Bill Text: IL HB5814 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Creates the Carbon Dioxide Transport and Storage Protections Act. Defines terms. Provides that (i) title to pore space belongs to and is vested in the surface owner of the overlying surface estate, (ii) a conveyance of title to a surface estate conveys title to the pore space in all strata underlying the surface estate, and (iii) title to pore space may not be severed from title to the surface estate. Notwithstanding any other provision of law, prohibits the amalgamation of pore space under the Eminent Domain Act. Contains requirements for valid amalgamation. Requires the Illinois Emergency Management Agency and Office of Homeland Security to determine a fee for carbon sequestration by rule. Creates the Carbon Transportation and Sequestration Readiness Fund and makes a conforming change in the State Finance Act. Requires the Illinois Emergency Management Agency and Office of Homeland Security and the Department of Public Health to conduct training with specified requirements. Contains other provisions. Amends the Illinois Power Agency Act. Makes changes to the definition of "sequester". Removes language requiring specified facilities to be clean coal facilities. Makes other changes. Amends the Carbon Dioxide Transportation and Sequestration Act. Contains requirements for receiving a certificate of authority. Makes other changes. Amends the Environmental Protection Act. Requires any person seeking to sequester carbon dioxide in Illinois to first obtain a carbon sequestration permit from the Agency. Contains other provisions and makes other changes. Contains a severability provision. Effective immediately.
Spectrum: Partisan Bill (Democrat 5-0)
Status: (Introduced) 2024-05-13 - Added Co-Sponsor Rep. Anna Moeller [HB5814 Detail]
Download: Illinois-2023-HB5814-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning safety.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 1. Short title. This Act may be cited as the Carbon | |||||||||||||||||||
5 | Dioxide Transport and Storage Protections Act.
| |||||||||||||||||||
6 | Section 5. Legislative findings and objectives. The | |||||||||||||||||||
7 | General Assembly finds that: | |||||||||||||||||||
8 | (1) State law currently lacks clarity concerning the | |||||||||||||||||||
9 | rights of landowners with regard to pore space in the | |||||||||||||||||||
10 | subsurface beneath their land, limiting landowners' | |||||||||||||||||||
11 | ability to fully enjoy and protect their property. | |||||||||||||||||||
12 | (2) The transport of carbon dioxide via pipelines | |||||||||||||||||||
13 | significantly affects landowners' rights to enjoy their | |||||||||||||||||||
14 | property. Carbon dioxide pipelines may impede access to | |||||||||||||||||||
15 | property and fields, harm crops and topsoil, and pose a | |||||||||||||||||||
16 | risk of grave harm if there is a release of carbon dioxide. | |||||||||||||||||||
17 | (3) The storage of carbon dioxide in subsurface pore | |||||||||||||||||||
18 | space may have profound impacts upon the surface estate. | |||||||||||||||||||
19 | Subsurface carbon dioxide storage may require easements | |||||||||||||||||||
20 | for pipelines, injection wells, monitoring equipment, and | |||||||||||||||||||
21 | other infrastructure, and may harm crops and topsoil and | |||||||||||||||||||
22 | risk grave harm to landowners, surrounding ecosystems, and | |||||||||||||||||||
23 | water supplies if carbon dioxide is released. |
| |||||||
| |||||||
1 | (4) To protect landowners, surface ecosystems, | ||||||
2 | groundwater, and nearby residents, it is essential that | ||||||
3 | the State clarify the ownership, liability, and other | ||||||
4 | property rights associated with carbon dioxide | ||||||
5 | transportation and storage before additional carbon | ||||||
6 | transport and storage takes place in the State, as well as | ||||||
7 | provide units of local government and residents with | ||||||
8 | training and resources so they can be prepared if there is | ||||||
9 | a carbon dioxide release.
