the effective date of Public Act 95-1027).
8 "Clean coal SNG brownfield facility" means a facility that
9(1) has commenced construction by July 1, 2015 on an urban
10brownfield site in a municipality with at least 1,000,000
11residents; (2) uses a gasification process to produce
12substitute natural gas; (3) uses coal as at least 50% of the
13total feedstock over the term of any sourcing agreement with a
14utility and the remainder of the feedstock may be either
15petroleum coke or coal, with all such coal having a high
16bituminous rank and greater than 1.7 pounds of sulfur per
17million Btu content unless the facility reasonably determines
18that it is necessary to use additional petroleum coke to
19deliver additional consumer savings, in which case the
20facility shall use coal for at least 35% of the total feedstock
21over the term of any sourcing agreement; and (4) captures and
22sequesters at least 85% of the total carbon dioxide emissions
23that the facility would otherwise emit.
24 "Clean coal SNG facility" means a facility that uses a
25gasification process to produce substitute natural gas, that
26sequesters at least 90% of the total carbon dioxide emissions

HB5544- 11 -LRB103 38715 CES 69699 b
1that the facility would otherwise emit, that uses at least 90%
2coal as a feedstock, with all such coal having a high
3bituminous rank and greater than 1.7 pounds of sulfur per
4million Btu content, and that has a valid and effective permit
5to construct emission sources and air pollution control
6equipment and approval with respect to the federal regulations
7for Prevention of Significant Deterioration of Air Quality
8(PSD) for the plant pursuant to the federal Clean Air Act;
9provided, however, a clean coal SNG brownfield facility shall
10not be a clean coal SNG facility.
11 "Clean energy" means energy generation that is 90% or
12greater free of carbon dioxide emissions.
13 "Commission" means the Illinois Commerce Commission.
14 "Community renewable generation project" means an electric
15generating facility that:
16 (1) is powered by wind, solar thermal energy,
17 photovoltaic cells or panels, biodiesel, crops and
18 untreated and unadulterated organic waste biomass, and
19 hydropower that does not involve new construction of dams;
20 (2) is interconnected at the distribution system level
21 of an electric utility as defined in this Section, a
22 municipal utility as defined in this Section that owns or
23 operates electric distribution facilities, a public
24 utility as defined in Section 3-105 of the Public
25 Utilities Act, or an electric cooperative, as defined in
26 Section 3-119 of the Public Utilities Act;

HB5544- 12 -LRB103 38715 CES 69699 b
1 (3) credits the value of electricity generated by the
2 facility to the subscribers of the facility; and
3 (4) is limited in nameplate capacity to less than or
4 equal to 5,000 kilowatts.
5 "Costs incurred in connection with the development and
6construction of a facility" means:
7 (1) the cost of acquisition of all real property,
8 fixtures, and improvements in connection therewith and
9 equipment, personal property, and other property, rights,
10 and easements acquired that are deemed necessary for the
11 operation and maintenance of the facility;
12 (2) financing costs with respect to bonds, notes, and
13 other evidences of indebtedness of the Agency;
14 (3) all origination, commitment, utilization,
15 facility, placement, underwriting, syndication, credit
16 enhancement, and rating agency fees;
17 (4) engineering, design, procurement, consulting,
18 legal, accounting, title insurance, survey, appraisal,
19 escrow, trustee, collateral agency, interest rate hedging,
20 interest rate swap, capitalized interest, contingency, as
21 required by lenders, and other financing costs, and other
22 expenses for professional services; and
23 (5) the costs of plans, specifications, site study and
24 investigation, installation, surveys, other Agency costs
25 and estimates of costs, and other expenses necessary or
26 incidental to determining the feasibility of any project,

HB5544- 13 -LRB103 38715 CES 69699 b
1 together with such other expenses as may be necessary or
2 incidental to the financing, insuring, acquisition, and
3 construction of a specific project and starting up,
4 commissioning, and placing that project in operation.
5 "Delivery services" has the same definition as found in
6Section 16-102 of the Public Utilities Act.
7 "Delivery year" means the consecutive 12-month period
8beginning June 1 of a given year and ending May 31 of the
9following year.
10 "Department" means the Department of Commerce and Economic
11Opportunity.
12 "Director" means the Director of the Illinois Power
13Agency.
14 "Demand-response" means measures that decrease peak
15electricity demand or shift demand from peak to off-peak
16periods.
17 "Distributed renewable energy generation device" means a
18device that is:
19 (1) powered by wind, solar thermal energy,
20 photovoltaic cells or panels, biodiesel, crops and
21 untreated and unadulterated organic waste biomass, tree
22 waste, and hydropower that does not involve new
23 construction of dams, waste heat to power systems, or
24 qualified combined heat and power systems;
25 (2) interconnected at the distribution system level of
26 either an electric utility as defined in this Section, a

HB5544- 14 -LRB103 38715 CES 69699 b
1 municipal utility as defined in this Section that owns or
2 operates electric distribution facilities, or a rural
3 electric cooperative as defined in Section 3-119 of the
4 Public Utilities Act;
5 (3) located on the customer side of the customer's
6 electric meter and is primarily used to offset that
7 customer's electricity load; and
8 (4) (blank).
9 "Energy efficiency" means measures that reduce the amount
10of electricity or natural gas consumed in order to achieve a
11given end use. "Energy efficiency" includes voltage
12optimization measures that optimize the voltage at points on
13the electric distribution voltage system and thereby reduce
14electricity consumption by electric customers' end use
15devices. "Energy efficiency" also includes measures that
16reduce the total Btus of electricity, natural gas, and other
17fuels needed to meet the end use or uses.
18 "Energy storage capacity" means the nameplate capacity of
19a contracted energy storage system, measured in megawatts AC.
20 "Energy storage credit" means a fungible credit that
21represents the flexibility value of a contracted energy
22storage system. An energy storage credit is produced for each
23one megawatt of energy storage capacity multiplied by the
24energy storage duration each day that the contracted energy
25storage system is interconnected with wholesale electricity
26markets.

HB5544- 15 -LRB103 38715 CES 69699 b
1 "Energy storage duration" means the number of hours over
2which an energy storage system is capable of continuously
3discharging energy at its full energy storage capacity.
4 "Energy storage system and energy storage resource" means
5commercially available technology that is capable of absorbing
6energy and storing it for use at a later time, including, but
7not limited to, electrochemical and electromechanical
8technologies. "Energy storage system and energy storage
9resource" does not include technologies that require
10combustion.
11 "Electric utility" has the same definition as found in
12Section 16-102 of the Public Utilities Act.
13 "Equity investment eligible community" or "eligible
14community" are synonymous and mean the geographic areas
15throughout Illinois which would most benefit from equitable
16investments by the State designed to combat discrimination.
17Specifically, the eligible communities shall be defined as the
18following areas:
19 (1) R3 Areas as established pursuant to Section 10-40
20 of the Cannabis Regulation and Tax Act, where residents
21 have historically been excluded from economic
22 opportunities, including opportunities in the energy
23 sector; and
24 (2) environmental justice communities, as defined by
25 the Illinois Power Agency pursuant to the Illinois Power
26 Agency Act, where residents have historically been subject

HB5544- 16 -LRB103 38715 CES 69699 b
1 to disproportionate burdens of pollution, including
2 pollution from the energy sector.
3 "Equity eligible persons" or "eligible persons" means
4persons who would most benefit from equitable investments by
5the State designed to combat discrimination, specifically:
6 (1) persons who graduate from or are current or former
7 participants in the Clean Jobs Workforce Network Program,
8 the Clean Energy Contractor Incubator Program, the
9 Illinois Climate Works Preapprenticeship Program,
10 Returning Residents Clean Jobs Training Program, or the
11 Clean Energy Primes Contractor Accelerator Program, and
12 the solar training pipeline and multi-cultural jobs
13 program created in paragraphs (a)(1) and (a)(3) of Section
14 16-208.12 of the Public Utilities Act;
15 (2) persons who are graduates of or currently enrolled
16 in the foster care system;
17 (3) persons who were formerly incarcerated;
18 (4) persons whose primary residence is in an equity
19 investment eligible community.
20 "Equity eligible contractor" means a business that is
21majority-owned by eligible persons, or a nonprofit or
22cooperative that is majority-governed by eligible persons, or
23is a natural person that is an eligible person offering
24personal services as an independent contractor.
25 "Facility" means an electric generating unit or a
26co-generating unit that produces electricity along with

HB5544- 17 -LRB103 38715 CES 69699 b
1related equipment necessary to connect the facility to an
2electric transmission or distribution system.
3 "General contractor" means the entity or organization with
4main responsibility for the building of a construction project
5and who is the party signing the prime construction contract
6for the project.
7 "Governmental aggregator" means one or more units of local
8government that individually or collectively procure
9electricity to serve residential retail electrical loads
10located within its or their jurisdiction.
11 "High voltage direct current converter station" means the
12collection of equipment that converts direct current energy
13from a high voltage direct current transmission line into
14alternating current using Voltage Source Conversion technology
15and that is interconnected with transmission or distribution
16assets located in Illinois.
17 "High voltage direct current renewable energy credit"
18means a renewable energy credit associated with a renewable
19energy resource where the renewable energy resource has
20entered into a contract to transmit the energy associated with
21such renewable energy credit over high voltage direct current
22transmission facilities.
23 "High voltage direct current transmission facilities"
24means the collection of installed equipment that converts
25alternating current energy in one location to direct current
26and transmits that direct current energy to a high voltage

HB5544- 18 -LRB103 38715 CES 69699 b
1direct current converter station using Voltage Source
2Conversion technology. "High voltage direct current
3transmission facilities" includes the high voltage direct
4current converter station itself and associated high voltage
5direct current transmission lines. Notwithstanding the
6preceding, after September 15, 2021 (the effective date of
7Public Act 102-662), an otherwise qualifying collection of
8equipment does not qualify as high voltage direct current
9transmission facilities unless its developer entered into a
10project labor agreement, is capable of transmitting
11electricity at 525kv with an Illinois converter station
12located and interconnected in the region of the PJM
13Interconnection, LLC, and the system does not operate as a
14public utility, as that term is defined in Section 3-105 of the
15Public Utilities Act.
16 "Hydropower" means any method of electricity generation or
17storage that results from the flow of water, including
18impoundment facilities, diversion facilities, and pumped
19storage facilities.
20 "Index price" means the real-time energy settlement price
21at the applicable Illinois trading hub, such as PJM-NIHUB or
22MISO-IL, for a given settlement period.
23 "Indexed renewable energy credit" means a tradable credit
24that represents the environmental attributes of one megawatt
25hour of energy produced from a renewable energy resource, the
26price of which shall be calculated by subtracting the strike

HB5544- 19 -LRB103 38715 CES 69699 b
1price offered by a new utility-scale wind project or a new
2utility-scale photovoltaic project from the index price in a
3given settlement period.
4 "Indexed renewable energy credit counterparty" has the
5same meaning as "public utility" as defined in Section 3-105
6of the Public Utilities Act.
7 "Local government" means a unit of local government as
8defined in Section 1 of Article VII of the Illinois
9Constitution.
10 "Long-duration energy storage" means an energy storage
11system capable of dispatching energy at its full rated
12capacity for 10 or more hours.
13 "Long-term energy storage contract" means a contract for
14the purchase of energy storage generated by an energy storage
15system for a period of at least 15 years.
16 "Multi-day energy storage" means an energy storage system
17capable of dispatching energy at its full rated capacity for
18greater than 24 hours.
19 "Modernized" or "retooled" means the construction, repair,
20maintenance, or significant expansion of turbines and existing
21hydropower dams.
22 "Municipality" means a city, village, or incorporated
23town.
24 "Municipal utility" means a public utility owned and
25operated by any subdivision or municipal corporation of this
26State.

HB5544- 20 -LRB103 38715 CES 69699 b
1 "Nameplate capacity" means the aggregate inverter
2nameplate capacity in kilowatts AC.
3 "Person" means any natural person, firm, partnership,
4corporation, either domestic or foreign, company, association,
5limited liability company, joint stock company, or association
6and includes any trustee, receiver, assignee, or personal
7representative thereof.
8 "Project" means the planning, bidding, and construction of
9a facility.
10 "Project labor agreement" means a pre-hire collective
11bargaining agreement that covers all terms and conditions of
12employment on a specific construction project and must include
13the following:
14 (1) provisions establishing the minimum hourly wage
15 for each class of labor organization employee;
16 (2) provisions establishing the benefits and other
17 compensation for each class of labor organization
18 employee;
19 (3) provisions establishing that no strike or disputes
20 will be engaged in by the labor organization employees;
21 (4) provisions establishing that no lockout or
22 disputes will be engaged in by the general contractor
23 building the project; and
24 (5) provisions for minorities and women, as defined
25 under the Business Enterprise for Minorities, Women, and
26 Persons with Disabilities Act, setting forth goals for

HB5544- 21 -LRB103 38715 CES 69699 b
1 apprenticeship hours to be performed by minorities and
2 women and setting forth goals for total hours to be
3 performed by underrepresented minorities and women.
4 A labor organization and the general contractor building
5the project shall have the authority to include other terms
6and conditions as they deem necessary.
7 "Public utility" has the same definition as found in
8Section 3-105 of the Public Utilities Act.
9 "Qualified combined heat and power systems" means systems
10that, either simultaneously or sequentially, produce
11electricity and useful thermal energy from a single fuel
12source. Such systems are eligible for "renewable energy
13credits" in an amount equal to its total energy output where a
14renewable fuel is consumed or in an amount equal to the net
15reduction in nonrenewable fuel consumed on a total energy
16output basis.
17 "Real property" means any interest in land together with
18all structures, fixtures, and improvements thereon, including
19lands under water and riparian rights, any easements,
20covenants, licenses, leases, rights-of-way, uses, and other
21interests, together with any liens, judgments, mortgages, or
22other claims or security interests related to real property.
23 "Renewable energy credit" means a tradable credit that
24represents the environmental attributes of one megawatt hour
25of energy produced from a renewable energy resource.
26 "Renewable energy resources" includes energy and its

HB5544- 22 -LRB103 38715 CES 69699 b
1associated renewable energy credit or renewable energy credits
2from wind, solar thermal energy, photovoltaic cells and
3panels, biodiesel, anaerobic digestion, crops and untreated
4and unadulterated organic waste biomass, and hydropower that
5does not involve new construction of dams, waste heat to power
6systems, or qualified combined heat and power systems. For
7purposes of this Act, landfill gas produced in the State is
8considered a renewable energy resource. "Renewable energy
9resources" does not include the incineration or burning of
10tires, garbage, general household, institutional, and
11commercial waste, industrial lunchroom or office waste,
12landscape waste, railroad crossties, utility poles, or
13construction or demolition debris, other than untreated and
14unadulterated waste wood. "Renewable energy resources" also
15includes high voltage direct current renewable energy credits
16and the associated energy converted to alternating current by
17a high voltage direct current converter station to the extent
18that: (1) the generator of such renewable energy resource
19contracted with a third party to transmit the energy over the
20high voltage direct current transmission facilities, and (2)
21the third-party contracting for delivery of renewable energy
22resources over the high voltage direct current transmission
23facilities have ownership rights over the unretired associated
24high voltage direct current renewable energy credit.
25 "Retail customer" has the same definition as found in
26Section 16-102 of the Public Utilities Act.

HB5544- 23 -LRB103 38715 CES 69699 b
1 "Revenue bond" means any bond, note, or other evidence of
2indebtedness issued by the Authority, the principal and
3interest of which is payable solely from revenues or income
4derived from any project or activity of the Agency.
5 "Sequester" means permanent storage of carbon dioxide by
6injecting it into a saline aquifer, a depleted gas reservoir,
7or an oil reservoir, directly or through an enhanced oil
8recovery process that may involve intermediate storage,
9regardless of whether these activities are conducted by a
10clean coal facility, a clean coal SNG facility, a clean coal
11SNG brownfield facility, or a party with which a clean coal
12facility, clean coal SNG facility, or clean coal SNG
13brownfield facility has contracted for such purposes.
14 "Service area" has the same definition as found in Section
1516-102 of the Public Utilities Act.
16 "Settlement period" means the period of time utilized by
17MISO and PJM and their successor organizations as the basis
18for settlement calculations in the real-time energy market.
19 "Sourcing agreement" means (i) in the case of an electric
20utility, an agreement between the owner of a clean coal
21facility and such electric utility, which agreement shall have
22terms and conditions meeting the requirements of paragraph (3)
23of subsection (d) of Section 1-75, (ii) in the case of an
24alternative retail electric supplier, an agreement between the
25owner of a clean coal facility and such alternative retail
26electric supplier, which agreement shall have terms and

HB5544- 24 -LRB103 38715 CES 69699 b
1conditions meeting the requirements of Section 16-115(d)(5) of
2the Public Utilities Act, and (iii) in case of a gas utility,
3an agreement between the owner of a clean coal SNG brownfield
4facility and the gas utility, which agreement shall have the
5terms and conditions meeting the requirements of subsection
6(h-1) of Section 9-220 of the Public Utilities Act.
7 "Strike price" means a contract price for energy and
8renewable energy credits from a new utility-scale wind project
9or a new utility-scale photovoltaic project.
10 "Subscriber" means a person who (i) takes delivery service
11from an electric utility, and (ii) has a subscription of no
12less than 200 watts to a community renewable generation
13project that is located in the electric utility's service
14area. No subscriber's subscriptions may total more than 40% of
15the nameplate capacity of an individual community renewable
16generation project. Entities that are affiliated by virtue of
17a common parent shall not represent multiple subscriptions
18that total more than 40% of the nameplate capacity of an
19individual community renewable generation project.
20 "Subscription" means an interest in a community renewable
21generation project expressed in kilowatts, which is sized
22primarily to offset part or all of the subscriber's
23electricity usage.
24 "Substitute natural gas" or "SNG" means a gas manufactured
25by gasification of hydrocarbon feedstock, which is
26substantially interchangeable in use and distribution with

HB5544- 25 -LRB103 38715 CES 69699 b
1conventional natural gas.
2 "Total resource cost test" or "TRC test" means a standard
3that is met if, for an investment in energy efficiency or
4demand-response measures, the benefit-cost ratio is greater
5than one. The benefit-cost ratio is the ratio of the net
6present value of the total benefits of the program to the net
7present value of the total costs as calculated over the
8lifetime of the measures. A total resource cost test compares
9the sum of avoided electric utility costs, representing the
10benefits that accrue to the system and the participant in the
11delivery of those efficiency measures and including avoided
12costs associated with reduced use of natural gas or other
13fuels, avoided costs associated with reduced water
14consumption, and avoided costs associated with reduced
15operation and maintenance costs, as well as other quantifiable
16societal benefits, to the sum of all incremental costs of
17end-use measures that are implemented due to the program
18(including both utility and participant contributions), plus
19costs to administer, deliver, and evaluate each demand-side
20program, to quantify the net savings obtained by substituting
21the demand-side program for supply resources. In calculating
22avoided costs of power and energy that an electric utility
23would otherwise have had to acquire, reasonable estimates
24shall be included of financial costs likely to be imposed by
25future regulations and legislation on emissions of greenhouse
26gases. In discounting future societal costs and benefits for

HB5544- 26 -LRB103 38715 CES 69699 b
1the purpose of calculating net present values, a societal
2discount rate based on actual, long-term Treasury bond yields
3should be used. Notwithstanding anything to the contrary, the
4TRC test shall not include or take into account a calculation
5of market price suppression effects or demand reduction
6induced price effects.
7 "Utility-scale solar project" means an electric generating
8facility that:
9 (1) generates electricity using photovoltaic cells;
10 and
11 (2) has a nameplate capacity that is greater than
12 5,000 kilowatts.
13 "Utility-scale wind project" means an electric generating
14facility that:
15 (1) generates electricity using wind; and
16 (2) has a nameplate capacity that is greater than
17 5,000 kilowatts.
18 "Waste Heat to Power Systems" means systems that capture
19and generate electricity from energy that would otherwise be
20lost to the atmosphere without the use of additional fuel.
21 "Zero emission credit" means a tradable credit that
22represents the environmental attributes of one megawatt hour
23of energy produced from a zero emission facility.
24 "Zero emission facility" means a facility that: (1) is
25fueled by nuclear power; and (2) is interconnected with PJM
26Interconnection, LLC or the Midcontinent Independent System

HB5544- 27 -LRB103 38715 CES 69699 b
1Operator, Inc., or their successors.
2(Source: P.A. 102-662, eff. 9-15-21; 103-154, eff. 6-28-23;
3103-380, eff. 1-1-24.)
4 (20 ILCS 3855/1-20)
5 Sec. 1-20. General powers and duties of the Agency.
6 (a) The Agency is authorized to do each of the following:
7 (1) Develop electricity procurement plans to ensure
8 adequate, reliable, affordable, efficient, and
9 environmentally sustainable electric service at the lowest
10 total cost over time, taking into account any benefits of
11 price stability, for electric utilities that on December
12 31, 2005 provided electric service to at least 100,000
13 customers in Illinois and for small multi-jurisdictional
14 electric utilities that (A) on December 31, 2005 served
15 less than 100,000 customers in Illinois and (B) request a
16 procurement plan for their Illinois jurisdictional load.
17 Except as provided in paragraph (1.5) of this subsection
18 (a), the electricity procurement plans shall be updated on
19 an annual basis and shall include electricity generated
20 from renewable resources sufficient to achieve the
21 standards specified in this Act. Beginning with the
22 delivery year commencing June 1, 2017, develop procurement
23 plans to include zero emission credits generated from zero
24 emission facilities sufficient to achieve the standards
25 specified in this Act. Beginning with the delivery year

HB5544- 28 -LRB103 38715 CES 69699 b
1 commencing on June 1, 2022, the Agency is authorized to
2 develop carbon mitigation credit procurement plans to
3 include carbon mitigation credits generated from
4 carbon-free energy resources sufficient to achieve the
5 standards specified in this Act.
6 (1.5) Develop a long-term renewable resources
7 procurement plan in accordance with subsection (c) of
8 Section 1-75 of this Act for renewable energy credits in
9 amounts sufficient to achieve the standards specified in
10 this Act for delivery years commencing June 1, 2017 and
11 for the programs and renewable energy credits specified in
12 Section 1-56 of this Act. Electricity procurement plans
13 for delivery years commencing after May 31, 2017, shall
14 not include procurement of renewable energy resources.
15 (2) Conduct competitive procurement processes to
16 procure the supply resources identified in the electricity
17 procurement plan, pursuant to Section 16-111.5 of the
18 Public Utilities Act, and, for the delivery year
19 commencing June 1, 2017, conduct procurement processes to
20 procure zero emission credits from zero emission
21 facilities, under subsection (d-5) of Section 1-75 of this
22 Act. For the delivery year commencing June 1, 2022, the
23 Agency is authorized to conduct procurement processes to
24 procure carbon mitigation credits from carbon-free energy
25 resources, under subsection (d-10) of Section 1-75 of this
26 Act.

HB5544- 29 -LRB103 38715 CES 69699 b
1 (2.5) Beginning with the procurement for the 2017
2 delivery year, conduct competitive procurement processes
3 and implement programs to procure renewable energy credits
4 identified in the long-term renewable resources
5 procurement plan developed and approved under subsection
6 (c) of Section 1-75 of this Act and Section 16-111.5 of the
7 Public Utilities Act.
8 (2.10) Oversee the procurement by electric utilities
9 that served more than 300,000 customers in this State as
10 of January 1, 2019 of renewable energy credits from new
11 renewable energy facilities to be installed, along with
12 energy storage facilities, at or adjacent to the sites of
13 electric generating facilities that burned coal as their
14 primary fuel source as of January 1, 2016 in accordance
15 with subsection (c-5) of Section 1-75 of this Act.
16 (2.15) Oversee the procurement by electric utilities
17 of renewable energy credits from newly modernized or
18 retooled hydropower dams or dams that have been converted
19 to support hydropower generation.
20 (3) Develop electric generation and co-generation
21 facilities that use indigenous coal or renewable
22 resources, or both, financed with bonds issued by the
23 Illinois Finance Authority.
24 (4) Supply electricity from the Agency's facilities at
25 cost to one or more of the following: municipal electric
26 systems, governmental aggregators, or rural electric

HB5544- 30 -LRB103 38715 CES 69699 b
1 cooperatives in Illinois.
2 (5) Conduct competitive solicitations to procure
3 energy storage resources sufficient to achieve, at
4 minimum, the energy storage standard under Section 1-93 of
5 this Act.
6 (b) Except as otherwise limited by this Act, the Agency
7has all of the powers necessary or convenient to carry out the
8purposes and provisions of this Act, including without
9limitation, each of the following:
10 (1) To have a corporate seal, and to alter that seal at
11 pleasure, and to use it by causing it or a facsimile to be
12 affixed or impressed or reproduced in any other manner.
13 (2) To use the services of the Illinois Finance
14 Authority necessary to carry out the Agency's purposes.
15 (3) To negotiate and enter into loan agreements and
16 other agreements with the Illinois Finance Authority.
17 (4) To obtain and employ personnel and hire
18 consultants that are necessary to fulfill the Agency's
19 purposes, and to make expenditures for that purpose within
20 the appropriations for that purpose.
21 (5) To purchase, receive, take by grant, gift, devise,
22 bequest, or otherwise, lease, or otherwise acquire, own,
23 hold, improve, employ, use, and otherwise deal in and
24 with, real or personal property whether tangible or
25 intangible, or any interest therein, within the State.
26 (6) To acquire real or personal property, whether

HB5544- 31 -LRB103 38715 CES 69699 b
1 tangible or intangible, including without limitation
2 property rights, interests in property, franchises,
3 obligations, contracts, and debt and equity securities,
4 and to do so by the exercise of the power of eminent domain
5 in accordance with Section 1-21; except that any real
6 property acquired by the exercise of the power of eminent
7 domain must be located within the State.
8 (7) To sell, convey, lease, exchange, transfer,
9 abandon, or otherwise dispose of, or mortgage, pledge, or
10 create a security interest in, any of its assets,
11 properties, or any interest therein, wherever situated.
12 (8) To purchase, take, receive, subscribe for, or
13 otherwise acquire, hold, make a tender offer for, vote,
14 employ, sell, lend, lease, exchange, transfer, or
15 otherwise dispose of, mortgage, pledge, or grant a
16 security interest in, use, and otherwise deal in and with,
17 bonds and other obligations, shares, or other securities
18 (or interests therein) issued by others, whether engaged
19 in a similar or different business or activity.
20 (9) To make and execute agreements, contracts, and
21 other instruments necessary or convenient in the exercise
22 of the powers and functions of the Agency under this Act,
23 including contracts with any person, including personal
24 service contracts, or with any local government, State
25 agency, or other entity; and all State agencies and all
26 local governments are authorized to enter into and do all

HB5544- 32 -LRB103 38715 CES 69699 b
1 things necessary to perform any such agreement, contract,
2 or other instrument with the Agency. No such agreement,
3 contract, or other instrument shall exceed 40 years.
4 (10) To lend money, invest and reinvest its funds in
5 accordance with the Public Funds Investment Act, and take
6 and hold real and personal property as security for the
7 payment of funds loaned or invested.
8 (11) To borrow money at such rate or rates of interest
9 as the Agency may determine, issue its notes, bonds, or
10 other obligations to evidence that indebtedness, and
11 secure any of its obligations by mortgage or pledge of its
12 real or personal property, machinery, equipment,
13 structures, fixtures, inventories, revenues, grants, and
14 other funds as provided or any interest therein, wherever
15 situated.
16 (12) To enter into agreements with the Illinois
17 Finance Authority to issue bonds whether or not the income
18 therefrom is exempt from federal taxation.
19 (13) To procure insurance against any loss in
20 connection with its properties or operations in such
21 amount or amounts and from such insurers, including the
22 federal government, as it may deem necessary or desirable,
23 and to pay any premiums therefor.
24 (14) To negotiate and enter into agreements with
25 trustees or receivers appointed by United States
26 bankruptcy courts or federal district courts or in other

HB5544- 33 -LRB103 38715 CES 69699 b
1 proceedings involving adjustment of debts and authorize
2 proceedings involving adjustment of debts and authorize
3 legal counsel for the Agency to appear in any such
4 proceedings.
5 (15) To file a petition under Chapter 9 of Title 11 of
6 the United States Bankruptcy Code or take other similar
7 action for the adjustment of its debts.
8 (16) To enter into management agreements for the
9 operation of any of the property or facilities owned by
10 the Agency.
11 (17) To enter into an agreement to transfer and to
12 transfer any land, facilities, fixtures, or equipment of
13 the Agency to one or more municipal electric systems,
14 governmental aggregators, or rural electric agencies or
15 cooperatives, for such consideration and upon such terms
16 as the Agency may determine to be in the best interest of
17 the residents of Illinois.
18 (18) To enter upon any lands and within any building
19 whenever in its judgment it may be necessary for the
20 purpose of making surveys and examinations to accomplish
21 any purpose authorized by this Act.
22 (19) To maintain an office or offices at such place or
23 places in the State as it may determine.
24 (20) To request information, and to make any inquiry,
25 investigation, survey, or study that the Agency may deem
26 necessary to enable it effectively to carry out the

HB5544- 34 -LRB103 38715 CES 69699 b
1 provisions of this Act.
2 (21) To accept and expend appropriations.
3 (22) To engage in any activity or operation that is
4 incidental to and in furtherance of efficient operation to
5 accomplish the Agency's purposes, including hiring
6 employees that the Director deems essential for the
7 operations of the Agency.
8 (23) To adopt, revise, amend, and repeal rules with
9 respect to its operations, properties, and facilities as
10 may be necessary or convenient to carry out the purposes
11 of this Act, subject to the provisions of the Illinois
12 Administrative Procedure Act and Sections 1-22 and 1-35 of
13 this Act.
14 (24) To establish and collect charges and fees as
15 described in this Act.
16 (25) To conduct competitive gasification feedstock
17 procurement processes to procure the feedstocks for the
18 clean coal SNG brownfield facility in accordance with the
19 requirements of Section 1-78 of this Act.
20 (26) To review, revise, and approve sourcing
21 agreements and mediate and resolve disputes between gas
22 utilities and the clean coal SNG brownfield facility
23 pursuant to subsection (h-1) of Section 9-220 of the
24 Public Utilities Act.
25 (27) To request, review and accept proposals, execute
26 contracts, purchase renewable energy credits and otherwise

HB5544- 35 -LRB103 38715 CES 69699 b
1 dedicate funds from the Illinois Power Agency Renewable
2 Energy Resources Fund to create and carry out the
3 objectives of the Illinois Solar for All Program in
4 accordance with Section 1-56 of this Act.
5 (28) To ensure Illinois residents and business benefit
6 from programs administered by the Agency and are properly
7 protected from any deceptive or misleading marketing
8 practices by participants in the Agency's programs and
9 procurements.
10 (29) To conduct procurement events by which electric
11 utilities execute contracts to purchase energy storage
12 resources.
13 (c) In conducting the procurement of electricity or other
14products, beginning January 1, 2022, the Agency shall not
15procure any products or services from persons or organizations
16that are in violation of the Displaced Energy Workers Bill of
17Rights, as provided under the Energy Community Reinvestment
18Act at the time of the procurement event or fail to comply the
19labor standards established in subparagraph (Q) of paragraph
20(1) of subsection (c) of Section 1-75.
21(Source: P.A. 102-662, eff. 9-15-21; 103-380, eff. 1-1-24.)
22 (20 ILCS 3855/1-75)
23 Sec. 1-75. Planning and Procurement Bureau. The Planning
24and Procurement Bureau has the following duties and
25responsibilities:

HB5544- 36 -LRB103 38715 CES 69699 b
1 (a) The Planning and Procurement Bureau shall each year,
2beginning in 2008, develop procurement plans and conduct
3competitive procurement processes in accordance with the
4requirements of Section 16-111.5 of the Public Utilities Act
5for the eligible retail customers of electric utilities that
6on December 31, 2005 provided electric service to at least
7100,000 customers in Illinois. Beginning with the delivery
8year commencing on June 1, 2017, the Planning and Procurement
9Bureau shall develop plans and processes for the procurement
10of zero emission credits from zero emission facilities in
11accordance with the requirements of subsection (d-5) of this
12Section. Beginning on the effective date of this amendatory
13Act of the 102nd General Assembly, the Planning and
14Procurement Bureau shall develop plans and processes for the
15procurement of carbon mitigation credits from carbon-free
16energy resources in accordance with the requirements of
17subsection (d-10) of this Section. The Planning and
18Procurement Bureau shall also develop procurement plans and
19conduct competitive procurement processes in accordance with
20the requirements of Section 16-111.5 of the Public Utilities
21Act for the eligible retail customers of small
22multi-jurisdictional electric utilities that (i) on December
2331, 2005 served less than 100,000 customers in Illinois and
24(ii) request a procurement plan for their Illinois
25jurisdictional load. This Section shall not apply to a small
26multi-jurisdictional utility until such time as a small

HB5544- 37 -LRB103 38715 CES 69699 b
1multi-jurisdictional utility requests the Agency to prepare a
2procurement plan for their Illinois jurisdictional load. For
3the purposes of this Section, the term "eligible retail
4customers" has the same definition as found in Section
516-111.5(a) of the Public Utilities Act.
6 Beginning with the plan or plans to be implemented in the
72017 delivery year, the Agency shall no longer include the
8procurement of renewable energy resources in the annual
9procurement plans required by this subsection (a), except as
10provided in subsection (q) of Section 16-111.5 of the Public
11Utilities Act, and shall instead develop a long-term renewable
12resources procurement plan in accordance with subsection (c)
13of this Section and Section 16-111.5 of the Public Utilities
14Act.
15 In accordance with subsection (c-5) of this Section, the
16Planning and Procurement Bureau shall oversee the procurement
17by electric utilities that served more than 300,000 retail
18customers in this State as of January 1, 2019 of renewable
19energy credits from new utility-scale solar projects to be
20installed, along with energy storage facilities, at or
21adjacent to the sites of electric generating facilities that,
22as of January 1, 2016, burned coal as their primary fuel
23source.
24 (1) The Agency shall each year, beginning in 2008, as
25 needed, issue a request for qualifications for experts or
26 expert consulting firms to develop the procurement plans

HB5544- 38 -LRB103 38715 CES 69699 b
1 in accordance with Section 16-111.5 of the Public
2 Utilities Act. In order to qualify an expert or expert
3 consulting firm must have:
4 (A) direct previous experience assembling
5 large-scale power supply plans or portfolios for
6 end-use customers;
7 (B) an advanced degree in economics, mathematics,
8 engineering, risk management, or a related area of
9 study;
10 (C) 10 years of experience in the electricity
11 sector, including managing supply risk;
12 (D) expertise in wholesale electricity market
13 rules, including those established by the Federal
14 Energy Regulatory Commission and regional transmission
15 organizations;
16 (E) expertise in credit protocols and familiarity
17 with contract protocols;
18 (F) adequate resources to perform and fulfill the
19 required functions and responsibilities; and
20 (G) the absence of a conflict of interest and
21 inappropriate bias for or against potential bidders or
22 the affected electric utilities.
23 (2) The Agency shall each year, as needed, issue a
24 request for qualifications for a procurement administrator
25 to conduct the competitive procurement processes in
26 accordance with Section 16-111.5 of the Public Utilities

HB5544- 39 -LRB103 38715 CES 69699 b
1 Act. In order to qualify an expert or expert consulting
2 firm must have:
3 (A) direct previous experience administering a
4 large-scale competitive procurement process;
5 (B) an advanced degree in economics, mathematics,
6 engineering, or a related area of study;
7 (C) 10 years of experience in the electricity
8 sector, including risk management experience;
9 (D) expertise in wholesale electricity market
10 rules, including those established by the Federal
11 Energy Regulatory Commission and regional transmission
12 organizations;
13 (E) expertise in credit and contract protocols;
14 (F) adequate resources to perform and fulfill the
15 required functions and responsibilities; and
16 (G) the absence of a conflict of interest and
17 inappropriate bias for or against potential bidders or
18 the affected electric utilities.
19 (3) The Agency shall provide affected utilities and
20 other interested parties with the lists of qualified
21 experts or expert consulting firms identified through the
22 request for qualifications processes that are under
23 consideration to develop the procurement plans and to
24 serve as the procurement administrator. The Agency shall
25 also provide each qualified expert's or expert consulting
26 firm's response to the request for qualifications. All

HB5544- 40 -LRB103 38715 CES 69699 b
1 information provided under this subparagraph shall also be
2 provided to the Commission. The Agency may provide by rule
3 for fees associated with supplying the information to
4 utilities and other interested parties. These parties
5 shall, within 5 business days, notify the Agency in
6 writing if they object to any experts or expert consulting
7 firms on the lists. Objections shall be based on:
8 (A) failure to satisfy qualification criteria;
9 (B) identification of a conflict of interest; or
10 (C) evidence of inappropriate bias for or against
11 potential bidders or the affected utilities.
12 The Agency shall remove experts or expert consulting
13 firms from the lists within 10 days if there is a
14 reasonable basis for an objection and provide the updated
15 lists to the affected utilities and other interested
16 parties. If the Agency fails to remove an expert or expert
17 consulting firm from a list, an objecting party may seek
18 review by the Commission within 5 days thereafter by
19 filing a petition, and the Commission shall render a
20 ruling on the petition within 10 days. There is no right of
21 appeal of the Commission's ruling.
22 (4) The Agency shall issue requests for proposals to
23 the qualified experts or expert consulting firms to
24 develop a procurement plan for the affected utilities and
25 to serve as procurement administrator.
26 (5) The Agency shall select an expert or expert

HB5544- 41 -LRB103 38715 CES 69699 b
1 consulting firm to develop procurement plans based on the
2 proposals submitted and shall award contracts of up to 5
3 years to those selected.
4 (6) The Agency shall select an expert or expert
5 consulting firm, with approval of the Commission, to serve
6 as procurement administrator based on the proposals
7 submitted. If the Commission rejects, within 5 days, the
8 Agency's selection, the Agency shall submit another
9 recommendation within 3 days based on the proposals
10 submitted. The Agency shall award a 5-year contract to the
11 expert or expert consulting firm so selected with
12 Commission approval.
13 (b) The experts or expert consulting firms retained by the
14Agency shall, as appropriate, prepare procurement plans, and
15conduct a competitive procurement process as prescribed in
16Section 16-111.5 of the Public Utilities Act, to ensure
17adequate, reliable, affordable, efficient, and environmentally
18sustainable electric service at the lowest total cost over
19time, taking into account any benefits of price stability, for
20eligible retail customers of electric utilities that on
21December 31, 2005 provided electric service to at least
22100,000 customers in the State of Illinois, and for eligible
23Illinois retail customers of small multi-jurisdictional
24electric utilities that (i) on December 31, 2005 served less
25than 100,000 customers in Illinois and (ii) request a
26procurement plan for their Illinois jurisdictional load.

HB5544- 42 -LRB103 38715 CES 69699 b
1 (c) Renewable portfolio standard.
2 (1)(A) The Agency shall develop a long-term renewable
3 resources procurement plan that shall include procurement
4 programs and competitive procurement events necessary to
5 meet the goals set forth in this subsection (c). The
6 initial long-term renewable resources procurement plan
7 shall be released for comment no later than 160 days after
8 June 1, 2017 (the effective date of Public Act 99-906).
9 The Agency shall review, and may revise on an expedited
10 basis, the long-term renewable resources procurement plan
11 at least every 2 years, which shall be conducted in
12 conjunction with the procurement plan under Section
13 16-111.5 of the Public Utilities Act to the extent
14 practicable to minimize administrative expense. No later
15 than 120 days after the effective date of this amendatory
16 Act of the 103rd General Assembly, the Agency shall
17 release for comment a revision to the long-term renewable
18 resources procurement plan, updating elements of the most
19 recently approved plan as needed to comply with this
20 amendatory Act of the 103rd General Assembly, and any
21 long-term renewable resources procurement plan update
22 published by the Agency but not yet approved by the
23 Illinois Commerce Commission shall be withdrawn. The
24 long-term renewable resources procurement plans shall be
25 subject to review and approval by the Commission under
26 Section 16-111.5 of the Public Utilities Act.

HB5544- 43 -LRB103 38715 CES 69699 b
1 (B) Subject to subparagraph (F) of this paragraph (1),
2 the long-term renewable resources procurement plan shall
3 attempt to meet the goals for procurement of renewable
4 energy credits at levels of at least the following overall
5 percentages: 13% by the 2017 delivery year; increasing by
6 at least 1.5% each delivery year thereafter to at least
7 25% by the 2025 delivery year; increasing by at least 3%
8 each delivery year thereafter to at least 40% by the 2030
9 delivery year, and continuing at no less than 40% for each
10 delivery year thereafter. The Agency shall attempt to
11 procure 50% by delivery year 2040. The Agency shall
12 determine the annual increase between delivery year 2030
13 and delivery year 2040, if any, taking into account energy
14 demand, other energy resources, and other public policy
15 goals. In the event of a conflict between these goals and
16 the new wind, new photovoltaic, and hydropower procurement
17 requirements described in items (i) through (iii) of
18 subparagraph (C) of this paragraph (1), the long-term plan
19 shall prioritize compliance with the new wind, new
20 photovoltaic, and hydropower procurement requirements
21 described in items (i) through (iii) of subparagraph (C)
22 of this paragraph (1) over the annual percentage targets
23 described in this subparagraph (B). The Agency shall not
24 comply with the annual percentage targets described in
25 this subparagraph (B) by procuring renewable energy
26 credits that are unlikely to lead to the development of

HB5544- 44 -LRB103 38715 CES 69699 b
1 new renewable resources or new, modernized, or retooled
2 hydropower facilities.
3 For the delivery year beginning June 1, 2017, the
4 procurement plan shall attempt to include, subject to the
5 prioritization outlined in this subparagraph (B),
6 cost-effective renewable energy resources equal to at
7 least 13% of each utility's load for eligible retail
8 customers and 13% of the applicable portion of each
9 utility's load for retail customers who are not eligible
10 retail customers, which applicable portion shall equal 50%
11 of the utility's load for retail customers who are not
12 eligible retail customers on February 28, 2017.
13 For the delivery year beginning June 1, 2018, the
14 procurement plan shall attempt to include, subject to the
15 prioritization outlined in this subparagraph (B),
16 cost-effective renewable energy resources equal to at
17 least 14.5% of each utility's load for eligible retail
18 customers and 14.5% of the applicable portion of each
19 utility's load for retail customers who are not eligible
20 retail customers, which applicable portion shall equal 75%
21 of the utility's load for retail customers who are not
22 eligible retail customers on February 28, 2017.
23 For the delivery year beginning June 1, 2019, and for
24 each year thereafter, the procurement plans shall attempt
25 to include, subject to the prioritization outlined in this
26 subparagraph (B), cost-effective renewable energy

HB5544- 45 -LRB103 38715 CES 69699 b
1 resources equal to a minimum percentage of each utility's
2 load for all retail customers as follows: 16% by June 1,
3 2019; increasing by 1.5% each year thereafter to 25% by
4 June 1, 2025; and 25% by June 1, 2026; increasing by at
5 least 3% each delivery year thereafter to at least 40% by
6 the 2030 delivery year, and continuing at no less than 40%
7 for each delivery year thereafter. The Agency shall
8 attempt to procure 50% by delivery year 2040. The Agency
9 shall determine the annual increase between delivery year
10 2030 and delivery year 2040, if any, taking into account
11 energy demand, other energy resources, and other public
12 policy goals.
13 For each delivery year, the Agency shall first
14 recognize each utility's obligations for that delivery
15 year under existing contracts. Any renewable energy
16 credits under existing contracts, including renewable
17 energy credits as part of renewable energy resources,
18 shall be used to meet the goals set forth in this
19 subsection (c) for the delivery year.
20 (C) The long-term renewable resources procurement plan
21 described in subparagraph (A) of this paragraph (1) shall
22 include the procurement of renewable energy credits from
23 new projects pursuant to the following terms:
24 (i) At least 10,000,000 renewable energy credits
25 delivered annually by the end of the 2021 delivery
26 year, and increasing ratably to reach 45,000,000

HB5544- 46 -LRB103 38715 CES 69699 b
1 renewable energy credits delivered annually from new
2 wind and solar projects by the end of delivery year
3 2030 such that the goals in subparagraph (B) of this
4 paragraph (1) are met entirely by procurements of
5 renewable energy credits from new wind and
6 photovoltaic projects. Of that amount, to the extent
7 possible, the Agency shall procure 45% from wind and
8 hydropower projects and 55% from photovoltaic
9 projects. Of the amount to be procured from
10 photovoltaic projects, the Agency shall procure: at
11 least 50% from solar photovoltaic projects using the
12 program outlined in subparagraph (K) of this paragraph
13 (1) from distributed renewable energy generation
14 devices or community renewable generation projects; at
15 least 47% from utility-scale solar projects; at least
16 3% from brownfield site photovoltaic projects that are
17 not community renewable generation projects.
18 In developing the long-term renewable resources
19 procurement plan, the Agency shall consider other
20 approaches, in addition to competitive procurements,
21 that can be used to procure renewable energy credits
22 from brownfield site photovoltaic projects and thereby
23 help return blighted or contaminated land to
24 productive use while enhancing public health and the
25 well-being of Illinois residents, including those in
26 environmental justice communities, as defined using

HB5544- 47 -LRB103 38715 CES 69699 b
1 existing methodologies and findings used by the Agency
2 and its Administrator in its Illinois Solar for All
3 Program. The Agency shall also consider other
4 approaches, in addition to competitive procurements,
5 to procure renewable energy credits from new and
6 existing hydropower facilities to support the
7 development and maintenance of these facilities. The
8 Agency shall explore options to convert existing dams
9 but shall not consider approaches to develop new dams
10 where they do not already exist.
11 (ii) In any given delivery year, if forecasted
12 expenses are less than the maximum budget available
13 under subparagraph (E) of this paragraph (1), the
14 Agency shall continue to procure new renewable energy
15 credits until that budget is exhausted in the manner
16 outlined in item (i) of this subparagraph (C).
17 (iii) For purposes of this Section:
18 "New wind projects" means wind renewable energy
19 facilities that are energized after June 1, 2017 for
20 the delivery year commencing June 1, 2017.
21 "New photovoltaic projects" means photovoltaic
22 renewable energy facilities that are energized after
23 June 1, 2017. Photovoltaic projects developed under
24 Section 1-56 of this Act shall not apply towards the
25 new photovoltaic project requirements in this
26 subparagraph (C).

HB5544- 48 -LRB103 38715 CES 69699 b
1 For purposes of calculating whether the Agency has
2 procured enough new wind and solar renewable energy
3 credits required by this subparagraph (C), renewable
4 energy facilities that have a multi-year renewable
5 energy credit delivery contract with the utility
6 through at least delivery year 2030 shall be
7 considered new, however no renewable energy credits
8 from contracts entered into before June 1, 2021 shall
9 be used to calculate whether the Agency has procured
10 the correct proportion of new wind and new solar
11 contracts described in this subparagraph (C) for
12 delivery year 2021 and thereafter.
13 (D) Renewable energy credits shall be cost effective.
14 For purposes of this subsection (c), "cost effective"
15 means that the costs of procuring renewable energy
16 resources do not cause the limit stated in subparagraph
17 (E) of this paragraph (1) to be exceeded and, for
18 renewable energy credits procured through a competitive
19 procurement event, do not exceed benchmarks based on
20 market prices for like products in the region. For
21 purposes of this subsection (c), "like products" means
22 contracts for renewable energy credits from the same or
23 substantially similar technology, same or substantially
24 similar vintage (new or existing), the same or
25 substantially similar quantity, and the same or
26 substantially similar contract length and structure.

HB5544- 49 -LRB103 38715 CES 69699 b
1 Benchmarks shall reflect development, financing, or
2 related costs resulting from requirements imposed through
3 other provisions of State law, including, but not limited
4 to, requirements in subparagraphs (P) and (Q) of this
5 paragraph (1) and the Renewable Energy Facilities
6 Agricultural Impact Mitigation Act. Confidential
7 benchmarks shall be developed by the procurement
8 administrator, in consultation with the Commission staff,
9 Agency staff, and the procurement monitor and shall be
10 subject to Commission review and approval. If price
11 benchmarks for like products in the region are not
12 available, the procurement administrator shall establish
13 price benchmarks based on publicly available data on
14 regional technology costs and expected current and future
15 regional energy prices. The benchmarks in this Section
16 shall not be used to curtail or otherwise reduce
17 contractual obligations entered into by or through the
18 Agency prior to June 1, 2017 (the effective date of Public
19 Act 99-906).
20 (E) For purposes of this subsection (c), the required
21 procurement of cost-effective renewable energy resources
22 for a particular year commencing prior to June 1, 2017
23 shall be measured as a percentage of the actual amount of
24 electricity (megawatt-hours) supplied by the electric
25 utility to eligible retail customers in the delivery year
26 ending immediately prior to the procurement, and, for

HB5544- 50 -LRB103 38715 CES 69699 b
1 delivery years commencing on and after June 1, 2017, the
2 required procurement of cost-effective renewable energy
3 resources for a particular year shall be measured as a
4 percentage of the actual amount of electricity
5 (megawatt-hours) delivered by the electric utility in the
6 delivery year ending immediately prior to the procurement,
7 to all retail customers in its service territory. For
8 purposes of this subsection (c), the amount paid per
9 kilowatthour means the total amount paid for electric
10 service expressed on a per kilowatthour basis. For
11 purposes of this subsection (c), the total amount paid for
12 electric service includes without limitation amounts paid
13 for supply, transmission, capacity, distribution,
14 surcharges, and add-on taxes.
15 Notwithstanding the requirements of this subsection
16 (c), the total of renewable energy resources procured
17 under the procurement plan for any single year shall be
18 subject to the limitations of this subparagraph (E). Such
19 procurement shall be reduced for all retail customers
20 based on the amount necessary to limit the annual
21 estimated average net increase due to the costs of these
22 resources included in the amounts paid by eligible retail
23 customers in connection with electric service to no more
24 than 4.25% of the amount paid per kilowatthour by those
25 customers during the year ending May 31, 2009. To arrive
26 at a maximum dollar amount of renewable energy resources

HB5544- 51 -LRB103 38715 CES 69699 b
1 to be procured for the particular delivery year, the
2 resulting per kilowatthour amount shall be applied to the
3 actual amount of kilowatthours of electricity delivered,
4 or applicable portion of such amount as specified in
5 paragraph (1) of this subsection (c), as applicable, by
6 the electric utility in the delivery year immediately
7 prior to the procurement to all retail customers in its
8 service territory. The calculations required by this
9 subparagraph (E) shall be made only once for each delivery
10 year at the time that the renewable energy resources are
11 procured. Once the determination as to the amount of
12 renewable energy resources to procure is made based on the
13 calculations set forth in this subparagraph (E) and the
14 contracts procuring those amounts are executed, no
15 subsequent rate impact determinations shall be made and no
16 adjustments to those contract amounts shall be allowed.
17 All costs incurred under such contracts shall be fully
18 recoverable by the electric utility as provided in this
19 Section.
20 (F) If the limitation on the amount of renewable
21 energy resources procured in subparagraph (E) of this
22 paragraph (1) prevents the Agency from meeting all of the
23 goals in this subsection (c), the Agency's long-term plan
24 shall prioritize compliance with the requirements of this
25 subsection (c) regarding renewable energy credits in the
26 following order:

HB5544- 52 -LRB103 38715 CES 69699 b
1 (i) renewable energy credits under existing
2 contractual obligations as of June 1, 2021;
3 (i-5) funding for the Illinois Solar for All
4 Program, as described in subparagraph (O) of this
5 paragraph (1);
6 (ii) renewable energy credits necessary to comply
7 with the new wind and new photovoltaic procurement
8 requirements described in items (i) through (iii) of
9 subparagraph (C) of this paragraph (1); and
10 (iii) renewable energy credits necessary to meet
11 the remaining requirements of this subsection (c).
12 (G) The following provisions shall apply to the
13 Agency's procurement of renewable energy credits under
14 this subsection (c):
15 (i) Notwithstanding whether a long-term renewable
16 resources procurement plan has been approved, the
17 Agency shall conduct an initial forward procurement
18 for renewable energy credits from new utility-scale
19 wind projects within 160 days after June 1, 2017 (the
20 effective date of Public Act 99-906). For the purposes
21 of this initial forward procurement, the Agency shall
22 solicit 15-year contracts for delivery of 1,000,000
23 renewable energy credits delivered annually from new
24 utility-scale wind projects to begin delivery on June
25 1, 2019, if available, but not later than June 1, 2021,
26 unless the project has delays in the establishment of

HB5544- 53 -LRB103 38715 CES 69699 b
1 an operating interconnection with the applicable
2 transmission or distribution system as a result of the
3 actions or inactions of the transmission or
4 distribution provider, or other causes for force
5 majeure as outlined in the procurement contract, in
6 which case, not later than June 1, 2022. Payments to
7 suppliers of renewable energy credits shall commence
8 upon delivery. Renewable energy credits procured under
9 this initial procurement shall be included in the
10 Agency's long-term plan and shall apply to all
11 renewable energy goals in this subsection (c).
12 (ii) Notwithstanding whether a long-term renewable
13 resources procurement plan has been approved, the
14 Agency shall conduct an initial forward procurement
15 for renewable energy credits from new utility-scale
16 solar projects and brownfield site photovoltaic
17 projects within one year after June 1, 2017 (the
18 effective date of Public Act 99-906). For the purposes
19 of this initial forward procurement, the Agency shall
20 solicit 15-year contracts for delivery of 1,000,000
21 renewable energy credits delivered annually from new
22 utility-scale solar projects and brownfield site
23 photovoltaic projects to begin delivery on June 1,
24 2019, if available, but not later than June 1, 2021,
25 unless the project has delays in the establishment of
26 an operating interconnection with the applicable

HB5544- 54 -LRB103 38715 CES 69699 b
1 transmission or distribution system as a result of the
2 actions or inactions of the transmission or
3 distribution provider, or other causes for force
4 majeure as outlined in the procurement contract, in
5 which case, not later than June 1, 2022. The Agency may
6 structure this initial procurement in one or more
7 discrete procurement events. Payments to suppliers of
8 renewable energy credits shall commence upon delivery.
9 Renewable energy credits procured under this initial
10 procurement shall be included in the Agency's
11 long-term plan and shall apply to all renewable energy
12 goals in this subsection (c).
13 (iii) Notwithstanding whether the Commission has
14 approved the periodic long-term renewable resources
15 procurement plan revision described in Section
16 16-111.5 of the Public Utilities Act, the Agency shall
17 conduct at least one subsequent forward procurement
18 for renewable energy credits from new utility-scale
19 wind projects, new utility-scale solar projects, and
20 new brownfield site photovoltaic projects within 240
21 days after the effective date of this amendatory Act
22 of the 102nd General Assembly in quantities necessary
23 to meet the requirements of subparagraph (C) of this
24 paragraph (1) through the delivery year beginning June
25 1, 2021.
26 (iv) Notwithstanding whether the Commission has

HB5544- 55 -LRB103 38715 CES 69699 b
1 approved the periodic long-term renewable resources
2 procurement plan revision described in Section
3 16-111.5 of the Public Utilities Act, the Agency shall
4 open capacity for each category in the Adjustable
5 Block program within 90 days after the effective date
6 of this amendatory Act of the 102nd General Assembly
7 manner:
8 (1) The Agency shall open the first block of
9 annual capacity for the category described in item
10 (i) of subparagraph (K) of this paragraph (1). The
11 first block of annual capacity for item (i) shall
12 be for at least 75 megawatts of total nameplate
13 capacity. The price of the renewable energy credit
14 for this block of capacity shall be 4% less than
15 the price of the last open block in this category.
16 Projects on a waitlist shall be awarded contracts
17 first in the order in which they appear on the
18 waitlist. Notwithstanding anything to the
19 contrary, for those renewable energy credits that
20 qualify and are procured under this subitem (1) of
21 this item (iv), the renewable energy credit
22 delivery contract value shall be paid in full,
23 based on the estimated generation during the first
24 15 years of operation, by the contracting
25 utilities at the time that the facility producing
26 the renewable energy credits is interconnected at

HB5544- 56 -LRB103 38715 CES 69699 b
1 the distribution system level of the utility and
2 verified as energized and in compliance by the
3 Program Administrator. The electric utility shall
4 receive and retire all renewable energy credits
5 generated by the project for the first 15 years of
6 operation. Renewable energy credits generated by
7 the project thereafter shall not be transferred
8 under the renewable energy credit delivery
9 contract with the counterparty electric utility.
10 (2) The Agency shall open the first block of
11 annual capacity for the category described in item
12 (ii) of subparagraph (K) of this paragraph (1).
13 The first block of annual capacity for item (ii)
14 shall be for at least 75 megawatts of total
15 nameplate capacity.
16 (A) The price of the renewable energy
17 credit for any project on a waitlist for this
18 category before the opening of this block
19 shall be 4% less than the price of the last
20 open block in this category. Projects on the
21 waitlist shall be awarded contracts first in
22 the order in which they appear on the
23 waitlist. Any projects that are less than or
24 equal to 25 kilowatts in size on the waitlist
25 for this capacity shall be moved to the
26 waitlist for paragraph (1) of this item (iv).

HB5544- 57 -LRB103 38715 CES 69699 b
1 Notwithstanding anything to the contrary,
2 projects that were on the waitlist prior to
3 opening of this block shall not be required to
4 be in compliance with the requirements of
5 subparagraph (Q) of this paragraph (1) of this
6 subsection (c). Notwithstanding anything to
7 the contrary, for those renewable energy
8 credits procured from projects that were on
9 the waitlist for this category before the
10 opening of this block 20% of the renewable
11 energy credit delivery contract value, based
12 on the estimated generation during the first
13 15 years of operation, shall be paid by the
14 contracting utilities at the time that the
15 facility producing the renewable energy
16 credits is interconnected at the distribution
17 system level of the utility and verified as
18 energized by the Program Administrator. The
19 remaining portion shall be paid ratably over
20 the subsequent 4-year period. The electric
21 utility shall receive and retire all renewable
22 energy credits generated by the project during
23 the first 15 years of operation. Renewable
24 energy credits generated by the project
25 thereafter shall not be transferred under the
26 renewable energy credit delivery contract with

HB5544- 58 -LRB103 38715 CES 69699 b
1 the counterparty electric utility.
2 (B) The price of renewable energy credits
3 for any project not on the waitlist for this
4 category before the opening of the block shall
5 be determined and published by the Agency.
6 Projects not on a waitlist as of the opening
7 of this block shall be subject to the
8 requirements of subparagraph (Q) of this
9 paragraph (1), as applicable. Projects not on
10 a waitlist as of the opening of this block
11 shall be subject to the contract provisions
12 outlined in item (iii) of subparagraph (L) of
13 this paragraph (1). The Agency shall strive to
14 publish updated prices and an updated
15 renewable energy credit delivery contract as
16 quickly as possible.
17 (3) For opening the first 2 blocks of annual
18 capacity for projects participating in item (iii)
19 of subparagraph (K) of paragraph (1) of subsection
20 (c), projects shall be selected exclusively from
21 those projects on the ordinal waitlists of
22 community renewable generation projects
23 established by the Agency based on the status of
24 those ordinal waitlists as of December 31, 2020,
25 and only those projects previously determined to
26 be eligible for the Agency's April 2019 community

HB5544- 59 -LRB103 38715 CES 69699 b
1 solar project selection process.
2 The first 2 blocks of annual capacity for item
3 (iii) shall be for 250 megawatts of total
4 nameplate capacity, with both blocks opening
5 simultaneously under the schedule outlined in the
6 paragraphs below. Projects shall be selected as
7 follows:
8 (A) The geographic balance of selected
9 projects shall follow the Group classification
10 found in the Agency's Revised Long-Term
11 Renewable Resources Procurement Plan, with 70%
12 of capacity allocated to projects on the Group
13 B waitlist and 30% of capacity allocated to
14 projects on the Group A waitlist.
15 (B) Contract awards for waitlisted
16 projects shall be allocated proportionate to
17 the total nameplate capacity amount across
18 both ordinal waitlists associated with that
19 applicant firm or its affiliates, subject to
20 the following conditions.
21 (i) Each applicant firm having a
22 waitlisted project eligible for selection
23 shall receive no less than 500 kilowatts
24 in awarded capacity across all groups, and
25 no approved vendor may receive more than
26 20% of each Group's waitlist allocation.

HB5544- 60 -LRB103 38715 CES 69699 b
1 (ii) Each applicant firm, upon
2 receiving an award of program capacity
3 proportionate to its waitlisted capacity,
4 may then determine which waitlisted
5 projects it chooses to be selected for a
6 contract award up to that capacity amount.
7 (iii) Assuming all other program
8 requirements are met, applicant firms may
9 adjust the nameplate capacity of applicant
10 projects without losing waitlist
11 eligibility, so long as no project is
12 greater than 2,000 kilowatts in size.
13 (iv) Assuming all other program
14 requirements are met, applicant firms may
15 adjust the expected production associated
16 with applicant projects, subject to
17 verification by the Program Administrator.
18 (C) After a review of affiliate
19 information and the current ordinal waitlists,
20 the Agency shall announce the nameplate
21 capacity award amounts associated with
22 applicant firms no later than 90 days after
23 the effective date of this amendatory Act of
24 the 102nd General Assembly.
25 (D) Applicant firms shall submit their
26 portfolio of projects used to satisfy those

HB5544- 61 -LRB103 38715 CES 69699 b
1 contract awards no less than 90 days after the
2 Agency's announcement. The total nameplate
3 capacity of all projects used to satisfy that
4 portfolio shall be no greater than the
5 Agency's nameplate capacity award amount
6 associated with that applicant firm. An
7 applicant firm may decline, in whole or in
8 part, its nameplate capacity award without
9 penalty, with such unmet capacity rolled over
10 to the next block opening for project
11 selection under item (iii) of subparagraph (K)
12 of this subsection (c). Any projects not
13 included in an applicant firm's portfolio may
14 reapply without prejudice upon the next block
15 reopening for project selection under item
16 (iii) of subparagraph (K) of this subsection
17 (c).
18 (E) The renewable energy credit delivery
19 contract shall be subject to the contract and
20 payment terms outlined in item (iv) of
21 subparagraph (L) of this subsection (c).
22 Contract instruments used for this
23 subparagraph shall contain the following
24 terms:
25 (i) Renewable energy credit prices
26 shall be fixed, without further adjustment

HB5544- 62 -LRB103 38715 CES 69699 b
1 under any other provision of this Act or
2 for any other reason, at 10% lower than
3 prices applicable to the last open block
4 for this category, inclusive of any adders
5 available for achieving a minimum of 50%
6 of subscribers to the project's nameplate
7 capacity being residential or small
8 commercial customers with subscriptions of
9 below 25 kilowatts in size;
10 (ii) A requirement that a minimum of
11 50% of subscribers to the project's
12 nameplate capacity be residential or small
13 commercial customers with subscriptions of
14 below 25 kilowatts in size;
15 (iii) Permission for the ability of a
16 contract holder to substitute projects
17 with other waitlisted projects without
18 penalty should a project receive a
19 non-binding estimate of costs to construct
20 the interconnection facilities and any
21 required distribution upgrades associated
22 with that project of greater than 30 cents
23 per watt AC of that project's nameplate
24 capacity. In developing the applicable
25 contract instrument, the Agency may
26 consider whether other circumstances

HB5544- 63 -LRB103 38715 CES 69699 b
1 outside of the control of the applicant
2 firm should also warrant project
3 substitution rights.
4 The Agency shall publish a finalized
5 updated renewable energy credit delivery
6 contract developed consistent with these terms
7 and conditions no less than 30 days before
8 applicant firms must submit their portfolio of
9 projects pursuant to item (D).
10 (F) To be eligible for an award, the
11 applicant firm shall certify that not less
12 than prevailing wage, as determined pursuant
13 to the Illinois Prevailing Wage Act, was or
14 will be paid to employees who are engaged in
15 construction activities associated with a
16 selected project.
17 (4) The Agency shall open the first block of
18 annual capacity for the category described in item
19 (iv) of subparagraph (K) of this paragraph (1).
20 The first block of annual capacity for item (iv)
21 shall be for at least 50 megawatts of total
22 nameplate capacity. Renewable energy credit prices
23 shall be fixed, without further adjustment under
24 any other provision of this Act or for any other
25 reason, at the price in the last open block in the
26 category described in item (ii) of subparagraph

HB5544- 64 -LRB103 38715 CES 69699 b
1 (K) of this paragraph (1). Pricing for future
2 blocks of annual capacity for this category may be
3 adjusted in the Agency's second revision to its
4 Long-Term Renewable Resources Procurement Plan.
5 Projects in this category shall be subject to the
6 contract terms outlined in item (iv) of
7 subparagraph (L) of this paragraph (1).
8 (5) The Agency shall open the equivalent of 2
9 years of annual capacity for the category
10 described in item (v) of subparagraph (K) of this
11 paragraph (1). The first block of annual capacity
12 for item (v) shall be for at least 10 megawatts of
13 total nameplate capacity. Notwithstanding the
14 provisions of item (v) of subparagraph (K) of this
15 paragraph (1), for the purpose of this initial
16 block, the agency shall accept new project
17 applications intended to increase the diversity of
18 areas hosting community solar projects, the
19 business models of projects, and the size of
20 projects, as described by the Agency in its
21 long-term renewable resources procurement plan
22 that is approved as of the effective date of this
23 amendatory Act of the 102nd General Assembly.
24 Projects in this category shall be subject to the
25 contract terms outlined in item (iii) of
26 subsection (L) of this paragraph (1).

HB5544- 65 -LRB103 38715 CES 69699 b
1 (6) The Agency shall open the first blocks of
2 annual capacity for the category described in item
3 (vi) of subparagraph (K) of this paragraph (1),
4 with allocations of capacity within the block
5 generally matching the historical share of block
6 capacity allocated between the category described
7 in items (i) and (ii) of subparagraph (K) of this
8 paragraph (1). The first two blocks of annual
9 capacity for item (vi) shall be for at least 75
10 megawatts of total nameplate capacity. The price
11 of renewable energy credits for the blocks of
12 capacity shall be 4% less than the price of the
13 last open blocks in the categories described in
14 items (i) and (ii) of subparagraph (K) of this
15 paragraph (1). Pricing for future blocks of annual
16 capacity for this category may be adjusted in the
17 Agency's second revision to its Long-Term
18 Renewable Resources Procurement Plan. Projects in
19 this category shall be subject to the applicable
20 contract terms outlined in items (ii) and (iii) of
21 subparagraph (L) of this paragraph (1).
22 (v) Upon the effective date of this amendatory Act
23 of the 102nd General Assembly, for all competitive
24 procurements and any procurements of renewable energy
25 credit from new utility-scale wind and new
26 utility-scale photovoltaic projects, the Agency shall

HB5544- 66 -LRB103 38715 CES 69699 b
1 procure indexed renewable energy credits and direct
2 respondents to offer a strike price.
3 (1) The purchase price of the indexed
4 renewable energy credit payment shall be
5 calculated for each settlement period. That
6 payment, for any settlement period, shall be equal
7 to the difference resulting from subtracting the
8 strike price from the index price for that
9 settlement period. If this difference results in a
10 negative number, the indexed REC counterparty
11 shall owe the seller the absolute value multiplied
12 by the quantity of energy produced in the relevant
13 settlement period. If this difference results in a
14 positive number, the seller shall owe the indexed
15 REC counterparty this amount multiplied by the
16 quantity of energy produced in the relevant
17 settlement period.
18 (2) Parties shall cash settle every month,
19 summing up all settlements (both positive and
20 negative, if applicable) for the prior month.
21 (3) To ensure funding in the annual budget
22 established under subparagraph (E) for indexed
23 renewable energy credit procurements for each year
24 of the term of such contracts, which must have a
25 minimum tenure of 20 calendar years, the
26 procurement administrator, Agency, Commission

HB5544- 67 -LRB103 38715 CES 69699 b
1 staff, and procurement monitor shall quantify the
2 annual cost of the contract by utilizing an
3 industry-standard, third-party forward price curve
4 for energy at the appropriate hub or load zone,
5 including the estimated magnitude and timing of
6 the price effects related to federal carbon
7 controls. Each forward price curve shall contain a
8 specific value of the forecasted market price of
9 electricity for each annual delivery year of the
10 contract. For procurement planning purposes, the
11 impact on the annual budget for the cost of
12 indexed renewable energy credits for each delivery
13 year shall be determined as the expected annual
14 contract expenditure for that year, equaling the
15 difference between (i) the sum across all relevant
16 contracts of the applicable strike price
17 multiplied by contract quantity and (ii) the sum
18 across all relevant contracts of the forward price
19 curve for the applicable load zone for that year
20 multiplied by contract quantity. The contracting
21 utility shall not assume an obligation in excess
22 of the estimated annual cost of the contracts for
23 indexed renewable energy credits. Forward curves
24 shall be revised on an annual basis as updated
25 forward price curves are released and filed with
26 the Commission in the proceeding approving the

HB5544- 68 -LRB103 38715 CES 69699 b
1 Agency's most recent long-term renewable resources
2 procurement plan. If the expected contract spend
3 is higher or lower than the total quantity of
4 contracts multiplied by the forward price curve
5 value for that year, the forward price curve shall
6 be updated by the procurement administrator, in
7 consultation with the Agency, Commission staff,
8 and procurement monitors, using then-currently
9 available price forecast data and additional
10 budget dollars shall be obligated or reobligated
11 as appropriate.
12 (4) To ensure that indexed renewable energy
13 credit prices remain predictable and affordable,
14 the Agency may consider the institution of a price
15 collar on REC prices paid under indexed renewable
16 energy credit procurements establishing floor and
17 ceiling REC prices applicable to indexed REC
18 contract prices. Any price collars applicable to
19 indexed REC procurements shall be proposed by the
20 Agency through its long-term renewable resources
21 procurement plan.
22 (vi) All procurements under this subparagraph (G),
23 including the procurement of renewable energy credits
24 from hydropower facilities, shall comply with the
25 geographic requirements in subparagraph (I) of this
26 paragraph (1) and shall follow the procurement

HB5544- 69 -LRB103 38715 CES 69699 b
1 processes and procedures described in this Section and
2 Section 16-111.5 of the Public Utilities Act to the
3 extent practicable, and these processes and procedures
4 may be expedited to accommodate the schedule
5 established by this subparagraph (G).
6 (vii) On and after the effective date of this
7 amendatory Act of the 103rd General Assembly, for all
8 procurements of renewable energy credits from
9 hydropower facilities, the Agency shall establish
10 contract terms designed to optimize existing
11 hydropower facilities through modernization or
12 retooling and establish new hydropower facilities at
13 existing dams. Procurements made under this item (vii)
14 shall prioritize projects located in designated
15 environmental justice communities, as defined in
16 subsection (b) of Section 1-56 of this Act, or in
17 projects located in units of local government with
18 median incomes that do not exceed 82% of the median
19 income of the State.
20 (H) The procurement of renewable energy resources for
21 a given delivery year shall be reduced as described in
22 this subparagraph (H) if an alternative retail electric
23 supplier meets the requirements described in this
24 subparagraph (H).
25 (i) Within 45 days after June 1, 2017 (the
26 effective date of Public Act 99-906), an alternative

HB5544- 70 -LRB103 38715 CES 69699 b
1 retail electric supplier or its successor shall submit
2 an informational filing to the Illinois Commerce
3 Commission certifying that, as of December 31, 2015,
4 the alternative retail electric supplier owned one or
5 more electric generating facilities that generates
6 renewable energy resources as defined in Section 1-10
7 of this Act, provided that such facilities are not
8 powered by wind or photovoltaics, and the facilities
9 generate one renewable energy credit for each
10 megawatthour of energy produced from the facility.
11 The informational filing shall identify each
12 facility that was eligible to satisfy the alternative
13 retail electric supplier's obligations under Section
14 16-115D of the Public Utilities Act as described in
15 this item (i).
16 (ii) For a given delivery year, the alternative
17 retail electric supplier may elect to supply its
18 retail customers with renewable energy credits from
19 the facility or facilities described in item (i) of
20 this subparagraph (H) that continue to be owned by the
21 alternative retail electric supplier.
22 (iii) The alternative retail electric supplier
23 shall notify the Agency and the applicable utility, no
24 later than February 28 of the year preceding the
25 applicable delivery year or 15 days after June 1, 2017
26 (the effective date of Public Act 99-906), whichever

HB5544- 71 -LRB103 38715 CES 69699 b
1 is later, of its election under item (ii) of this
2 subparagraph (H) to supply renewable energy credits to
3 retail customers of the utility. Such election shall
4 identify the amount of renewable energy credits to be
5 supplied by the alternative retail electric supplier
6 to the utility's retail customers and the source of
7 the renewable energy credits identified in the
8 informational filing as described in item (i) of this
9 subparagraph (H), subject to the following
10 limitations:
11 For the delivery year beginning June 1, 2018,
12 the maximum amount of renewable energy credits to
13 be supplied by an alternative retail electric
14 supplier under this subparagraph (H) shall be 68%
15 multiplied by 25% multiplied by 14.5% multiplied
16 by the amount of metered electricity
17 (megawatt-hours) delivered by the alternative
18 retail electric supplier to Illinois retail
19 customers during the delivery year ending May 31,
20 2016.
21 For delivery years beginning June 1, 2019 and
22 each year thereafter, the maximum amount of
23 renewable energy credits to be supplied by an
24 alternative retail electric supplier under this
25 subparagraph (H) shall be 68% multiplied by 50%
26 multiplied by 16% multiplied by the amount of

HB5544- 72 -LRB103 38715 CES 69699 b
1 metered electricity (megawatt-hours) delivered by
2 the alternative retail electric supplier to
3 Illinois retail customers during the delivery year
4 ending May 31, 2016, provided that the 16% value
5 shall increase by 1.5% each delivery year
6 thereafter to 25% by the delivery year beginning
7 June 1, 2025, and thereafter the 25% value shall
8 apply to each delivery year.
9 For each delivery year, the total amount of
10 renewable energy credits supplied by all alternative
11 retail electric suppliers under this subparagraph (H)
12 shall not exceed 9% of the Illinois target renewable
13 energy credit quantity. The Illinois target renewable
14 energy credit quantity for the delivery year beginning
15 June 1, 2018 is 14.5% multiplied by the total amount of
16 metered electricity (megawatt-hours) delivered in the
17 delivery year immediately preceding that delivery
18 year, provided that the 14.5% shall increase by 1.5%
19 each delivery year thereafter to 25% by the delivery
20 year beginning June 1, 2025, and thereafter the 25%
21 value shall apply to each delivery year.
22 If the requirements set forth in items (i) through
23 (iii) of this subparagraph (H) are met, the charges
24 that would otherwise be applicable to the retail
25 customers of the alternative retail electric supplier
26 under paragraph (6) of this subsection (c) for the

HB5544- 73 -LRB103 38715 CES 69699 b
1 applicable delivery year shall be reduced by the ratio
2 of the quantity of renewable energy credits supplied
3 by the alternative retail electric supplier compared
4 to that supplier's target renewable energy credit
5 quantity. The supplier's target renewable energy
6 credit quantity for the delivery year beginning June
7 1, 2018 is 14.5% multiplied by the total amount of
8 metered electricity (megawatt-hours) delivered by the
9 alternative retail supplier in that delivery year,
10 provided that the 14.5% shall increase by 1.5% each
11 delivery year thereafter to 25% by the delivery year
12 beginning June 1, 2025, and thereafter the 25% value
13 shall apply to each delivery year.
14 On or before April 1 of each year, the Agency shall
15 annually publish a report on its website that
16 identifies the aggregate amount of renewable energy
17 credits supplied by alternative retail electric
18 suppliers under this subparagraph (H).
19 (I) The Agency shall design its long-term renewable
20 energy procurement plan to maximize the State's interest
21 in the health, safety, and welfare of its residents,
22 including but not limited to minimizing sulfur dioxide,
23 nitrogen oxide, particulate matter and other pollution
24 that adversely affects public health in this State,
25 increasing fuel and resource diversity in this State,
26 enhancing the reliability and resiliency of the

HB5544- 74 -LRB103 38715 CES 69699 b
1 electricity distribution system in this State, meeting
2 goals to limit carbon dioxide emissions under federal or
3 State law, and contributing to a cleaner and healthier
4 environment for the citizens of this State. In order to
5 further these legislative purposes, renewable energy
6 credits shall be eligible to be counted toward the
7 renewable energy requirements of this subsection (c) if
8 they are generated from facilities located in this State.
9 The Agency may qualify renewable energy credits from
10 facilities located in states adjacent to Illinois or
11 renewable energy credits associated with the electricity
12 generated by a utility-scale wind energy facility or
13 utility-scale photovoltaic facility and transmitted by a
14 qualifying direct current project described in subsection
15 (b-5) of Section 8-406 of the Public Utilities Act to a
16 delivery point on the electric transmission grid located
17 in this State or a state adjacent to Illinois, if the
18 generator demonstrates and the Agency determines that the
19 operation of such facility or facilities will help promote
20 the State's interest in the health, safety, and welfare of
21 its residents based on the public interest criteria
22 described above. For the purposes of this Section,
23 renewable resources that are delivered via a high voltage
24 direct current converter station located in Illinois shall
25 be deemed generated in Illinois at the time and location
26 the energy is converted to alternating current by the high

HB5544- 75 -LRB103 38715 CES 69699 b
1 voltage direct current converter station if the high
2 voltage direct current transmission line: (i) after the
3 effective date of this amendatory Act of the 102nd General
4 Assembly, was constructed with a project labor agreement;
5 (ii) is capable of transmitting electricity at 525kv;
6 (iii) has an Illinois converter station located and
7 interconnected in the region of the PJM Interconnection,
8 LLC; (iv) does not operate as a public utility; and (v) if
9 the high voltage direct current transmission line was
10 energized after June 1, 2023. To ensure that the public
11 interest criteria are applied to the procurement and given
12 full effect, the Agency's long-term procurement plan shall
13 describe in detail how each public interest factor shall
14 be considered and weighted for facilities located in
15 states adjacent to Illinois.
16 (J) In order to promote the competitive development of
17 renewable energy resources in furtherance of the State's
18 interest in the health, safety, and welfare of its
19 residents, renewable energy credits shall not be eligible
20 to be counted toward the renewable energy requirements of
21 this subsection (c) if they are sourced from a generating
22 unit whose costs were being recovered through rates
23 regulated by this State or any other state or states on or
24 after January 1, 2017. Each contract executed to purchase
25 renewable energy credits under this subsection (c) shall
26 provide for the contract's termination if the costs of the

HB5544- 76 -LRB103 38715 CES 69699 b
1 generating unit supplying the renewable energy credits
2 subsequently begin to be recovered through rates regulated
3 by this State or any other state or states; and each
4 contract shall further provide that, in that event, the
5 supplier of the credits must return 110% of all payments
6 received under the contract. Amounts returned under the
7 requirements of this subparagraph (J) shall be retained by
8 the utility and all of these amounts shall be used for the
9 procurement of additional renewable energy credits from
10 new wind or new photovoltaic resources as defined in this
11 subsection (c). The long-term plan shall provide that
12 these renewable energy credits shall be procured in the
13 next procurement event.
14 Notwithstanding the limitations of this subparagraph
15 (J), renewable energy credits sourced from generating
16 units that are constructed, purchased, owned, or leased by
17 an electric utility as part of an approved project,
18 program, or pilot under Section 1-56 of this Act shall be
19 eligible to be counted toward the renewable energy
20 requirements of this subsection (c), regardless of how the
21 costs of these units are recovered. As long as a
22 generating unit or an identifiable portion of a generating
23 unit has not had and does not have its costs recovered
24 through rates regulated by this State or any other state,
25 HVDC renewable energy credits associated with that
26 generating unit or identifiable portion thereof shall be