| ||||||
10 | Section 10. Definitions. As used in this Act: | ||||||
11 | "Agency" means the Illinois Environmental Protection | ||||||
12 | Agency. | ||||||
13 | "Amalgamation" means the combining or uniting of property | ||||||
14 | rights in adjacent subsurface pore space for the permanent | ||||||
15 | storage of carbon dioxide. | ||||||
16 | "Area of review" has the meaning given to that term in | ||||||
17 | Section 3.121 of the Environmental Protection Act. | ||||||
18 | "Carbon dioxide injection well" means a well that is used | ||||||
19 | to inject carbon dioxide into a reservoir for permanent | ||||||
20 | geologic sequestration. | ||||||
21 | "Carbon dioxide pipeline" or "pipeline" means the in-State | ||||||
22 | portion of a pipeline, including appurtenant facilities, | ||||||
23 | property rights, and easements, that are used to transport | ||||||
24 | carbon dioxide. | ||||||
25 | "Carbon dioxide sequestration reservoir" means a portion |
| |||||||
| |||||||
1 | of a sedimentary geologic stratum or formation containing pore | ||||||
2 | space, including, but not limited to, depleted reservoirs and | ||||||
3 | saline formations, that the United States Environmental | ||||||
4 | Protection Agency has determined is suitable for the injection | ||||||
5 | and permanent storage of carbon dioxide. | ||||||
6 | "Carbon dioxide stream" means carbon dioxide, any | ||||||
7 | incidental associated substances derived from the source | ||||||
8 | materials and process of producing or capturing carbon | ||||||
9 | dioxide, and any substance added to the stream to enable or | ||||||
10 | improve the injection process or the detection of a leak or | ||||||
11 | rupture. | ||||||
12 | "Department" means the Department of Public Health. | ||||||
13 | "Fund" means the Carbon Transportation and Sequestration | ||||||
14 | Readiness Fund. | ||||||
15 | "Person" has the meaning given to that term in Section | ||||||
16 | 3.315 of the Environmental Protection Act. | ||||||
17 | "Pipeline operator" means a person who owns, leases, | ||||||
18 | operates, controls, or supervises a pipeline that transports | ||||||
19 | carbon dioxide. | ||||||
20 | "Pore space" or "porosity" means the portion of geologic | ||||||
21 | media that contains gas or fluid, including, but not limited | ||||||
22 | to, oil or water, and that can be used to store carbon dioxide. | ||||||
23 | "Pore space" also includes solution-mined cavities. | ||||||
24 | "Pore space owner" means the person who has title to a pore | ||||||
25 | space. | ||||||
26 | "Qualified Third Party" means a person or entity |
| |||||||
| |||||||
1 | determined by the Department to have the capacity and | ||||||
2 | experience to carry out relevant duties. "Qualified Third | ||||||
3 | Party" does not include any person or entity that has | ||||||
4 | received, or is receiving, funding from any source to | ||||||
5 | research, engage or assist in the capture, transport, or | ||||||
6 | sequestration of carbon dioxide. | ||||||
7 | "Sequester" has the meaning given to that term in Section | ||||||
8 | 1-10 of the Illinois Power Agency Act. | ||||||
9 | "Sequestration" means to sequester or be sequestered. | ||||||
10 | "Sequestration facility" means the carbon dioxide | ||||||
11 | sequestration reservoir, underground equipment, including, but | ||||||
12 | not limited to, well penetrations, and surface facilities and | ||||||
13 | equipment used or proposed to be used in a geologic storage | ||||||
14 | operation. "Sequestration facility" includes an injection well | ||||||
15 | and equipment used to connect the surface facility and | ||||||
16 | equipment to the carbon dioxide sequestration reservoir and | ||||||
17 | underground equipment. "Sequestration facility" does not | ||||||
18 | include pipelines used to transport carbon dioxide to a | ||||||
19 | sequestration facility. | ||||||
20 | "Sequestration operator" means a person who holds, is | ||||||
21 | applying for, or is required to obtain a carbon sequestration | ||||||
22 | permit under Section 22.64 of the Environmental Protection | ||||||
23 | Act. | ||||||
24 | "Sequestration pore space" means a pore space proposed, | ||||||
25 | authorized, or used for sequestering one or more carbon | ||||||
26 | dioxide streams in accordance with a permit or permit |
| |||||||
| |||||||
1 | application under Section 22.64 of the Environmental | ||||||
2 | Protection Act. | ||||||
3 | "Surface owner" means a person identified in the records | ||||||
4 | of the recorder of deeds for each county containing some | ||||||
5 | portion of a proposed carbon dioxide sequestration reservoir | ||||||
6 | as an owner of a whole or undivided fee simple interest or | ||||||
7 | other freehold interest in real property in the surface above | ||||||
8 | the sequestration pore space. "Surface owner" does not include | ||||||
9 | an owner of a right-of-way, easement, leasehold, or any other | ||||||
10 | lesser estate. | ||||||
11 | "Transportation" or "transport" means the physical | ||||||
12 | movement of carbon dioxide by pipeline conducted for any | ||||||
13 | person's use or on any person's account.