HB5544- 77 -LRB103 38715 CES 69699 b
1 eligible to be counted toward the renewable energy
2 requirements of this subsection (c).
3 (K) The long-term renewable resources procurement plan
4 developed by the Agency in accordance with subparagraph
5 (A) of this paragraph (1) shall include an Adjustable
6 Block program for the procurement of renewable energy
7 credits from new photovoltaic projects that are
8 distributed renewable energy generation devices or new
9 photovoltaic community renewable generation projects. The
10 Adjustable Block program shall be generally designed to
11 provide for the steady, predictable, and sustainable
12 growth of new solar photovoltaic development in Illinois.
13 To this end, the Adjustable Block program shall provide a
14 transparent annual schedule of prices and quantities to
15 enable the photovoltaic market to scale up and for
16 renewable energy credit prices to adjust at a predictable
17 rate over time. The prices set by the Adjustable Block
18 program can be reflected as a set value or as the product
19 of a formula.
20 The Adjustable Block program shall include for each
21 category of eligible projects for each delivery year: a
22 single block of nameplate capacity, a price for renewable
23 energy credits within that block, and the terms and
24 conditions for securing a spot on a waitlist once the
25 block is fully committed or reserved. Except as outlined
26 below, the waitlist of projects in a given year will carry

HB5544- 78 -LRB103 38715 CES 69699 b
1 over to apply to the subsequent year when another block is
2 opened. Only projects energized on or after June 1, 2017
3 shall be eligible for the Adjustable Block program. For
4 each category for each delivery year the Agency shall
5 determine the amount of generation capacity in each block,
6 and the purchase price for each block, provided that the
7 purchase price provided and the total amount of generation
8 in all blocks for all categories shall be sufficient to
9 meet the goals in this subsection (c). The Agency shall
10 strive to issue a single block sized to provide for
11 stability and market growth. The Agency shall establish
12 program eligibility requirements that ensure that projects
13 that enter the program are sufficiently mature to indicate
14 a demonstrable path to completion. The Agency may
15 periodically review its prior decisions establishing the
16 amount of generation capacity in each block, and the
17 purchase price for each block, and may propose, on an
18 expedited basis, changes to these previously set values,
19 including but not limited to redistributing these amounts
20 and the available funds as necessary and appropriate,
21 subject to Commission approval as part of the periodic
22 plan revision process described in Section 16-111.5 of the
23 Public Utilities Act. The Agency may define different
24 block sizes, purchase prices, or other distinct terms and
25 conditions for projects located in different utility
26 service territories if the Agency deems it necessary to

HB5544- 79 -LRB103 38715 CES 69699 b
1 meet the goals in this subsection (c).
2 The Adjustable Block program shall include the
3 following categories in at least the following amounts:
4 (i) At least 20% from distributed renewable energy
5 generation devices with a nameplate capacity of no
6 more than 25 kilowatts.
7 (ii) At least 20% from distributed renewable
8 energy generation devices with a nameplate capacity of
9 more than 25 kilowatts and no more than 5,000
10 kilowatts. The Agency may create sub-categories within
11 this category to account for the differences between
12 projects for small commercial customers, large
13 commercial customers, and public or non-profit
14 customers.
15 (iii) At least 30% from photovoltaic community
16 renewable generation projects. Capacity for this
17 category for the first 2 delivery years after the
18 effective date of this amendatory Act of the 102nd
19 General Assembly shall be allocated to waitlist
20 projects as provided in paragraph (3) of item (iv) of
21 subparagraph (G). Starting in the third delivery year
22 after the effective date of this amendatory Act of the
23 102nd General Assembly or earlier if the Agency
24 determines there is additional capacity needed for to
25 meet previous delivery year requirements, the
26 following shall apply:

HB5544- 80 -LRB103 38715 CES 69699 b
1 (1) the Agency shall select projects on a
2 first-come, first-serve basis, however the Agency
3 may suggest additional methods to prioritize
4 projects that are submitted at the same time;
5 (2) projects shall have subscriptions of 25 kW
6 or less for at least 50% of the facility's
7 nameplate capacity and the Agency shall price the
8 renewable energy credits with that as a factor;
9 (3) projects shall not be colocated with one
10 or more other community renewable generation
11 projects, as defined in the Agency's first revised
12 long-term renewable resources procurement plan
13 approved by the Commission on February 18, 2020,
14 such that the aggregate nameplate capacity exceeds
15 5,000 kilowatts; and
16 (4) projects greater than 2 MW may not apply
17 until after the approval of the Agency's revised
18 Long-Term Renewable Resources Procurement Plan
19 after the effective date of this amendatory Act of
20 the 102nd General Assembly.
21 (iv) At least 15% from distributed renewable
22 generation devices or photovoltaic community renewable
23 generation projects installed on public school land.
24 The Agency may create subcategories within this
25 category to account for the differences between
26 project size or location. Projects located within

HB5544- 81 -LRB103 38715 CES 69699 b
1 environmental justice communities or within
2 Organizational Units that fall within Tier 1 or Tier 2
3 shall be given priority. Each of the Agency's periodic
4 updates to its long-term renewable resources
5 procurement plan to incorporate the procurement
6 described in this subparagraph (iv) shall also include
7 the proposed quantities or blocks, pricing, and
8 contract terms applicable to the procurement as
9 indicated herein. In each such update and procurement,
10 the Agency shall set the renewable energy credit price
11 and establish payment terms for the renewable energy
12 credits procured pursuant to this subparagraph (iv)
13 that make it feasible and affordable for public
14 schools to install photovoltaic distributed renewable
15 energy devices on their premises, including, but not
16 limited to, those public schools subject to the
17 prioritization provisions of this subparagraph. For
18 the purposes of this item (iv):
19 "Environmental Justice Community" shall have the
20 same meaning set forth in the Agency's long-term
21 renewable resources procurement plan;
22 "Organization Unit", "Tier 1" and "Tier 2" shall
23 have the meanings set for in Section 18-8.15 of the
24 School Code;
25 "Public schools" shall have the meaning set forth
26 in Section 1-3 of the School Code and includes public

HB5544- 82 -LRB103 38715 CES 69699 b
1 institutions of higher education, as defined in the
2 Board of Higher Education Act.
3 (v) At least 5% from community-driven community
4 solar projects intended to provide more direct and
5 tangible connection and benefits to the communities
6 which they serve or in which they operate and,
7 additionally, to increase the variety of community
8 solar locations, models, and options in Illinois. As
9 part of its long-term renewable resources procurement
10 plan, the Agency shall develop selection criteria for
11 projects participating in this category. Nothing in
12 this Section shall preclude the Agency from creating a
13 selection process that maximizes community ownership
14 and community benefits in selecting projects to
15 receive renewable energy credits. Selection criteria
16 shall include:
17 (1) community ownership or community
18 wealth-building;
19 (2) additional direct and indirect community
20 benefit, beyond project participation as a
21 subscriber, including, but not limited to,
22 economic, environmental, social, cultural, and
23 physical benefits;
24 (3) meaningful involvement in project
25 organization and development by community members
26 or nonprofit organizations or public entities

HB5544- 83 -LRB103 38715 CES 69699 b
1 located in or serving the community;
2 (4) engagement in project operations and
3 management by nonprofit organizations, public
4 entities, or community members; and
5 (5) whether a project is developed in response
6 to a site-specific RFP developed by community
7 members or a nonprofit organization or public
8 entity located in or serving the community.
9 Selection criteria may also prioritize projects
10 that:
11 (1) are developed in collaboration with or to
12 provide complementary opportunities for the Clean
13 Jobs Workforce Network Program, the Illinois
14 Climate Works Preapprenticeship Program, the
15 Returning Residents Clean Jobs Training Program,
16 the Clean Energy Contractor Incubator Program, or
17 the Clean Energy Primes Contractor Accelerator
18 Program;
19 (2) increase the diversity of locations of
20 community solar projects in Illinois, including by
21 locating in urban areas and population centers;
22 (3) are located in Equity Investment Eligible
23 Communities;
24 (4) are not greenfield projects;
25 (5) serve only local subscribers;
26 (6) have a nameplate capacity that does not

HB5544- 84 -LRB103 38715 CES 69699 b
1 exceed 500 kW;
2 (7) are developed by an equity eligible
3 contractor; or
4 (8) otherwise meaningfully advance the goals
5 of providing more direct and tangible connection
6 and benefits to the communities which they serve
7 or in which they operate and increasing the
8 variety of community solar locations, models, and
9 options in Illinois.
10 For the purposes of this item (v):
11 "Community" means a social unit in which people
12 come together regularly to effect change; a social
13 unit in which participants are marked by a cooperative
14 spirit, a common purpose, or shared interests or
15 characteristics; or a space understood by its
16 residents to be delineated through geographic
17 boundaries or landmarks.
18 "Community benefit" means a range of services and
19 activities that provide affirmative, economic,
20 environmental, social, cultural, or physical value to
21 a community; or a mechanism that enables economic
22 development, high-quality employment, and education
23 opportunities for local workers and residents, or
24 formal monitoring and oversight structures such that
25 community members may ensure that those services and
26 activities respond to local knowledge and needs.

HB5544- 85 -LRB103 38715 CES 69699 b
1 "Community ownership" means an arrangement in
2 which an electric generating facility is, or over time
3 will be, in significant part, owned collectively by
4 members of the community to which an electric
5 generating facility provides benefits; members of that
6 community participate in decisions regarding the
7 governance, operation, maintenance, and upgrades of
8 and to that facility; and members of that community
9 benefit from regular use of that facility.
10 Terms and guidance within these criteria that are
11 not defined in this item (v) shall be defined by the
12 Agency, with stakeholder input, during the development
13 of the Agency's long-term renewable resources
14 procurement plan. The Agency shall develop regular
15 opportunities for projects to submit applications for
16 projects under this category, and develop selection
17 criteria that gives preference to projects that better
18 meet individual criteria as well as projects that
19 address a higher number of criteria.
20 (vi) At least 10% from distributed renewable
21 energy generation devices, which includes distributed
22 renewable energy devices with a nameplate capacity
23 under 5,000 kilowatts or photovoltaic community
24 renewable generation projects, from applicants that
25 are equity eligible contractors. The Agency may create
26 subcategories within this category to account for the

HB5544- 86 -LRB103 38715 CES 69699 b
1 differences between project size and type. The Agency
2 shall propose to increase the percentage in this item
3 (vi) over time to 40% based on factors, including, but
4 not limited to, the number of equity eligible
5 contractors and capacity used in this item (vi) in
6 previous delivery years.
7 The Agency shall propose a payment structure for
8 contracts executed pursuant to this paragraph under
9 which, upon a demonstration of qualification or need,
10 applicant firms are advanced capital disbursed after
11 contract execution but before the contracted project's
12 energization. The amount or percentage of capital
13 advanced prior to project energization shall be
14 sufficient to both cover any increase in development
15 costs resulting from prevailing wage requirements or
16 project-labor agreements, and designed to overcome
17 barriers in access to capital faced by equity eligible
18 contractors. The amount or percentage of advanced
19 capital may vary by subcategory within this category
20 and by an applicant's demonstration of need, with such
21 levels to be established through the Long-Term
22 Renewable Resources Procurement Plan authorized under
23 subparagraph (A) of paragraph (1) of subsection (c) of
24 this Section.
25 Contracts developed featuring capital advanced
26 prior to a project's energization shall feature

HB5544- 87 -LRB103 38715 CES 69699 b
1 provisions to ensure both the successful development
2 of applicant projects and the delivery of the
3 renewable energy credits for the full term of the
4 contract, including ongoing collateral requirements
5 and other provisions deemed necessary by the Agency,
6 and may include energization timelines longer than for
7 comparable project types. The percentage or amount of
8 capital advanced prior to project energization shall
9 not operate to increase the overall contract value,
10 however contracts executed under this subparagraph may
11 feature renewable energy credit prices higher than
12 those offered to similar projects participating in
13 other categories. Capital advanced prior to
14 energization shall serve to reduce the ratable
15 payments made after energization under items (ii) and
16 (iii) of subparagraph (L) or payments made for each
17 renewable energy credit delivery under item (iv) of
18 subparagraph (L).
19 (vii) The remaining capacity shall be allocated by
20 the Agency in order to respond to market demand. The
21 Agency shall allocate any discretionary capacity prior
22 to the beginning of each delivery year.
23 To the extent there is uncontracted capacity from any
24 block in any of categories (i) through (vi) at the end of a
25 delivery year, the Agency shall redistribute that capacity
26 to one or more other categories giving priority to

HB5544- 88 -LRB103 38715 CES 69699 b
1 categories with projects on a waitlist. The redistributed
2 capacity shall be added to the annual capacity in the
3 subsequent delivery year, and the price for renewable
4 energy credits shall be the price for the new delivery
5 year. Redistributed capacity shall not be considered
6 redistributed when determining whether the goals in this
7 subsection (K) have been met.
8 Notwithstanding anything to the contrary, as the
9 Agency increases the capacity in item (vi) to 40% over
10 time, the Agency may reduce the capacity of items (i)
11 through (v) proportionate to the capacity of the
12 categories of projects in item (vi), to achieve a balance
13 of project types.
14 The Adjustable Block program shall be designed to
15 ensure that renewable energy credits are procured from
16 projects in diverse locations and are not concentrated in
17 a few regional areas.
18 (L) Notwithstanding provisions for advancing capital
19 prior to project energization found in item (vi) of
20 subparagraph (K), the procurement of photovoltaic
21 renewable energy credits under items (i) through (vi) of
22 subparagraph (K) of this paragraph (1) shall otherwise be
23 subject to the following contract and payment terms:
24 (i) (Blank).
25 (ii) For those renewable energy credits that
26 qualify and are procured under item (i) of

HB5544- 89 -LRB103 38715 CES 69699 b
1 subparagraph (K) of this paragraph (1), and any
2 similar category projects that are procured under item
3 (vi) of subparagraph (K) of this paragraph (1) that
4 qualify and are procured under item (vi), the contract
5 length shall be 15 years. The renewable energy credit
6 delivery contract value shall be paid in full, based
7 on the estimated generation during the first 15 years
8 of operation, by the contracting utilities at the time
9 that the facility producing the renewable energy
10 credits is interconnected at the distribution system
11 level of the utility and verified as energized and
12 compliant by the Program Administrator. The electric
13 utility shall receive and retire all renewable energy
14 credits generated by the project for the first 15
15 years of operation. Renewable energy credits generated
16 by the project thereafter shall not be transferred
17 under the renewable energy credit delivery contract
18 with the counterparty electric utility.
19 (iii) For those renewable energy credits that
20 qualify and are procured under item (ii) and (v) of
21 subparagraph (K) of this paragraph (1) and any like
22 projects similar category that qualify and are
23 procured under item (vi), the contract length shall be
24 15 years. 15% of the renewable energy credit delivery
25 contract value, based on the estimated generation
26 during the first 15 years of operation, shall be paid

HB5544- 90 -LRB103 38715 CES 69699 b
1 by the contracting utilities at the time that the
2 facility producing the renewable energy credits is
3 interconnected at the distribution system level of the
4 utility and verified as energized and compliant by the
5 Program Administrator. The remaining portion shall be
6 paid ratably over the subsequent 6-year period. The
7 electric utility shall receive and retire all
8 renewable energy credits generated by the project for
9 the first 15 years of operation. Renewable energy
10 credits generated by the project thereafter shall not
11 be transferred under the renewable energy credit
12 delivery contract with the counterparty electric
13 utility.
14 (iv) For those renewable energy credits that
15 qualify and are procured under items (iii) and (iv) of
16 subparagraph (K) of this paragraph (1), and any like
17 projects that qualify and are procured under item
18 (vi), the renewable energy credit delivery contract
19 length shall be 20 years and shall be paid over the
20 delivery term, not to exceed during each delivery year
21 the contract price multiplied by the estimated annual
22 renewable energy credit generation amount. If
23 generation of renewable energy credits during a
24 delivery year exceeds the estimated annual generation
25 amount, the excess renewable energy credits shall be
26 carried forward to future delivery years and shall not

HB5544- 91 -LRB103 38715 CES 69699 b
1 expire during the delivery term. If generation of
2 renewable energy credits during a delivery year,
3 including carried forward excess renewable energy
4 credits, if any, is less than the estimated annual
5 generation amount, payments during such delivery year
6 will not exceed the quantity generated plus the
7 quantity carried forward multiplied by the contract
8 price. The electric utility shall receive all
9 renewable energy credits generated by the project
10 during the first 20 years of operation and retire all
11 renewable energy credits paid for under this item (iv)
12 and return at the end of the delivery term all
13 renewable energy credits that were not paid for.
14 Renewable energy credits generated by the project
15 thereafter shall not be transferred under the
16 renewable energy credit delivery contract with the
17 counterparty electric utility. Notwithstanding the
18 preceding, for those projects participating under item
19 (iii) of subparagraph (K), the contract price for a
20 delivery year shall be based on subscription levels as
21 measured on the higher of the first business day of the
22 delivery year or the first business day 6 months after
23 the first business day of the delivery year.
24 Subscription of 90% of nameplate capacity or greater
25 shall be deemed to be fully subscribed for the
26 purposes of this item (iv). For projects receiving a

HB5544- 92 -LRB103 38715 CES 69699 b
1 20-year delivery contract, REC prices shall be
2 adjusted downward for consistency with the incentive
3 levels previously determined to be necessary to
4 support projects under 15-year delivery contracts,
5 taking into consideration any additional new
6 requirements placed on the projects, including, but
7 not limited to, labor standards.
8 (v) Each contract shall include provisions to
9 ensure the delivery of the estimated quantity of
10 renewable energy credits and ongoing collateral
11 requirements and other provisions deemed appropriate
12 by the Agency.
13 (vi) The utility shall be the counterparty to the
14 contracts executed under this subparagraph (L) that
15 are approved by the Commission under the process
16 described in Section 16-111.5 of the Public Utilities
17 Act. No contract shall be executed for an amount that
18 is less than one renewable energy credit per year.
19 (vii) If, at any time, approved applications for
20 the Adjustable Block program exceed funds collected by
21 the electric utility or would cause the Agency to
22 exceed the limitation described in subparagraph (E) of
23 this paragraph (1) on the amount of renewable energy
24 resources that may be procured, then the Agency may
25 consider future uncommitted funds to be reserved for
26 these contracts on a first-come, first-served basis.

HB5544- 93 -LRB103 38715 CES 69699 b
1 (viii) Nothing in this Section shall require the
2 utility to advance any payment or pay any amounts that
3 exceed the actual amount of revenues anticipated to be
4 collected by the utility under paragraph (6) of this
5 subsection (c) and subsection (k) of Section 16-108 of
6 the Public Utilities Act inclusive of eligible funds
7 collected in prior years and alternative compliance
8 payments for use by the utility, and contracts
9 executed under this Section shall expressly
10 incorporate this limitation.
11 (ix) Notwithstanding other requirements of this
12 subparagraph (L), no modification shall be required to
13 Adjustable Block program contracts if they were
14 already executed prior to the establishment, approval,
15 and implementation of new contract forms as a result
16 of this amendatory Act of the 102nd General Assembly.
17 (x) Contracts may be assignable, but only to
18 entities first deemed by the Agency to have met
19 program terms and requirements applicable to direct
20 program participation. In developing contracts for the
21 delivery of renewable energy credits, the Agency shall
22 be permitted to establish fees applicable to each
23 contract assignment.
24 (M) The Agency shall be authorized to retain one or
25 more experts or expert consulting firms to develop,
26 administer, implement, operate, and evaluate the

HB5544- 94 -LRB103 38715 CES 69699 b
1 Adjustable Block program described in subparagraph (K) of
2 this paragraph (1), and the Agency shall retain the
3 consultant or consultants in the same manner, to the
4 extent practicable, as the Agency retains others to
5 administer provisions of this Act, including, but not
6 limited to, the procurement administrator. The selection
7 of experts and expert consulting firms and the procurement
8 process described in this subparagraph (M) are exempt from
9 the requirements of Section 20-10 of the Illinois
10 Procurement Code, under Section 20-10 of that Code. The
11 Agency shall strive to minimize administrative expenses in
12 the implementation of the Adjustable Block program.
13 The Program Administrator may charge application fees
14 to participating firms to cover the cost of program
15 administration. Any application fee amounts shall
16 initially be determined through the long-term renewable
17 resources procurement plan, and modifications to any
18 application fee that deviate more than 25% from the
19 Commission's approved value must be approved by the
20 Commission as a long-term plan revision under Section
21 16-111.5 of the Public Utilities Act. The Agency shall
22 consider stakeholder feedback when making adjustments to
23 application fees and shall notify stakeholders in advance
24 of any planned changes.
25 In addition to covering the costs of program
26 administration, the Agency, in conjunction with its

HB5544- 95 -LRB103 38715 CES 69699 b
1 Program Administrator, may also use the proceeds of such
2 fees charged to participating firms to support public
3 education and ongoing regional and national coordination
4 with nonprofit organizations, public bodies, and others
5 engaged in the implementation of renewable energy
6 incentive programs or similar initiatives. This work may
7 include developing papers and reports, hosting regional
8 and national conferences, and other work deemed necessary
9 by the Agency to position the State of Illinois as a
10 national leader in renewable energy incentive program
11 development and administration.
12 The Agency and its consultant or consultants shall
13 monitor block activity, share program activity with
14 stakeholders and conduct quarterly meetings to discuss
15 program activity and market conditions. If necessary, the
16 Agency may make prospective administrative adjustments to
17 the Adjustable Block program design, such as making
18 adjustments to purchase prices as necessary to achieve the
19 goals of this subsection (c). Program modifications to any
20 block price that do not deviate from the Commission's
21 approved value by more than 10% shall take effect
22 immediately and are not subject to Commission review and
23 approval. Program modifications to any block price that
24 deviate more than 10% from the Commission's approved value
25 must be approved by the Commission as a long-term plan
26 amendment under Section 16-111.5 of the Public Utilities

HB5544- 96 -LRB103 38715 CES 69699 b
1 Act. The Agency shall consider stakeholder feedback when
2 making adjustments to the Adjustable Block design and
3 shall notify stakeholders in advance of any planned
4 changes.
5 The Agency and its program administrators for both the
6 Adjustable Block program and the Illinois Solar for All
7 Program, consistent with the requirements of this
8 subsection (c) and subsection (b) of Section 1-56 of this
9 Act, shall propose the Adjustable Block program terms,
10 conditions, and requirements, including the prices to be
11 paid for renewable energy credits, where applicable, and
12 requirements applicable to participating entities and
13 project applications, through the development, review, and
14 approval of the Agency's long-term renewable resources
15 procurement plan described in this subsection (c) and
16 paragraph (5) of subsection (b) of Section 16-111.5 of the
17 Public Utilities Act. Terms, conditions, and requirements
18 for program participation shall include the following:
19 (i) The Agency shall establish a registration
20 process for entities seeking to qualify for
21 program-administered incentive funding and establish
22 baseline qualifications for vendor approval. The
23 Agency must maintain a list of approved entities on
24 each program's website, and may revoke a vendor's
25 ability to receive program-administered incentive
26 funding status upon a determination that the vendor

HB5544- 97 -LRB103 38715 CES 69699 b
1 failed to comply with contract terms, the law, or
2 other program requirements.
3 (ii) The Agency shall establish program
4 requirements and minimum contract terms to ensure
5 projects are properly installed and produce their
6 expected amounts of energy. Program requirements may
7 include on-site inspections and photo documentation of
8 projects under construction. The Agency may require
9 repairs, alterations, or additions to remedy any
10 material deficiencies discovered. Vendors who have a
11 disproportionately high number of deficient systems
12 may lose their eligibility to continue to receive
13 State-administered incentive funding through Agency
14 programs and procurements.
15 (iii) To discourage deceptive marketing or other
16 bad faith business practices, the Agency may require
17 direct program participants, including agents
18 operating on their behalf, to provide standardized
19 disclosures to a customer prior to that customer's
20 execution of a contract for the development of a
21 distributed generation system or a subscription to a
22 community solar project.
23 (iv) The Agency shall establish one or multiple
24 Consumer Complaints Centers to accept complaints
25 regarding businesses that participate in, or otherwise
26 benefit from, State-administered incentive funding

HB5544- 98 -LRB103 38715 CES 69699 b
1 through Agency-administered programs. The Agency shall
2 maintain a public database of complaints with any
3 confidential or particularly sensitive information
4 redacted from public entries.
5 (v) Through a filing in the proceeding for the
6 approval of its long-term renewable energy resources
7 procurement plan, the Agency shall provide an annual
8 written report to the Illinois Commerce Commission
9 documenting the frequency and nature of complaints and
10 any enforcement actions taken in response to those
11 complaints.
12 (vi) The Agency shall schedule regular meetings
13 with representatives of the Office of the Attorney
14 General, the Illinois Commerce Commission, consumer
15 protection groups, and other interested stakeholders
16 to share relevant information about consumer
17 protection, project compliance, and complaints
18 received.
19 (vii) To the extent that complaints received
20 implicate the jurisdiction of the Office of the
21 Attorney General, the Illinois Commerce Commission, or
22 local, State, or federal law enforcement, the Agency
23 shall also refer complaints to those entities as
24 appropriate.
25 (N) The Agency shall establish the terms, conditions,
26 and program requirements for photovoltaic community

HB5544- 99 -LRB103 38715 CES 69699 b
1 renewable generation projects with a goal to expand access
2 to a broader group of energy consumers, to ensure robust
3 participation opportunities for residential and small
4 commercial customers and those who cannot install
5 renewable energy on their own properties. Subject to
6 reasonable limitations, any plan approved by the
7 Commission shall allow subscriptions to community
8 renewable generation projects to be portable and
9 transferable. For purposes of this subparagraph (N),
10 "portable" means that subscriptions may be retained by the
11 subscriber even if the subscriber relocates or changes its
12 address within the same utility service territory; and
13 "transferable" means that a subscriber may assign or sell
14 subscriptions to another person within the same utility
15 service territory.
16 Through the development of its long-term renewable
17 resources procurement plan, the Agency may consider
18 whether community renewable generation projects utilizing
19 technologies other than photovoltaics should be supported
20 through State-administered incentive funding, and may
21 issue requests for information to gauge market demand.
22 Electric utilities shall provide a monetary credit to
23 a subscriber's subsequent bill for service for the
24 proportional output of a community renewable generation
25 project attributable to that subscriber as specified in
26 Section 16-107.5 of the Public Utilities Act.

HB5544- 100 -LRB103 38715 CES 69699 b
1 The Agency shall purchase renewable energy credits
2 from subscribed shares of photovoltaic community renewable
3 generation projects through the Adjustable Block program
4 described in subparagraph (K) of this paragraph (1) or
5 through the Illinois Solar for All Program described in
6 Section 1-56 of this Act. The electric utility shall
7 purchase any unsubscribed energy from community renewable
8 generation projects that are Qualifying Facilities ("QF")
9 under the electric utility's tariff for purchasing the
10 output from QFs under Public Utilities Regulatory Policies
11 Act of 1978.
12 The owners of and any subscribers to a community
13 renewable generation project shall not be considered
14 public utilities or alternative retail electricity
15 suppliers under the Public Utilities Act solely as a
16 result of their interest in or subscription to a community
17 renewable generation project and shall not be required to
18 become an alternative retail electric supplier by
19 participating in a community renewable generation project
20 with a public utility.
21 (O) For the delivery year beginning June 1, 2018, the
22 long-term renewable resources procurement plan required by
23 this subsection (c) shall provide for the Agency to
24 procure contracts to continue offering the Illinois Solar
25 for All Program described in subsection (b) of Section
26 1-56 of this Act, and the contracts approved by the

HB5544- 101 -LRB103 38715 CES 69699 b
1 Commission shall be executed by the utilities that are
2 subject to this subsection (c). The long-term renewable
3 resources procurement plan shall allocate up to
4 $50,000,000 per delivery year to fund the programs, and
5 the plan shall determine the amount of funding to be
6 apportioned to the programs identified in subsection (b)
7 of Section 1-56 of this Act; provided that for the
8 delivery years beginning June 1, 2021, June 1, 2022, and
9 June 1, 2023, the long-term renewable resources
10 procurement plan may average the annual budgets over a
11 3-year period to account for program ramp-up. For the
12 delivery years beginning June 1, 2021, June 1, 2024, June
13 1, 2027, and June 1, 2030 and additional $10,000,000 shall
14 be provided to the Department of Commerce and Economic
15 Opportunity to implement the workforce development
16 programs and reporting as outlined in Section 16-108.12 of
17 the Public Utilities Act. In making the determinations
18 required under this subparagraph (O), the Commission shall
19 consider the experience and performance under the programs
20 and any evaluation reports. The Commission shall also
21 provide for an independent evaluation of those programs on
22 a periodic basis that are funded under this subparagraph
23 (O).
24 (P) All programs and procurements under this
25 subsection (c) shall be designed to encourage
26 participating projects to use a diverse and equitable

HB5544- 102 -LRB103 38715 CES 69699 b
1 workforce and a diverse set of contractors, including
2 minority-owned businesses, disadvantaged businesses,
3 trade unions, graduates of any workforce training programs
4 administered under this Act, and small businesses.
5 The Agency shall develop a method to optimize
6 procurement of renewable energy credits from proposed
7 utility-scale projects that are located in communities
8 eligible to receive Energy Transition Community Grants
9 pursuant to Section 10-20 of the Energy Community
10 Reinvestment Act. If this requirement conflicts with other
11 provisions of law or the Agency determines that full
12 compliance with the requirements of this subparagraph (P)
13 would be unreasonably costly or administratively
14 impractical, the Agency is to propose alternative
15 approaches to achieve development of renewable energy
16 resources in communities eligible to receive Energy
17 Transition Community Grants pursuant to Section 10-20 of
18 the Energy Community Reinvestment Act or seek an exemption
19 from this requirement from the Commission.
20 (Q) Each facility listed in subitems (i) through (ix)
21 of item (1) of this subparagraph (Q) for which a renewable
22 energy credit delivery contract is signed after the
23 effective date of this amendatory Act of the 102nd General
24 Assembly is subject to the following requirements through
25 the Agency's long-term renewable resources procurement
26 plan:

HB5544- 103 -LRB103 38715 CES 69699 b
1 (1) Each facility shall be subject to the
2 prevailing wage requirements included in the
3 Prevailing Wage Act. The Agency shall require
4 verification that all construction performed on the
5 facility by the renewable energy credit delivery
6 contract holder, its contractors, or its
7 subcontractors relating to construction of the
8 facility is performed by construction employees
9 receiving an amount for that work equal to or greater
10 than the general prevailing rate, as that term is
11 defined in Section 3 of the Prevailing Wage Act. For
12 purposes of this item (1), "house of worship" means
13 property that is both (1) used exclusively by a
14 religious society or body of persons as a place for
15 religious exercise or religious worship and (2)
16 recognized as exempt from taxation pursuant to Section
17 15-40 of the Property Tax Code. This item (1) shall
18 apply to any the following:
19 (i) all new utility-scale wind projects;
20 (ii) all new utility-scale photovoltaic
21 projects;
22 (iii) all new brownfield photovoltaic
23 projects;
24 (iv) all new photovoltaic community renewable
25 energy facilities and any associated energy
26 storage systems that qualify for item (iii) of

HB5544- 104 -LRB103 38715 CES 69699 b
1 subparagraph (K) of this paragraph (1);
2 (v) all new community driven community
3 photovoltaic projects and any associated energy
4 storage systems that qualify for item (v) of
5 subparagraph (K) of this paragraph (1);
6 (vi) all new photovoltaic projects on public
7 school land and any associated energy storage
8 systems that qualify for item (iv) of subparagraph
9 (K) of this paragraph (1);
10 (vii) all new photovoltaic distributed
11 renewable energy generation devices and any
12 associated energy storage systems that (1) qualify
13 for item (i) of subparagraph (K) of this paragraph
14 (1); (2) are not projects that serve single-family
15 or multi-family residential buildings; and (3) are
16 not houses of worship where the aggregate capacity
17 including collocated projects would not exceed 100
18 kilowatts;
19 (viii) all new photovoltaic distributed
20 renewable energy generation devices and any
21 associated energy storage systems that (1) qualify
22 for item (ii) of subparagraph (K) of this
23 paragraph (1); (2) are not projects that serve
24 single-family or multi-family residential
25 buildings; and (3) are not houses of worship where
26 the aggregate capacity including collocated

HB5544- 105 -LRB103 38715 CES 69699 b
1 projects would not exceed 100 kilowatts;
2 (ix) all new, modernized, or retooled
3 hydropower facilities.
4 (2) Renewable energy credits procured from new
5 utility-scale wind projects, new utility-scale solar
6 projects, and new brownfield solar projects pursuant
7 to Agency procurement events occurring after the
8 effective date of this amendatory Act of the 102nd
9 General Assembly must be from facilities built by
10 general contractors that must enter into a project
11 labor agreement, as defined by this Act, prior to
12 construction. The project labor agreement shall be
13 filed with the Director in accordance with procedures
14 established by the Agency through its long-term
15 renewable resources procurement plan. Any information
16 submitted to the Agency in this item (2) shall be
17 considered commercially sensitive information. At a
18 minimum, the project labor agreement must provide the
19 names, addresses, and occupations of the owner of the
20 plant and the individuals representing the labor
21 organization employees participating in the project
22 labor agreement consistent with the Project Labor
23 Agreements Act. The agreement must also specify the
24 terms and conditions as defined by this Act.
25 (3) It is the intent of this Section to ensure that
26 economic development occurs across Illinois

HB5544- 106 -LRB103 38715 CES 69699 b
1 communities, that emerging businesses may grow, and
2 that there is improved access to the clean energy
3 economy by persons who have greater economic burdens
4 to success. The Agency shall take into consideration
5 the unique cost of compliance of this subparagraph (Q)
6 that might be borne by equity eligible contractors,
7 shall include such costs when determining the price of
8 renewable energy credits in the Adjustable Block
9 program, and shall take such costs into consideration
10 in a nondiscriminatory manner when comparing bids for
11 competitive procurements. The Agency shall consider
12 costs associated with compliance whether in the
13 development, financing, or construction of projects.
14 The Agency shall periodically review the assumptions
15 in these costs and may adjust prices, in compliance
16 with subparagraph (M) of this paragraph (1).
17 (R) In its long-term renewable resources procurement
18 plan, the Agency shall establish a self-direct renewable
19 portfolio standard compliance program for eligible
20 self-direct customers that purchase renewable energy
21 credits from utility-scale wind and solar projects through
22 long-term agreements for purchase of renewable energy
23 credits as described in this Section. Such long-term
24 agreements may include the purchase of energy or other
25 products on a physical or financial basis and may involve
26 an alternative retail electric supplier as defined in

HB5544- 107 -LRB103 38715 CES 69699 b
1 Section 16-102 of the Public Utilities Act. This program
2 shall take effect in the delivery year commencing June 1,
3 2023.
4 (1) For the purposes of this subparagraph:
5 "Eligible self-direct customer" means any retail
6 customers of an electric utility that serves 3,000,000
7 or more retail customers in the State and whose total
8 highest 30-minute demand was more than 10,000
9 kilowatts, or any retail customers of an electric
10 utility that serves less than 3,000,000 retail
11 customers but more than 500,000 retail customers in
12 the State and whose total highest 15-minute demand was
13 more than 10,000 kilowatts.
14 "Retail customer" has the meaning set forth in
15 Section 16-102 of the Public Utilities Act and
16 multiple retail customer accounts under the same
17 corporate parent may aggregate their account demands
18 to meet the 10,000 kilowatt threshold. The criteria
19 for determining whether this subparagraph is
20 applicable to a retail customer shall be based on the
21 12 consecutive billing periods prior to the start of
22 the year in which the application is filed.
23 (2) For renewable energy credits to count toward
24 the self-direct renewable portfolio standard
25 compliance program, they must:
26 (i) qualify as renewable energy credits as

HB5544- 108 -LRB103 38715 CES 69699 b
1 defined in Section 1-10 of this Act;
2 (ii) be sourced from one or more renewable
3 energy generating facilities that comply with the
4 geographic requirements as set forth in
5 subparagraph (I) of paragraph (1) of subsection
6 (c) as interpreted through the Agency's long-term
7 renewable resources procurement plan, or, where
8 applicable, the geographic requirements that
9 governed utility-scale renewable energy credits at
10 the time the eligible self-direct customer entered
11 into the applicable renewable energy credit
12 purchase agreement;
13 (iii) be procured through long-term contracts
14 with term lengths of at least 10 years either
15 directly with the renewable energy generating
16 facility or through a bundled power purchase
17 agreement, a virtual power purchase agreement, an
18 agreement between the renewable generating
19 facility, an alternative retail electric supplier,
20 and the customer, or such other structure as is
21 permissible under this subparagraph (R);
22 (iv) be equivalent in volume to at least 40%
23 of the eligible self-direct customer's usage,
24 determined annually by the eligible self-direct
25 customer's usage during the previous delivery
26 year, measured to the nearest megawatt-hour;

HB5544- 109 -LRB103 38715 CES 69699 b
1 (v) be retired by or on behalf of the large
2 energy customer;
3 (vi) be sourced from new utility-scale wind
4 projects or new utility-scale solar projects; and
5 (vii) if the contracts for renewable energy
6 credits are entered into after the effective date
7 of this amendatory Act of the 102nd General
8 Assembly, the new utility-scale wind projects or
9 new utility-scale solar projects must comply with
10 the requirements established in subparagraphs (P)
11 and (Q) of paragraph (1) of this subsection (c)
12 and subsection (c-10).
13 (3) The self-direct renewable portfolio standard
14 compliance program shall be designed to allow eligible
15 self-direct customers to procure new renewable energy
16 credits from new utility-scale wind projects or new
17 utility-scale photovoltaic projects. The Agency shall
18 annually determine the amount of utility-scale
19 renewable energy credits it will include each year
20 from the self-direct renewable portfolio standard
21 compliance program, subject to receiving qualifying
22 applications. In making this determination, the Agency
23 shall evaluate publicly available analyses and studies
24 of the potential market size for utility-scale
25 renewable energy long-term purchase agreements by
26 commercial and industrial energy customers and make

HB5544- 110 -LRB103 38715 CES 69699 b
1 that report publicly available. If demand for
2 participation in the self-direct renewable portfolio
3 standard compliance program exceeds availability, the
4 Agency shall ensure participation is evenly split
5 between commercial and industrial users to the extent
6 there is sufficient demand from both customer classes.
7 Each renewable energy credit procured pursuant to this
8 subparagraph (R) by a self-direct customer shall
9 reduce the total volume of renewable energy credits
10 the Agency is otherwise required to procure from new
11 utility-scale projects pursuant to subparagraph (C) of
12 paragraph (1) of this subsection (c) on behalf of
13 contracting utilities where the eligible self-direct
14 customer is located. The self-direct customer shall
15 file an annual compliance report with the Agency
16 pursuant to terms established by the Agency through
17 its long-term renewable resources procurement plan to
18 be eligible for participation in this program.
19 Customers must provide the Agency with their most
20 recent electricity billing statements or other
21 information deemed necessary by the Agency to
22 demonstrate they are an eligible self-direct customer.
23 (4) The Commission shall approve a reduction in
24 the volumetric charges collected pursuant to Section
25 16-108 of the Public Utilities Act for approved
26 eligible self-direct customers equivalent to the

HB5544- 111 -LRB103 38715 CES 69699 b
1 anticipated cost of renewable energy credit deliveries
2 under contracts for new utility-scale wind and new
3 utility-scale solar entered for each delivery year
4 after the large energy customer begins retiring
5 eligible new utility scale renewable energy credits
6 for self-compliance. The self-direct credit amount
7 shall be determined annually and is equal to the
8 estimated portion of the cost authorized by
9 subparagraph (E) of paragraph (1) of this subsection
10 (c) that supported the annual procurement of
11 utility-scale renewable energy credits in the prior
12 delivery year using a methodology described in the
13 long-term renewable resources procurement plan,
14 expressed on a per kilowatthour basis, and does not
15 include (i) costs associated with any contracts
16 entered into before the delivery year in which the
17 customer files the initial compliance report to be
18 eligible for participation in the self-direct program,
19 and (ii) costs associated with procuring renewable
20 energy credits through existing and future contracts
21 through the Adjustable Block Program, subsection (c-5)
22 of this Section 1-75, and the Solar for All Program.
23 The Agency shall assist the Commission in determining
24 the current and future costs. The Agency must
25 determine the self-direct credit amount for new and
26 existing eligible self-direct customers and submit

HB5544- 112 -LRB103 38715 CES 69699 b
1 this to the Commission in an annual compliance filing.
2 The Commission must approve the self-direct credit
3 amount by June 1, 2023 and June 1 of each delivery year
4 thereafter.
5 (5) Customers described in this subparagraph (R)
6 shall apply, on a form developed by the Agency, to the
7 Agency to be designated as a self-direct eligible
8 customer. Once the Agency determines that a
9 self-direct customer is eligible for participation in
10 the program, the self-direct customer will remain
11 eligible until the end of the term of the contract.
12 Thereafter, application may be made not less than 12
13 months before the filing date of the long-term
14 renewable resources procurement plan described in this
15 Act. At a minimum, such application shall contain the
16 following:
17 (i) the customer's certification that, at the
18 time of the customer's application, the customer
19 qualifies to be a self-direct eligible customer,
20 including documents demonstrating that
21 qualification;
22 (ii) the customer's certification that the
23 customer has entered into or will enter into by
24 the beginning of the applicable procurement year,
25 one or more bilateral contracts for new wind
26 projects or new photovoltaic projects, including

HB5544- 113 -LRB103 38715 CES 69699 b
1 supporting documentation;
2 (iii) certification that the contract or
3 contracts for new renewable energy resources are
4 long-term contracts with term lengths of at least
5 10 years, including supporting documentation;
6 (iv) certification of the quantities of
7 renewable energy credits that the customer will
8 purchase each year under such contract or
9 contracts, including supporting documentation;
10 (v) proof that the contract is sufficient to
11 produce renewable energy credits to be equivalent
12 in volume to at least 40% of the large energy
13 customer's usage from the previous delivery year,
14 measured to the nearest megawatt-hour; and
15 (vi) certification that the customer intends
16 to maintain the contract for the duration of the
17 length of the contract.
18 (6) If a customer receives the self-direct credit
19 but fails to properly procure and retire renewable
20 energy credits as required under this subparagraph
21 (R), the Commission, on petition from the Agency and
22 after notice and hearing, may direct such customer's
23 utility to recover the cost of the wrongfully received
24 self-direct credits plus interest through an adder to
25 charges assessed pursuant to Section 16-108 of the
26 Public Utilities Act. Self-direct customers who

HB5544- 114 -LRB103 38715 CES 69699 b
1 knowingly fail to properly procure and retire
2 renewable energy credits and do not notify the Agency
3 are ineligible for continued participation in the
4 self-direct renewable portfolio standard compliance
5 program.
6 (2) (Blank).
7 (3) (Blank).
8 (4) The electric utility shall retire all renewable
9 energy credits used to comply with the standard.
10 (5) Beginning with the 2010 delivery year and ending
11 June 1, 2017, an electric utility subject to this
12 subsection (c) shall apply the lesser of the maximum
13 alternative compliance payment rate or the most recent
14 estimated alternative compliance payment rate for its
15 service territory for the corresponding compliance period,
16 established pursuant to subsection (d) of Section 16-115D
17 of the Public Utilities Act to its retail customers that
18 take service pursuant to the electric utility's hourly
19 pricing tariff or tariffs. The electric utility shall
20 retain all amounts collected as a result of the
21 application of the alternative compliance payment rate or
22 rates to such customers, and, beginning in 2011, the
23 utility shall include in the information provided under
24 item (1) of subsection (d) of Section 16-111.5 of the
25 Public Utilities Act the amounts collected under the
26 alternative compliance payment rate or rates for the prior

HB5544- 115 -LRB103 38715 CES 69699 b
1 year ending May 31. Notwithstanding any limitation on the
2 procurement of renewable energy resources imposed by item
3 (2) of this subsection (c), the Agency shall increase its
4 spending on the purchase of renewable energy resources to
5 be procured by the electric utility for the next plan year
6 by an amount equal to the amounts collected by the utility
7 under the alternative compliance payment rate or rates in
8 the prior year ending May 31.
9 (6) The electric utility shall be entitled to recover
10 all of its costs associated with the procurement of
11 renewable energy credits under plans approved under this
12 Section and Section 16-111.5 of the Public Utilities Act.
13 These costs shall include associated reasonable expenses
14 for implementing the procurement programs, including, but
15 not limited to, the costs of administering and evaluating
16 the Adjustable Block program, through an automatic
17 adjustment clause tariff in accordance with subsection (k)
18 of Section 16-108 of the Public Utilities Act.
19 (7) Renewable energy credits procured from new
20 photovoltaic projects or new distributed renewable energy
21 generation devices under this Section after June 1, 2017
22 (the effective date of Public Act 99-906) must be procured
23 from devices installed by a qualified person in compliance
24 with the requirements of Section 16-128A of the Public
25 Utilities Act and any rules or regulations adopted
26 thereunder.