| ||||||
14 | Section 15. Ownership and conveyance of pore space. | ||||||
15 | (a) Title to pore space belongs to and is vested in the | ||||||
16 | surface owner of the surface estate. | ||||||
17 | (b) A conveyance of title to a surface estate conveys | ||||||
18 | title to the pore space in all strata underlying the surface | ||||||
19 | estate. | ||||||
20 | (c) Title to pore space may not be severed from title to | ||||||
21 | the surface estate. A grant of easement for use of pore space | ||||||
22 | is not a severance prohibited under this subsection. | ||||||
23 | (d) A grant of easement for use of pore space shall not | ||||||
24 | confer any right to enter upon or otherwise use the surface of | ||||||
25 | the land unless the grant of easement expressly provides that |
| |||||||
| |||||||
1 | right. | ||||||
2 | (e) Any grant of easement for use of pore space shall be | ||||||
3 | recorded in the same manner as easements of real estate. | ||||||
4 | If the holder of an easement or lease of pore space | ||||||
5 | withdraws or is denied a permit for sequestration of carbon | ||||||
6 | dioxide under Section 22.64 of the Environmental Protection | ||||||
7 | Act, including, but not limited to, the disapproval of | ||||||
8 | financial assurance under subsection (e) of Section 22.64 of | ||||||
9 | the Environmental Protection Act, the owner of the surface | ||||||
10 | estate shall have the right to have the title or interest | ||||||
11 | returned for any amounts paid to the holder of the easement or | ||||||
12 | lease.
| ||||||
13 | Section 20. No compulsory amalgamation. Notwithstanding | ||||||
14 | any other provision of law, a sequestration operator may not | ||||||
15 | exercise any authority to take or acquire any easement or | ||||||
16 | title to any pore space or any portion of an area of review | ||||||
17 | under the Eminent Domain Act for amalgamation. A sequestration | ||||||
18 | operator must obtain, for the entirety of the area of review | ||||||
19 | the person seeks to use for carbon sequestration, one of the | ||||||
20 | following: | ||||||
21 | (1) a written grant of easement to enter into and use a | ||||||
22 | surface owner's portion of the proposed area of review for | ||||||
23 | carbon sequestration; | ||||||
24 | (2) a written lease agreement allowing the person to | ||||||
25 | enter into and use a surface owner's portion of the |
| |||||||
| |||||||
1 | proposed area of review for carbon sequestration; or | ||||||
2 | (3) title to that portion of the proposed area of | ||||||
3 | review and surface estate.
| ||||||
4 | Section 25. Ownership of carbon dioxide; liability. | ||||||
5 | (a) A sequestration operator is liable for any and all | ||||||
6 | damage caused by carbon dioxide or other fluids, including, | ||||||
7 | but not limited to, brine, that are within the sequestration | ||||||
8 | operator's sequestration facility for injection or | ||||||
9 | sequestration or that are otherwise under the sequestration | ||||||
10 | operator's control, including, but not limited to, damage | ||||||
11 | caused by carbon dioxide or other fluids released from the | ||||||
12 | sequestration facility, regardless of who holds title to the | ||||||
13 | carbon dioxide, the pore space, or the surface estate. | ||||||
14 | Liability for damage caused by carbon dioxide that is within a | ||||||
15 | sequestration facility or otherwise within a sequestration | ||||||
16 | operator's control, including carbon dioxide being transferred | ||||||
17 | from a pipeline to the injection well, may be joint and several | ||||||
18 | with a third party adjudicated to have caused or contributed | ||||||
19 | to such damage. The State shall not be liable for any damage | ||||||
20 | caused by carbon dioxide or other fluids within a | ||||||
21 | sequestration facility. A pipeline operator is liable for any | ||||||
22 | and all damage caused by carbon dioxide during transportation, | ||||||
23 | including, but not limited to, damage caused by carbon dioxide | ||||||
24 | released from the pipeline. Liability for damage caused by | ||||||
25 | carbon dioxide during transportation may be joint and several |
| |||||||
| |||||||
1 | with: (i) the entity that owns title to the carbon dioxide if | ||||||
2 | that entity is different from the operator; or (ii) the | ||||||
3 | sequestration operator if damage occurs at the point where | ||||||
4 | carbon dioxide changes control. | ||||||
5 | (b) A sequestration operator is liable for any and all | ||||||
6 | damage or harm that may result from equipment associated with | ||||||
7 | carbon sequestration, including, but not limited to, operation | ||||||
8 | of the equipment. Liability for harms or damage resulting from | ||||||
9 | equipment associated with carbon sequestration, including | ||||||
10 | equipment used to transfer carbon dioxide from the pipeline to | ||||||
11 | the injection well, may be joint and several with a third party | ||||||
12 | adjudicated to have willfully or recklessly caused or | ||||||
13 | contributed to such harms or damage. | ||||||
14 | (c) Title to carbon dioxide sequestered in this State | ||||||
15 | shall not be vested in the owner of the sequestration pore | ||||||
16 | space. Sequestered carbon dioxide is a separate property | ||||||
17 | independent of the sequestration pore space.