HB5544- 116 -LRB103 38715 CES 69699 b
1 In meeting the renewable energy requirements of this
2 subsection (c), to the extent feasible and consistent with
3 State and federal law, the renewable energy credit
4 procurements, Adjustable Block solar program, and
5 community renewable generation program shall provide
6 employment opportunities for all segments of the
7 population and workforce, including minority-owned and
8 female-owned business enterprises, and shall not,
9 consistent with State and federal law, discriminate based
10 on race or socioeconomic status.
11 (c-5) Procurement of renewable energy credits from new
12renewable energy facilities installed at or adjacent to the
13sites of electric generating facilities that burn or burned
14coal as their primary fuel source.
15 (1) In addition to the procurement of renewable energy
16 credits pursuant to long-term renewable resources
17 procurement plans in accordance with subsection (c) of
18 this Section and Section 16-111.5 of the Public Utilities
19 Act, the Agency shall conduct procurement events in
20 accordance with this subsection (c-5) for the procurement
21 by electric utilities that served more than 300,000 retail
22 customers in this State as of January 1, 2019 of renewable
23 energy credits from new renewable energy facilities to be
24 installed at or adjacent to the sites of electric
25 generating facilities that, as of January 1, 2016, burned
26 coal as their primary fuel source and meet the other

HB5544- 117 -LRB103 38715 CES 69699 b
1 criteria specified in this subsection (c-5). For purposes
2 of this subsection (c-5), "new renewable energy facility"
3 means a new utility-scale solar project as defined in this
4 Section 1-75. The renewable energy credits procured
5 pursuant to this subsection (c-5) may be included or
6 counted for purposes of compliance with the amounts of
7 renewable energy credits required to be procured pursuant
8 to subsection (c) of this Section to the extent that there
9 are otherwise shortfalls in compliance with such
10 requirements. The procurement of renewable energy credits
11 by electric utilities pursuant to this subsection (c-5)
12 shall be funded solely by revenues collected from the Coal
13 to Solar and Energy Storage Initiative Charge provided for
14 in this subsection (c-5) and subsection (i-5) of Section
15 16-108 of the Public Utilities Act, shall not be funded by
16 revenues collected through any of the other funding
17 mechanisms provided for in subsection (c) of this Section,
18 and shall not be subject to the limitation imposed by
19 subsection (c) on charges to retail customers for costs to
20 procure renewable energy resources pursuant to subsection
21 (c), and shall not be subject to any other requirements or
22 limitations of subsection (c).
23 (2) The Agency shall conduct 2 procurement events to
24 select owners of electric generating facilities meeting
25 the eligibility criteria specified in this subsection
26 (c-5) to enter into long-term contracts to sell renewable

HB5544- 118 -LRB103 38715 CES 69699 b
1 energy credits to electric utilities serving more than
2 300,000 retail customers in this State as of January 1,
3 2019. The first procurement event shall be conducted no
4 later than March 31, 2022, unless the Agency elects to
5 delay it, until no later than May 1, 2022, due to its
6 overall volume of work, and shall be to select owners of
7 electric generating facilities located in this State and
8 south of federal Interstate Highway 80 that meet the
9 eligibility criteria specified in this subsection (c-5).
10 The second procurement event shall be conducted no sooner
11 than September 30, 2022 and no later than October 31, 2022
12 and shall be to select owners of electric generating
13 facilities located anywhere in this State that meet the
14 eligibility criteria specified in this subsection (c-5).
15 The Agency shall establish and announce a time period,
16 which shall begin no later than 30 days prior to the
17 scheduled date for the procurement event, during which
18 applicants may submit applications to be selected as
19 suppliers of renewable energy credits pursuant to this
20 subsection (c-5). The eligibility criteria for selection
21 as a supplier of renewable energy credits pursuant to this
22 subsection (c-5) shall be as follows:
23 (A) The applicant owns an electric generating
24 facility located in this State that: (i) as of January
25 1, 2016, burned coal as its primary fuel to generate
26 electricity; and (ii) has, or had prior to retirement,

HB5544- 119 -LRB103 38715 CES 69699 b
1 an electric generating capacity of at least 150
2 megawatts. The electric generating facility can be
3 either: (i) retired as of the date of the procurement
4 event; or (ii) still operating as of the date of the
5 procurement event.
6 (B) The applicant is not (i) an electric
7 cooperative as defined in Section 3-119 of the Public
8 Utilities Act, or (ii) an entity described in
9 subsection (b)(1) of Section 3-105 of the Public
10 Utilities Act, or an association or consortium of or
11 an entity owned by entities described in (i) or (ii);
12 and the coal-fueled electric generating facility was
13 at one time owned, in whole or in part, by a public
14 utility as defined in Section 3-105 of the Public
15 Utilities Act.
16 (C) If participating in the first procurement
17 event, the applicant proposes and commits to construct
18 and operate, at the site, and if necessary for
19 sufficient space on property adjacent to the existing
20 property, at which the electric generating facility
21 identified in paragraph (A) is located: (i) a new
22 renewable energy facility of at least 20 megawatts but
23 no more than 100 megawatts of electric generating
24 capacity, and (ii) an energy storage facility having a
25 storage capacity equal to at least 2 megawatts and at
26 most 10 megawatts. If participating in the second

HB5544- 120 -LRB103 38715 CES 69699 b
1 procurement event, the applicant proposes and commits
2 to construct and operate, at the site, and if
3 necessary for sufficient space on property adjacent to
4 the existing property, at which the electric
5 generating facility identified in paragraph (A) is
6 located: (i) a new renewable energy facility of at
7 least 5 megawatts but no more than 20 megawatts of
8 electric generating capacity, and (ii) an energy
9 storage facility having a storage capacity equal to at
10 least 0.5 megawatts and at most one megawatt.
11 (D) The applicant agrees that the new renewable
12 energy facility and the energy storage facility will
13 be constructed or installed by a qualified entity or
14 entities in compliance with the requirements of
15 subsection (g) of Section 16-128A of the Public
16 Utilities Act and any rules adopted thereunder.
17 (E) The applicant agrees that personnel operating
18 the new renewable energy facility and the energy
19 storage facility will have the requisite skills,
20 knowledge, training, experience, and competence, which
21 may be demonstrated by completion or current
22 participation and ultimate completion by employees of
23 an accredited or otherwise recognized apprenticeship
24 program for the employee's particular craft, trade, or
25 skill, including through training and education
26 courses and opportunities offered by the owner to

HB5544- 121 -LRB103 38715 CES 69699 b
1 employees of the coal-fueled electric generating
2 facility or by previous employment experience
3 performing the employee's particular work skill or
4 function.
5 (F) The applicant commits that not less than the
6 prevailing wage, as determined pursuant to the
7 Prevailing Wage Act, will be paid to the applicant's
8 employees engaged in construction activities
9 associated with the new renewable energy facility and
10 the new energy storage facility and to the employees
11 of applicant's contractors engaged in construction
12 activities associated with the new renewable energy
13 facility and the new energy storage facility, and
14 that, on or before the commercial operation date of
15 the new renewable energy facility, the applicant shall
16 file a report with the Agency certifying that the
17 requirements of this subparagraph (F) have been met.
18 (G) The applicant commits that if selected, it
19 will negotiate a project labor agreement for the
20 construction of the new renewable energy facility and
21 associated energy storage facility that includes
22 provisions requiring the parties to the agreement to
23 work together to establish diversity threshold
24 requirements and to ensure best efforts to meet
25 diversity targets, improve diversity at the applicable
26 job site, create diverse apprenticeship opportunities,

HB5544- 122 -LRB103 38715 CES 69699 b
1 and create opportunities to employ former coal-fired
2 power plant workers.
3 (H) The applicant commits to enter into a contract
4 or contracts for the applicable duration to provide
5 specified numbers of renewable energy credits each
6 year from the new renewable energy facility to
7 electric utilities that served more than 300,000
8 retail customers in this State as of January 1, 2019,
9 at a price of $30 per renewable energy credit. The
10 price per renewable energy credit shall be fixed at
11 $30 for the applicable duration and the renewable
12 energy credits shall not be indexed renewable energy
13 credits as provided for in item (v) of subparagraph
14 (G) of paragraph (1) of subsection (c) of Section 1-75
15 of this Act. The applicable duration of each contract
16 shall be 20 years, unless the applicant is physically
17 interconnected to the PJM Interconnection, LLC
18 transmission grid and had a generating capacity of at
19 least 1,200 megawatts as of January 1, 2021, in which
20 case the applicable duration of the contract shall be
21 15 years.
22 (I) The applicant's application is certified by an
23 officer of the applicant and by an officer of the
24 applicant's ultimate parent company, if any.
25 (3) An applicant may submit applications to contract
26 to supply renewable energy credits from more than one new

HB5544- 123 -LRB103 38715 CES 69699 b
1 renewable energy facility to be constructed at or adjacent
2 to one or more qualifying electric generating facilities
3 owned by the applicant. The Agency may select new
4 renewable energy facilities to be located at or adjacent
5 to the sites of more than one qualifying electric
6 generation facility owned by an applicant to contract with
7 electric utilities to supply renewable energy credits from
8 such facilities.
9 (4) The Agency shall assess fees to each applicant to
10 recover the Agency's costs incurred in receiving and
11 evaluating applications, conducting the procurement event,
12 developing contracts for sale, delivery and purchase of
13 renewable energy credits, and monitoring the
14 administration of such contracts, as provided for in this
15 subsection (c-5), including fees paid to a procurement
16 administrator retained by the Agency for one or more of
17 these purposes.
18 (5) The Agency shall select the applicants and the new
19 renewable energy facilities to contract with electric
20 utilities to supply renewable energy credits in accordance
21 with this subsection (c-5). In the first procurement
22 event, the Agency shall select applicants and new
23 renewable energy facilities to supply renewable energy
24 credits, at a price of $30 per renewable energy credit,
25 aggregating to no less than 400,000 renewable energy
26 credits per year for the applicable duration, assuming

HB5544- 124 -LRB103 38715 CES 69699 b
1 sufficient qualifying applications to supply, in the
2 aggregate, at least that amount of renewable energy
3 credits per year; and not more than 580,000 renewable
4 energy credits per year for the applicable duration. In
5 the second procurement event, the Agency shall select
6 applicants and new renewable energy facilities to supply
7 renewable energy credits, at a price of $30 per renewable
8 energy credit, aggregating to no more than 625,000
9 renewable energy credits per year less the amount of
10 renewable energy credits each year contracted for as a
11 result of the first procurement event, for the applicable
12 durations. The number of renewable energy credits to be
13 procured as specified in this paragraph (5) shall not be
14 reduced based on renewable energy credits procured in the
15 self-direct renewable energy credit compliance program
16 established pursuant to subparagraph (R) of paragraph (1)
17 of subsection (c) of Section 1-75.
18 (6) The obligation to purchase renewable energy
19 credits from the applicants and their new renewable energy
20 facilities selected by the Agency shall be allocated to
21 the electric utilities based on their respective
22 percentages of kilowatthours delivered to delivery
23 services customers to the aggregate kilowatthour
24 deliveries by the electric utilities to delivery services
25 customers for the year ended December 31, 2021. In order
26 to achieve these allocation percentages between or among

HB5544- 125 -LRB103 38715 CES 69699 b
1 the electric utilities, the Agency shall require each
2 applicant that is selected in the procurement event to
3 enter into a contract with each electric utility for the
4 sale and purchase of renewable energy credits from each
5 new renewable energy facility to be constructed and
6 operated by the applicant, with the sale and purchase
7 obligations under the contracts to aggregate to the total
8 number of renewable energy credits per year to be supplied
9 by the applicant from the new renewable energy facility.
10 (7) The Agency shall submit its proposed selection of
11 applicants, new renewable energy facilities to be
12 constructed, and renewable energy credit amounts for each
13 procurement event to the Commission for approval. The
14 Commission shall, within 2 business days after receipt of
15 the Agency's proposed selections, approve the proposed
16 selections if it determines that the applicants and the
17 new renewable energy facilities to be constructed meet the
18 selection criteria set forth in this subsection (c-5) and
19 that the Agency seeks approval for contracts of applicable
20 durations aggregating to no more than the maximum amount
21 of renewable energy credits per year authorized by this
22 subsection (c-5) for the procurement event, at a price of
23 $30 per renewable energy credit.
24 (8) The Agency, in conjunction with its procurement
25 administrator if one is retained, the electric utilities,
26 and potential applicants for contracts to produce and

HB5544- 126 -LRB103 38715 CES 69699 b
1 supply renewable energy credits pursuant to this
2 subsection (c-5), shall develop a standard form contract
3 for the sale, delivery and purchase of renewable energy
4 credits pursuant to this subsection (c-5). Each contract
5 resulting from the first procurement event shall allow for
6 a commercial operation date for the new renewable energy
7 facility of either June 1, 2023 or June 1, 2024, with such
8 dates subject to adjustment as provided in this paragraph.
9 Each contract resulting from the second procurement event
10 shall provide for a commercial operation date on June 1
11 next occurring up to 48 months after execution of the
12 contract. Each contract shall provide that the owner shall
13 receive payments for renewable energy credits for the
14 applicable durations beginning with the commercial
15 operation date of the new renewable energy facility. The
16 form contract shall provide for adjustments to the
17 commercial operation and payment start dates as needed due
18 to any delays in completing the procurement and
19 contracting processes, in finalizing interconnection
20 agreements and installing interconnection facilities, and
21 in obtaining other necessary governmental permits and
22 approvals. The form contract shall be, to the maximum
23 extent possible, consistent with standard electric
24 industry contracts for sale, delivery, and purchase of
25 renewable energy credits while taking into account the
26 specific requirements of this subsection (c-5). The form

HB5544- 127 -LRB103 38715 CES 69699 b
1 contract shall provide for over-delivery and
2 under-delivery of renewable energy credits within
3 reasonable ranges during each 12-month period and penalty,
4 default, and enforcement provisions for failure of the
5 selling party to deliver renewable energy credits as
6 specified in the contract and to comply with the
7 requirements of this subsection (c-5). The standard form
8 contract shall specify that all renewable energy credits
9 delivered to the electric utility pursuant to the contract
10 shall be retired. The Agency shall make the proposed
11 contracts available for a reasonable period for comment by
12 potential applicants, and shall publish the final form
13 contract at least 30 days before the date of the first
14 procurement event.
15 (9) Coal to Solar and Energy Storage Initiative
16 Charge.
17 (A) By no later than July 1, 2022, each electric
18 utility that served more than 300,000 retail customers
19 in this State as of January 1, 2019 shall file a tariff
20 with the Commission for the billing and collection of
21 a Coal to Solar and Energy Storage Initiative Charge
22 in accordance with subsection (i-5) of Section 16-108
23 of the Public Utilities Act, with such tariff to be
24 effective, following review and approval or
25 modification by the Commission, beginning January 1,
26 2023. The tariff shall provide for the calculation and

HB5544- 128 -LRB103 38715 CES 69699 b
1 setting of the electric utility's Coal to Solar and
2 Energy Storage Initiative Charge to collect revenues
3 estimated to be sufficient, in the aggregate, (i) to
4 enable the electric utility to pay for the renewable
5 energy credits it has contracted to purchase in the
6 delivery year beginning June 1, 2023 and each delivery
7 year thereafter from new renewable energy facilities
8 located at the sites of qualifying electric generating
9 facilities, and (ii) to fund the grant payments to be
10 made in each delivery year by the Department of
11 Commerce and Economic Opportunity, or any successor
12 department or agency, which shall be referred to in
13 this subsection (c-5) as the Department, pursuant to
14 paragraph (10) of this subsection (c-5). The electric
15 utility's tariff shall provide for the billing and
16 collection of the Coal to Solar and Energy Storage
17 Initiative Charge on each kilowatthour of electricity
18 delivered to its delivery services customers within
19 its service territory and shall provide for an annual
20 reconciliation of revenues collected with actual
21 costs, in accordance with subsection (i-5) of Section
22 16-108 of the Public Utilities Act.
23 (B) Each electric utility shall remit on a monthly
24 basis to the State Treasurer, for deposit in the Coal
25 to Solar and Energy Storage Initiative Fund provided
26 for in this subsection (c-5), the electric utility's

HB5544- 129 -LRB103 38715 CES 69699 b
1 collections of the Coal to Solar and Energy Storage
2 Initiative Charge in the amount estimated to be needed
3 by the Department for grant payments pursuant to grant
4 contracts entered into by the Department pursuant to
5 paragraph (10) of this subsection (c-5).
6 (10) Coal to Solar and Energy Storage Initiative Fund.
7 (A) The Coal to Solar and Energy Storage
8 Initiative Fund is established as a special fund in
9 the State treasury. The Coal to Solar and Energy
10 Storage Initiative Fund is authorized to receive, by
11 statutory deposit, that portion specified in item (B)
12 of paragraph (9) of this subsection (c-5) of moneys
13 collected by electric utilities through imposition of
14 the Coal to Solar and Energy Storage Initiative Charge
15 required by this subsection (c-5). The Coal to Solar
16 and Energy Storage Initiative Fund shall be
17 administered by the Department to provide grants to
18 support the installation and operation of energy
19 storage facilities at the sites of qualifying electric
20 generating facilities meeting the criteria specified
21 in this paragraph (10).
22 (B) The Coal to Solar and Energy Storage
23 Initiative Fund shall not be subject to sweeps,
24 administrative charges, or chargebacks, including, but
25 not limited to, those authorized under Section 8h of
26 the State Finance Act, that would in any way result in

HB5544- 130 -LRB103 38715 CES 69699 b
1 the transfer of those funds from the Coal to Solar and
2 Energy Storage Initiative Fund to any other fund of
3 this State or in having any such funds utilized for any
4 purpose other than the express purposes set forth in
5 this paragraph (10).
6 (C) The Department shall utilize up to
7 $280,500,000 in the Coal to Solar and Energy Storage
8 Initiative Fund for grants, assuming sufficient
9 qualifying applicants, to support installation of
10 energy storage facilities at the sites of up to 3
11 qualifying electric generating facilities located in
12 the Midcontinent Independent System Operator, Inc.,
13 region in Illinois and the sites of up to 2 qualifying
14 electric generating facilities located in the PJM
15 Interconnection, LLC region in Illinois that meet the
16 criteria set forth in this subparagraph (C). The
17 criteria for receipt of a grant pursuant to this
18 subparagraph (C) are as follows:
19 (1) the electric generating facility at the
20 site has, or had prior to retirement, an electric
21 generating capacity of at least 150 megawatts;
22 (2) the electric generating facility burns (or
23 burned prior to retirement) coal as its primary
24 source of fuel;
25 (3) if the electric generating facility is
26 retired, it was retired subsequent to January 1,

HB5544- 131 -LRB103 38715 CES 69699 b
1 2016;
2 (4) the owner of the electric generating
3 facility has not been selected by the Agency
4 pursuant to this subsection (c-5) of this Section
5 to enter into a contract to sell renewable energy
6 credits to one or more electric utilities from a
7 new renewable energy facility located or to be
8 located at or adjacent to the site at which the
9 electric generating facility is located;
10 (5) the electric generating facility located
11 at the site was at one time owned, in whole or in
12 part, by a public utility as defined in Section
13 3-105 of the Public Utilities Act;
14 (6) the electric generating facility at the
15 site is not owned by (i) an electric cooperative
16 as defined in Section 3-119 of the Public
17 Utilities Act, or (ii) an entity described in
18 subsection (b)(1) of Section 3-105 of the Public
19 Utilities Act, or an association or consortium of
20 or an entity owned by entities described in items
21 (i) or (ii);
22 (7) the proposed energy storage facility at
23 the site will have energy storage capacity of at
24 least 37 megawatts;
25 (8) the owner commits to place the energy
26 storage facility into commercial operation on

HB5544- 132 -LRB103 38715 CES 69699 b
1 either June 1, 2023, June 1, 2024, or June 1, 2025,
2 with such date subject to adjustment as needed due
3 to any delays in completing the grant contracting
4 process, in finalizing interconnection agreements
5 and in installing interconnection facilities, and
6 in obtaining necessary governmental permits and
7 approvals;
8 (9) the owner agrees that the new energy
9 storage facility will be constructed or installed
10 by a qualified entity or entities consistent with
11 the requirements of subsection (g) of Section
12 16-128A of the Public Utilities Act and any rules
13 adopted under that Section;
14 (10) the owner agrees that personnel operating
15 the energy storage facility will have the
16 requisite skills, knowledge, training, experience,
17 and competence, which may be demonstrated by
18 completion or current participation and ultimate
19 completion by employees of an accredited or
20 otherwise recognized apprenticeship program for
21 the employee's particular craft, trade, or skill,
22 including through training and education courses
23 and opportunities offered by the owner to
24 employees of the coal-fueled electric generating
25 facility or by previous employment experience
26 performing the employee's particular work skill or

HB5544- 133 -LRB103 38715 CES 69699 b
1 function;
2 (11) the owner commits that not less than the
3 prevailing wage, as determined pursuant to the
4 Prevailing Wage Act, will be paid to the owner's
5 employees engaged in construction activities
6 associated with the new energy storage facility
7 and to the employees of the owner's contractors
8 engaged in construction activities associated with
9 the new energy storage facility, and that, on or
10 before the commercial operation date of the new
11 energy storage facility, the owner shall file a
12 report with the Department certifying that the
13 requirements of this subparagraph (11) have been
14 met; and
15 (12) the owner commits that if selected to
16 receive a grant, it will negotiate a project labor
17 agreement for the construction of the new energy
18 storage facility that includes provisions
19 requiring the parties to the agreement to work
20 together to establish diversity threshold
21 requirements and to ensure best efforts to meet
22 diversity targets, improve diversity at the
23 applicable job site, create diverse apprenticeship
24 opportunities, and create opportunities to employ
25 former coal-fired power plant workers.
26 The Department shall accept applications for this

HB5544- 134 -LRB103 38715 CES 69699 b
1 grant program until March 31, 2022 and shall announce
2 the award of grants no later than June 1, 2022. The
3 Department shall make the grant payments to a
4 recipient in equal annual amounts for 10 years
5 following the date the energy storage facility is
6 placed into commercial operation. The annual grant
7 payments to a qualifying energy storage facility shall
8 be $110,000 per megawatt of energy storage capacity,
9 with total annual grant payments pursuant to this
10 subparagraph (C) for qualifying energy storage
11 facilities not to exceed $28,050,000 in any year.
12 (D) Grants of funding for energy storage
13 facilities pursuant to subparagraph (C) of this
14 paragraph (10), from the Coal to Solar and Energy
15 Storage Initiative Fund, shall be memorialized in
16 grant contracts between the Department and the
17 recipient. The grant contracts shall specify the date
18 or dates in each year on which the annual grant
19 payments shall be paid.
20 (E) All disbursements from the Coal to Solar and
21 Energy Storage Initiative Fund shall be made only upon
22 warrants of the Comptroller drawn upon the Treasurer
23 as custodian of the Fund upon vouchers signed by the
24 Director of the Department or by the person or persons
25 designated by the Director of the Department for that
26 purpose. The Comptroller is authorized to draw the

HB5544- 135 -LRB103 38715 CES 69699 b
1 warrants upon vouchers so signed. The Treasurer shall
2 accept all written warrants so signed and shall be
3 released from liability for all payments made on those
4 warrants.
5 (11) Diversity, equity, and inclusion plans.
6 (A) Each applicant selected in a procurement event
7 to contract to supply renewable energy credits in
8 accordance with this subsection (c-5) and each owner
9 selected by the Department to receive a grant or
10 grants to support the construction and operation of a
11 new energy storage facility or facilities in
12 accordance with this subsection (c-5) shall, within 60
13 days following the Commission's approval of the
14 applicant to contract to supply renewable energy
15 credits or within 60 days following execution of a
16 grant contract with the Department, as applicable,
17 submit to the Commission a diversity, equity, and
18 inclusion plan setting forth the applicant's or
19 owner's numeric goals for the diversity composition of
20 its supplier entities for the new renewable energy
21 facility or new energy storage facility, as
22 applicable, which shall be referred to for purposes of
23 this paragraph (11) as the project, and the
24 applicant's or owner's action plan and schedule for
25 achieving those goals.
26 (B) For purposes of this paragraph (11), diversity

HB5544- 136 -LRB103 38715 CES 69699 b
1 composition shall be based on the percentage, which
2 shall be a minimum of 25%, of eligible expenditures
3 for contract awards for materials and services (which
4 shall be defined in the plan) to business enterprises
5 owned by minority persons, women, or persons with
6 disabilities as defined in Section 2 of the Business
7 Enterprise for Minorities, Women, and Persons with
8 Disabilities Act, to LGBTQ business enterprises, to
9 veteran-owned business enterprises, and to business
10 enterprises located in environmental justice
11 communities. The diversity composition goals of the
12 plan may include eligible expenditures in areas for
13 vendor or supplier opportunities in addition to
14 development and construction of the project, and may
15 exclude from eligible expenditures materials and
16 services with limited market availability, limited
17 production and availability from suppliers in the
18 United States, such as solar panels and storage
19 batteries, and material and services that are subject
20 to critical energy infrastructure or cybersecurity
21 requirements or restrictions. The plan may provide
22 that the diversity composition goals may be met
23 through Tier 1 Direct or Tier 2 subcontracting
24 expenditures or a combination thereof for the project.
25 (C) The plan shall provide for, but not be limited
26 to: (i) internal initiatives, including multi-tier

HB5544- 137 -LRB103 38715 CES 69699 b
1 initiatives, by the applicant or owner, or by its
2 engineering, procurement and construction contractor
3 if one is used for the project, which for purposes of
4 this paragraph (11) shall be referred to as the EPC
5 contractor, to enable diverse businesses to be
6 considered fairly for selection to provide materials
7 and services; (ii) requirements for the applicant or
8 owner or its EPC contractor to proactively solicit and
9 utilize diverse businesses to provide materials and
10 services; and (iii) requirements for the applicant or
11 owner or its EPC contractor to hire a diverse
12 workforce for the project. The plan shall include a
13 description of the applicant's or owner's diversity
14 recruiting efforts both for the project and for other
15 areas of the applicant's or owner's business
16 operations. The plan shall provide for the imposition
17 of financial penalties on the applicant's or owner's
18 EPC contractor for failure to exercise best efforts to
19 comply with and execute the EPC contractor's diversity
20 obligations under the plan. The plan may provide for
21 the applicant or owner to set aside a portion of the
22 work on the project to serve as an incubation program
23 for qualified businesses, as specified in the plan,
24 owned by minority persons, women, persons with
25 disabilities, LGBTQ persons, and veterans, and
26 businesses located in environmental justice

HB5544- 138 -LRB103 38715 CES 69699 b
1 communities, seeking to enter the renewable energy
2 industry.
3 (D) The applicant or owner may submit a revised or
4 updated plan to the Commission from time to time as
5 circumstances warrant. The applicant or owner shall
6 file annual reports with the Commission detailing the
7 applicant's or owner's progress in implementing its
8 plan and achieving its goals and any modifications the
9 applicant or owner has made to its plan to better
10 achieve its diversity, equity and inclusion goals. The
11 applicant or owner shall file a final report on the
12 fifth June 1 following the commercial operation date
13 of the new renewable energy resource or new energy
14 storage facility, but the applicant or owner shall
15 thereafter continue to be subject to applicable
16 reporting requirements of Section 5-117 of the Public
17 Utilities Act.
18 (c-10) Equity accountability system. It is the purpose of
19this subsection (c-10) to create an equity accountability
20system, which includes the minimum equity standards for all
21renewable energy procurements, the equity category of the
22Adjustable Block Program, and the equity prioritization for
23noncompetitive procurements, that is successful in advancing
24priority access to the clean energy economy for businesses and
25workers from communities that have been excluded from economic
26opportunities in the energy sector, have been subject to

HB5544- 139 -LRB103 38715 CES 69699 b
1disproportionate levels of pollution, and have
2disproportionately experienced negative public health
3outcomes. Further, it is the purpose of this subsection to
4ensure that this equity accountability system is successful in
5advancing equity across Illinois by providing access to the
6clean energy economy for businesses and workers from
7communities that have been historically excluded from economic
8opportunities in the energy sector, have been subject to
9disproportionate levels of pollution, and have
10disproportionately experienced negative public health
11outcomes.
12 (1) Minimum equity standards. The Agency shall create
13 programs with the purpose of increasing access to and
14 development of equity eligible contractors, who are prime
15 contractors and subcontractors, across all of the programs
16 it manages. All applications for renewable energy credit
17 procurements shall comply with specific minimum equity
18 commitments. Starting in the delivery year immediately
19 following the next long-term renewable resources
20 procurement plan, at least 10% of the project workforce
21 for each entity participating in a procurement program
22 outlined in this subsection (c-10) must be done by equity
23 eligible persons or equity eligible contractors. The
24 Agency shall increase the minimum percentage each delivery
25 year thereafter by increments that ensure a statewide
26 average of 30% of the project workforce for each entity

HB5544- 140 -LRB103 38715 CES 69699 b
1 participating in a procurement program is done by equity
2 eligible persons or equity eligible contractors by 2030.
3 The Agency shall propose a schedule of percentage
4 increases to the minimum equity standards in its draft
5 revised renewable energy resources procurement plan
6 submitted to the Commission for approval pursuant to
7 paragraph (5) of subsection (b) of Section 16-111.5 of the
8 Public Utilities Act. In determining these annual
9 increases, the Agency shall have the discretion to
10 establish different minimum equity standards for different
11 types of procurements and different regions of the State
12 if the Agency finds that doing so will further the
13 purposes of this subsection (c-10). The proposed schedule
14 of annual increases shall be revisited and updated on an
15 annual basis. Revisions shall be developed with
16 stakeholder input, including from equity eligible persons,
17 equity eligible contractors, clean energy industry
18 representatives, and community-based organizations that
19 work with such persons and contractors.
20 (A) At the start of each delivery year, the Agency
21 shall require a compliance plan from each entity
22 participating in a procurement program of subsection
23 (c) of this Section that demonstrates how they will
24 achieve compliance with the minimum equity standard
25 percentage for work completed in that delivery year.
26 If an entity applies for its approved vendor or

HB5544- 141 -LRB103 38715 CES 69699 b
1 designee status between delivery years, the Agency
2 shall require a compliance plan at the time of
3 application.
4 (B) Halfway through each delivery year, the Agency
5 shall require each entity participating in a
6 procurement program to confirm that it will achieve
7 compliance in that delivery year, when applicable. The
8 Agency may offer corrective action plans to entities
9 that are not on track to achieve compliance.
10 (C) At the end of each delivery year, each entity
11 participating and completing work in that delivery
12 year in a procurement program of subsection (c) shall
13 submit a report to the Agency that demonstrates how it
14 achieved compliance with the minimum equity standards
15 percentage for that delivery year.
16 (D) The Agency shall prohibit participation in
17 procurement programs by an approved vendor or
18 designee, as applicable, or entities with which an
19 approved vendor or designee, as applicable, shares a
20 common parent company if an approved vendor or
21 designee, as applicable, failed to meet the minimum
22 equity standards for the prior delivery year. Waivers
23 approved for lack of equity eligible persons or equity
24 eligible contractors in a geographic area of a project
25 shall not count against the approved vendor or
26 designee. The Agency shall offer a corrective action

HB5544- 142 -LRB103 38715 CES 69699 b
1 plan for any such entities to assist them in obtaining
2 compliance and shall allow continued access to
3 procurement programs upon an approved vendor or
4 designee demonstrating compliance.
5 (E) The Agency shall pursue efficiencies achieved
6 by combining with other approved vendor or designee
7 reporting.
8 (2) Equity accountability system within the Adjustable
9 Block program. The equity category described in item (vi)
10 of subparagraph (K) of subsection (c) is only available to
11 applicants that are equity eligible contractors.
12 (3) Equity accountability system within competitive
13 procurements. Through its long-term renewable resources
14 procurement plan, the Agency shall develop requirements
15 for ensuring that competitive procurement processes,
16 including utility-scale solar, utility-scale wind, and
17 brownfield site photovoltaic projects, advance the equity
18 goals of this subsection (c-10). Subject to Commission
19 approval, the Agency shall develop bid application
20 requirements and a bid evaluation methodology for ensuring
21 that utilization of equity eligible contractors, whether
22 as bidders or as participants on project development, is
23 optimized, including requiring that winning or successful
24 applicants for utility-scale projects are or will partner
25 with equity eligible contractors and giving preference to
26 bids through which a higher portion of contract value

HB5544- 143 -LRB103 38715 CES 69699 b
1 flows to equity eligible contractors. To the extent
2 practicable, entities participating in competitive
3 procurements shall also be required to meet all the equity
4 accountability requirements for approved vendors and their
5 designees under this subsection (c-10). In developing
6 these requirements, the Agency shall also consider whether
7 equity goals can be further advanced through additional
8 measures.
9 (4) In the first revision to the long-term renewable
10 energy resources procurement plan and each revision
11 thereafter, the Agency shall include the following:
12 (A) The current status and number of equity
13 eligible contractors listed in the Energy Workforce
14 Equity Database designed in subsection (c-25),
15 including the number of equity eligible contractors
16 with current certifications as issued by the Agency.
17 (B) A mechanism for measuring, tracking, and
18 reporting project workforce at the approved vendor or
19 designee level, as applicable, which shall include a
20 measurement methodology and records to be made
21 available for audit by the Agency or the Program
22 Administrator.
23 (C) A program for approved vendors, designees,
24 eligible persons, and equity eligible contractors to
25 receive trainings, guidance, and other support from
26 the Agency or its designee regarding the equity

HB5544- 144 -LRB103 38715 CES 69699 b
1 category outlined in item (vi) of subparagraph (K) of
2 paragraph (1) of subsection (c) and in meeting the
3 minimum equity standards of this subsection (c-10).
4 (D) A process for certifying equity eligible
5 contractors and equity eligible persons. The
6 certification process shall coordinate with the Energy
7 Workforce Equity Database set forth in subsection
8 (c-25).
9 (E) An application for waiver of the minimum
10 equity standards of this subsection, which the Agency
11 shall have the discretion to grant in rare
12 circumstances. The Agency may grant such a waiver
13 where the applicant provides evidence of significant
14 efforts toward meeting the minimum equity commitment,
15 including: use of the Energy Workforce Equity
16 Database; efforts to hire or contract with entities
17 that hire eligible persons; and efforts to establish
18 contracting relationships with eligible contractors.
19 The Agency shall support applicants in understanding
20 the Energy Workforce Equity Database and other
21 resources for pursuing compliance of the minimum
22 equity standards. Waivers shall be project-specific,
23 unless the Agency deems it necessary to grant a waiver
24 across a portfolio of projects, and in effect for no
25 longer than one year. Any waiver extension or
26 subsequent waiver request from an applicant shall be

HB5544- 145 -LRB103 38715 CES 69699 b
1 subject to the requirements of this Section and shall
2 specify efforts made to reach compliance. When
3 considering whether to grant a waiver, and to what
4 extent, the Agency shall consider the degree to which
5 similarly situated applicants have been able to meet
6 these minimum equity commitments. For repeated waiver
7 requests for specific lack of eligible persons or
8 eligible contractors available, the Agency shall make
9 recommendations to target recruitment to add such
10 eligible persons or eligible contractors to the
11 database.
12 (5) The Agency shall collect information about work on
13 projects or portfolios of projects subject to these
14 minimum equity standards to ensure compliance with this
15 subsection (c-10). Reporting in furtherance of this
16 requirement may be combined with other annual reporting
17 requirements. Such reporting shall include proof of
18 certification of each equity eligible contractor or equity
19 eligible person during the applicable time period.
20 (6) The Agency shall keep confidential all information
21 and communication that provides private or personal
22 information.
23 (7) Modifications to the equity accountability system.
24 As part of the update of the long-term renewable resources
25 procurement plan to be initiated in 2023, or sooner if the
26 Agency deems necessary, the Agency shall determine the

HB5544- 146 -LRB103 38715 CES 69699 b
1 extent to which the equity accountability system described
2 in this subsection (c-10) has advanced the goals of this
3 amendatory Act of the 102nd General Assembly, including
4 through the inclusion of equity eligible persons and
5 equity eligible contractors in renewable energy credit
6 projects. If the Agency finds that the equity
7 accountability system has failed to meet those goals to
8 its fullest potential, the Agency may revise the following
9 criteria for future Agency procurements: (A) the
10 percentage of project workforce, or other appropriate
11 workforce measure, certified as equity eligible persons or
12 equity eligible contractors; (B) definitions for equity
13 investment eligible persons and equity investment eligible
14 community; and (C) such other modifications necessary to
15 advance the goals of this amendatory Act of the 102nd
16 General Assembly effectively. Such revised criteria may
17 also establish distinct equity accountability systems for
18 different types of procurements or different regions of
19 the State if the Agency finds that doing so will further
20 the purposes of such programs. Revisions shall be
21 developed with stakeholder input, including from equity
22 eligible persons, equity eligible contractors, and
23 community-based organizations that work with such persons
24 and contractors.
25 (c-15) Racial discrimination elimination powers and
26process.

HB5544- 147 -LRB103 38715 CES 69699 b
1 (1) Purpose. It is the purpose of this subsection to
2 empower the Agency and other State actors to remedy racial
3 discrimination in Illinois' clean energy economy as
4 effectively and expediently as possible, including through
5 the use of race-conscious remedies, such as race-conscious
6 contracting and hiring goals, as consistent with State and
7 federal law.
8 (2) Racial disparity and discrimination review
9 process.
10 (A) Within one year after awarding contracts using
11 the equity actions processes established in this
12 Section, the Agency shall publish a report evaluating
13 the effectiveness of the equity actions point criteria
14 of this Section in increasing participation of equity
15 eligible persons and equity eligible contractors. The
16 report shall disaggregate participating workers and
17 contractors by race and ethnicity. The report shall be
18 forwarded to the Governor, the General Assembly, and
19 the Illinois Commerce Commission and be made available
20 to the public.
21 (B) As soon as is practicable thereafter, the
22 Agency, in consultation with the Department of
23 Commerce and Economic Opportunity, Department of
24 Labor, and other agencies that may be relevant, shall
25 commission and publish a disparity and availability
26 study that measures the presence and impact of

HB5544- 148 -LRB103 38715 CES 69699 b
1 discrimination on minority businesses and workers in
2 Illinois' clean energy economy. The Agency may hire
3 consultants and experts to conduct the disparity and
4 availability study, with the retention of those
5 consultants and experts exempt from the requirements
6 of Section 20-10 of the Illinois Procurement Code. The
7 Illinois Power Agency shall forward a copy of its
8 findings and recommendations to the Governor, the
9 General Assembly, and the Illinois Commerce
10 Commission. If the disparity and availability study
11 establishes a strong basis in evidence that there is
12 discrimination in Illinois' clean energy economy, the
13 Agency, Department of Commerce and Economic
14 Opportunity, Department of Labor, Department of
15 Corrections, and other appropriate agencies shall take
16 appropriate remedial actions, including race-conscious
17 remedial actions as consistent with State and federal
18 law, to effectively remedy this discrimination. Such
19 remedies may include modification of the equity
20 accountability system as described in subsection
21 (c-10).
22 (c-20) Program data collection.
23 (1) Purpose. Data collection, data analysis, and
24 reporting are critical to ensure that the benefits of the
25 clean energy economy provided to Illinois residents and
26 businesses are equitably distributed across the State. The

HB5544- 149 -LRB103 38715 CES 69699 b
1 Agency shall collect data from program applicants in order
2 to track and improve equitable distribution of benefits
3 across Illinois communities for all procurements the
4 Agency conducts. The Agency shall use this data to, among
5 other things, measure any potential impact of racial
6 discrimination on the distribution of benefits and provide
7 information necessary to correct any discrimination
8 through methods consistent with State and federal law.
9 (2) Agency collection of program data. The Agency
10 shall collect demographic and geographic data for each
11 entity awarded contracts under any Agency-administered
12 program.
13 (3) Required information to be collected. The Agency
14 shall collect the following information from applicants
15 and program participants where applicable:
16 (A) demographic information, including racial or
17 ethnic identity for real persons employed, contracted,
18 or subcontracted through the program and owners of
19 businesses or entities that apply to receive renewable
20 energy credits from the Agency;
21 (B) geographic location of the residency of real
22 persons employed, contracted, or subcontracted through
23 the program and geographic location of the
24 headquarters of the business or entity that applies to
25 receive renewable energy credits from the Agency; and
26 (C) any other information the Agency determines is

HB5544- 150 -LRB103 38715 CES 69699 b
1 necessary for the purpose of achieving the purpose of
2 this subsection.
3 (4) Publication of collected information. The Agency
4 shall publish, at least annually, information on the
5 demographics of program participants on an aggregate
6 basis.
7 (5) Nothing in this subsection shall be interpreted to
8 limit the authority of the Agency, or other agency or
9 department of the State, to require or collect demographic
10 information from applicants of other State programs.
11 (c-25) Energy Workforce Equity Database.
12 (1) The Agency, in consultation with the Department of
13 Commerce and Economic Opportunity, shall create an Energy
14 Workforce Equity Database, and may contract with a third
15 party to do so ("database program administrator"). If the
16 Department decides to contract with a third party, that
17 third party shall be exempt from the requirements of
18 Section 20-10 of the Illinois Procurement Code. The Energy
19 Workforce Equity Database shall be a searchable database
20 of suppliers, vendors, and subcontractors for clean energy
21 industries that is:
22 (A) publicly accessible;
23 (B) easy for people to find and use;
24 (C) organized by company specialty or field;
25 (D) region-specific; and
26 (E) populated with information including, but not

HB5544- 151 -LRB103 38715 CES 69699 b
1 limited to, contacts for suppliers, vendors, or
2 subcontractors who are minority and women-owned
3 business enterprise certified or who participate or
4 have participated in any of the programs described in
5 this Act.
6 (2) The Agency shall create an easily accessible,
7 public facing online tool using the database information
8 that includes, at a minimum, the following:
9 (A) a map of environmental justice and equity
10 investment eligible communities;
11 (B) job postings and recruiting opportunities;
12 (C) a means by which recruiting clean energy
13 companies can find and interact with current or former
14 participants of clean energy workforce training
15 programs;
16 (D) information on workforce training service
17 providers and training opportunities available to
18 prospective workers;
19 (E) renewable energy company diversity reporting;
20 (F) a list of equity eligible contractors with
21 their contact information, types of work performed,
22 and locations worked in;
23 (G) reporting on outcomes of the programs
24 described in the workforce programs of the Energy
25 Transition Act, including information such as, but not
26 limited to, retention rate, graduation rate, and

HB5544- 152 -LRB103 38715 CES 69699 b
1 placement rates of trainees; and
2 (H) information about the Jobs and Environmental
3 Justice Grant Program, the Clean Energy Jobs and
4 Justice Fund, and other sources of capital.
5 (3) The Agency shall ensure the database is regularly
6 updated to ensure information is current and shall
7 coordinate with the Department of Commerce and Economic
8 Opportunity to ensure that it includes information on
9 individuals and entities that are or have participated in
10 the Clean Jobs Workforce Network Program, Clean Energy
11 Contractor Incubator Program, Returning Residents Clean
12 Jobs Training Program, or Clean Energy Primes Contractor
13 Accelerator Program.
14 (c-30) Enforcement of minimum equity standards. All
15entities seeking renewable energy credits must submit an
16annual report to demonstrate compliance with each of the
17equity commitments required under subsection (c-10). If the
18Agency concludes the entity has not met or maintained its
19minimum equity standards required under the applicable
20subparagraphs under subsection (c-10), the Agency shall deny
21the entity's ability to participate in procurement programs in
22subsection (c), including by withholding approved vendor or
23designee status. The Agency may require the entity to enter
24into a corrective action plan. An entity that is not
25recertified for failing to meet required equity actions in
26subparagraph (c-10) may reapply once they have a corrective

HB5544- 153 -LRB103 38715 CES 69699 b
1action plan and achieve compliance with the minimum equity
2standards.
3 (d) Clean coal portfolio standard.
4 (1) The procurement plans shall include electricity
5 generated using clean coal. Each utility shall enter into
6 one or more sourcing agreements with the initial clean
7 coal facility, as provided in paragraph (3) of this
8 subsection (d), covering electricity generated by the
9 initial clean coal facility representing at least 5% of
10 each utility's total supply to serve the load of eligible
11 retail customers in 2015 and each year thereafter, as
12 described in paragraph (3) of this subsection (d), subject
13 to the limits specified in paragraph (2) of this
14 subsection (d). It is the goal of the State that by January
15 1, 2025, 25% of the electricity used in the State shall be
16 generated by cost-effective clean coal facilities. For
17 purposes of this subsection (d), "cost-effective" means
18 that the expenditures pursuant to such sourcing agreements
19 do not cause the limit stated in paragraph (2) of this
20 subsection (d) to be exceeded and do not exceed cost-based
21 benchmarks, which shall be developed to assess all
22 expenditures pursuant to such sourcing agreements covering
23 electricity generated by clean coal facilities, other than
24 the initial clean coal facility, by the procurement
25 administrator, in consultation with the Commission staff,
26 Agency staff, and the procurement monitor and shall be

HB5544- 154 -LRB103 38715 CES 69699 b
1 subject to Commission review and approval.
2 A utility party to a sourcing agreement shall
3 immediately retire any emission credits that it receives
4 in connection with the electricity covered by such
5 agreement.
6 Utilities shall maintain adequate records documenting
7 the purchases under the sourcing agreement to comply with
8 this subsection (d) and shall file an accounting with the
9 load forecast that must be filed with the Agency by July 15
10 of each year, in accordance with subsection (d) of Section
11 16-111.5 of the Public Utilities Act.
12 A utility shall be deemed to have complied with the
13 clean coal portfolio standard specified in this subsection
14 (d) if the utility enters into a sourcing agreement as
15 required by this subsection (d).
16 (2) For purposes of this subsection (d), the required
17 execution of sourcing agreements with the initial clean
18 coal facility for a particular year shall be measured as a
19 percentage of the actual amount of electricity
20 (megawatt-hours) supplied by the electric utility to
21 eligible retail customers in the planning year ending
22 immediately prior to the agreement's execution. For
23 purposes of this subsection (d), the amount paid per
24 kilowatthour means the total amount paid for electric
25 service expressed on a per kilowatthour basis. For
26 purposes of this subsection (d), the total amount paid for

HB5544- 155 -LRB103 38715 CES 69699 b
1 electric service includes without limitation amounts paid
2 for supply, transmission, distribution, surcharges and
3 add-on taxes.
4 Notwithstanding the requirements of this subsection
5 (d), the total amount paid under sourcing agreements with
6 clean coal facilities pursuant to the procurement plan for
7 any given year shall be reduced by an amount necessary to
8 limit the annual estimated average net increase due to the
9 costs of these resources included in the amounts paid by
10 eligible retail customers in connection with electric
11 service to:
12 (A) in 2010, no more than 0.5% of the amount paid
13 per kilowatthour by those customers during the year
14 ending May 31, 2009;
15 (B) in 2011, the greater of an additional 0.5% of
16 the amount paid per kilowatthour by those customers
17 during the year ending May 31, 2010 or 1% of the amount
18 paid per kilowatthour by those customers during the
19 year ending May 31, 2009;
20 (C) in 2012, the greater of an additional 0.5% of
21 the amount paid per kilowatthour by those customers
22 during the year ending May 31, 2011 or 1.5% of the
23 amount paid per kilowatthour by those customers during
24 the year ending May 31, 2009;
25 (D) in 2013, the greater of an additional 0.5% of
26 the amount paid per kilowatthour by those customers

HB5544- 156 -LRB103 38715 CES 69699 b
1 during the year ending May 31, 2012 or 2% of the amount
2 paid per kilowatthour by those customers during the
3 year ending May 31, 2009; and
4 (E) thereafter, the total amount paid under
5 sourcing agreements with clean coal facilities
6 pursuant to the procurement plan for any single year
7 shall be reduced by an amount necessary to limit the
8 estimated average net increase due to the cost of
9 these resources included in the amounts paid by
10 eligible retail customers in connection with electric
11 service to no more than the greater of (i) 2.015% of
12 the amount paid per kilowatthour by those customers
13 during the year ending May 31, 2009 or (ii) the
14 incremental amount per kilowatthour paid for these
15 resources in 2013. These requirements may be altered
16 only as provided by statute.
17 No later than June 30, 2015, the Commission shall
18 review the limitation on the total amount paid under
19 sourcing agreements, if any, with clean coal facilities
20 pursuant to this subsection (d) and report to the General
21 Assembly its findings as to whether that limitation unduly
22 constrains the amount of electricity generated by
23 cost-effective clean coal facilities that is covered by
24 sourcing agreements.
25 (3) Initial clean coal facility. In order to promote
26 development of clean coal facilities in Illinois, each

HB5544- 157 -LRB103 38715 CES 69699 b
1 electric utility subject to this Section shall execute a
2 sourcing agreement to source electricity from a proposed
3 clean coal facility in Illinois (the "initial clean coal
4 facility") that will have a nameplate capacity of at least
5 500 MW when commercial operation commences, that has a
6 final Clean Air Act permit on June 1, 2009 (the effective
7 date of Public Act 95-1027), and that will meet the
8 definition of clean coal facility in Section 1-10 of this
9 Act when commercial operation commences. The sourcing
10 agreements with this initial clean coal facility shall be
11 subject to both approval of the initial clean coal
12 facility by the General Assembly and satisfaction of the
13 requirements of paragraph (4) of this subsection (d) and
14 shall be executed within 90 days after any such approval
15 by the General Assembly. The Agency and the Commission
16 shall have authority to inspect all books and records
17 associated with the initial clean coal facility during the
18 term of such a sourcing agreement. A utility's sourcing
19 agreement for electricity produced by the initial clean
20 coal facility shall include:
21 (A) a formula contractual price (the "contract
22 price") approved pursuant to paragraph (4) of this
23 subsection (d), which shall:
24 (i) be determined using a cost of service
25 methodology employing either a level or deferred
26 capital recovery component, based on a capital

HB5544- 158 -LRB103 38715 CES 69699 b
1 structure consisting of 45% equity and 55% debt,
2 and a return on equity as may be approved by the
3 Federal Energy Regulatory Commission, which in any
4 case may not exceed the lower of 11.5% or the rate
5 of return approved by the General Assembly
6 pursuant to paragraph (4) of this subsection (d);
7 and
8 (ii) provide that all miscellaneous net
9 revenue, including but not limited to net revenue
10 from the sale of emission allowances, if any,
11 substitute natural gas, if any, grants or other
12 support provided by the State of Illinois or the
13 United States Government, firm transmission
14 rights, if any, by-products produced by the
15 facility, energy or capacity derived from the
16 facility and not covered by a sourcing agreement
17 pursuant to paragraph (3) of this subsection (d)
18 or item (5) of subsection (d) of Section 16-115 of
19 the Public Utilities Act, whether generated from
20 the synthesis gas derived from coal, from SNG, or
21 from natural gas, shall be credited against the
22 revenue requirement for this initial clean coal
23 facility;
24 (B) power purchase provisions, which shall:
25 (i) provide that the utility party to such
26 sourcing agreement shall pay the contract price

HB5544- 159 -LRB103 38715 CES 69699 b
1 for electricity delivered under such sourcing
2 agreement;
3 (ii) require delivery of electricity to the
4 regional transmission organization market of the
5 utility that is party to such sourcing agreement;
6 (iii) require the utility party to such
7 sourcing agreement to buy from the initial clean
8 coal facility in each hour an amount of energy
9 equal to all clean coal energy made available from
10 the initial clean coal facility during such hour
11 times a fraction, the numerator of which is such
12 utility's retail market sales of electricity
13 (expressed in kilowatthours sold) in the State
14 during the prior calendar month and the
15 denominator of which is the total retail market
16 sales of electricity (expressed in kilowatthours
17 sold) in the State by utilities during such prior
18 month and the sales of electricity (expressed in
19 kilowatthours sold) in the State by alternative
20 retail electric suppliers during such prior month
21 that are subject to the requirements of this
22 subsection (d) and paragraph (5) of subsection (d)
23 of Section 16-115 of the Public Utilities Act,
24 provided that the amount purchased by the utility
25 in any year will be limited by paragraph (2) of
26 this subsection (d); and

HB5544- 160 -LRB103 38715 CES 69699 b
1 (iv) be considered pre-existing contracts in
2 such utility's procurement plans for eligible
3 retail customers;
4 (C) contract for differences provisions, which
5 shall:
6 (i) require the utility party to such sourcing
7 agreement to contract with the initial clean coal
8 facility in each hour with respect to an amount of
9 energy equal to all clean coal energy made
10 available from the initial clean coal facility
11 during such hour times a fraction, the numerator
12 of which is such utility's retail market sales of
13 electricity (expressed in kilowatthours sold) in
14 the utility's service territory in the State
15 during the prior calendar month and the
16 denominator of which is the total retail market
17 sales of electricity (expressed in kilowatthours
18 sold) in the State by utilities during such prior
19 month and the sales of electricity (expressed in
20 kilowatthours sold) in the State by alternative
21 retail electric suppliers during such prior month
22 that are subject to the requirements of this
23 subsection (d) and paragraph (5) of subsection (d)
24 of Section 16-115 of the Public Utilities Act,
25 provided that the amount paid by the utility in
26 any year will be limited by paragraph (2) of this

HB5544- 161 -LRB103 38715 CES 69699 b
1 subsection (d);
2 (ii) provide that the utility's payment
3 obligation in respect of the quantity of
4 electricity determined pursuant to the preceding
5 clause (i) shall be limited to an amount equal to
6 (1) the difference between the contract price
7 determined pursuant to subparagraph (A) of
8 paragraph (3) of this subsection (d) and the
9 day-ahead price for electricity delivered to the
10 regional transmission organization market of the
11 utility that is party to such sourcing agreement
12 (or any successor delivery point at which such
13 utility's supply obligations are financially
14 settled on an hourly basis) (the "reference
15 price") on the day preceding the day on which the
16 electricity is delivered to the initial clean coal
17 facility busbar, multiplied by (2) the quantity of
18 electricity determined pursuant to the preceding
19 clause (i); and
20 (iii) not require the utility to take physical
21 delivery of the electricity produced by the
22 facility;
23 (D) general provisions, which shall:
24 (i) specify a term of no more than 30 years,
25 commencing on the commercial operation date of the
26 facility;

HB5544- 162 -LRB103 38715 CES 69699 b
1 (ii) provide that utilities shall maintain
2 adequate records documenting purchases under the
3 sourcing agreements entered into to comply with
4 this subsection (d) and shall file an accounting
5 with the load forecast that must be filed with the
6 Agency by July 15 of each year, in accordance with
7 subsection (d) of Section 16-111.5 of the Public
8 Utilities Act;
9 (iii) provide that all costs associated with
10 the initial clean coal facility will be
11 periodically reported to the Federal Energy
12 Regulatory Commission and to purchasers in
13 accordance with applicable laws governing
14 cost-based wholesale power contracts;
15 (iv) permit the Illinois Power Agency to
16 assume ownership of the initial clean coal
17 facility, without monetary consideration and
18 otherwise on reasonable terms acceptable to the
19 Agency, if the Agency so requests no less than 3
20 years prior to the end of the stated contract
21 term;
22 (v) require the owner of the initial clean
23 coal facility to provide documentation to the
24 Commission each year, starting in the facility's
25 first year of commercial operation, accurately
26 reporting the quantity of carbon emissions from

HB5544- 163 -LRB103 38715 CES 69699 b
1 the facility that have been captured and
2 sequestered and report any quantities of carbon
3 released from the site or sites at which carbon
4 emissions were sequestered in prior years, based
5 on continuous monitoring of such sites. If, in any
6 year after the first year of commercial operation,
7 the owner of the facility fails to demonstrate
8 that the initial clean coal facility captured and
9 sequestered at least 50% of the total carbon
10 emissions that the facility would otherwise emit
11 or that sequestration of emissions from prior
12 years has failed, resulting in the release of
13 carbon dioxide into the atmosphere, the owner of
14 the facility must offset excess emissions. Any
15 such carbon offsets must be permanent, additional,
16 verifiable, real, located within the State of
17 Illinois, and legally and practicably enforceable.
18 The cost of such offsets for the facility that are
19 not recoverable shall not exceed $15 million in
20 any given year. No costs of any such purchases of
21 carbon offsets may be recovered from a utility or
22 its customers. All carbon offsets purchased for
23 this purpose and any carbon emission credits
24 associated with sequestration of carbon from the
25 facility must be permanently retired. The initial
26 clean coal facility shall not forfeit its

HB5544- 164 -LRB103 38715 CES 69699 b
1 designation as a clean coal facility if the
2 facility fails to fully comply with the applicable
3 carbon sequestration requirements in any given
4 year, provided the requisite offsets are
5 purchased. However, the Attorney General, on
6 behalf of the People of the State of Illinois, may
7 specifically enforce the facility's sequestration
8 requirement and the other terms of this contract
9 provision. Compliance with the sequestration
10 requirements and offset purchase requirements
11 specified in paragraph (3) of this subsection (d)
12 shall be reviewed annually by an independent
13 expert retained by the owner of the initial clean
14 coal facility, with the advance written approval
15 of the Attorney General. The Commission may, in
16 the course of the review specified in item (vii),
17 reduce the allowable return on equity for the
18 facility if the facility willfully fails to comply
19 with the carbon capture and sequestration
20 requirements set forth in this item (v);
21 (vi) include limits on, and accordingly
22 provide for modification of, the amount the
23 utility is required to source under the sourcing
24 agreement consistent with paragraph (2) of this
25 subsection (d);
26 (vii) require Commission review: (1) to

HB5544- 165 -LRB103 38715 CES 69699 b
1 determine the justness, reasonableness, and
2 prudence of the inputs to the formula referenced
3 in subparagraphs (A)(i) through (A)(iii) of
4 paragraph (3) of this subsection (d), prior to an
5 adjustment in those inputs including, without
6 limitation, the capital structure and return on
7 equity, fuel costs, and other operations and
8 maintenance costs and (2) to approve the costs to
9 be passed through to customers under the sourcing
10 agreement by which the utility satisfies its
11 statutory obligations. Commission review shall
12 occur no less than every 3 years, regardless of
13 whether any adjustments have been proposed, and
14 shall be completed within 9 months;
15 (viii) limit the utility's obligation to such
16 amount as the utility is allowed to recover
17 through tariffs filed with the Commission,
18 provided that neither the clean coal facility nor
19 the utility waives any right to assert federal
20 pre-emption or any other argument in response to a
21 purported disallowance of recovery costs;
22 (ix) limit the utility's or alternative retail
23 electric supplier's obligation to incur any
24 liability until such time as the facility is in
25 commercial operation and generating power and
26 energy and such power and energy is being

HB5544- 166 -LRB103 38715 CES 69699 b
1 delivered to the facility busbar;
2 (x) provide that the owner or owners of the
3 initial clean coal facility, which is the
4 counterparty to such sourcing agreement, shall
5 have the right from time to time to elect whether
6 the obligations of the utility party thereto shall
7 be governed by the power purchase provisions or
8 the contract for differences provisions;
9 (xi) append documentation showing that the
10 formula rate and contract, insofar as they relate
11 to the power purchase provisions, have been
12 approved by the Federal Energy Regulatory
13 Commission pursuant to Section 205 of the Federal
14 Power Act;
15 (xii) provide that any changes to the terms of
16 the contract, insofar as such changes relate to
17 the power purchase provisions, are subject to
18 review under the public interest standard applied
19 by the Federal Energy Regulatory Commission
20 pursuant to Sections 205 and 206 of the Federal
21 Power Act; and
22 (xiii) conform with customary lender
23 requirements in power purchase agreements used as
24 the basis for financing non-utility generators.
25 (4) Effective date of sourcing agreements with the
26 initial clean coal facility. Any proposed sourcing

HB5544- 167 -LRB103 38715 CES 69699 b
1 agreement with the initial clean coal facility shall not
2 become effective unless the following reports are prepared
3 and submitted and authorizations and approvals obtained:
4 (i) Facility cost report. The owner of the initial
5 clean coal facility shall submit to the Commission,
6 the Agency, and the General Assembly a front-end
7 engineering and design study, a facility cost report,
8 method of financing (including but not limited to
9 structure and associated costs), and an operating and
10 maintenance cost quote for the facility (collectively
11 "facility cost report"), which shall be prepared in
12 accordance with the requirements of this paragraph (4)
13 of subsection (d) of this Section, and shall provide
14 the Commission and the Agency access to the work
15 papers, relied upon documents, and any other backup
16 documentation related to the facility cost report.
17 (ii) Commission report. Within 6 months following
18 receipt of the facility cost report, the Commission,
19 in consultation with the Agency, shall submit a report
20 to the General Assembly setting forth its analysis of
21 the facility cost report. Such report shall include,
22 but not be limited to, a comparison of the costs
23 associated with electricity generated by the initial
24 clean coal facility to the costs associated with
25 electricity generated by other types of generation
26 facilities, an analysis of the rate impacts on

HB5544- 168 -LRB103 38715 CES 69699 b
1 residential and small business customers over the life
2 of the sourcing agreements, and an analysis of the
3 likelihood that the initial clean coal facility will
4 commence commercial operation by and be delivering
5 power to the facility's busbar by 2016. To assist in
6 the preparation of its report, the Commission, in
7 consultation with the Agency, may hire one or more
8 experts or consultants, the costs of which shall be
9 paid for by the owner of the initial clean coal
10 facility. The Commission and Agency may begin the
11 process of selecting such experts or consultants prior
12 to receipt of the facility cost report.
13 (iii) General Assembly approval. The proposed
14 sourcing agreements shall not take effect unless,
15 based on the facility cost report and the Commission's
16 report, the General Assembly enacts authorizing
17 legislation approving (A) the projected price, stated
18 in cents per kilowatthour, to be charged for
19 electricity generated by the initial clean coal
20 facility, (B) the projected impact on residential and
21 small business customers' bills over the life of the
22 sourcing agreements, and (C) the maximum allowable
23 return on equity for the project; and
24 (iv) Commission review. If the General Assembly
25 enacts authorizing legislation pursuant to
26 subparagraph (iii) approving a sourcing agreement, the

HB5544- 169 -LRB103 38715 CES 69699 b
1 Commission shall, within 90 days of such enactment,
2 complete a review of such sourcing agreement. During
3 such time period, the Commission shall implement any
4 directive of the General Assembly, resolve any
5 disputes between the parties to the sourcing agreement
6 concerning the terms of such agreement, approve the
7 form of such agreement, and issue an order finding
8 that the sourcing agreement is prudent and reasonable.
9 The facility cost report shall be prepared as follows:
10 (A) The facility cost report shall be prepared by
11 duly licensed engineering and construction firms
12 detailing the estimated capital costs payable to one
13 or more contractors or suppliers for the engineering,
14 procurement and construction of the components
15 comprising the initial clean coal facility and the
16 estimated costs of operation and maintenance of the
17 facility. The facility cost report shall include:
18 (i) an estimate of the capital cost of the
19 core plant based on one or more front end
20 engineering and design studies for the
21 gasification island and related facilities. The
22 core plant shall include all civil, structural,
23 mechanical, electrical, control, and safety
24 systems.
25 (ii) an estimate of the capital cost of the
26 balance of the plant, including any capital costs

HB5544- 170 -LRB103 38715 CES 69699 b
1 associated with sequestration of carbon dioxide
2 emissions and all interconnects and interfaces
3 required to operate the facility, such as
4 transmission of electricity, construction or
5 backfeed power supply, pipelines to transport
6 substitute natural gas or carbon dioxide, potable
7 water supply, natural gas supply, water supply,
8 water discharge, landfill, access roads, and coal
9 delivery.
10 The quoted construction costs shall be expressed
11 in nominal dollars as of the date that the quote is
12 prepared and shall include capitalized financing costs
13 during construction, taxes, insurance, and other
14 owner's costs, and an assumed escalation in materials
15 and labor beyond the date as of which the construction
16 cost quote is expressed.
17 (B) The front end engineering and design study for
18 the gasification island and the cost study for the
19 balance of plant shall include sufficient design work
20 to permit quantification of major categories of
21 materials, commodities and labor hours, and receipt of
22 quotes from vendors of major equipment required to
23 construct and operate the clean coal facility.
24 (C) The facility cost report shall also include an
25 operating and maintenance cost quote that will provide
26 the estimated cost of delivered fuel, personnel,

HB5544- 171 -LRB103 38715 CES 69699 b
1 maintenance contracts, chemicals, catalysts,
2 consumables, spares, and other fixed and variable
3 operations and maintenance costs. The delivered fuel
4 cost estimate will be provided by a recognized third
5 party expert or experts in the fuel and transportation
6 industries. The balance of the operating and
7 maintenance cost quote, excluding delivered fuel
8 costs, will be developed based on the inputs provided
9 by duly licensed engineering and construction firms
10 performing the construction cost quote, potential
11 vendors under long-term service agreements and plant
12 operating agreements, or recognized third party plant
13 operator or operators.
14 The operating and maintenance cost quote
15 (including the cost of the front end engineering and
16 design study) shall be expressed in nominal dollars as
17 of the date that the quote is prepared and shall
18 include taxes, insurance, and other owner's costs, and
19 an assumed escalation in materials and labor beyond
20 the date as of which the operating and maintenance
21 cost quote is expressed.
22 (D) The facility cost report shall also include an
23 analysis of the initial clean coal facility's ability
24 to deliver power and energy into the applicable
25 regional transmission organization markets and an
26 analysis of the expected capacity factor for the

HB5544- 172 -LRB103 38715 CES 69699 b
1 initial clean coal facility.
2 (E) Amounts paid to third parties unrelated to the
3 owner or owners of the initial clean coal facility to
4 prepare the core plant construction cost quote,
5 including the front end engineering and design study,
6 and the operating and maintenance cost quote will be
7 reimbursed through Coal Development Bonds.
8 (5) Re-powering and retrofitting coal-fired power
9 plants previously owned by Illinois utilities to qualify
10 as clean coal facilities. During the 2009 procurement
11 planning process and thereafter, the Agency and the
12 Commission shall consider sourcing agreements covering
13 electricity generated by power plants that were previously
14 owned by Illinois utilities and that have been or will be
15 converted into clean coal facilities, as defined by
16 Section 1-10 of this Act. Pursuant to such procurement
17 planning process, the owners of such facilities may
18 propose to the Agency sourcing agreements with utilities
19 and alternative retail electric suppliers required to
20 comply with subsection (d) of this Section and item (5) of
21 subsection (d) of Section 16-115 of the Public Utilities
22 Act, covering electricity generated by such facilities. In
23 the case of sourcing agreements that are power purchase
24 agreements, the contract price for electricity sales shall
25 be established on a cost of service basis. In the case of
26 sourcing agreements that are contracts for differences,

HB5544- 173 -LRB103 38715 CES 69699 b
1 the contract price from which the reference price is
2 subtracted shall be established on a cost of service
3 basis. The Agency and the Commission may approve any such
4 utility sourcing agreements that do not exceed cost-based
5 benchmarks developed by the procurement administrator, in
6 consultation with the Commission staff, Agency staff and
7 the procurement monitor, subject to Commission review and
8 approval. The Commission shall have authority to inspect
9 all books and records associated with these clean coal
10 facilities during the term of any such contract.
11 (6) Costs incurred under this subsection (d) or
12 pursuant to a contract entered into under this subsection
13 (d) shall be deemed prudently incurred and reasonable in
14 amount and the electric utility shall be entitled to full
15 cost recovery pursuant to the tariffs filed with the
16 Commission.
17 (d-5) Zero emission standard.
18 (1) Beginning with the delivery year commencing on
19 June 1, 2017, the Agency shall, for electric utilities
20 that serve at least 100,000 retail customers in this
21 State, procure contracts with zero emission facilities
22 that are reasonably capable of generating cost-effective
23 zero emission credits in an amount approximately equal to
24 16% of the actual amount of electricity delivered by each
25 electric utility to retail customers in the State during
26 calendar year 2014. For an electric utility serving fewer

HB5544- 174 -LRB103 38715 CES 69699 b
1 than 100,000 retail customers in this State that
2 requested, under Section 16-111.5 of the Public Utilities
3 Act, that the Agency procure power and energy for all or a
4 portion of the utility's Illinois load for the delivery
5 year commencing June 1, 2016, the Agency shall procure
6 contracts with zero emission facilities that are
7 reasonably capable of generating cost-effective zero
8 emission credits in an amount approximately equal to 16%
9 of the portion of power and energy to be procured by the
10 Agency for the utility. The duration of the contracts
11 procured under this subsection (d-5) shall be for a term
12 of 10 years ending May 31, 2027. The quantity of zero
13 emission credits to be procured under the contracts shall
14 be all of the zero emission credits generated by the zero
15 emission facility in each delivery year; however, if the
16 zero emission facility is owned by more than one entity,
17 then the quantity of zero emission credits to be procured
18 under the contracts shall be the amount of zero emission
19 credits that are generated from the portion of the zero
20 emission facility that is owned by the winning supplier.
21 The 16% value identified in this paragraph (1) is the
22 average of the percentage targets in subparagraph (B) of
23 paragraph (1) of subsection (c) of this Section for the 5
24 delivery years beginning June 1, 2017.
25 The procurement process shall be subject to the
26 following provisions:

HB5544- 175 -LRB103 38715 CES 69699 b
1 (A) Those zero emission facilities that intend to
2 participate in the procurement shall submit to the
3 Agency the following eligibility information for each
4 zero emission facility on or before the date
5 established by the Agency:
6 (i) the in-service date and remaining useful
7 life of the zero emission facility;
8 (ii) the amount of power generated annually
9 for each of the years 2005 through 2015, and the
10 projected zero emission credits to be generated
11 over the remaining useful life of the zero
12 emission facility, which shall be used to
13 determine the capability of each facility;
14 (iii) the annual zero emission facility cost
15 projections, expressed on a per megawatthour
16 basis, over the next 6 delivery years, which shall
17 include the following: operation and maintenance
18 expenses; fully allocated overhead costs, which
19 shall be allocated using the methodology developed
20 by the Institute for Nuclear Power Operations;
21 fuel expenditures; non-fuel capital expenditures;
22 spent fuel expenditures; a return on working
23 capital; the cost of operational and market risks
24 that could be avoided by ceasing operation; and
25 any other costs necessary for continued
26 operations, provided that "necessary" means, for

HB5544- 176 -LRB103 38715 CES 69699 b
1 purposes of this item (iii), that the costs could
2 reasonably be avoided only by ceasing operations
3 of the zero emission facility; and
4 (iv) a commitment to continue operating, for
5 the duration of the contract or contracts executed
6 under the procurement held under this subsection
7 (d-5), the zero emission facility that produces
8 the zero emission credits to be procured in the
9 procurement.
10 The information described in item (iii) of this
11 subparagraph (A) may be submitted on a confidential
12 basis and shall be treated and maintained by the
13 Agency, the procurement administrator, and the
14 Commission as confidential and proprietary and exempt
15 from disclosure under subparagraphs (a) and (g) of
16 paragraph (1) of Section 7 of the Freedom of
17 Information Act. The Office of Attorney General shall
18 have access to, and maintain the confidentiality of,
19 such information pursuant to Section 6.5 of the
20 Attorney General Act.
21 (B) The price for each zero emission credit
22 procured under this subsection (d-5) for each delivery
23 year shall be in an amount that equals the Social Cost
24 of Carbon, expressed on a price per megawatthour
25 basis. However, to ensure that the procurement remains
26 affordable to retail customers in this State if

HB5544- 177 -LRB103 38715 CES 69699 b
1 electricity prices increase, the price in an
2 applicable delivery year shall be reduced below the
3 Social Cost of Carbon by the amount ("Price
4 Adjustment") by which the market price index for the
5 applicable delivery year exceeds the baseline market
6 price index for the consecutive 12-month period ending
7 May 31, 2016. If the Price Adjustment is greater than
8 or equal to the Social Cost of Carbon in an applicable
9 delivery year, then no payments shall be due in that
10 delivery year. The components of this calculation are
11 defined as follows:
12 (i) Social Cost of Carbon: The Social Cost of
13 Carbon is $16.50 per megawatthour, which is based
14 on the U.S. Interagency Working Group on Social
15 Cost of Carbon's price in the August 2016
16 Technical Update using a 3% discount rate,
17 adjusted for inflation for each year of the
18 program. Beginning with the delivery year
19 commencing June 1, 2023, the price per
20 megawatthour shall increase by $1 per
21 megawatthour, and continue to increase by an
22 additional $1 per megawatthour each delivery year
23 thereafter.
24 (ii) Baseline market price index: The baseline
25 market price index for the consecutive 12-month
26 period ending May 31, 2016 is $31.40 per

HB5544- 178 -LRB103 38715 CES 69699 b
1 megawatthour, which is based on the sum of (aa)
2 the average day-ahead energy price across all
3 hours of such 12-month period at the PJM
4 Interconnection LLC Northern Illinois Hub, (bb)
5 50% multiplied by the Base Residual Auction, or
6 its successor, capacity price for the rest of the
7 RTO zone group determined by PJM Interconnection
8 LLC, divided by 24 hours per day, and (cc) 50%
9 multiplied by the Planning Resource Auction, or
10 its successor, capacity price for Zone 4
11 determined by the Midcontinent Independent System
12 Operator, Inc., divided by 24 hours per day.
13 (iii) Market price index: The market price
14 index for a delivery year shall be the sum of
15 projected energy prices and projected capacity
16 prices determined as follows:
17 (aa) Projected energy prices: the
18 projected energy prices for the applicable
19 delivery year shall be calculated once for the
20 year using the forward market price for the
21 PJM Interconnection, LLC Northern Illinois
22 Hub. The forward market price shall be
23 calculated as follows: the energy forward
24 prices for each month of the applicable
25 delivery year averaged for each trade date
26 during the calendar year immediately preceding

HB5544- 179 -LRB103 38715 CES 69699 b
1 that delivery year to produce a single energy
2 forward price for the delivery year. The
3 forward market price calculation shall use
4 data published by the Intercontinental
5 Exchange, or its successor.
6 (bb) Projected capacity prices:
7 (I) For the delivery years commencing
8 June 1, 2017, June 1, 2018, and June 1,
9 2019, the projected capacity price shall
10 be equal to the sum of (1) 50% multiplied
11 by the Base Residual Auction, or its
12 successor, price for the rest of the RTO
13 zone group as determined by PJM
14 Interconnection LLC, divided by 24 hours
15 per day and, (2) 50% multiplied by the
16 resource auction price determined in the
17 resource auction administered by the
18 Midcontinent Independent System Operator,
19 Inc., in which the largest percentage of
20 load cleared for Local Resource Zone 4,
21 divided by 24 hours per day, and where
22 such price is determined by the
23 Midcontinent Independent System Operator,
24 Inc.
25 (II) For the delivery year commencing
26 June 1, 2020, and each year thereafter,

HB5544- 180 -LRB103 38715 CES 69699 b
1 the projected capacity price shall be
2 equal to the sum of (1) 50% multiplied by
3 the Base Residual Auction, or its
4 successor, price for the ComEd zone as
5 determined by PJM Interconnection LLC,
6 divided by 24 hours per day, and (2) 50%
7 multiplied by the resource auction price
8 determined in the resource auction
9 administered by the Midcontinent
10 Independent System Operator, Inc., in
11 which the largest percentage of load
12 cleared for Local Resource Zone 4, divided
13 by 24 hours per day, and where such price
14 is determined by the Midcontinent
15 Independent System Operator, Inc.
16 For purposes of this subsection (d-5):
17 "Rest of the RTO" and "ComEd Zone" shall have
18 the meaning ascribed to them by PJM
19 Interconnection, LLC.
20 "RTO" means regional transmission
21 organization.
22 (C) No later than 45 days after June 1, 2017 (the
23 effective date of Public Act 99-906), the Agency shall
24 publish its proposed zero emission standard
25 procurement plan. The plan shall be consistent with
26 the provisions of this paragraph (1) and shall provide

HB5544- 181 -LRB103 38715 CES 69699 b
1 that winning bids shall be selected based on public
2 interest criteria that include, but are not limited
3 to, minimizing carbon dioxide emissions that result
4 from electricity consumed in Illinois and minimizing
5 sulfur dioxide, nitrogen oxide, and particulate matter
6 emissions that adversely affect the citizens of this
7 State. In particular, the selection of winning bids
8 shall take into account the incremental environmental
9 benefits resulting from the procurement, such as any
10 existing environmental benefits that are preserved by
11 the procurements held under Public Act 99-906 and
12 would cease to exist if the procurements were not
13 held, including the preservation of zero emission
14 facilities. The plan shall also describe in detail how
15 each public interest factor shall be considered and
16 weighted in the bid selection process to ensure that
17 the public interest criteria are applied to the
18 procurement and given full effect.
19 For purposes of developing the plan, the Agency
20 shall consider any reports issued by a State agency,
21 board, or commission under House Resolution 1146 of
22 the 98th General Assembly and paragraph (4) of
23 subsection (d) of this Section, as well as publicly
24 available analyses and studies performed by or for
25 regional transmission organizations that serve the
26 State and their independent market monitors.