| ||||||
18 | Section 30. Carbon transportation and sequestration | ||||||
19 | emergency response fee. In addition to any permit fees | ||||||
20 | required under the Environmental Protection Act, all | ||||||
21 | sequestration operators and pipeline operators who transport | ||||||
22 | or sequester carbon dioxide in this State must pay a fee each | ||||||
23 | year to the Illinois Emergency Management Agency and Office of | ||||||
24 | Homeland Security. The fee shall be deposited into the Carbon | ||||||
25 | Transportation and Sequestration Readiness Fund. The fee |
| |||||||
| |||||||
1 | amount shall be determined by the Illinois Emergency | ||||||
2 | Management Agency and Office of Homeland Security through | ||||||
3 | rulemaking as a set amount (i) per mile of approved pipeline | ||||||
4 | for each carbon dioxide pipeline and, for each approved carbon | ||||||
5 | sequestration project, (ii) per square mile of area of review | ||||||
6 | and (iii) per ton of carbon dioxide sequestered, and shall be | ||||||
7 | based, among other information the Illinois Emergency | ||||||
8 | Management Agency and Office of Homeland Security deems | ||||||
9 | relevant, on the Carbon Dioxide Pipeline Setback Study | ||||||
10 | required by Section 45. The fee shall be adjusted annually for | ||||||
11 | inflation and other relevant factors and shall be in an amount | ||||||
12 | determined by the Illinois Emergency Management Agency and | ||||||
13 | Office of Homeland Security as being more than adequate to | ||||||
14 | fund emergency preparedness and response costs for units of | ||||||
15 | local government through which a carbon dioxide pipeline | ||||||
16 | passes or in which carbon sequestration takes place.
| ||||||
17 | Section 35. Carbon Transportation and Sequestration | ||||||
18 | Readiness Fund. | ||||||
19 | (a) The Carbon Transportation and Sequestration Readiness | ||||||
20 | Fund is established as a special fund in the State treasury. | ||||||
21 | (b) The Fund shall consist of all moneys from fees | ||||||
22 | collected under Section 30, all interest earned on moneys in | ||||||
23 | the Fund, and any additional moneys allocated or appropriated | ||||||
24 | to the Fund by the General Assembly. | ||||||
25 | (c) Moneys in the Fund shall be used only to: |
| |||||||
| |||||||
1 | (1) cover administrative costs of the Illinois | ||||||
2 | Emergency Management Agency and Office of Homeland | ||||||
3 | Security for administration of grants awarded under this | ||||||
4 | Section and costs to the Illinois Emergency Management | ||||||
5 | Agency and Office of Homeland Security and Department for | ||||||
6 | preparing the training materials and offering the training | ||||||
7 | sessions required under Section 40; | ||||||
8 | (2) provide funding to units of local government | ||||||
9 | through which a carbon dioxide pipeline has been proposed | ||||||
10 | or approved or in which carbon sequestration has been | ||||||
11 | proposed or is taking place to enhance emergency | ||||||
12 | preparedness and response capabilities if a carbon dioxide | ||||||
13 | release occurs; allowable expenditures of moneys provided | ||||||
14 | under this paragraph are: | ||||||
15 | (A) preparing emergency response plans for carbon | ||||||
16 | dioxide release; | ||||||
17 | (B) purchasing electric emergency response | ||||||
18 | vehicles; | ||||||
19 | (C) developing or maintaining a text message or | ||||||
20 | other emergency communication alert system; | ||||||
21 | (D) purchasing or maintaining devices that assist | ||||||
22 | in the detection of a carbon dioxide release; | ||||||
23 | (E) purchasing or maintaining equipment for first | ||||||
24 | responders, local residents, and medical facilities | ||||||
25 | that assist in the preparation for, detection of, or | ||||||
26 | response to the release of carbon dioxide or other |
| |||||||
| |||||||
1 | toxic or hazardous materials; and | ||||||
2 | (F) developing, purchasing, or maintaining | ||||||
3 | training and training materials for first responders, | ||||||
4 | local residents, businesses, and other local entities | ||||||
5 | to prepare for and respond to the release of carbon | ||||||
6 | dioxide or other toxic or hazardous materials; | ||||||
7 | (3) fund research to better understand the scope of | ||||||
8 | potential carbon dioxide releases and methods to limit the | ||||||
9 | likelihood of a carbon dioxide release from a pipeline or | ||||||
10 | sequestration facility, including, but not limited to, | ||||||
11 | computer modeling to simulate carbon dioxide leaks from | ||||||
12 | pipelines of varying diameters and lengths. | ||||||
13 | All research funded under paragraph (3) must be included | ||||||
14 | in a report published by the Illinois Emergency Management | ||||||
15 | Agency and Office of Homeland Security on its website, which | ||||||
16 | shall contain recommendations for safety measures to protect | ||||||
17 | communities from carbon dioxide releases, such as hazard | ||||||
18 | zones, setbacks, additional monitoring, or other measures. | ||||||
19 | (d) The Fund shall be administered by the Illinois | ||||||
20 | Emergency Management Agency and Office of Homeland Security. | ||||||
21 | The Illinois Emergency Management Agency and Office of | ||||||
22 | Homeland Security shall issue annual requests for proposals to | ||||||
23 | receive Fund moneys and shall award grants to qualified | ||||||
24 | applicants who meet the criteria under subsection (c) and any | ||||||
25 | other criteria the Illinois Emergency Management Agency and | ||||||
26 | Office of Homeland Security deems necessary for the Fund to |
| |||||||
| |||||||
1 | serve its intended purpose. The Illinois Emergency Management | ||||||
2 | Agency and Office of Homeland Security shall not limit the | ||||||
3 | number of proposals an applicant may submit under this | ||||||
4 | subsection. | ||||||
5 | (e) The Fund is not subject to subsection (c) of Section 5 | ||||||
6 | of the State Finance Act.