HB5544- 182 -LRB103 38715 CES 69699 b
1 Upon publishing of the zero emission standard
2 procurement plan, copies of the plan shall be posted
3 and made publicly available on the Agency's website.
4 All interested parties shall have 10 days following
5 the date of posting to provide comment to the Agency on
6 the plan. All comments shall be posted to the Agency's
7 website. Following the end of the comment period, but
8 no more than 60 days later than June 1, 2017 (the
9 effective date of Public Act 99-906), the Agency shall
10 revise the plan as necessary based on the comments
11 received and file its zero emission standard
12 procurement plan with the Commission.
13 If the Commission determines that the plan will
14 result in the procurement of cost-effective zero
15 emission credits, then the Commission shall, after
16 notice and hearing, but no later than 45 days after the
17 Agency filed the plan, approve the plan or approve
18 with modification. For purposes of this subsection
19 (d-5), "cost effective" means the projected costs of
20 procuring zero emission credits from zero emission
21 facilities do not cause the limit stated in paragraph
22 (2) of this subsection to be exceeded.
23 (C-5) As part of the Commission's review and
24 acceptance or rejection of the procurement results,
25 the Commission shall, in its public notice of
26 successful bidders:

HB5544- 183 -LRB103 38715 CES 69699 b
1 (i) identify how the winning bids satisfy the
2 public interest criteria described in subparagraph
3 (C) of this paragraph (1) of minimizing carbon
4 dioxide emissions that result from electricity
5 consumed in Illinois and minimizing sulfur
6 dioxide, nitrogen oxide, and particulate matter
7 emissions that adversely affect the citizens of
8 this State;
9 (ii) specifically address how the selection of
10 winning bids takes into account the incremental
11 environmental benefits resulting from the
12 procurement, including any existing environmental
13 benefits that are preserved by the procurements
14 held under Public Act 99-906 and would have ceased
15 to exist if the procurements had not been held,
16 such as the preservation of zero emission
17 facilities;
18 (iii) quantify the environmental benefit of
19 preserving the resources identified in item (ii)
20 of this subparagraph (C-5), including the
21 following:
22 (aa) the value of avoided greenhouse gas
23 emissions measured as the product of the zero
24 emission facilities' output over the contract
25 term multiplied by the U.S. Environmental
26 Protection Agency eGrid subregion carbon

HB5544- 184 -LRB103 38715 CES 69699 b
1 dioxide emission rate and the U.S. Interagency
2 Working Group on Social Cost of Carbon's price
3 in the August 2016 Technical Update using a 3%
4 discount rate, adjusted for inflation for each
5 delivery year; and
6 (bb) the costs of replacement with other
7 zero carbon dioxide resources, including wind
8 and photovoltaic, based upon the simple
9 average of the following:
10 (I) the price, or if there is more
11 than one price, the average of the prices,
12 paid for renewable energy credits from new
13 utility-scale wind projects in the
14 procurement events specified in item (i)
15 of subparagraph (G) of paragraph (1) of
16 subsection (c) of this Section; and
17 (II) the price, or if there is more
18 than one price, the average of the prices,
19 paid for renewable energy credits from new
20 utility-scale solar projects and
21 brownfield site photovoltaic projects in
22 the procurement events specified in item
23 (ii) of subparagraph (G) of paragraph (1)
24 of subsection (c) of this Section and,
25 after January 1, 2015, renewable energy
26 credits from photovoltaic distributed

HB5544- 185 -LRB103 38715 CES 69699 b
1 generation projects in procurement events
2 held under subsection (c) of this Section.
3 Each utility shall enter into binding contractual
4 arrangements with the winning suppliers.
5 The procurement described in this subsection
6 (d-5), including, but not limited to, the execution of
7 all contracts procured, shall be completed no later
8 than May 10, 2017. Based on the effective date of
9 Public Act 99-906, the Agency and Commission may, as
10 appropriate, modify the various dates and timelines
11 under this subparagraph and subparagraphs (C) and (D)
12 of this paragraph (1). The procurement and plan
13 approval processes required by this subsection (d-5)
14 shall be conducted in conjunction with the procurement
15 and plan approval processes required by subsection (c)
16 of this Section and Section 16-111.5 of the Public
17 Utilities Act, to the extent practicable.
18 Notwithstanding whether a procurement event is
19 conducted under Section 16-111.5 of the Public
20 Utilities Act, the Agency shall immediately initiate a
21 procurement process on June 1, 2017 (the effective
22 date of Public Act 99-906).
23 (D) Following the procurement event described in
24 this paragraph (1) and consistent with subparagraph
25 (B) of this paragraph (1), the Agency shall calculate
26 the payments to be made under each contract for the

HB5544- 186 -LRB103 38715 CES 69699 b
1 next delivery year based on the market price index for
2 that delivery year. The Agency shall publish the
3 payment calculations no later than May 25, 2017 and
4 every May 25 thereafter.
5 (E) Notwithstanding the requirements of this
6 subsection (d-5), the contracts executed under this
7 subsection (d-5) shall provide that the zero emission
8 facility may, as applicable, suspend or terminate
9 performance under the contracts in the following
10 instances:
11 (i) A zero emission facility shall be excused
12 from its performance under the contract for any
13 cause beyond the control of the resource,
14 including, but not restricted to, acts of God,
15 flood, drought, earthquake, storm, fire,
16 lightning, epidemic, war, riot, civil disturbance
17 or disobedience, labor dispute, labor or material
18 shortage, sabotage, acts of public enemy,
19 explosions, orders, regulations or restrictions
20 imposed by governmental, military, or lawfully
21 established civilian authorities, which, in any of
22 the foregoing cases, by exercise of commercially
23 reasonable efforts the zero emission facility
24 could not reasonably have been expected to avoid,
25 and which, by the exercise of commercially
26 reasonable efforts, it has been unable to

HB5544- 187 -LRB103 38715 CES 69699 b
1 overcome. In such event, the zero emission
2 facility shall be excused from performance for the
3 duration of the event, including, but not limited
4 to, delivery of zero emission credits, and no
5 payment shall be due to the zero emission facility
6 during the duration of the event.
7 (ii) A zero emission facility shall be
8 permitted to terminate the contract if legislation
9 is enacted into law by the General Assembly that
10 imposes or authorizes a new tax, special
11 assessment, or fee on the generation of
12 electricity, the ownership or leasehold of a
13 generating unit, or the privilege or occupation of
14 such generation, ownership, or leasehold of
15 generation units by a zero emission facility.
16 However, the provisions of this item (ii) do not
17 apply to any generally applicable tax, special
18 assessment or fee, or requirements imposed by
19 federal law.
20 (iii) A zero emission facility shall be
21 permitted to terminate the contract in the event
22 that the resource requires capital expenditures in
23 excess of $40,000,000 that were neither known nor
24 reasonably foreseeable at the time it executed the
25 contract and that a prudent owner or operator of
26 such resource would not undertake.

HB5544- 188 -LRB103 38715 CES 69699 b
1 (iv) A zero emission facility shall be
2 permitted to terminate the contract in the event
3 the Nuclear Regulatory Commission terminates the
4 resource's license.
5 (F) If the zero emission facility elects to
6 terminate a contract under subparagraph (E) of this
7 paragraph (1), then the Commission shall reopen the
8 docket in which the Commission approved the zero
9 emission standard procurement plan under subparagraph
10 (C) of this paragraph (1) and, after notice and
11 hearing, enter an order acknowledging the contract
12 termination election if such termination is consistent
13 with the provisions of this subsection (d-5).
14 (2) For purposes of this subsection (d-5), the amount
15 paid per kilowatthour means the total amount paid for
16 electric service expressed on a per kilowatthour basis.
17 For purposes of this subsection (d-5), the total amount
18 paid for electric service includes, without limitation,
19 amounts paid for supply, transmission, distribution,
20 surcharges, and add-on taxes.
21 Notwithstanding the requirements of this subsection
22 (d-5), the contracts executed under this subsection (d-5)
23 shall provide that the total of zero emission credits
24 procured under a procurement plan shall be subject to the
25 limitations of this paragraph (2). For each delivery year,
26 the contractual volume receiving payments in such year

HB5544- 189 -LRB103 38715 CES 69699 b
1 shall be reduced for all retail customers based on the
2 amount necessary to limit the net increase that delivery
3 year to the costs of those credits included in the amounts
4 paid by eligible retail customers in connection with
5 electric service to no more than 1.65% of the amount paid
6 per kilowatthour by eligible retail customers during the
7 year ending May 31, 2009. The result of this computation
8 shall apply to and reduce the procurement for all retail
9 customers, and all those customers shall pay the same
10 single, uniform cents per kilowatthour charge under
11 subsection (k) of Section 16-108 of the Public Utilities
12 Act. To arrive at a maximum dollar amount of zero emission
13 credits to be paid for the particular delivery year, the
14 resulting per kilowatthour amount shall be applied to the
15 actual amount of kilowatthours of electricity delivered by
16 the electric utility in the delivery year immediately
17 prior to the procurement, to all retail customers in its
18 service territory. Unpaid contractual volume for any
19 delivery year shall be paid in any subsequent delivery
20 year in which such payments can be made without exceeding
21 the amount specified in this paragraph (2). The
22 calculations required by this paragraph (2) shall be made
23 only once for each procurement plan year. Once the
24 determination as to the amount of zero emission credits to
25 be paid is made based on the calculations set forth in this
26 paragraph (2), no subsequent rate impact determinations

HB5544- 190 -LRB103 38715 CES 69699 b
1 shall be made and no adjustments to those contract amounts
2 shall be allowed. All costs incurred under those contracts
3 and in implementing this subsection (d-5) shall be
4 recovered by the electric utility as provided in this
5 Section.
6 No later than June 30, 2019, the Commission shall
7 review the limitation on the amount of zero emission
8 credits procured under this subsection (d-5) and report to
9 the General Assembly its findings as to whether that
10 limitation unduly constrains the procurement of
11 cost-effective zero emission credits.
12 (3) Six years after the execution of a contract under
13 this subsection (d-5), the Agency shall determine whether
14 the actual zero emission credit payments received by the
15 supplier over the 6-year period exceed the Average ZEC
16 Payment. In addition, at the end of the term of a contract
17 executed under this subsection (d-5), or at the time, if
18 any, a zero emission facility's contract is terminated
19 under subparagraph (E) of paragraph (1) of this subsection
20 (d-5), then the Agency shall determine whether the actual
21 zero emission credit payments received by the supplier
22 over the term of the contract exceed the Average ZEC
23 Payment, after taking into account any amounts previously
24 credited back to the utility under this paragraph (3). If
25 the Agency determines that the actual zero emission credit
26 payments received by the supplier over the relevant period

HB5544- 191 -LRB103 38715 CES 69699 b
1 exceed the Average ZEC Payment, then the supplier shall
2 credit the difference back to the utility. The amount of
3 the credit shall be remitted to the applicable electric
4 utility no later than 120 days after the Agency's
5 determination, which the utility shall reflect as a credit
6 on its retail customer bills as soon as practicable;
7 however, the credit remitted to the utility shall not
8 exceed the total amount of payments received by the
9 facility under its contract.
10 For purposes of this Section, the Average ZEC Payment
11 shall be calculated by multiplying the quantity of zero
12 emission credits delivered under the contract times the
13 average contract price. The average contract price shall
14 be determined by subtracting the amount calculated under
15 subparagraph (B) of this paragraph (3) from the amount
16 calculated under subparagraph (A) of this paragraph (3),
17 as follows:
18 (A) The average of the Social Cost of Carbon, as
19 defined in subparagraph (B) of paragraph (1) of this
20 subsection (d-5), during the term of the contract.
21 (B) The average of the market price indices, as
22 defined in subparagraph (B) of paragraph (1) of this
23 subsection (d-5), during the term of the contract,
24 minus the baseline market price index, as defined in
25 subparagraph (B) of paragraph (1) of this subsection
26 (d-5).

HB5544- 192 -LRB103 38715 CES 69699 b
1 If the subtraction yields a negative number, then the
2 Average ZEC Payment shall be zero.
3 (4) Cost-effective zero emission credits procured from
4 zero emission facilities shall satisfy the applicable
5 definitions set forth in Section 1-10 of this Act.
6 (5) The electric utility shall retire all zero
7 emission credits used to comply with the requirements of
8 this subsection (d-5).
9 (6) Electric utilities shall be entitled to recover
10 all of the costs associated with the procurement of zero
11 emission credits through an automatic adjustment clause
12 tariff in accordance with subsection (k) and (m) of
13 Section 16-108 of the Public Utilities Act, and the
14 contracts executed under this subsection (d-5) shall
15 provide that the utilities' payment obligations under such
16 contracts shall be reduced if an adjustment is required
17 under subsection (m) of Section 16-108 of the Public
18 Utilities Act.
19 (7) This subsection (d-5) shall become inoperative on
20 January 1, 2028.
21 (d-10) Nuclear Plant Assistance; carbon mitigation
22credits.
23 (1) The General Assembly finds:
24 (A) The health, welfare, and prosperity of all
25 Illinois citizens require that the State of Illinois act
26 to avoid and not increase carbon emissions from electric

HB5544- 193 -LRB103 38715 CES 69699 b
1 generation sources while continuing to ensure affordable,
2 stable, and reliable electricity to all citizens.
3 (B) Absent immediate action by the State to preserve
4 existing carbon-free energy resources, those resources may
5 retire, and the electric generation needs of Illinois'
6 retail customers may be met instead by facilities that
7 emit significant amounts of carbon pollution and other
8 harmful air pollutants at a high social and economic cost
9 until Illinois is able to develop other forms of clean
10 energy.
11 (C) The General Assembly finds that nuclear power
12 generation is necessary for the State's transition to 100%
13 clean energy, and ensuring continued operation of nuclear
14 plants advances environmental and public health interests
15 through providing carbon-free electricity while reducing
16 the air pollution profile of the Illinois energy
17 generation fleet.
18 (D) The clean energy attributes of nuclear generation
19 facilities support the State in its efforts to achieve
20 100% clean energy.
21 (E) The State currently invests in various forms of
22 clean energy, including, but not limited to, renewable
23 energy, energy efficiency, and low-emission vehicles,
24 among others.
25 (F) The Environmental Protection Agency commissioned
26 an independent audit which provided a detailed assessment

HB5544- 194 -LRB103 38715 CES 69699 b
1 of the financial condition of the Illinois nuclear fleet
2 to evaluate its financial viability and whether the
3 environmental benefits of such resources were at risk. The
4 report identified the risk of losing the environmental
5 benefits of several specific nuclear units. The report
6 also identified that the LaSalle County Generating Station
7 will continue to operate through 2026 and therefore is not
8 eligible to participate in the carbon mitigation credit
9 program.
10 (G) Nuclear plants provide carbon-free energy, which
11 helps to avoid many health-related negative impacts for
12 Illinois residents.
13 (H) The procurement of carbon mitigation credits
14 representing the environmental benefits of carbon-free
15 generation will further the State's efforts at achieving
16 100% clean energy and decarbonizing the electricity sector
17 in a safe, reliable, and affordable manner. Further, the
18 procurement of carbon emission credits will enhance the
19 health and welfare of Illinois residents through decreased
20 reliance on more highly polluting generation.
21 (I) The General Assembly therefore finds it necessary
22 to establish carbon mitigation credits to ensure decreased
23 reliance on more carbon-intensive energy resources, for
24 transitioning to a fully decarbonized electricity sector,
25 and to help ensure health and welfare of the State's
26 residents.

HB5544- 195 -LRB103 38715 CES 69699 b
1 (2) As used in this subsection:
2 "Baseline costs" means costs used to establish a customer
3protection cap that have been evaluated through an independent
4audit of a carbon-free energy resource conducted by the
5Environmental Protection Agency that evaluated projected
6annual costs for operation and maintenance expenses; fully
7allocated overhead costs, which shall be allocated using the
8methodology developed by the Institute for Nuclear Power
9Operations; fuel expenditures; nonfuel capital expenditures;
10spent fuel expenditures; a return on working capital; the cost
11of operational and market risks that could be avoided by
12ceasing operation; and any other costs necessary for continued
13operations, provided that "necessary" means, for purposes of
14this definition, that the costs could reasonably be avoided
15only by ceasing operations of the carbon-free energy resource.
16 "Carbon mitigation credit" means a tradable credit that
17represents the carbon emission reduction attributes of one
18megawatt-hour of energy produced from a carbon-free energy
19resource.
20 "Carbon-free energy resource" means a generation facility
21that: (1) is fueled by nuclear power; and (2) is
22interconnected to PJM Interconnection, LLC.
23 (3) Procurement.
24 (A) Beginning with the delivery year commencing on
25 June 1, 2022, the Agency shall, for electric utilities
26 serving at least 3,000,000 retail customers in the State,

HB5544- 196 -LRB103 38715 CES 69699 b
1 seek to procure contracts for no more than approximately
2 54,500,000 cost-effective carbon mitigation credits from
3 carbon-free energy resources because such credits are
4 necessary to support current levels of carbon-free energy
5 generation and ensure the State meets its carbon dioxide
6 emissions reduction goals. The Agency shall not make a
7 partial award of a contract for carbon mitigation credits
8 covering a fractional amount of a carbon-free energy
9 resource's projected output.
10 (B) Each carbon-free energy resource that intends to
11 participate in a procurement shall be required to submit
12 to the Agency the following information for the resource
13 on or before the date established by the Agency:
14 (i) the in-service date and remaining useful life
15 of the carbon-free energy resource;
16 (ii) the amount of power generated annually for
17 each of the past 10 years, which shall be used to
18 determine the capability of each facility;
19 (iii) a commitment to be reflected in any contract
20 entered into pursuant to this subsection (d-10) to
21 continue operating the carbon-free energy resource at
22 a capacity factor of at least 88% annually on average
23 for the duration of the contract or contracts executed
24 under the procurement held under this subsection
25 (d-10), except in an instance described in
26 subparagraph (E) of paragraph (1) of subsection (d-5)

HB5544- 197 -LRB103 38715 CES 69699 b
1 of this Section or made impracticable as a result of
2 compliance with law or regulation;
3 (iv) financial need and the risk of loss of the
4 environmental benefits of such resource, which shall
5 include the following information:
6 (I) the carbon-free energy resource's cost
7 projections, expressed on a per megawatt-hour
8 basis, over the next 5 delivery years, which shall
9 include the following: operation and maintenance
10 expenses; fully allocated overhead costs, which
11 shall be allocated using the methodology developed
12 by the Institute for Nuclear Power Operations;
13 fuel expenditures; nonfuel capital expenditures;
14 spent fuel expenditures; a return on working
15 capital; the cost of operational and market risks
16 that could be avoided by ceasing operation; and
17 any other costs necessary for continued
18 operations, provided that "necessary" means, for
19 purposes of this subitem (I), that the costs could
20 reasonably be avoided only by ceasing operations
21 of the carbon-free energy resource; and
22 (II) the carbon-free energy resource's revenue
23 projections, including energy, capacity, ancillary
24 services, any other direct State support, known or
25 anticipated federal attribute credits, known or
26 anticipated tax credits, and any other direct

HB5544- 198 -LRB103 38715 CES 69699 b
1 federal support.
2 The information described in this subparagraph (B) may
3 be submitted on a confidential basis and shall be treated
4 and maintained by the Agency, the procurement
5 administrator, and the Commission as confidential and
6 proprietary and exempt from disclosure under subparagraphs
7 (a) and (g) of paragraph (1) of Section 7 of the Freedom of
8 Information Act. The Office of the Attorney General shall
9 have access to, and maintain the confidentiality of, such
10 information pursuant to Section 6.5 of the Attorney
11 General Act.
12 (C) The Agency shall solicit bids for the contracts
13 described in this subsection (d-10) from carbon-free
14 energy resources that have satisfied the requirements of
15 subparagraph (B) of this paragraph (3). The contracts
16 procured pursuant to a procurement event shall reflect,
17 and be subject to, the following terms, requirements, and
18 limitations:
19 (i) Contracts are for delivery of carbon
20 mitigation credits, and are not energy or capacity
21 sales contracts requiring physical delivery. Pursuant
22 to item (iii), contract payments shall fully deduct
23 the value of any monetized federal production tax
24 credits, credits issued pursuant to a federal clean
25 energy standard, and other federal credits if
26 applicable.

HB5544- 199 -LRB103 38715 CES 69699 b
1 (ii) Contracts for carbon mitigation credits shall
2 commence with the delivery year beginning on June 1,
3 2022 and shall be for a term of 5 delivery years
4 concluding on May 31, 2027.
5 (iii) The price per carbon mitigation credit to be
6 paid under a contract for a given delivery year shall
7 be equal to an accepted bid price less the sum of:
8 (I) one of the following energy price indices,
9 selected by the bidder at the time of the bid for
10 the term of the contract:
11 (aa) the weighted-average hourly day-ahead
12 price for the applicable delivery year at the
13 busbar of all resources procured pursuant to
14 this subsection (d-10), weighted by actual
15 production from the resources; or
16 (bb) the projected energy price for the
17 PJM Interconnection, LLC Northern Illinois Hub
18 for the applicable delivery year determined
19 according to subitem (aa) of item (iii) of
20 subparagraph (B) of paragraph (1) of
21 subsection (d-5).
22 (II) the Base Residual Auction Capacity Price
23 for the ComEd zone as determined by PJM
24 Interconnection, LLC, divided by 24 hours per day,
25 for the applicable delivery year for the first 3
26 delivery years, and then any subsequent delivery

HB5544- 200 -LRB103 38715 CES 69699 b
1 years unless the PJM Interconnection, LLC applies
2 the Minimum Offer Price Rule to participating
3 carbon-free energy resources because they supply
4 carbon mitigation credits pursuant to this Section
5 at which time, upon notice by the carbon-free
6 energy resource to the Commission and subject to
7 the Commission's confirmation, the value under
8 this subitem shall be zero, as further described
9 in the carbon mitigation credit procurement plan;
10 and
11 (III) any value of monetized federal tax
12 credits, direct payments, or similar subsidy
13 provided to the carbon-free energy resource from
14 any unit of government that is not already
15 reflected in energy prices.
16 If the price-per-megawatt-hour calculation
17 performed under item (iii) of this subparagraph (C)
18 for a given delivery year results in a net positive
19 value, then the electric utility counterparty to the
20 contract shall multiply such net value by the
21 applicable contract quantity and remit the amount to
22 the supplier.
23 To protect retail customers from retail rate
24 impacts that may arise upon the initiation of carbon
25 policy changes, if the price-per-megawatt-hour
26 calculation performed under item (iii) of this

HB5544- 201 -LRB103 38715 CES 69699 b
1 subparagraph (C) for a given delivery year results in
2 a net negative value, then the supplier counterparty
3 to the contract shall multiply such net value by the
4 applicable contract quantity and remit such amount to
5 the electric utility counterparty. The electric
6 utility shall reflect such amounts remitted by
7 suppliers as a credit on its retail customer bills as
8 soon as practicable.
9 (iv) To ensure that retail customers in Northern
10 Illinois do not pay more for carbon mitigation credits
11 than the value such credits provide, and
12 notwithstanding the provisions of this subsection
13 (d-10), the Agency shall not accept bids for contracts
14 that exceed a customer protection cap equal to the
15 baseline costs of carbon-free energy resources.
16 The baseline costs for the applicable year shall
17 be the following:
18 (I) For the delivery year beginning June 1,
19 2022, the baseline costs shall be an amount equal
20 to $30.30 per megawatt-hour.
21 (II) For the delivery year beginning June 1,
22 2023, the baseline costs shall be an amount equal
23 to $32.50 per megawatt-hour.
24 (III) For the delivery year beginning June 1,
25 2024, the baseline costs shall be an amount equal
26 to $33.43 per megawatt-hour.

HB5544- 202 -LRB103 38715 CES 69699 b
1 (IV) For the delivery year beginning June 1,
2 2025, the baseline costs shall be an amount equal
3 to $33.50 per megawatt-hour.
4 (V) For the delivery year beginning June 1,
5 2026, the baseline costs shall be an amount equal
6 to $34.50 per megawatt-hour.
7 An Environmental Protection Agency consultant
8 forecast, included in a report issued April 14, 2021,
9 projects that a carbon-free energy resource has the
10 opportunity to earn on average approximately $30.28
11 per megawatt-hour, for the sale of energy and capacity
12 during the time period between 2022 and 2027.
13 Therefore, the sale of carbon mitigation credits
14 provides the opportunity to receive an additional
15 amount per megawatt-hour in addition to the projected
16 prices for energy and capacity.
17 Although actual energy and capacity prices may
18 vary from year-to-year, the General Assembly finds
19 that this customer protection cap will help ensure
20 that the cost of carbon mitigation credits will be
21 less than its value, based upon the social cost of
22 carbon identified in the Technical Support Document
23 issued in February 2021 by the U.S. Interagency
24 Working Group on Social Cost of Greenhouse Gases and
25 the PJM Interconnection, LLC carbon dioxide marginal
26 emission rate for 2020, and that a carbon-free energy

HB5544- 203 -LRB103 38715 CES 69699 b
1 resource receiving payment for carbon mitigation
2 credits receives no more than necessary to keep those
3 units in operation.
4 (D) No later than 7 days after the effective date of
5 this amendatory Act of the 102nd General Assembly, the
6 Agency shall publish its proposed carbon mitigation credit
7 procurement plan. The Plan shall provide that winning bids
8 shall be selected by taking into consideration which
9 resources best match public interest criteria that
10 include, but are not limited to, minimizing carbon dioxide
11 emissions that result from electricity consumed in
12 Illinois and minimizing sulfur dioxide, nitrogen oxide,
13 and particulate matter emissions that adversely affect the
14 citizens of this State. The selection of winning bids
15 shall also take into account the incremental environmental
16 benefits resulting from the procurement or procurements,
17 such as any existing environmental benefits that are
18 preserved by a procurement held under this subsection
19 (d-10) and would cease to exist if the procurement were
20 not held, including the preservation of carbon-free energy
21 resources. For those bidders having the same public
22 interest criteria score, the relative ranking of such
23 bidders shall be determined by price. The Plan shall
24 describe in detail how each public interest factor shall
25 be considered and weighted in the bid selection process to
26 ensure that the public interest criteria are applied to

HB5544- 204 -LRB103 38715 CES 69699 b
1 the procurement. The Plan shall, to the extent practical
2 and permissible by federal law, ensure that successful
3 bidders make commercially reasonable efforts to apply for
4 federal tax credits, direct payments, or similar subsidy
5 programs that support carbon-free generation and for which
6 the successful bidder is eligible. Upon publishing of the
7 carbon mitigation credit procurement plan, copies of the
8 plan shall be posted and made publicly available on the
9 Agency's website. All interested parties shall have 7 days
10 following the date of posting to provide comment to the
11 Agency on the plan. All comments shall be posted to the
12 Agency's website. Following the end of the comment period,
13 but no more than 19 days later than the effective date of
14 this amendatory Act of the 102nd General Assembly, the
15 Agency shall revise the plan as necessary based on the
16 comments received and file its carbon mitigation credit
17 procurement plan with the Commission.
18 (E) If the Commission determines that the plan is
19 likely to result in the procurement of cost-effective
20 carbon mitigation credits, then the Commission shall,
21 after notice and hearing and opportunity for comment, but
22 no later than 42 days after the Agency filed the plan,
23 approve the plan or approve it with modification. For
24 purposes of this subsection (d-10), "cost-effective" means
25 carbon mitigation credits that are procured from
26 carbon-free energy resources at prices that are within the

HB5544- 205 -LRB103 38715 CES 69699 b
1 limits specified in this paragraph (3). As part of the
2 Commission's review and acceptance or rejection of the
3 procurement results, the Commission shall, in its public
4 notice of successful bidders:
5 (i) identify how the selected carbon-free energy
6 resources satisfy the public interest criteria
7 described in this paragraph (3) of minimizing carbon
8 dioxide emissions that result from electricity
9 consumed in Illinois and minimizing sulfur dioxide,
10 nitrogen oxide, and particulate matter emissions that
11 adversely affect the citizens of this State;
12 (ii) specifically address how the selection of
13 carbon-free energy resources takes into account the
14 incremental environmental benefits resulting from the
15 procurement, including any existing environmental
16 benefits that are preserved by the procurements held
17 under this amendatory Act of the 102nd General
18 Assembly and would have ceased to exist if the
19 procurements had not been held, such as the
20 preservation of carbon-free energy resources;
21 (iii) quantify the environmental benefit of
22 preserving the carbon-free energy resources procured
23 pursuant to this subsection (d-10), including the
24 following:
25 (I) an assessment value of avoided greenhouse
26 gas emissions measured as the product of the

HB5544- 206 -LRB103 38715 CES 69699 b
1 carbon-free energy resources' output over the
2 contract term, using generally accepted
3 methodologies for the valuation of avoided
4 emissions; and
5 (II) an assessment of costs of replacement
6 with other carbon-free energy resources and
7 renewable energy resources, including wind and
8 photovoltaic generation, based upon an assessment
9 of the prices paid for renewable energy credits
10 through programs and procurements conducted
11 pursuant to subsection (c) of Section 1-75 of this
12 Act, and the additional storage necessary to
13 produce the same or similar capability of matching
14 customer usage patterns.
15 (F) The procurements described in this paragraph (3),
16 including, but not limited to, the execution of all
17 contracts procured, shall be completed no later than
18 December 3, 2021. The procurement and plan approval
19 processes required by this paragraph (3) shall be
20 conducted in conjunction with the procurement and plan
21 approval processes required by Section 16-111.5 of the
22 Public Utilities Act, to the extent practicable. However,
23 the Agency and Commission may, as appropriate, modify the
24 various dates and timelines under this subparagraph and
25 subparagraphs (D) and (E) of this paragraph (3) to meet
26 the December 3, 2021 contract execution deadline.

HB5544- 207 -LRB103 38715 CES 69699 b
1 Following the completion of such procurements, and
2 consistent with this paragraph (3), the Agency shall
3 calculate the payments to be made under each contract in a
4 timely fashion.
5 (F-1) Costs incurred by the electric utility pursuant
6 to a contract authorized by this subsection (d-10) shall
7 be deemed prudently incurred and reasonable in amount, and
8 the electric utility shall be entitled to full cost
9 recovery pursuant to a tariff or tariffs filed with the
10 Commission.
11 (G) The counterparty electric utility shall retire all
12 carbon mitigation credits used to comply with the
13 requirements of this subsection (d-10).
14 (H) If a carbon-free energy resource is sold to
15 another owner, the rights, obligations, and commitments
16 under this subsection (d-10) shall continue to the
17 subsequent owner.
18 (I) This subsection (d-10) shall become inoperative on
19 January 1, 2028.
20 (e) The draft procurement plans are subject to public
21comment, as required by Section 16-111.5 of the Public
22Utilities Act.
23 (f) The Agency shall submit the final procurement plan to
24the Commission. The Agency shall revise a procurement plan if
25the Commission determines that it does not meet the standards
26set forth in Section 16-111.5 of the Public Utilities Act.

HB5544- 208 -LRB103 38715 CES 69699 b
1 (g) The Agency shall assess fees to each affected utility
2to recover the costs incurred in preparation of the annual
3procurement plan for the utility.
4 (h) The Agency shall assess fees to each bidder to recover
5the costs incurred in connection with a competitive
6procurement process.
7 (i) A renewable energy credit, carbon emission credit,
8zero emission credit, or carbon mitigation credit can only be
9used once to comply with a single portfolio or other standard
10as set forth in subsection (c), subsection (d), or subsection
11(d-5) of this Section, respectively. A renewable energy
12credit, carbon emission credit, zero emission credit, or
13carbon mitigation credit cannot be used to satisfy the
14requirements of more than one standard. If more than one type
15of credit is issued for the same megawatt hour of energy, only
16one credit can be used to satisfy the requirements of a single
17standard. After such use, the credit must be retired together
18with any other credits issued for the same megawatt hour of
19energy.
20(Source: P.A. 102-662, eff. 9-15-21; 103-380, eff. 1-1-24;
21103-580, eff. 12-8-23.)
22 (20 ILCS 3855/1-93 new)
23 Sec. 1-93. Energy storage capacity targets.
24 (a) The Agency shall develop a storage procurement plan
25that results in the electric utilities contracting for energy

HB5544- 209 -LRB103 38715 CES 69699 b
1storage capacity from contracted energy storage systems in
2amounts determined by the Agency.
3 (b) Within 180 days of the effective date of this
4amendatory Act of the 103rd General Assembly, the Agency shall
5develop an energy storage procurement plan in accordance with
6this Section and Section 16-111.5 of the Public Utilities Act.
7 (c) All procurements under this Section shall comply with
8the geographic requirements in subparagraph (I) of paragraph
9(1) of subsection (c) of Section 1-75 and shall follow the
10procurement processes and procedures described in this Section
11and Section 16-111.5 of the Public Utilities Act to the extent
12practicable, and these processes and procedures may be
13expedited to accommodate the schedule established by this
14Section. The Agency shall require all bidders to pay to the
15Agency a nonrefundable deposit of $10,000 per bid. Bidders
16shall also demonstrate experience developing to commercial
17readiness. The winning bidders shall comply with the
18prevailing wage requirements in subparagraph (Q) of paragraph
19(1) of subsection (c) of Section 1-75 and equity
20accountability system requirements in subsection (c-10) of
21Section 1-75. In this subsection, "developing to commercial
22readiness" means having notice to proceed, owning, or
23operating energy facilities with a combined nameplate capacity
24of at least 100 megawatts.
25 (d) Notwithstanding any other provision of law, in all
26competitive procurements conducted by the Agency for

HB5544- 210 -LRB103 38715 CES 69699 b
1procurement of energy storage resources, the Agency, in
2ranking the bids for evaluation and selection, shall apply the
3downward bid price adjustment described in Section 5.4.3, as
4set forth in the first full paragraph on page 110, of its
5proposed 2024 Long-Term Renewable Resources Procurement Plan,
6filed on October 20, 2023 in Illinois Commerce Commission
7Docket 23-0714, to the bid submitted by any energy storage
8resource:
9 (1) located or proposed to be located in a
10 municipality, county, or other unit of local government
11 that is or was eligible to apply for an Energy Transition
12 Community Grant under Section 10-20 of the Energy
13 Transition Reinvestment Act or is located at a
14 fossil-fueled power plant or coal mine in this State that
15 was retired after December 31, 2015 or whose owner commits
16 to retire it by no later than December 31, 2030;
17 (2) located or proposed to be located in either an
18 environmental justice community, an R3 community, or in an
19 equity investment eligible community; or
20 (3) located or proposed to be located at a site
21 connecting to existing utility infrastructure at a
22 switchyard located within the property boundaries of a
23 fossil-fueled power plant in this State that was retired
24 after December 31, 2015 or whose owner commits to retire
25 it by no later than December 31, 2030, which project will
26 be used to replace retired or to be retired fossil fuel

HB5544- 211 -LRB103 38715 CES 69699 b
1 power plant facilities at that property, regardless of the
2 amount of generating capacity to be replaced, and that has
3 completed the interconnection process with the applicable
4 regional transmission organization or independent
5 transmission system operator and has entered into an
6 interconnection agreement for the project with the
7 applicable regional transmission operator, independent
8 transmission system operator, and applicable transmission
9 utility.
10 If an energy storage resource submitting a bid in a
11procurement event described in this subsection satisfies more
12than one of the criteria described in paragraphs (1), (2) or
13(3), the Agency shall apply the bid price adjustment 2 times in
14ranking and evaluating the bid submitted by the energy storage
15resource. It is the intent of the General Assembly in enacting
16this provision to: (i) provide a preference for energy storage
17resources located or to be located in areas that the General
18Assembly hereby finds and concludes have experienced or will
19experience adverse economic and employment impacts due to the
20closure of a fossil-fueled power plant or coal mine, the
21closure of which help to advance the State's decarbonization
22goals, and which preference will help provide a just
23transition for the areas in which the closed fossil power
24plants or coal mines are located or that are an proposed to be
25located in equity investment eligible community, an
26environmental justice community, or an R3 community; and (ii)

HB5544- 212 -LRB103 38715 CES 69699 b
1provide a preference for energy storage resources that are to
2be connected to existing utility infrastructure at switchyards
3of retired or to be retired fossil fuel power plants and have
4completed the interconnection process and entered into
5applicable interconnection agreements, thereby efficiently
6using existing infrastructure and presenting a greater
7likelihood of successful completion and operation, and at an
8earlier date, of the proposed energy storage resources.
9 (e) No later than December 31, 2026 and every 2 years
10thereafter, the Agency shall conduct an analysis to determine
11whether the contracted quantity of energy storage in energy
12storage capacity and energy storage duration is sufficient to
13support the State's renewable energy standards and carbon
14emission standards. To conduct the analysis, the Agency shall
15retain an independent consultant with experience in wholesale
16electric system modeling in PJM and MISO and may seek the
17support of the federal Department of Energy and National Labs
18to conduct its analysis. The independent consultant shall
19utilize a production cost model, capacity expansion model, or
20similar comprehensive analysis of the electricity systems and
21shall provide opportunities for stakeholders to provide
22feedback on the scope, inputs, and assumptions used in the
23analysis. The Agency is authorized to collect costs for
24conducting the analysis from electric utilities. The electric
25utilities are authorized to recover the cost of the analysis
26as part of the recovery of the cost of energy storage

HB5544- 213 -LRB103 38715 CES 69699 b
1resources, as authorized in this Section and Section 16-108 of
2the Public Utilities Act. If the Agency determines that the
3need for energy storage capacity or energy storage duration is
4greater than the energy storage resource target in this
5Section, the Agency shall establish, and the Commission shall
6approve, new energy storage resource targets to meet the
7identified need. If the Agency determines that deployment of
8energy storage beyond 2030 will not be achieved through
9wholesale market prices and other energy storage programs
10established by the State, the Agency shall establish
11additional targets for years beyond 2030.
12 (f) The Agency shall include in the long-term procurement
13plan the energy storage duration of energy storage systems
14from which the Agency shall procure energy storage resources.
15For all solicitations prior to the delivery year 2028, the
16energy storage duration shall be 4 hours. For solicitations in
17the delivery year 2028 and thereafter, and informed by the
18analysis described in subsection (e), the Agency shall
19designate the energy storage duration or durations and the
20amount of energy storage capacity at each duration from which
21the Agency intends to procure energy storage resources.
22 (g) The Agency shall identify in the long-term procurement
23plan the regional transmission organization or independent
24system operator to which energy storage systems shall be
25interconnected in order to be eligible to offer a strike price
26for energy storage credits.

HB5544- 214 -LRB103 38715 CES 69699 b
1 (h) Energy storage resources shall be cost effective. The
2procurement administrator shall establish confidential price
3benchmarks based on publicly available data on regional
4technology costs. Confidential benchmarks shall be developed
5by the procurement administrator, in consultation with the
6Commission staff, Agency staff, and the procurement monitor,
7and shall be subject to Commission review and approval.
8Benchmarks shall reflect development, financing, and related
9costs resulting from requirements imposed through other
10provisions of State law. In this subsection, "cost effective"
11means that the price bid to supply energy storage resources do
12not exceed confidential benchmarks.
13 (i) When developing each storage procurement plan, upon
14solicitation from stakeholders, the Agency shall consider
15additional procurement approaches that would result in the
16electric utilities contracting for energy storage to achieve
17the requirements in subsection (a).
18 (j) Energy storage resources procured under this Section
19must be from energy storage systems built by general
20contractors that must enter into a project labor agreement
21prior to construction. The project labor agreement shall be
22filed with the Director in accordance with procedures
23established by the Agency through its storage procurement
24plan. Any information submitted to the Agency under this
25subsection shall be considered commercially sensitive
26information. At a minimum, the project labor agreement must

HB5544- 215 -LRB103 38715 CES 69699 b
1provide the names, addresses, and occupations of the owner of
2the plant and the individuals representing the labor
3organization employees participating in the project labor
4agreement in accordance with the Project Labor Agreements Act.
5The agreement must also specify the terms and conditions as
6described in this Act.
7 (20 ILCS 3855/1-94 new)
8 Sec. 1-94. Firm energy resource procurement plan. The
9Agency is authorized to develop and implement a firm energy
10resource procurement plan for new resources, including
11initiating proceedings and conducting competitive
12solicitations to deploy new long-duration and multi-day energy
13storage. The procurement plan shall ensure regular procurement
14opportunities to deploy new long-duration and multi-day energy
15storage resources by 2030 and shall ensure stable, competitive
16resource development at a pace needed to ensure grid
17reliability and resilience during atypical or extreme grid
18conditions that may occur at least once in 20 years while
19meeting the emissions requirements of Section 9.15 of the
20Environmental Protection Act.
21 The Agency's plan shall ensure that a minimum of 2 new
22long-duration or multi-day energy storage resources each with
23a rated capacity greater than 20 megawatts shall be deployed
24or contracted by the end of delivery year 2027.
25 Within 365 days of the effective date of this amendatory

HB5544- 216 -LRB103 38715 CES 69699 b
1Act of the 103rd General Assembly, the Agency shall develop a
2firm energy resource procurement plan in accordance with this
3Section and Section 16-111.5 of the Public Utilities Act.
4 Section 10. The Public Utilities Act is amended by
5changing Sections 16-108 and 16-111.5 as follows:
6 (220 ILCS 5/16-108)
7 Sec. 16-108. Recovery of costs associated with the
8provision of delivery and other services.
9 (a) An electric utility shall file a delivery services
10tariff with the Commission at least 210 days prior to the date
11that it is required to begin offering such services pursuant
12to this Act. An electric utility shall provide the components
13of delivery services that are subject to the jurisdiction of
14the Federal Energy Regulatory Commission at the same prices,
15terms and conditions set forth in its applicable tariff as
16approved or allowed into effect by that Commission. The
17Commission shall otherwise have the authority pursuant to
18Article IX to review, approve, and modify the prices, terms
19and conditions of those components of delivery services not
20subject to the jurisdiction of the Federal Energy Regulatory
21Commission, including the authority to determine the extent to
22which such delivery services should be offered on an unbundled
23basis. In making any such determination the Commission shall
24consider, at a minimum, the effect of additional unbundling on

HB5544- 217 -LRB103 38715 CES 69699 b
1(i) the objective of just and reasonable rates, (ii) electric
2utility employees, and (iii) the development of competitive
3markets for electric energy services in Illinois.
4 (b) The Commission shall enter an order approving, or
5approving as modified, the delivery services tariff no later
6than 30 days prior to the date on which the electric utility
7must commence offering such services. The Commission may
8subsequently modify such tariff pursuant to this Act.
9 (c) The electric utility's tariffs shall define the
10classes of its customers for purposes of delivery services
11charges. Delivery services shall be priced and made available
12to all retail customers electing delivery services in each
13such class on a nondiscriminatory basis regardless of whether
14the retail customer chooses the electric utility, an affiliate
15of the electric utility, or another entity as its supplier of
16electric power and energy. Charges for delivery services shall
17be cost based, and shall allow the electric utility to recover
18the costs of providing delivery services through its charges
19to its delivery service customers that use the facilities and
20services associated with such costs. Such costs shall include
21the costs of owning, operating and maintaining transmission
22and distribution facilities. The Commission shall also be
23authorized to consider whether, and if so to what extent, the
24following costs are appropriately included in the electric
25utility's delivery services rates: (i) the costs of that
26portion of generation facilities used for the production and

HB5544- 218 -LRB103 38715 CES 69699 b
1absorption of reactive power in order that retail customers
2located in the electric utility's service area can receive
3electric power and energy from suppliers other than the
4electric utility, and (ii) the costs associated with the use
5and redispatch of generation facilities to mitigate
6constraints on the transmission or distribution system in
7order that retail customers located in the electric utility's
8service area can receive electric power and energy from
9suppliers other than the electric utility. Nothing in this
10subsection shall be construed as directing the Commission to
11allocate any of the costs described in (i) or (ii) that are
12found to be appropriately included in the electric utility's
13delivery services rates to any particular customer group or
14geographic area in setting delivery services rates.
15 (d) The Commission shall establish charges, terms and
16conditions for delivery services that are just and reasonable
17and shall take into account customer impacts when establishing
18such charges. In establishing charges, terms and conditions
19for delivery services, the Commission shall take into account
20voltage level differences. A retail customer shall have the
21option to request to purchase electric service at any delivery
22service voltage reasonably and technically feasible from the
23electric facilities serving that customer's premises provided
24that there are no significant adverse impacts upon system
25reliability or system efficiency. A retail customer shall also
26have the option to request to purchase electric service at any

HB5544- 219 -LRB103 38715 CES 69699 b
1point of delivery that is reasonably and technically feasible
2provided that there are no significant adverse impacts on
3system reliability or efficiency. Such requests shall not be
4unreasonably denied.
5 (e) Electric utilities shall recover the costs of
6installing, operating or maintaining facilities for the
7particular benefit of one or more delivery services customers,
8including without limitation any costs incurred in complying
9with a customer's request to be served at a different voltage
10level, directly from the retail customer or customers for
11whose benefit the costs were incurred, to the extent such
12costs are not recovered through the charges referred to in
13subsections (c) and (d) of this Section.
14 (f) An electric utility shall be entitled but not required
15to implement transition charges in conjunction with the
16offering of delivery services pursuant to Section 16-104. If
17an electric utility implements transition charges, it shall
18implement such charges for all delivery services customers and
19for all customers described in subsection (h), but shall not
20implement transition charges for power and energy that a
21retail customer takes from cogeneration or self-generation
22facilities located on that retail customer's premises, if such
23facilities meet the following criteria:
24 (i) the cogeneration or self-generation facilities
25 serve a single retail customer and are located on that
26 retail customer's premises (for purposes of this

HB5544- 220 -LRB103 38715 CES 69699 b
1 subparagraph and subparagraph (ii), an industrial or
2 manufacturing retail customer and a third party contractor
3 that is served by such industrial or manufacturing
4 customer through such retail customer's own electrical
5 distribution facilities under the circumstances described
6 in subsection (vi) of the definition of "alternative
7 retail electric supplier" set forth in Section 16-102,
8 shall be considered a single retail customer);
9 (ii) the cogeneration or self-generation facilities
10 either (A) are sized pursuant to generally accepted
11 engineering standards for the retail customer's electrical
12 load at that premises (taking into account standby or
13 other reliability considerations related to that retail
14 customer's operations at that site) or (B) if the facility
15 is a cogeneration facility located on the retail
16 customer's premises, the retail customer is the thermal
17 host for that facility and the facility has been designed
18 to meet that retail customer's thermal energy requirements
19 resulting in electrical output beyond that retail
20 customer's electrical demand at that premises, comply with
21 the operating and efficiency standards applicable to
22 "qualifying facilities" specified in title 18 Code of
23 Federal Regulations Section 292.205 as in effect on the
24 effective date of this amendatory Act of 1999;
25 (iii) the retail customer on whose premises the
26 facilities are located either has an exclusive right to

HB5544- 221 -LRB103 38715 CES 69699 b
1 receive, and corresponding obligation to pay for, all of
2 the electrical capacity of the facility, or in the case of
3 a cogeneration facility that has been designed to meet the
4 retail customer's thermal energy requirements at that
5 premises, an identified amount of the electrical capacity
6 of the facility, over a minimum 5-year period; and
7 (iv) if the cogeneration facility is sized for the
8 retail customer's thermal load at that premises but
9 exceeds the electrical load, any sales of excess power or
10 energy are made only at wholesale, are subject to the
11 jurisdiction of the Federal Energy Regulatory Commission,
12 and are not for the purpose of circumventing the
13 provisions of this subsection (f).
14If a generation facility located at a retail customer's
15premises does not meet the above criteria, an electric utility
16implementing transition charges shall implement a transition
17charge until December 31, 2006 for any power and energy taken
18by such retail customer from such facility as if such power and
19energy had been delivered by the electric utility. Provided,
20however, that an industrial retail customer that is taking
21power from a generation facility that does not meet the above
22criteria but that is located on such customer's premises will
23not be subject to a transition charge for the power and energy
24taken by such retail customer from such generation facility if
25the facility does not serve any other retail customer and
26either was installed on behalf of the customer and for its own

HB5544- 222 -LRB103 38715 CES 69699 b
1use prior to January 1, 1997, or is both predominantly fueled
2by byproducts of such customer's manufacturing process at such
3premises and sells or offers an average of 300 megawatts or
4more of electricity produced from such generation facility
5into the wholesale market. Such charges shall be calculated as
6provided in Section 16-102, and shall be collected on each
7kilowatt-hour delivered under a delivery services tariff to a
8retail customer from the date the customer first takes
9delivery services until December 31, 2006 except as provided
10in subsection (h) of this Section. Provided, however, that an
11electric utility, other than an electric utility providing
12service to at least 1,000,000 customers in this State on
13January 1, 1999, shall be entitled to petition for entry of an
14order by the Commission authorizing the electric utility to
15implement transition charges for an additional period ending
16no later than December 31, 2008. The electric utility shall
17file its petition with supporting evidence no earlier than 16
18months, and no later than 12 months, prior to December 31,
192006. The Commission shall hold a hearing on the electric
20utility's petition and shall enter its order no later than 8
21months after the petition is filed. The Commission shall
22determine whether and to what extent the electric utility
23shall be authorized to implement transition charges for an
24additional period. The Commission may authorize the electric
25utility to implement transition charges for some or all of the
26additional period, and shall determine the mitigation factors

HB5544- 223 -LRB103 38715 CES 69699 b
1to be used in implementing such transition charges; provided,
2that the Commission shall not authorize mitigation factors
3less than 110% of those in effect during the 12 months ended
4December 31, 2006. In making its determination, the Commission
5shall consider the following factors: the necessity to
6implement transition charges for an additional period in order
7to maintain the financial integrity of the electric utility;
8the prudence of the electric utility's actions in reducing its
9costs since the effective date of this amendatory Act of 1997;
10the ability of the electric utility to provide safe, adequate
11and reliable service to retail customers in its service area;
12and the impact on competition of allowing the electric utility
13to implement transition charges for the additional period.
14 (g) The electric utility shall file tariffs that establish
15the transition charges to be paid by each class of customers to
16the electric utility in conjunction with the provision of
17delivery services. The electric utility's tariffs shall define
18the classes of its customers for purposes of calculating
19transition charges. The electric utility's tariffs shall
20provide for the calculation of transition charges on a
21customer-specific basis for any retail customer whose average
22monthly maximum electrical demand on the electric utility's
23system during the 6 months with the customer's highest monthly
24maximum electrical demands equals or exceeds 3.0 megawatts for
25electric utilities having more than 1,000,000 customers, and
26for other electric utilities for any customer that has an

HB5544- 224 -LRB103 38715 CES 69699 b
1average monthly maximum electrical demand on the electric
2utility's system of one megawatt or more, and (A) for which
3there exists data on the customer's usage during the 3 years
4preceding the date that the customer became eligible to take
5delivery services, or (B) for which there does not exist data
6on the customer's usage during the 3 years preceding the date
7that the customer became eligible to take delivery services,
8if in the electric utility's reasonable judgment there exists
9comparable usage information or a sufficient basis to develop
10such information, and further provided that the electric
11utility can require customers for which an individual
12calculation is made to sign contracts that set forth the
13transition charges to be paid by the customer to the electric
14utility pursuant to the tariff.
15 (h) An electric utility shall also be entitled to file
16tariffs that allow it to collect transition charges from
17retail customers in the electric utility's service area that
18do not take delivery services but that take electric power or
19energy from an alternative retail electric supplier or from an
20electric utility other than the electric utility in whose
21service area the customer is located. Such charges shall be
22calculated, in accordance with the definition of transition
23charges in Section 16-102, for the period of time that the
24customer would be obligated to pay transition charges if it
25were taking delivery services, except that no deduction for
26delivery services revenues shall be made in such calculation,

HB5544- 225 -LRB103 38715 CES 69699 b
1and usage data from the customer's class shall be used where
2historical usage data is not available for the individual
3customer. The customer shall be obligated to pay such charges
4on a lump sum basis on or before the date on which the customer
5commences to take service from the alternative retail electric
6supplier or other electric utility, provided, that the
7electric utility in whose service area the customer is located
8shall offer the customer the option of signing a contract
9pursuant to which the customer pays such charges ratably over
10the period in which the charges would otherwise have applied.
11 (i) An electric utility shall be entitled to add to the
12bills of delivery services customers charges pursuant to
13Sections 9-221, 9-222 (except as provided in Section 9-222.1),
14and Section 16-114 of this Act, Section 5-5 of the Electricity
15Infrastructure Maintenance Fee Law, Section 6-5 of the
16Renewable Energy, Energy Efficiency, and Coal Resources
17Development Law of 1997, and Section 13 of the Energy
18Assistance Act.
19 (i-5) An electric utility required to impose the Coal to
20Solar and Energy Storage Initiative Charge provided for in
21subsection (c-5) of Section 1-75 of the Illinois Power Agency
22Act shall add such charge to the bills of its delivery services
23customers pursuant to the terms of a tariff conforming to the
24requirements of subsection (c-5) of Section 1-75 of the
25Illinois Power Agency Act and this subsection (i-5) and filed
26with and approved by the Commission. The electric utility

HB5544- 226 -LRB103 38715 CES 69699 b
1shall file its proposed tariff with the Commission on or
2before July 1, 2022 to be effective, after review and approval
3or modification by the Commission, beginning January 1, 2023.
4On or before December 1, 2022, the Commission shall review the
5electric utility's proposed tariff, including by conducting a
6docketed proceeding if deemed necessary by the Commission, and
7shall approve the proposed tariff or direct the electric
8utility to make modifications the Commission finds necessary
9for the tariff to conform to the requirements of subsection
10(c-5) of Section 1-75 of the Illinois Power Agency Act and this
11subsection (i-5). The electric utility's tariff shall provide
12for imposition of the Coal to Solar and Energy Storage
13Initiative Charge on a per-kilowatthour basis to all
14kilowatthours delivered by the electric utility to its
15delivery services customers. The tariff shall provide for the
16calculation of the Coal to Solar and Energy Storage Initiative
17Charge to be in effect for the year beginning January 1, 2023
18and each year beginning January 1 thereafter, sufficient to
19collect the electric utility's estimated payment obligations
20for the delivery year beginning the following June 1 under
21contracts for purchase of renewable energy credits entered
22into pursuant to subsection (c-5) of Section 1-75 of the
23Illinois Power Agency Act and the obligations of the
24Department of Commerce and Economic Opportunity, or any
25successor department or agency, which for purposes of this
26subsection (i-5) shall be referred to as the Department, to

HB5544- 227 -LRB103 38715 CES 69699 b
1make grant payments during such delivery year from the Coal to
2Solar and Energy Storage Initiative Fund pursuant to grant
3contracts entered into pursuant to subsection (c-5) of Section
41-75 of the Illinois Power Agency Act, and using the electric
5utility's kilowatthour deliveries to its delivery services
6customers during the delivery year ended May 31 of the
7preceding calendar year. On or before November 1 of each year
8beginning November 1, 2022, the Department shall notify the
9electric utilities of the amount of the Department's estimated
10obligations for grant payments during the delivery year
11beginning the following June 1 pursuant to grant contracts
12entered into pursuant to subsection (c-5) of Section 1-75 of
13the Illinois Power Agency Act; and each electric utility shall
14incorporate in the calculation of its Coal to Solar and Energy
15Storage Initiative Charge the fractional portion of the
16Department's estimated obligations equal to the electric
17utility's kilowatthour deliveries to its delivery services
18customers in the delivery year ended the preceding May 31
19divided by the aggregate deliveries of both electric utilities
20to delivery services customers in such delivery year. The
21electric utility shall remit on a monthly basis to the State
22Treasurer, for deposit in the Coal to Solar and Energy Storage
23Initiative Fund provided for in subsection (c-5) of Section
241-75 of the Illinois Power Agency Act, the electric utility's
25collections of the Coal to Solar and Energy Storage Initiative
26Charge estimated to be needed by the Department for grant

HB5544- 228 -LRB103 38715 CES 69699 b
1payments pursuant to grant contracts entered into pursuant to
2subsection (c-5) of Section 1-75 of the Illinois Power Agency
3Act. The initial charge under the electric utility's tariff
4shall be effective for kilowatthours delivered beginning
5January 1, 2023, and thereafter shall be revised to be
6effective January 1, 2024 and each January 1 thereafter, based
7on the payment obligations for the delivery year beginning the
8following June 1. The tariff shall provide for the electric
9utility to make an annual filing with the Commission on or
10before November 15 of each year, beginning in 2023, setting
11forth the Coal to Solar and Energy Storage Initiative Charge
12to be in effect for the year beginning the following January 1.
13The electric utility's tariff shall also provide that the
14electric utility shall make a filing with the Commission on or
15before August 1 of each year beginning in 2024 setting forth a
16reconciliation, for the delivery year ended the preceding May
1731, of the electric utility's collections of the Coal to Solar
18and Energy Storage Initiative Charge against actual payments
19for renewable energy credits pursuant to contracts entered
20into, and the actual grant payments by the Department pursuant
21to grant contracts entered into, pursuant to subsection (c-5)
22of Section 1-75 of the Illinois Power Agency Act. The tariff
23shall provide that any excess or shortfall of collections to
24payments shall be deducted from or added to, on a
25per-kilowatthour basis, the Coal to Solar and Energy Storage
26Initiative Charge, over the 6-month period beginning October 1

HB5544- 229 -LRB103 38715 CES 69699 b
1of that calendar year.
2 (j) If a retail customer that obtains electric power and
3energy from cogeneration or self-generation facilities
4installed for its own use on or before January 1, 1997,
5subsequently takes service from an alternative retail electric
6supplier or an electric utility other than the electric
7utility in whose service area the customer is located for any
8portion of the customer's electric power and energy
9requirements formerly obtained from those facilities
10(including that amount purchased from the utility in lieu of
11such generation and not as standby power purchases, under a
12cogeneration displacement tariff in effect as of the effective
13date of this amendatory Act of 1997), the transition charges
14otherwise applicable pursuant to subsections (f), (g), or (h)
15of this Section shall not be applicable in any year to that
16portion of the customer's electric power and energy
17requirements formerly obtained from those facilities,
18provided, that for purposes of this subsection (j), such
19portion shall not exceed the average number of kilowatt-hours
20per year obtained from the cogeneration or self-generation
21facilities during the 3 years prior to the date on which the
22customer became eligible for delivery services, except as
23provided in subsection (f) of Section 16-110.
24 (k) The electric utility shall be entitled to recover
25through tariffed charges all of the costs associated with the
26purchase of zero emission credits from zero emission

HB5544- 230 -LRB103 38715 CES 69699 b
1facilities to meet the requirements of subsection (d-5) of
2Section 1-75 of the Illinois Power Agency Act and all of the
3costs associated with the purchase of carbon mitigation
4credits from carbon-free energy resources to meet the
5requirements of subsection (d-10) of Section 1-75 of the
6Illinois Power Agency Act. Such costs shall include the costs
7of procuring the zero emission credits and carbon mitigation
8credits from carbon-free energy resources, as well as the
9reasonable costs that the utility incurs as part of the
10procurement processes and to implement and comply with plans
11and processes approved by the Commission under subsections
12(d-5) and (d-10). The costs shall be allocated across all
13retail customers through a single, uniform cents per
14kilowatt-hour charge applicable to all retail customers, which
15shall appear as a separate line item on each customer's bill.
16Beginning June 1, 2024, the electric utility shall be entitled
17to recover through tariffed charges all of the costs
18associated with the purchase of energy storage resources to
19meet the energy storage standards of Section 1-93 of the
20Illinois Power Agency Act under procurement plans approved in
21accordance with that Section and Section 16-111.5. Such costs
22shall include the costs of procuring the energy storage
23resources and the reasonable costs that the utility incurs as
24part of the procurement processes and implementing and
25complying with plans and processes approved by the Commission
26under such Sections. The costs associated with the purchase of

HB5544- 231 -LRB103 38715 CES 69699 b
1energy storage resources shall be allocated across all retail
2customers in proportion to the amount of energy storage
3resources the electric utility procures for such customers
4through a single, uniform cents per kilowatt-hour charge
5applicable to such retail customers, which shall appear as a
6separate line item on each customer's bill. Beginning June 1,
72017, the electric utility shall be entitled to recover
8through tariffed charges all of the costs associated with the
9purchase of renewable energy resources to meet the renewable
10energy resource standards of subsection (c) of Section 1-75 of
11the Illinois Power Agency Act, under procurement plans as
12approved in accordance with that Section and Section 16-111.5
13of this Act. Such costs shall include the costs of procuring
14the renewable energy resources, as well as the reasonable
15costs that the utility incurs as part of the procurement
16processes and to implement and comply with plans and processes
17approved by the Commission under such Sections. The costs
18associated with the purchase of renewable energy resources
19shall be allocated across all retail customers in proportion
20to the amount of renewable energy resources the utility
21procures for such customers through a single, uniform cents
22per kilowatt-hour charge applicable to such retail customers,
23which shall appear as a separate line item on each such
24customer's bill. The credits, costs, and penalties associated
25with the self-direct renewable portfolio standard compliance
26program described in subparagraph (R) of paragraph (1) of

HB5544- 232 -LRB103 38715 CES 69699 b
1subsection (c) of Section 1-75 of the Illinois Power Agency
2Act shall be allocated to approved eligible self-direct
3customers by the utility in a cents per kilowatt-hour credit,
4cost, or penalty, which shall appear as a separate line item on
5each such customer's bill.
6 Notwithstanding whether the Commission has approved the
7initial long-term renewable resources procurement plan as of
8June 1, 2017, an electric utility shall place new tariffed
9charges into effect beginning with the June 2017 monthly
10billing period, to the extent practicable, to begin recovering
11the costs of procuring renewable energy resources, as those
12charges are calculated under the limitations described in
13subparagraph (E) of paragraph (1) of subsection (c) of Section
141-75 of the Illinois Power Agency Act. Notwithstanding the
15date on which the utility places such new tariffed charges
16into effect, the utility shall be permitted to collect the
17charges under such tariff as if the tariff had been in effect
18beginning with the first day of the June 2017 monthly billing
19period. For the delivery years commencing June 1, 2017, June
201, 2018, June 1, 2019, and each delivery year thereafter, the
21electric utility shall deposit into a separate interest
22bearing account of a financial institution the monies
23collected under the tariffed charges. Money collected from
24customers for the procurement of renewable energy resources in
25a given delivery year may be spent by the utility for the
26procurement of renewable resources over any of the following 5

HB5544- 233 -LRB103 38715 CES 69699 b
1delivery years, after which unspent money shall be credited
2back to retail customers. The electric utility shall spend all
3money collected in earlier delivery years that has not yet
4been returned to customers, first, before spending money
5collected in later delivery years. Any interest earned shall
6be credited back to retail customers under the reconciliation
7proceeding provided for in this subsection (k), provided that
8the electric utility shall first be reimbursed from the
9interest for the administrative costs that it incurs to
10administer and manage the account. Any taxes due on the funds
11in the account, or interest earned on it, will be paid from the
12account or, if insufficient monies are available in the
13account, from the monies collected under the tariffed charges
14to recover the costs of procuring renewable energy resources.
15Monies deposited in the account shall be subject to the
16review, reconciliation, and true-up process described in this
17subsection (k) that is applicable to the funds collected and
18costs incurred for the procurement of renewable energy
19resources.
20 The electric utility shall be entitled to recover all of
21the costs identified in this subsection (k) through automatic
22adjustment clause tariffs applicable to all of the utility's
23retail customers that allow the electric utility to adjust its
24tariffed charges consistent with this subsection (k). The
25determination as to whether any excess funds were collected
26during a given delivery year for the purchase of renewable

HB5544- 234 -LRB103 38715 CES 69699 b
1energy resources, and the crediting of any excess funds back
2to retail customers, shall not be made until after the close of
3the delivery year, which will ensure that the maximum amount
4of funds is available to implement the approved long-term
5renewable resources procurement plan during a given delivery
6year. The amount of excess funds eligible to be credited back
7to retail customers shall be reduced by an amount equal to the
8payment obligations required by any contracts entered into by
9an electric utility under contracts described in subsection
10(b) of Section 1-56 and subsection (c) of Section 1-75 of the
11Illinois Power Agency Act, even if such payments have not yet
12been made and regardless of the delivery year in which those
13payment obligations were incurred. Notwithstanding anything to
14the contrary, including in tariffs authorized by this
15subsection (k) in effect before the effective date of this
16amendatory Act of the 102nd General Assembly, all unspent
17funds as of May 31, 2021, excluding any funds credited to
18customers during any utility billing cycle that commences
19prior to the effective date of this amendatory Act of the 102nd
20General Assembly, shall remain in the utility account and
21shall on a first in, first out basis be used toward utility
22payment obligations under contracts described in subsection
23(b) of Section 1-56 and subsection (c) of Section 1-75 of the
24Illinois Power Agency Act. The electric utility's collections
25under such automatic adjustment clause tariffs to recover the
26costs of renewable energy resources, zero emission credits

HB5544- 235 -LRB103 38715 CES 69699 b
1from zero emission facilities, and carbon mitigation credits
2from carbon-free energy resources shall be subject to separate
3annual review, reconciliation, and true-up against actual
4costs by the Commission under a procedure that shall be
5specified in the electric utility's automatic adjustment
6clause tariffs and that shall be approved by the Commission in
7connection with its approval of such tariffs. The procedure
8shall provide that any difference between the electric
9utility's collections for zero emission credits and carbon
10mitigation credits under the automatic adjustment charges for
11an annual period and the electric utility's actual costs of
12zero emission credits from zero emission facilities and carbon
13mitigation credits from carbon-free energy resources for that
14same annual period shall be refunded to or collected from, as
15applicable, the electric utility's retail customers in
16subsequent periods.
17 Nothing in this subsection (k) is intended to affect,
18limit, or change the right of the electric utility to recover
19the costs associated with the procurement of renewable energy
20resources for periods commencing before, on, or after June 1,
212017, as otherwise provided in the Illinois Power Agency Act.
22 The funding available under this subsection (k), if any,
23for the programs described under subsection (b) of Section
241-56 of the Illinois Power Agency Act shall not reduce the
25amount of funding for the programs described in subparagraph
26(O) of paragraph (1) of subsection (c) of Section 1-75 of the

HB5544- 236 -LRB103 38715 CES 69699 b
1Illinois Power Agency Act. If funding is available under this
2subsection (k) for programs described under subsection (b) of
3Section 1-56 of the Illinois Power Agency Act, then the
4long-term renewable resources plan shall provide for the
5Agency to procure contracts in an amount that does not exceed
6the funding, and the contracts approved by the Commission
7shall be executed by the applicable utility or utilities.
8 (l) A utility that has terminated any contract executed
9under subsection (d-5) or (d-10) of Section 1-75 of the
10Illinois Power Agency Act shall be entitled to recover any
11remaining balance associated with the purchase of zero
12emission credits prior to such termination, and such utility
13shall also apply a credit to its retail customer bills in the
14event of any over-collection.
15 (m)(1) An electric utility that recovers its costs of
16procuring zero emission credits from zero emission facilities
17through a cents-per-kilowatthour charge under subsection (k)
18of this Section shall be subject to the requirements of this
19subsection (m). Notwithstanding anything to the contrary, such
20electric utility shall, beginning on April 30, 2018, and each
21April 30 thereafter until April 30, 2026, calculate whether
22any reduction must be applied to such cents-per-kilowatthour
23charge that is paid by retail customers of the electric
24utility that have opted out of subsections (a) through (j) of
25Section 8-103B of this Act under subsection (l) of Section
268-103B. Such charge shall be reduced for such customers for

HB5544- 237 -LRB103 38715 CES 69699 b
1the next delivery year commencing on June 1 based on the amount
2necessary, if any, to limit the annual estimated average net
3increase for the prior calendar year due to the future energy
4investment costs to no more than 1.3% of 5.98 cents per
5kilowatt-hour, which is the average amount paid per
6kilowatthour for electric service during the year ending
7December 31, 2015 by Illinois industrial retail customers, as
8reported to the Edison Electric Institute.
9 The calculations required by this subsection (m) shall be
10made only once for each year, and no subsequent rate impact
11determinations shall be made.
12 (2) For purposes of this Section, "future energy
13investment costs" shall be calculated by subtracting the
14cents-per-kilowatthour charge identified in subparagraph (A)
15of this paragraph (2) from the sum of the
16cents-per-kilowatthour charges identified in subparagraph (B)
17of this paragraph (2):
18 (A) The cents-per-kilowatthour charge identified in
19 the electric utility's tariff placed into effect under
20 Section 8-103 of the Public Utilities Act that, on
21 December 1, 2016, was applicable to those retail customers
22 that have opted out of subsections (a) through (j) of
23 Section 8-103B of this Act under subsection (l) of Section
24 8-103B.
25 (B) The sum of the following cents-per-kilowatthour
26 charges applicable to those retail customers that have

HB5544- 238 -LRB103 38715 CES 69699 b
1 opted out of subsections (a) through (j) of Section 8-103B
2 of this Act under subsection (l) of Section 8-103B,
3 provided that if one or more of the following charges has
4 been in effect and applied to such customers for more than
5 one calendar year, then each charge shall be equal to the
6 average of the charges applied over a period that
7 commences with the calendar year ending December 31, 2017
8 and ends with the most recently completed calendar year
9 prior to the calculation required by this subsection (m):
10 (i) the cents-per-kilowatthour charge to recover
11 the costs incurred by the utility under subsection
12 (d-5) of Section 1-75 of the Illinois Power Agency
13 Act, adjusted for any reductions required under this
14 subsection (m); and
15 (ii) the cents-per-kilowatthour charge to recover
16 the costs incurred by the utility under Section
17 16-107.6 of the Public Utilities Act.
18 If no charge was applied for a given calendar year
19 under item (i) or (ii) of this subparagraph (B), then the
20 value of the charge for that year shall be zero.
21 (3) If a reduction is required by the calculation
22performed under this subsection (m), then the amount of the
23reduction shall be multiplied by the number of years reflected
24in the averages calculated under subparagraph (B) of paragraph
25(2) of this subsection (m). Such reduction shall be applied to
26the cents-per-kilowatthour charge that is applicable to those

HB5544- 239 -LRB103 38715 CES 69699 b
1retail customers that have opted out of subsections (a)
2through (j) of Section 8-103B of this Act under subsection (l)
3of Section 8-103B beginning with the next delivery year
4commencing after the date of the calculation required by this
5subsection (m).
6 (4) The electric utility shall file a notice with the
7Commission on May 1 of 2018 and each May 1 thereafter until May
81, 2026 containing the reduction, if any, which must be
9applied for the delivery year which begins in the year of the
10filing. The notice shall contain the calculations made
11pursuant to this Section. By October 1 of each year beginning
12in 2018, each electric utility shall notify the Commission if
13it appears, based on an estimate of the calculation required
14in this subsection (m), that a reduction will be required in
15the next year.
16(Source: P.A. 102-662, eff. 9-15-21.)
17 (220 ILCS 5/16-111.5)
18 Sec. 16-111.5. Provisions relating to procurement.
19 (a) An electric utility that on December 31, 2005 served
20at least 100,000 customers in Illinois shall procure power and
21energy for its eligible retail customers in accordance with
22the applicable provisions set forth in Section 1-75 of the
23Illinois Power Agency Act and this Section. Beginning with the
24delivery year commencing on June 1, 2024, an electric utility
25serving over 100,000 customers shall also procure energy

HB5544- 240 -LRB103 38715 CES 69699 b
1storage resources in accordance with the applicable provisions
2of Section 1-75 of the Illinois Power Agency Act and this
3Section. Beginning with the delivery year commencing on June
41, 2017, such electric utility shall also procure zero
5emission credits from zero emission facilities in accordance
6with the applicable provisions set forth in Section 1-75 of
7the Illinois Power Agency Act, and, for years beginning on or
8after June 1, 2017, the utility shall procure renewable energy
9resources in accordance with the applicable provisions set
10forth in Section 1-75 of the Illinois Power Agency Act and this
11Section. Beginning with the delivery year commencing on June
121, 2022, an electric utility serving over 3,000,000 customers
13shall also procure carbon mitigation credits from carbon-free
14energy resources in accordance with the applicable provisions
15set forth in Section 1-75 of the Illinois Power Agency Act and
16this Section. A small multi-jurisdictional electric utility
17that on December 31, 2005 served less than 100,000 customers
18in Illinois may elect to procure power and energy for all or a
19portion of its eligible Illinois retail customers in
20accordance with the applicable provisions set forth in this
21Section and Section 1-75 of the Illinois Power Agency Act.
22This Section shall not apply to a small multi-jurisdictional
23utility until such time as a small multi-jurisdictional
24utility requests the Illinois Power Agency to prepare a
25procurement plan for its eligible retail customers. "Eligible
26retail customers" for the purposes of this Section means those

HB5544- 241 -LRB103 38715 CES 69699 b
1retail customers that purchase power and energy from the
2electric utility under fixed-price bundled service tariffs,
3other than those retail customers whose service is declared or
4deemed competitive under Section 16-113 and those other
5customer groups specified in this Section, including
6self-generating customers, customers electing hourly pricing,
7or those customers who are otherwise ineligible for
8fixed-price bundled tariff service. For those customers that
9are excluded from the procurement plan's electric supply
10service requirements, and the utility shall procure any supply
11requirements, including capacity, ancillary services, and
12hourly priced energy, in the applicable markets as needed to
13serve those customers, provided that the utility may include
14in its procurement plan load requirements for the load that is
15associated with those retail customers whose service has been
16declared or deemed competitive pursuant to Section 16-113 of
17this Act to the extent that those customers are purchasing
18power and energy during one of the transition periods
19identified in subsection (b) of Section 16-113 of this Act.
20 (b) A procurement plan shall be prepared for each electric
21utility consistent with the applicable requirements of the
22Illinois Power Agency Act and this Section. For purposes of
23this Section, Illinois electric utilities that are affiliated
24by virtue of a common parent company are considered to be a
25single electric utility. Small multi-jurisdictional utilities
26may request a procurement plan for a portion of or all of its

HB5544- 242 -LRB103 38715 CES 69699 b
1Illinois load. Each procurement plan shall analyze the
2projected balance of supply and demand for those retail
3customers to be included in the plan's electric supply service
4requirements over a 5-year period, with the first planning
5year beginning on June 1 of the year following the year in
6which the plan is filed. The plan shall specifically identify
7the wholesale products to be procured following plan approval,
8and shall follow all the requirements set forth in the Public
9Utilities Act and all applicable State and federal laws,
10statutes, rules, or regulations, as well as Commission orders.
11Nothing in this Section precludes consideration of contracts
12longer than 5 years and related forecast data. Unless
13specified otherwise in this Section, in the procurement plan
14or in the implementing tariff, any procurement occurring in
15accordance with this plan shall be competitively bid through a
16request for proposals process. Approval and implementation of
17the procurement plan shall be subject to review and approval
18by the Commission according to the provisions set forth in
19this Section. A procurement plan shall include each of the
20following components:
21 (1) Hourly load analysis. This analysis shall include:
22 (i) multi-year historical analysis of hourly
23 loads;
24 (ii) switching trends and competitive retail
25 market analysis;
26 (iii) known or projected changes to future loads;

HB5544- 243 -LRB103 38715 CES 69699 b
1 and
2 (iv) growth forecasts by customer class.
3 (2) Analysis of the impact of any demand side and
4 renewable energy initiatives. This analysis shall include:
5 (i) the impact of demand response programs and
6 energy efficiency programs, both current and
7 projected; for small multi-jurisdictional utilities,
8 the impact of demand response and energy efficiency
9 programs approved pursuant to Section 8-408 of this
10 Act, both current and projected; and
11 (ii) supply side needs that are projected to be
12 offset by purchases of renewable energy resources, if
13 any.
14 (3) A plan for meeting the expected load requirements
15 that will not be met through preexisting contracts. This
16 plan shall include:
17 (i) definitions of the different Illinois retail
18 customer classes for which supply is being purchased;
19 (ii) the proposed mix of demand-response products
20 for which contracts will be executed during the next
21 year. For small multi-jurisdictional electric
22 utilities that on December 31, 2005 served fewer than
23 100,000 customers in Illinois, these shall be defined
24 as demand-response products offered in an energy
25 efficiency plan approved pursuant to Section 8-408 of
26 this Act. The cost-effective demand-response measures

HB5544- 244 -LRB103 38715 CES 69699 b
1 shall be procured whenever the cost is lower than
2 procuring comparable capacity products, provided that
3 such products shall:
4 (A) be procured by a demand-response provider
5 from those retail customers included in the plan's
6 electric supply service requirements;
7 (B) at least satisfy the demand-response
8 requirements of the regional transmission
9 organization market in which the utility's service
10 territory is located, including, but not limited
11 to, any applicable capacity or dispatch
12 requirements;
13 (C) provide for customers' participation in
14 the stream of benefits produced by the
15 demand-response products;
16 (D) provide for reimbursement by the
17 demand-response provider of the utility for any
18 costs incurred as a result of the failure of the
19 supplier of such products to perform its
20 obligations thereunder; and
21 (E) meet the same credit requirements as apply
22 to suppliers of capacity, in the applicable
23 regional transmission organization market;
24 (iii) monthly forecasted system supply
25 requirements, including expected minimum, maximum, and
26 average values for the planning period;