| ||||||
7 | Section 40. Training for carbon dioxide emergencies. | ||||||
8 | (a) Within one year after the effective date of this Act, | ||||||
9 | the Illinois Emergency Management Agency and Office of | ||||||
10 | Homeland Security and the Department shall jointly prepare | ||||||
11 | training materials for local emergency responders and medical | ||||||
12 | personnel regarding what to do if carbon dioxide is released | ||||||
13 | from a pipeline or a sequestration facility, including, but | ||||||
14 | not limited to: | ||||||
15 | (1) how to identify a carbon dioxide release; | ||||||
16 | (2) communications protocols to quickly share | ||||||
17 | information about a carbon dioxide release; | ||||||
18 | (3) protocols for locating residents and others in the | ||||||
19 | affected area and, when necessary, transporting residents | ||||||
20 | and others in the affected area out of the area to health | ||||||
21 | care facilities; and | ||||||
22 | (4) symptoms of and treatment for exposure to a carbon | ||||||
23 | dioxide release. | ||||||
24 | (b) Each year, the Department and the Illinois Emergency | ||||||
25 | Management Agency and Office of Homeland Security shall offer |
| |||||||
| |||||||
1 | at least 3 training sessions on emergency response protocols | ||||||
2 | during carbon dioxide releases for emergency responders and | ||||||
3 | medical personnel in any county in which carbon dioxide is | ||||||
4 | proposed to be, or is, transported or sequestered. Unless a | ||||||
5 | health emergency necessitates virtual training only, the | ||||||
6 | training sessions shall be in-person with the option to join | ||||||
7 | remotely and shall be recorded. The recordings shall be | ||||||
8 | maintained on the Illinois Emergency Management Agency and | ||||||
9 | Office of Homeland Security's and Department's publicly | ||||||
10 | available websites. | ||||||
11 | (c) Within one year after the effective date of this Act, | ||||||
12 | the Illinois Emergency Management Agency and Office of | ||||||
13 | Homeland Security and the Department shall jointly prepare | ||||||
14 | training materials for residents, businesses, and other | ||||||
15 | persons and entities located within 2 miles of a carbon | ||||||
16 | dioxide pipeline or above the area of review regarding a | ||||||
17 | carbon dioxide release. The training materials shall include, | ||||||
18 | but are not limited to: | ||||||
19 | (1) how to identify a carbon dioxide release; | ||||||
20 | (2) what to do in the event of a carbon dioxide | ||||||
21 | release; | ||||||
22 | (3) symptoms of exposure to a carbon dioxide release; | ||||||
23 | and | ||||||
24 | (4) recommendations for items residents and other | ||||||
25 | entities may want to purchase or request, including, but | ||||||
26 | not limited to, carbon dioxide monitors and air supply |
| |||||||
| |||||||
1 | respirators. | ||||||
2 | (d) Each year, the Illinois Emergency Management Agency | ||||||
3 | and Office of Homeland Security and the Department, in | ||||||
4 | cooperation with local emergency response personnel, shall | ||||||
5 | offer at least 2 public training sessions for residents and | ||||||
6 | local businesses in every county in which carbon dioxide is | ||||||
7 | proposed to be, or is, transported or sequestered. Unless a | ||||||
8 | health emergency necessitates virtual training only, the | ||||||
9 | training sessions shall be in-person with the option to join | ||||||
10 | remotely and shall be recorded. The recordings shall be | ||||||
11 | maintained on the Illinois Emergency Management Agency and | ||||||
12 | Office of Homeland Security's and Department's publicly | ||||||
13 | available websites. | ||||||
14 | (e) Every 5 years, the Illinois Emergency Management | ||||||
15 | Agency and Office of Homeland Security and the Department | ||||||
16 | shall review and, if appropriate, revise the training | ||||||
17 | materials developed under this Section to incorporate new best | ||||||
18 | practices, technologies, developments, or information that (i) | ||||||
19 | improves emergency response and treatment for carbon dioxide | ||||||
20 | releases and (ii) may assist local residents and businesses to | ||||||
21 | be better prepared in the event of a carbon dioxide release.
| ||||||
22 | Section 45. Carbon Dioxide Pipeline Setback Study. | ||||||
23 | (a) The General Assembly finds and determines that: | ||||||
24 | (1) Carbon dioxide is an asphyxiant. A carbon dioxide | ||||||
25 | leak or rupture from a carbon dioxide pipeline poses a |
| |||||||
| |||||||
1 | risk of grave harm to human health, animals, and the | ||||||
2 | environment. No standards exist to minimize harm to humans | ||||||
3 | and animals in the event of a carbon dioxide pipeline leak | ||||||
4 | or rupture. | ||||||
5 | (2) Further information and analysis is necessary to | ||||||
6 | determine how far carbon dioxide pipelines must be | ||||||
7 | separated from populated and sensitive areas to minimize | ||||||
8 | potential harm to human health, animals, and the | ||||||
9 | environment. | ||||||
10 | (b) Within 3 months of the effective date of this Act of | ||||||
11 | the 103rd General Assembly, the State shall commission a study | ||||||
12 | evaluating how far carbon dioxide pipelines must be separated | ||||||
13 | from residences, hospitals, schools, nursing homes, places of | ||||||
14 | worship, jails, prisons, businesses, industry, other locations | ||||||
15 | where people congregate, and livestock, in order to ensure | ||||||
16 | that (i) a release of carbon dioxide will not intoxicate, | ||||||
17 | asphyxiate, or otherwise harm humans, livestock, or other | ||||||
18 | animals; and (ii) adequate time will be available for the safe | ||||||
19 | and successful evacuation or rescue of people and animals in | ||||||
20 | the event of a pipeline rupture or leak. The study shall: | ||||||
21 | (1) be conducted by the Department, in collaboration | ||||||
22 | with the Agency and the Illinois Emergency Management | ||||||
23 | Agency and Office of Homeland Security; the Department | ||||||
24 | may, at its discretion, contract with a Qualified Third | ||||||
25 | Party to conduct the study in its stead in accordance with | ||||||
26 | this Section; |
| |||||||
| |||||||
1 | (2) Incorporate input from first responders, including | ||||||
2 | both voluntary and paid professionals; law enforcement | ||||||
3 | officials; medical and veterinary professionals; | ||||||
4 | transportation experts; carbon dioxide pipeline engineers; | ||||||
5 | meteorologists; geologists; persons trained in | ||||||
6 | computational fluid dynamic modeling and other modeling of | ||||||
7 | carbon dioxide plumes; County Emergency Management | ||||||
8 | Agencies; township officials; county boards; village | ||||||
9 | boards; city councils; and the general public; | ||||||
10 | (3) Evaluate the effects on humans and livestock of | ||||||
11 | exposure to carbon dioxide resulting from carbon dioxide | ||||||
12 | pipeline ruptures or leaks in a variety of urban, | ||||||
13 | suburban, and rural settings that exist throughout the | ||||||
14 | State, taking into account: | ||||||
15 | (i) a variety of pipeline diameters, including but | ||||||
16 | not limited to pipelines with diameters of 4 inches, | ||||||
17 | 10 inches, 16 inches, 22 inches, 28 inches, 34 inches, | ||||||
18 | and 40 inches; | ||||||
19 | (ii) the placement of crack arrestors and shutoff | ||||||
20 | valves in accordance with the most recent guidelines | ||||||
21 | issued by the federal Pipeline and Hazardous Materials | ||||||
22 | Safety Administration; | ||||||
23 | (iii) the operating pressures and flow rates of | ||||||
24 | pipelines transporting carbon dioxide as (A) a liquid | ||||||
25 | and (B) in supercritical state; | ||||||
26 | (iv) the movement of carbon dioxide in a variety |
| |||||||
| |||||||
1 | of topographies, built environments, and weather | ||||||
2 | conditions including but not limited to variations in | ||||||
3 | temperature, atmospheric pressure, precipitation, and | ||||||
4 | wind speed and direction; and | ||||||
5 | (v) studies and findings of the federal | ||||||
6 | Occupational Safety and Health Administration, the | ||||||
7 | United States Environmental Protection Agency, the | ||||||
8 | National Institute of Occupational Safety and Health, | ||||||
9 | and the Health and Safety Executive of the United | ||||||
10 | Kingdom concerning the health effects of exposure to | ||||||
11 | carbon dioxide at different concentrations and for | ||||||
12 | different durations, including but not limited to | ||||||
13 | those set out in Table B-1 of Appendix B of the United | ||||||