HB5544- 245 -LRB103 38715 CES 69699 b
1 (iv) the proposed mix and selection of standard
2 wholesale products for which contracts will be
3 executed during the next year, separately or in
4 combination, to meet that portion of its load
5 requirements not met through pre-existing contracts,
6 including but not limited to monthly 5 x 16 peak period
7 block energy, monthly off-peak wrap energy, monthly 7
8 x 24 energy, annual 5 x 16 energy, other standardized
9 energy or capacity products designed to provide
10 eligible retail customer benefits from commercially
11 deployed advanced technologies including but not
12 limited to high voltage direct current converter
13 stations, as such term is defined in Section 1-10 of
14 the Illinois Power Agency Act, whether or not such
15 product is currently available in wholesale markets,
16 annual off-peak wrap energy, annual 7 x 24 energy,
17 monthly capacity, annual capacity, peak load capacity
18 obligations, capacity purchase plan, and ancillary
19 services;
20 (v) proposed term structures for each wholesale
21 product type included in the proposed procurement plan
22 portfolio of products; and
23 (vi) an assessment of the price risk, load
24 uncertainty, and other factors that are associated
25 with the proposed procurement plan; this assessment,
26 to the extent possible, shall include an analysis of

HB5544- 246 -LRB103 38715 CES 69699 b
1 the following factors: contract terms, time frames for
2 securing products or services, fuel costs, weather
3 patterns, transmission costs, market conditions, and
4 the governmental regulatory environment; the proposed
5 procurement plan shall also identify alternatives for
6 those portfolio measures that are identified as having
7 significant price risk and mitigation in the form of
8 additional retail customer and ratepayer price,
9 reliability, and environmental benefits from
10 standardized energy products delivered from
11 commercially deployed advanced technologies,
12 including, but not limited to, high voltage direct
13 current converter stations, as such term is defined in
14 Section 1-10 of the Illinois Power Agency Act, whether
15 or not such product is currently available in
16 wholesale markets.
17 (4) Proposed procedures for balancing loads. The
18 procurement plan shall include, for load requirements
19 included in the procurement plan, the process for (i)
20 hourly balancing of supply and demand and (ii) the
21 criteria for portfolio re-balancing in the event of
22 significant shifts in load.
23 (5) Long-Term Renewable Resources Procurement Plan.
24 The Agency shall prepare a long-term renewable resources
25 procurement plan for the procurement of renewable energy
26 credits under Sections 1-56 and 1-75 of the Illinois Power

HB5544- 247 -LRB103 38715 CES 69699 b
1 Agency Act for delivery beginning in the 2017 delivery
2 year.
3 (i) The initial long-term renewable resources
4 procurement plan and all subsequent revisions shall be
5 subject to review and approval by the Commission. For
6 the purposes of this Section, "delivery year" has the
7 same meaning as in Section 1-10 of the Illinois Power
8 Agency Act. For purposes of this Section, "Agency"
9 shall mean the Illinois Power Agency.
10 (ii) The long-term renewable resources planning
11 process shall be conducted as follows:
12 (A) Electric utilities shall provide a range
13 of load forecasts to the Illinois Power Agency
14 within 45 days of the Agency's request for
15 forecasts, which request shall specify the length
16 and conditions for the forecasts including, but
17 not limited to, the quantity of distributed
18 generation expected to be interconnected for each
19 year.
20 (B) The Agency shall publish for comment the
21 initial long-term renewable resources procurement
22 plan no later than 120 days after the effective
23 date of this amendatory Act of the 99th General
24 Assembly and shall review, and may revise, the
25 plan at least every 2 years thereafter. To the
26 extent practicable, the Agency shall review and

HB5544- 248 -LRB103 38715 CES 69699 b
1 propose any revisions to the long-term renewable
2 energy resources procurement plan in conjunction
3 with the Agency's other planning and approval
4 processes conducted under this Section. The
5 initial long-term renewable resources procurement
6 plan shall:
7 (aa) Identify the procurement programs and
8 competitive procurement events consistent with
9 the applicable requirements of the Illinois
10 Power Agency Act and shall be designed to
11 achieve the goals set forth in subsection (c)
12 of Section 1-75 of that Act.
13 (bb) Include a schedule for procurements
14 for renewable energy credits from
15 utility-scale wind projects, utility-scale
16 solar projects, and brownfield site
17 photovoltaic projects consistent with
18 subparagraph (G) of paragraph (1) of
19 subsection (c) of Section 1-75 of the Illinois
20 Power Agency Act.
21 (cc) Identify the process whereby the
22 Agency will submit to the Commission for
23 review and approval the proposed contracts to
24 implement the programs required by such plan.
25 Copies of the initial long-term renewable
26 resources procurement plan and all subsequent

HB5544- 249 -LRB103 38715 CES 69699 b
1 revisions shall be posted and made publicly
2 available on the Agency's and Commission's
3 websites, and copies shall also be provided to
4 each affected electric utility. An affected
5 utility and other interested parties shall have 45
6 days following the date of posting to provide
7 comment to the Agency on the initial long-term
8 renewable resources procurement plan and all
9 subsequent revisions. All comments submitted to
10 the Agency shall be specific, supported by data or
11 other detailed analyses, and, if objecting to all
12 or a portion of the procurement plan, accompanied
13 by specific alternative wording or proposals. All
14 comments shall be posted on the Agency's and
15 Commission's websites. During this 45-day comment
16 period, the Agency shall hold at least one public
17 hearing within each utility's service area that is
18 subject to the requirements of this paragraph (5)
19 for the purpose of receiving public comment.
20 Within 21 days following the end of the 45-day
21 review period, the Agency may revise the long-term
22 renewable resources procurement plan based on the
23 comments received and shall file the plan with the
24 Commission for review and approval.
25 (C) Within 14 days after the filing of the
26 initial long-term renewable resources procurement

HB5544- 250 -LRB103 38715 CES 69699 b
1 plan or any subsequent revisions, any person
2 objecting to the plan may file an objection with
3 the Commission. Within 21 days after the filing of
4 the plan, the Commission shall determine whether a
5 hearing is necessary. The Commission shall enter
6 its order confirming or modifying the initial
7 long-term renewable resources procurement plan or
8 any subsequent revisions within 120 days after the
9 filing of the plan by the Illinois Power Agency.
10 (D) The Commission shall approve the initial
11 long-term renewable resources procurement plan and
12 any subsequent revisions, including expressly the
13 forecast used in the plan and taking into account
14 that funding will be limited to the amount of
15 revenues actually collected by the utilities, if
16 the Commission determines that the plan will
17 reasonably and prudently accomplish the
18 requirements of Section 1-56 and subsection (c) of
19 Section 1-75 of the Illinois Power Agency Act. The
20 Commission shall also approve the process for the
21 submission, review, and approval of the proposed
22 contracts to procure renewable energy credits or
23 implement the programs authorized by the
24 Commission pursuant to a long-term renewable
25 resources procurement plan approved under this
26 Section.

HB5544- 251 -LRB103 38715 CES 69699 b
1 In approving any long-term renewable resources
2 procurement plan after the effective date of this
3 amendatory Act of the 102nd General Assembly, the
4 Commission shall approve or modify the Agency's
5 proposal for minimum equity standards pursuant to
6 subsection (c-10) of Section 1-75 of the Illinois
7 Power Agency Act. The Commission shall consider
8 any analysis performed by the Agency in developing
9 its proposal, including past performance,
10 availability of equity eligible contractors, and
11 availability of equity eligible persons at the
12 time the long-term renewable resources procurement
13 plan is approved.
14 (iii) The Agency or third parties contracted by
15 the Agency shall implement all programs authorized by
16 the Commission in an approved long-term renewable
17 resources procurement plan without further review and
18 approval by the Commission. Third parties shall not
19 begin implementing any programs or receive any payment
20 under this Section until the Commission has approved
21 the contract or contracts under the process authorized
22 by the Commission in item (D) of subparagraph (ii) of
23 paragraph (5) of this subsection (b) and the third
24 party and the Agency or utility, as applicable, have
25 executed the contract. For those renewable energy
26 credits subject to procurement through a competitive

HB5544- 252 -LRB103 38715 CES 69699 b
1 bid process under the plan or under the initial
2 forward procurements for wind and solar resources
3 described in subparagraph (G) of paragraph (1) of
4 subsection (c) of Section 1-75 of the Illinois Power
5 Agency Act, the Agency shall follow the procurement
6 process specified in the provisions relating to
7 electricity procurement in subsections (e) through (i)
8 of this Section.
9 (iv) An electric utility shall recover its costs
10 associated with the procurement of renewable energy
11 credits under this Section and pursuant to subsection
12 (c-5) of Section 1-75 of the Illinois Power Agency Act
13 through an automatic adjustment clause tariff under
14 subsection (k) or a tariff pursuant to subsection
15 (i-5), as applicable, of Section 16-108 of this Act. A
16 utility shall not be required to advance any payment
17 or pay any amounts under this Section that exceed the
18 actual amount of revenues collected by the utility
19 under paragraph (6) of subsection (c) of Section 1-75
20 of the Illinois Power Agency Act, subsection (c-5) of
21 Section 1-75 of the Illinois Power Agency Act, and
22 subsection (k) or subsection (i-5), as applicable, of
23 Section 16-108 of this Act, and contracts executed
24 under this Section shall expressly incorporate this
25 limitation.
26 (v) For the public interest, safety, and welfare,

HB5544- 253 -LRB103 38715 CES 69699 b
1 the Agency and the Commission may adopt rules to carry
2 out the provisions of this Section on an emergency
3 basis immediately following the effective date of this
4 amendatory Act of the 99th General Assembly.
5 (vi) On or before July 1 of each year, the
6 Commission shall hold an informal hearing for the
7 purpose of receiving comments on the prior year's
8 procurement process and any recommendations for
9 change.
10 (6) Long-Term Energy Storage Resources Procurement
11 Plan. The Agency shall prepare an energy storage resources
12 procurement plan for the procurement of energy storage
13 resources in compliance with this Section and Section 1-93
14 of the Illinois Power Agency Act.
15 (i) The initial energy storage resources
16 procurement plan and all subsequent revisions shall be
17 subject to review and approval by the Commission. For
18 purposes of this Section, "delivery year" has the same
19 meaning as in Section 1-10 of the Illinois Power
20 Agency Act. In this paragraph, "Agency" means the
21 Illinois Power Agency.
22 (ii) The energy storage resources planning process
23 shall be conducted as follows:
24 (A) The Agency shall publish for comment the
25 initial energy storage resources procurement plan
26 no later than 180 days after the effective date of

HB5544- 254 -LRB103 38715 CES 69699 b
1 this amendatory Act of the 103rd General Assembly
2 and shall review, and may revise, the plan at
3 least every 2 years thereafter. To the extent
4 practicable, the Agency shall review and propose
5 any revisions to the energy storage resources
6 procurement plan in conjunction with the Agency's
7 other planning and approval processes conducted
8 under this Section. The initial energy storage
9 resources procurement plan shall:
10 (aa) include a schedule for procurements
11 of energy storage resources from qualified
12 sources consistent with Section 1-93 of the
13 Illinois Power Agency Act;
14 (bb) identify the process whereby the
15 Agency will submit to the Commission for
16 review and approval the proposed contracts or
17 other actions to implement the programs
18 required by such plan. In developing the plan,
19 the Agency shall consider, and may include in
20 the proposed plan, alternative methods to
21 obtain energy storage resources, including,
22 without limitation, procurement by electric
23 utilities of indexed energy storage credits,
24 tolling agreements between electric utilities
25 and owners of energy storage systems, and
26 other methods. Copies of the initial energy

HB5544- 255 -LRB103 38715 CES 69699 b
1 storage resources procurement plan and all
2 subsequent revisions shall be posted and made
3 publicly available on the Agency's and
4 Commission's websites, and copies shall also
5 be provided to each affected electric utility.
6 An affected utility and other interested
7 parties shall have 45 days following the date
8 of posting to provide comment to the Agency on
9 the initial energy storage resources
10 procurement plan and all subsequent revisions.
11 All comments shall be posted on the Agency's
12 and Commission's websites; and
13 (cc) upon solicitation from stakeholders,
14 consider additional procurement approaches
15 that would result in the electric utilities
16 obtaining energy storage resources to achieve
17 the requirements described in subsection (a);
18 and
19 (B) The Commission, after a hearing, if the
20 Commission finds a hearing would be necessary or
21 useful, shall approve the initial energy storage
22 resources procurement plan and any subsequent
23 revisions if the Commission determines that the
24 plan will reasonably and prudently accomplish the
25 requirements of Section 1-93 of the Illinois Power
26 Agency Act. The Commission shall also approve the

HB5544- 256 -LRB103 38715 CES 69699 b
1 process for the submission, review, and approval
2 of proposed contracts or other methods to procure
3 energy storage resources or implement the programs
4 authorized by the Commission pursuant to a
5 long-term energy storage resources procurement
6 plan approved under this Section.
7 In approving any long-term energy storage
8 procurement plan after the effective date of this
9 amendatory Act of the 103rd General Assembly, the
10 Commission shall approve or modify the Agency's
11 proposal for minimum equity standards pursuant to
12 subsection (c-10) of Section 1-75 of the Illinois
13 Power Agency Act. The Commission shall consider
14 any analysis performed by the Agency in developing
15 its proposal, including past performance,
16 availability of equity eligible contractors, and
17 availability of equity eligible persons at the
18 time the long-term renewable resources procurement
19 plan is approved.
20 (iii) The Agency or third parties contracted by
21 the Agency shall implement all programs authorized by
22 the Commission in an approved long-term energy storage
23 procurement plan without further review and approval
24 by the Commission. Third parties shall not begin
25 implementing any programs or receive any payment under
26 this Section until the Commission has approved the

HB5544- 257 -LRB103 38715 CES 69699 b
1 long-term storage contract or other method for
2 obtaining the energy storage resources.
3 (iv) An electric utility shall recover its costs
4 associated with the procurement of energy storage
5 resources under this Section and pursuant to Section
6 1-93 of the Illinois Power Agency Act through an
7 automatic adjustment clause tariff under subsection
8 (k) or a tariff pursuant to subsection (i-5), as
9 applicable, of Section 16-108.
10 (b-5) An electric utility that as of January 1, 2019
11served more than 300,000 retail customers in this State shall
12purchase renewable energy credits from new renewable energy
13facilities constructed at or adjacent to the sites of
14coal-fueled electric generating facilities in this State in
15accordance with subsection (c-5) of Section 1-75 of the
16Illinois Power Agency Act. Except as expressly provided in
17this Section, the plans and procedures for such procurements
18shall not be included in the procurement plans provided for in
19this Section, but rather shall be conducted and implemented
20solely in accordance with subsection (c-5) of Section 1-75 of
21the Illinois Power Agency Act.
22 (c) The provisions of this subsection (c) shall not apply
23to procurements conducted pursuant to subsection (c-5) of
24Section 1-75 of the Illinois Power Agency Act. However, the
25Agency may retain a procurement administrator to assist the
26Agency in planning and carrying out the procurement events and

HB5544- 258 -LRB103 38715 CES 69699 b
1implementing the other requirements specified in such
2subsection (c-5) of Section 1-75 of the Illinois Power Agency
3Act, with the costs incurred by the Agency for the procurement
4administrator to be recovered through fees charged to
5applicants for selection to sell and deliver renewable energy
6credits to electric utilities pursuant to subsection (c-5) of
7Section 1-75 of the Illinois Power Agency Act. The procurement
8process set forth in Section 1-75 of the Illinois Power Agency
9Act and subsection (e) of this Section shall be administered
10by a procurement administrator and monitored by a procurement
11monitor.
12 (1) The procurement administrator shall:
13 (i) design the final procurement process in
14 accordance with Section 1-75 of the Illinois Power
15 Agency Act and subsection (e) of this Section
16 following Commission approval of the procurement plan;
17 (ii) develop benchmarks in accordance with
18 subsection (e)(3) to be used to evaluate bids; these
19 benchmarks shall be submitted to the Commission for
20 review and approval on a confidential basis prior to
21 the procurement event;
22 (iii) serve as the interface between the electric
23 utility and suppliers;
24 (iv) manage the bidder pre-qualification and
25 registration process;
26 (v) obtain the electric utilities' agreement to

HB5544- 259 -LRB103 38715 CES 69699 b
1 the final form of all supply contracts and credit
2 collateral agreements;
3 (vi) administer the request for proposals process;
4 (vii) have the discretion to negotiate to
5 determine whether bidders are willing to lower the
6 price of bids that meet the benchmarks approved by the
7 Commission; any post-bid negotiations with bidders
8 shall be limited to price only and shall be completed
9 within 24 hours after opening the sealed bids and
10 shall be conducted in a fair and unbiased manner; in
11 conducting the negotiations, there shall be no
12 disclosure of any information derived from proposals
13 submitted by competing bidders; if information is
14 disclosed to any bidder, it shall be provided to all
15 competing bidders;
16 (viii) maintain confidentiality of supplier and
17 bidding information in a manner consistent with all
18 applicable laws, rules, regulations, and tariffs;
19 (ix) submit a confidential report to the
20 Commission recommending acceptance or rejection of
21 bids;
22 (x) notify the utility of contract counterparties
23 and contract specifics; and
24 (xi) administer related contingency procurement
25 events.
26 (2) The procurement monitor, who shall be retained by

HB5544- 260 -LRB103 38715 CES 69699 b
1 the Commission, shall:
2 (i) monitor interactions among the procurement
3 administrator, suppliers, and utility;
4 (ii) monitor and report to the Commission on the
5 progress of the procurement process;
6 (iii) provide an independent confidential report
7 to the Commission regarding the results of the
8 procurement event;
9 (iv) assess compliance with the procurement plans
10 approved by the Commission for each utility that on
11 December 31, 2005 provided electric service to at
12 least 100,000 customers in Illinois and for each small
13 multi-jurisdictional utility that on December 31, 2005
14 served less than 100,000 customers in Illinois;
15 (v) preserve the confidentiality of supplier and
16 bidding information in a manner consistent with all
17 applicable laws, rules, regulations, and tariffs;
18 (vi) provide expert advice to the Commission and
19 consult with the procurement administrator regarding
20 issues related to procurement process design, rules,
21 protocols, and policy-related matters; and
22 (vii) consult with the procurement administrator
23 regarding the development and use of benchmark
24 criteria, standard form contracts, credit policies,
25 and bid documents.
26 (d) Except as provided in subsection (j), the planning

HB5544- 261 -LRB103 38715 CES 69699 b
1process shall be conducted as follows:
2 (1) Beginning in 2008, each Illinois utility procuring
3 power pursuant to this Section shall annually provide a
4 range of load forecasts to the Illinois Power Agency by
5 July 15 of each year, or such other date as may be required
6 by the Commission or Agency. The load forecasts shall
7 cover the 5-year procurement planning period for the next
8 procurement plan and shall include hourly data
9 representing a high-load, low-load, and expected-load
10 scenario for the load of those retail customers included
11 in the plan's electric supply service requirements. The
12 utility shall provide supporting data and assumptions for
13 each of the scenarios.
14 (2) Beginning in 2008, the Illinois Power Agency shall
15 prepare a procurement plan by August 15th of each year, or
16 such other date as may be required by the Commission. The
17 procurement plan shall identify the portfolio of
18 demand-response and power and energy products to be
19 procured. Cost-effective demand-response measures shall be
20 procured as set forth in item (iii) of subsection (b) of
21 this Section. Copies of the procurement plan shall be
22 posted and made publicly available on the Agency's and
23 Commission's websites, and copies shall also be provided
24 to each affected electric utility. An affected utility
25 shall have 30 days following the date of posting to
26 provide comment to the Agency on the procurement plan.

HB5544- 262 -LRB103 38715 CES 69699 b
1 Other interested entities also may comment on the
2 procurement plan. All comments submitted to the Agency
3 shall be specific, supported by data or other detailed
4 analyses, and, if objecting to all or a portion of the
5 procurement plan, accompanied by specific alternative
6 wording or proposals. All comments shall be posted on the
7 Agency's and Commission's websites. During this 30-day
8 comment period, the Agency shall hold at least one public
9 hearing within each utility's service area for the purpose
10 of receiving public comment on the procurement plan.
11 Within 14 days following the end of the 30-day review
12 period, the Agency shall revise the procurement plan as
13 necessary based on the comments received and file the
14 procurement plan with the Commission and post the
15 procurement plan on the websites.
16 (3) Within 5 days after the filing of the procurement
17 plan, any person objecting to the procurement plan shall
18 file an objection with the Commission. Within 10 days
19 after the filing, the Commission shall determine whether a
20 hearing is necessary. The Commission shall enter its order
21 confirming or modifying the procurement plan within 90
22 days after the filing of the procurement plan by the
23 Illinois Power Agency.
24 (4) The Commission shall approve the procurement plan,
25 including expressly the forecast used in the procurement
26 plan, if the Commission determines that it will ensure

HB5544- 263 -LRB103 38715 CES 69699 b
1 adequate, reliable, affordable, efficient, and
2 environmentally sustainable electric service at the lowest
3 total cost over time, taking into account any benefits of
4 price stability.
5 (4.5) The Commission shall review the Agency's
6 recommendations for the selection of applicants to enter
7 into long-term contracts for the sale and delivery of
8 renewable energy credits from new renewable energy
9 facilities to be constructed at or adjacent to the sites
10 of coal-fueled electric generating facilities in this
11 State in accordance with the provisions of subsection
12 (c-5) of Section 1-75 of the Illinois Power Agency Act,
13 and shall approve the Agency's recommendations if the
14 Commission determines that the applicants recommended by
15 the Agency for selection, the proposed new renewable
16 energy facilities to be constructed, the amounts of
17 renewable energy credits to be delivered pursuant to the
18 contracts, and the other terms of the contracts, are
19 consistent with the requirements of subsection (c-5) of
20 Section 1-75 of the Illinois Power Agency Act.
21 (e) The procurement process shall include each of the
22following components:
23 (1) Solicitation, pre-qualification, and registration
24 of bidders. The procurement administrator shall
25 disseminate information to potential bidders to promote a
26 procurement event, notify potential bidders that the

HB5544- 264 -LRB103 38715 CES 69699 b
1 procurement administrator may enter into a post-bid price
2 negotiation with bidders that meet the applicable
3 benchmarks, provide supply requirements, and otherwise
4 explain the competitive procurement process. In addition
5 to such other publication as the procurement administrator
6 determines is appropriate, this information shall be
7 posted on the Illinois Power Agency's and the Commission's
8 websites. The procurement administrator shall also
9 administer the prequalification process, including
10 evaluation of credit worthiness, compliance with
11 procurement rules, and agreement to the standard form
12 contract developed pursuant to paragraph (2) of this
13 subsection (e). The procurement administrator shall then
14 identify and register bidders to participate in the
15 procurement event.
16 (2) Standard contract forms and credit terms and
17 instruments. The procurement administrator, in
18 consultation with the utilities, the Commission, and other
19 interested parties and subject to Commission oversight,
20 shall develop and provide standard contract forms for the
21 supplier contracts that meet generally accepted industry
22 practices. Standard credit terms and instruments that meet
23 generally accepted industry practices shall be similarly
24 developed. The procurement administrator shall make
25 available to the Commission all written comments it
26 receives on the contract forms, credit terms, or

HB5544- 265 -LRB103 38715 CES 69699 b
1 instruments. If the procurement administrator cannot reach
2 agreement with the applicable electric utility as to the
3 contract terms and conditions, the procurement
4 administrator must notify the Commission of any disputed
5 terms and the Commission shall resolve the dispute. The
6 terms of the contracts shall not be subject to negotiation
7 by winning bidders, and the bidders must agree to the
8 terms of the contract in advance so that winning bids are
9 selected solely on the basis of price.
10 (3) Establishment of a market-based price benchmark.
11 As part of the development of the procurement process, the
12 procurement administrator, in consultation with the
13 Commission staff, Agency staff, and the procurement
14 monitor, shall establish benchmarks for evaluating the
15 final prices in the contracts for each of the products
16 that will be procured through the procurement process. The
17 benchmarks shall be based on price data for similar
18 products for the same delivery period and same delivery
19 hub, or other delivery hubs after adjusting for that
20 difference. The price benchmarks may also be adjusted to
21 take into account differences between the information
22 reflected in the underlying data sources and the specific
23 products and procurement process being used to procure
24 power for the Illinois utilities. The benchmarks shall be
25 confidential but shall be provided to, and will be subject
26 to Commission review and approval, prior to a procurement

HB5544- 266 -LRB103 38715 CES 69699 b
1 event.
2 (4) Request for proposals competitive procurement
3 process. The procurement administrator shall design and
4 issue a request for proposals to supply electricity in
5 accordance with each utility's procurement plan, as
6 approved by the Commission. The request for proposals
7 shall set forth a procedure for sealed, binding commitment
8 bidding with pay-as-bid settlement, and provision for
9 selection of bids on the basis of price.
10 (5) A plan for implementing contingencies in the event
11 of supplier default or failure of the procurement process
12 to fully meet the expected load requirement due to
13 insufficient supplier participation, Commission rejection
14 of results, or any other cause.
15 (i) Event of supplier default: In the event of
16 supplier default, the utility shall review the
17 contract of the defaulting supplier to determine if
18 the amount of supply is 200 megawatts or greater, and
19 if there are more than 60 days remaining of the
20 contract term. If both of these conditions are met,
21 and the default results in termination of the
22 contract, the utility shall immediately notify the
23 Illinois Power Agency that a request for proposals
24 must be issued to procure replacement power, and the
25 procurement administrator shall run an additional
26 procurement event. If the contracted supply of the

HB5544- 267 -LRB103 38715 CES 69699 b
1 defaulting supplier is less than 200 megawatts or
2 there are less than 60 days remaining of the contract
3 term, the utility shall procure power and energy from
4 the applicable regional transmission organization
5 market, including ancillary services, capacity, and
6 day-ahead or real time energy, or both, for the
7 duration of the contract term to replace the
8 contracted supply; provided, however, that if a needed
9 product is not available through the regional
10 transmission organization market it shall be purchased
11 from the wholesale market.
12 (ii) Failure of the procurement process to fully
13 meet the expected load requirement: If the procurement
14 process fails to fully meet the expected load
15 requirement due to insufficient supplier participation
16 or due to a Commission rejection of the procurement
17 results, the procurement administrator, the
18 procurement monitor, and the Commission staff shall
19 meet within 10 days to analyze potential causes of low
20 supplier interest or causes for the Commission
21 decision. If changes are identified that would likely
22 result in increased supplier participation, or that
23 would address concerns causing the Commission to
24 reject the results of the prior procurement event, the
25 procurement administrator may implement those changes
26 and rerun the request for proposals process according

HB5544- 268 -LRB103 38715 CES 69699 b
1 to a schedule determined by those parties and
2 consistent with Section 1-75 of the Illinois Power
3 Agency Act and this subsection. In any event, a new
4 request for proposals process shall be implemented by
5 the procurement administrator within 90 days after the
6 determination that the procurement process has failed
7 to fully meet the expected load requirement.
8 (iii) In all cases where there is insufficient
9 supply provided under contracts awarded through the
10 procurement process to fully meet the electric
11 utility's load requirement, the utility shall meet the
12 load requirement by procuring power and energy from
13 the applicable regional transmission organization
14 market, including ancillary services, capacity, and
15 day-ahead or real time energy, or both; provided,
16 however, that if a needed product is not available
17 through the regional transmission organization market
18 it shall be purchased from the wholesale market.
19 (6) The procurement processes described in this
20 subsection and in subsection (c-5) of Section 1-75 of the
21 Illinois Power Agency Act are exempt from the requirements
22 of the Illinois Procurement Code, pursuant to Section
23 20-10 of that Code.
24 (f) Within 2 business days after opening the sealed bids,
25the procurement administrator shall submit a confidential
26report to the Commission. The report shall contain the results

HB5544- 269 -LRB103 38715 CES 69699 b
1of the bidding for each of the products along with the
2procurement administrator's recommendation for the acceptance
3and rejection of bids based on the price benchmark criteria
4and other factors observed in the process. The procurement
5monitor also shall submit a confidential report to the
6Commission within 2 business days after opening the sealed
7bids. The report shall contain the procurement monitor's
8assessment of bidder behavior in the process as well as an
9assessment of the procurement administrator's compliance with
10the procurement process and rules. The Commission shall review
11the confidential reports submitted by the procurement
12administrator and procurement monitor, and shall accept or
13reject the recommendations of the procurement administrator
14within 2 business days after receipt of the reports.
15 (g) Within 3 business days after the Commission decision
16approving the results of a procurement event, the utility
17shall enter into binding contractual arrangements with the
18winning suppliers using the standard form contracts; except
19that the utility shall not be required either directly or
20indirectly to execute the contracts if a tariff that is
21consistent with subsection (l) of this Section has not been
22approved and placed into effect for that utility.
23 (h) For the procurement of standard wholesale products,
24the names of the successful bidders and the load weighted
25average of the winning bid prices for each contract type and
26for each contract term shall be made available to the public at

HB5544- 270 -LRB103 38715 CES 69699 b
1the time of Commission approval of a procurement event. For
2procurements conducted to meet the requirements of subsection
3(b) of Section 1-56 or subsection (c) of Section 1-75 of the
4Illinois Power Agency Act governed by the provisions of this
5Section, the address and nameplate capacity of the new
6renewable energy generating facility proposed by a winning
7bidder shall also be made available to the public at the time
8of Commission approval of a procurement event, along with the
9business address and contact information for any winning
10bidder. An estimate or approximation of the nameplate capacity
11of the new renewable energy generating facility may be
12disclosed if necessary to protect the confidentiality of
13individual bid prices.
14 The Commission, the procurement monitor, the procurement
15administrator, the Illinois Power Agency, and all participants
16in the procurement process shall maintain the confidentiality
17of all other supplier and bidding information in a manner
18consistent with all applicable laws, rules, regulations, and
19tariffs. Confidential information, including the confidential
20reports submitted by the procurement administrator and
21procurement monitor pursuant to subsection (f) of this
22Section, shall not be made publicly available and shall not be
23discoverable by any party in any proceeding, absent a
24compelling demonstration of need, nor shall those reports be
25admissible in any proceeding other than one for law
26enforcement purposes.

HB5544- 271 -LRB103 38715 CES 69699 b
1 (i) Within 2 business days after a Commission decision
2approving the results of a procurement event or such other
3date as may be required by the Commission from time to time,
4the utility shall file for informational purposes with the
5Commission its actual or estimated retail supply charges, as
6applicable, by customer supply group reflecting the costs
7associated with the procurement and computed in accordance
8with the tariffs filed pursuant to subsection (l) of this
9Section and approved by the Commission.
10 (j) Within 60 days following August 28, 2007 (the
11effective date of Public Act 95-481), each electric utility
12that on December 31, 2005 provided electric service to at
13least 100,000 customers in Illinois shall prepare and file
14with the Commission an initial procurement plan, which shall
15conform in all material respects to the requirements of the
16procurement plan set forth in subsection (b); provided,
17however, that the Illinois Power Agency Act shall not apply to
18the initial procurement plan prepared pursuant to this
19subsection. The initial procurement plan shall identify the
20portfolio of power and energy products to be procured and
21delivered for the period June 2008 through May 2009, and shall
22identify the proposed procurement administrator, who shall
23have the same experience and expertise as is required of a
24procurement administrator hired pursuant to Section 1-75 of
25the Illinois Power Agency Act. Copies of the procurement plan
26shall be posted and made publicly available on the

HB5544- 272 -LRB103 38715 CES 69699 b
1Commission's website. The initial procurement plan may include
2contracts for renewable resources that extend beyond May 2009.
3 (i) Within 14 days following filing of the initial
4 procurement plan, any person may file a detailed objection
5 with the Commission contesting the procurement plan
6 submitted by the electric utility. All objections to the
7 electric utility's plan shall be specific, supported by
8 data or other detailed analyses. The electric utility may
9 file a response to any objections to its procurement plan
10 within 7 days after the date objections are due to be
11 filed. Within 7 days after the date the utility's response
12 is due, the Commission shall determine whether a hearing
13 is necessary. If it determines that a hearing is
14 necessary, it shall require the hearing to be completed
15 and issue an order on the procurement plan within 60 days
16 after the filing of the procurement plan by the electric
17 utility.
18 (ii) The order shall approve or modify the procurement
19 plan, approve an independent procurement administrator,
20 and approve or modify the electric utility's tariffs that
21 are proposed with the initial procurement plan. The
22 Commission shall approve the procurement plan if the
23 Commission determines that it will ensure adequate,
24 reliable, affordable, efficient, and environmentally
25 sustainable electric service at the lowest total cost over
26 time, taking into account any benefits of price stability.

HB5544- 273 -LRB103 38715 CES 69699 b
1 (k) (Blank).
2 (k-5) (Blank).
3 (l) An electric utility shall recover its costs incurred
4under this Section and subsection (c-5) of Section 1-75 of the
5Illinois Power Agency Act, including, but not limited to, the
6costs of procuring power and energy demand-response resources
7under this Section and its costs for purchasing renewable
8energy credits pursuant to subsection (c-5) of Section 1-75 of
9the Illinois Power Agency Act. The utility shall file with the
10initial procurement plan its proposed tariffs through which
11its costs of procuring power that are incurred pursuant to a
12Commission-approved procurement plan and those other costs
13identified in this subsection (l), will be recovered. The
14tariffs shall include a formula rate or charge designed to
15pass through both the costs incurred by the utility in
16procuring a supply of electric power and energy for the
17applicable customer classes with no mark-up or return on the
18price paid by the utility for that supply, plus any just and
19reasonable costs that the utility incurs in arranging and
20providing for the supply of electric power and energy. The
21formula rate or charge shall also contain provisions that
22ensure that its application does not result in over or under
23recovery due to changes in customer usage and demand patterns,
24and that provide for the correction, on at least an annual
25basis, of any accounting errors that may occur. A utility
26shall recover through the tariff all reasonable costs incurred

HB5544- 274 -LRB103 38715 CES 69699 b
1to implement or comply with any procurement plan that is
2developed and put into effect pursuant to Section 1-75 of the
3Illinois Power Agency Act and this Section, and for the
4procurement of renewable energy credits pursuant to subsection
5(c-5) of Section 1-75 of the Illinois Power Agency Act,
6including any fees assessed by the Illinois Power Agency,
7costs associated with load balancing, and contingency plan
8costs. The electric utility shall also recover its full costs
9of procuring electric supply for which it contracted before
10the effective date of this Section in conjunction with the
11provision of full requirements service under fixed-price
12bundled service tariffs subsequent to December 31, 2006. All
13such costs shall be deemed to have been prudently incurred.
14The pass-through tariffs that are filed and approved pursuant
15to this Section shall not be subject to review under, or in any
16way limited by, Section 16-111(i) of this Act. All of the costs
17incurred by the electric utility associated with the purchase
18of zero emission credits in accordance with subsection (d-5)
19of Section 1-75 of the Illinois Power Agency Act, all costs
20incurred by the electric utility associated with the purchase
21of carbon mitigation credits in accordance with subsection
22(d-10) of Section 1-75 of the Illinois Power Agency Act, and,
23beginning June 1, 2017, all of the costs incurred by the
24electric utility associated with the purchase of renewable
25energy resources in accordance with Sections 1-56 and 1-75 of
26the Illinois Power Agency Act, and all of the costs incurred by

HB5544- 275 -LRB103 38715 CES 69699 b
1the electric utility in purchasing renewable energy credits in
2accordance with subsection (c-5) of Section 1-75 of the
3Illinois Power Agency Act, and all costs incurred by the
4electric utility in purchasing energy storage resources in
5accordance with Section 1-93 of the Illinois Power Agency Act
6shall be recovered through the electric utility's tariffed
7charges applicable to all of its retail customers, as
8specified in subsection (k) or subsection (i-5), as
9applicable, of Section 16-108 of this Act, and shall not be
10recovered through the electric utility's tariffed charges for
11electric power and energy supply to its eligible retail
12customers.
13 (m) The Commission has the authority to adopt rules to
14carry out the provisions of this Section. For the public
15interest, safety, and welfare, the Commission also has
16authority to adopt rules to carry out the provisions of this
17Section on an emergency basis immediately following August 28,
182007 (the effective date of Public Act 95-481).
19 (n) Notwithstanding any other provision of this Act, any
20affiliated electric utilities that submit a single procurement
21plan covering their combined needs may procure for those
22combined needs in conjunction with that plan, and may enter
23jointly into power supply contracts, purchases, and other
24procurement arrangements, and allocate capacity and energy and
25cost responsibility therefor among themselves in proportion to
26their requirements.

HB5544- 276 -LRB103 38715 CES 69699 b
1 (o) On or before June 1 of each year, the Commission shall
2hold an informal hearing for the purpose of receiving comments
3on the prior year's procurement process and any
4recommendations for change.
5 (p) An electric utility subject to this Section may
6propose to invest, lease, own, or operate an electric
7generation facility as part of its procurement plan, provided
8the utility demonstrates that such facility is the least-cost
9option to provide electric service to those retail customers
10included in the plan's electric supply service requirements.
11If the facility is shown to be the least-cost option and is
12included in a procurement plan prepared in accordance with
13Section 1-75 of the Illinois Power Agency Act and this
14Section, then the electric utility shall make a filing
15pursuant to Section 8-406 of this Act, and may request of the
16Commission any statutory relief required thereunder. If the
17Commission grants all of the necessary approvals for the
18proposed facility, such supply shall thereafter be considered
19as a pre-existing contract under subsection (b) of this
20Section. The Commission shall in any order approving a
21proposal under this subsection specify how the utility will
22recover the prudently incurred costs of investing in, leasing,
23owning, or operating such generation facility through just and
24reasonable rates charged to those retail customers included in
25the plan's electric supply service requirements. Cost recovery
26for facilities included in the utility's procurement plan

HB5544- 277 -LRB103 38715 CES 69699 b
1pursuant to this subsection shall not be subject to review
2under or in any way limited by the provisions of Section
316-111(i) of this Act. Nothing in this Section is intended to
4prohibit a utility from filing for a fuel adjustment clause as
5is otherwise permitted under Section 9-220 of this Act.
6 (q) If the Illinois Power Agency filed with the
7Commission, under Section 16-111.5 of this Act, its proposed
8procurement plan for the period commencing June 1, 2017, and
9the Commission has not yet entered its final order approving
10the plan on or before the effective date of this amendatory Act
11of the 99th General Assembly, then the Illinois Power Agency
12shall file a notice of withdrawal with the Commission, after
13the effective date of this amendatory Act of the 99th General
14Assembly, to withdraw the proposed procurement of renewable
15energy resources to be approved under the plan, other than the
16procurement of renewable energy credits from distributed
17renewable energy generation devices using funds previously
18collected from electric utilities' retail customers that take
19service pursuant to electric utilities' hourly pricing tariff
20or tariffs and, for an electric utility that serves less than
21100,000 retail customers in the State, other than the
22procurement of renewable energy credits from distributed
23renewable energy generation devices. Upon receipt of the
24notice, the Commission shall enter an order that approves the
25withdrawal of the proposed procurement of renewable energy
26resources from the plan. The initially proposed procurement of

HB5544- 278 -LRB103 38715 CES 69699 b
1renewable energy resources shall not be approved or be the
2subject of any further hearing, investigation, proceeding, or
3order of any kind.
4 This amendatory Act of the 99th General Assembly preempts
5and supersedes any order entered by the Commission that
6approved the Illinois Power Agency's procurement plan for the
7period commencing June 1, 2017, to the extent it is
8inconsistent with the provisions of this amendatory Act of the
999th General Assembly. To the extent any previously entered
10order approved the procurement of renewable energy resources,
11the portion of that order approving the procurement shall be
12void, other than the procurement of renewable energy credits
13from distributed renewable energy generation devices using
14funds previously collected from electric utilities' retail
15customers that take service under electric utilities' hourly
16pricing tariff or tariffs and, for an electric utility that
17serves less than 100,000 retail customers in the State, other
18than the procurement of renewable energy credits for
19distributed renewable energy generation devices.
20(Source: P.A. 102-662, eff. 9-15-21.)