14 | States Environmental Protection Agency's report titled | ||||||
15 | "Carbon Dioxide as a Fire Suppressant: Examining the | ||||||
16 | Risks," EPA430-R-00-002, dated February 2000; the | ||||||
17 | Immediately Dangerous to Life or Health Value for | ||||||
18 | carbon dioxide exposure established by the National | ||||||
19 | Institute for Occupational Safety and Health; and the | ||||||
20 | paper titled "Assessment of the Major Hazard Potential | ||||||
21 | of Carbon Dioxide (CO2)" from the Health and Safety | ||||||
22 | Executive of the United Kingdom; and | ||||||
23 | (4) be completed within 21 months of the effective | ||||||
24 | date of this Act. | ||||||
25 | (c) Within 3 months of completion of the study, the | ||||||
26 | Department or Qualified Third Party shall issue a final report |
| |||||||
| |||||||
1 | containing the following: | ||||||
2 | (1) A summary of the study; | ||||||
3 | (2) Recommended setbacks for each setting and criteria | ||||||
4 | identified in subsection (b)(3), accounting for: | ||||||
5 | (i) varying concentrations of carbon dioxide, | ||||||
6 | duration of exposure, acute health effects, and time | ||||||
7 | consequences of exposure to carbon dioxide; | ||||||
8 | (ii) the time necessary to evacuate or be rescued | ||||||
9 | before oxygen deprivation or toxicity leads to serious | ||||||
10 | health effects, including but not limited to | ||||||
11 | convulsions, unconsciousness, coma, and/or death; | ||||||
12 | (iii) health impacts on, and challenges to | ||||||
13 | evacuation or rescue for, vulnerable populations, | ||||||
14 | including but not limited to: | ||||||
15 | (A)Pregnant women and people with respiratory | ||||||
16 | illness or insufficiency; | ||||||
17 | (B) The elderly, young children, and persons | ||||||
18 | with decreased mobility; and | ||||||
19 | (C) persons who depend primarily on public | ||||||
20 | transportation; | ||||||
21 | (iv) the availability of electric vehicles and | ||||||
22 | other transport options that do not use combustion | ||||||
23 | engines; | ||||||
24 | (v) the potential effects of inclement weather on | ||||||
25 | evacuation and rescue; | ||||||
26 | (vi) the availability of alternate escape routes; |
| |||||||
| |||||||
1 | and | ||||||
2 | (vii) the presence of carbon dioxide on highways | ||||||
3 | or railways; potential impacts on passengers on | ||||||
4 | highways or railways; and measures available to limit | ||||||
5 | passengers' exposure to carbon dioxide present on | ||||||
6 | highways or railways; | ||||||
7 | (3) Recommendations for initial funding amounts | ||||||
8 | sufficient to provide first responders, medical | ||||||
9 | professionals, and local governments the equipment, | ||||||
10 | training, staffing, and other items necessary to carry out | ||||||
11 | safe and timely evacuations and rescues in the event of a | ||||||
12 | pipeline leak or rupture, including but not limited to the | ||||||
13 | equipment required to prevent and treat hypothermia, | ||||||
14 | asphyxia, and toxicity; the funding amounts shall be | ||||||
15 | specified as follows: | ||||||
16 | (i) Different recommended funding amounts shall be | ||||||
17 | provided for pipelines that pass through High | ||||||
18 | Consequence Areas as defined by the federal Pipeline | ||||||
19 | and Hazardous Materials Safety Administration, and | ||||||
20 | carbon dioxide pipelines that do not pass through such | ||||||
21 | areas; | ||||||
22 | (ii) Different recommended funding amounts may be | ||||||
23 | provided for varying circumstances, including, but not | ||||||
24 | limited to, areas with few emergency responders; | ||||||
25 | (4) Recommendations for fees to be required of | ||||||
26 | pipeline operators to ensure availability of the |
| |||||||
| |||||||
1 | necessary funding amounts, and | ||||||
2 | (5) Recommendations for a method to update the | ||||||
3 | total funding amount and fees to account for changing | ||||||
4 | costs, inflation, and other relevant factors. | ||||||
5 | (d) The Department shall determine the costs of conducting | ||||||
6 | the study and preparing the report required by this Section | ||||||
7 | and each permittee authorized to capture, transport, or | ||||||
8 | sequester carbon dioxide in the State shall be required to pay | ||||||
9 | a supplemental fee, determined by the Department, to cover | ||||||
10 | those costs.
| ||||||
11 | Section 50. Carbon Dioxide Capture, Transport, and | ||||||
12 | Sequestration Report. | ||||||
13 | (a) Every 5 years, the Agency shall draft and present to | ||||||
14 | the General Assembly a report on carbon dioxide capture, | ||||||
15 | transport and sequestration in the State. The report shall | ||||||
16 | include, but is not limited to: | ||||||
17 | (i) the locations where carbon dioxide capture, | ||||||
18 | transport, or sequestration is occurring or proposed to | ||||||
19 | occur in the State; | ||||||
20 | (ii) the volume of carbon dioxide captured, | ||||||
21 | transported, and sequestered in the State; | ||||||
22 | (iii) total greenhouse gas emissions associated with | ||||||
23 | the capture, transport, and sequestration of carbon | ||||||
24 | dioxide in the State; | ||||||
25 | (iv) the capture rate of carbon dioxide achieved by |
| |||||||
| |||||||
1 | carbon dioxide capture projects in the State; | ||||||
2 | (v) known leaks or ruptures of any carbon dioxide | ||||||
3 | pipelines in the State, together with any damage, | ||||||
4 | injuries, or deaths associated with any such leaks or | ||||||
5 | ruptures; | ||||||
6 | (vi) known instances of carbon dioxide plumes | ||||||
7 | migrating out of confining zones in the State, together | ||||||
8 | with any contamination or harms associated with any such | ||||||
9 | instances; and | ||||||
10 | (vii) recommendations for legislative changes to | ||||||
11 | improve health or safety impacts associated with the | ||||||
12 | capture, transport, and sequestration of carbon dioxide in | ||||||
13 | the State. | ||||||
14 | (b) The Agency shall determine the costs of preparing the | ||||||
15 | reports required by this Section and each permittee authorized | ||||||
16 | to capture, transport, or sequester carbon dioxide in the | ||||||
17 | State shall be required to pay an annual fee, determined by the | ||||||
18 | Agency, to cover those costs.
| ||||||
19 | Section 55. The State Finance Act is amended by adding | ||||||
20 | Section 5.1015 as follows:
| ||||||
21 | (30 ILCS 105/5.1015 new) | ||||||
22 | Sec. 5.1015. The Carbon Transport and Sequestration | ||||||
23 | Readiness Fund.
|
| |||||||
| |||||||
1 | Section 60. The Illinois Power Agency Act is amended by | ||||||
2 | changing Sections 1-10 and 1-80 as follows:
| ||||||
3 | (20 ILCS 3855/1-10) | ||||||
4 | Sec. 1-10. Definitions. | ||||||
5 | "Agency" means the Illinois Power Agency. | ||||||
6 | "Agency loan agreement" means any agreement pursuant to | ||||||
7 | which the Illinois Finance Authority agrees to loan the | ||||||
8 | proceeds of revenue bonds issued with respect to a project to | ||||||
9 | the Agency upon terms providing for loan repayment | ||||||
10 | installments at least sufficient to pay when due all principal | ||||||
11 | of, interest and premium, if any, on those revenue bonds, and | ||||||
12 | providing for maintenance, insurance, and other matters in | ||||||
13 | respect of the project. | ||||||
14 | "Authority" means the Illinois Finance Authority. | ||||||
15 | "Brownfield site photovoltaic project" means photovoltaics | ||||||
16 | that are either: | ||||||
17 | (1) interconnected to an electric utility as defined | ||||||
18 | in this Section, a municipal utility as defined in this | ||||||
19 | Section, a public utility as defined in Section 3-105 of | ||||||
20 | the Public Utilities Act, or an electric cooperative as | ||||||
21 | defined in Section 3-119 of the Public Utilities Act and | ||||||
22 | located at a site that is regulated by any of the following | ||||||
23 | entities under the following programs: | ||||||
24 | (A) the United States Environmental Protection | ||||||
25 | Agency under the federal Comprehensive Environmental |
| |||||||
| |||||||
1 | Response, Compensation, and Liability Act of 1980, as | ||||||
2 | amended; | ||||||
3 | (B) the United States Environmental Protection | ||||||
4 | Agency under the Corrective Action Program of the | ||||||
5 | federal Resource Conservation and Recovery Act, as | ||||||
6 | amended; | ||||||
7 | (C) the Illinois Environmental Protection Agency | ||||||
8 | under the Illinois Site Remediation Program; or | ||||||
9 | (D) the Illinois Environmental Protection Agency | ||||||
10 | under the Illinois Solid Waste Program; or | ||||||
11 | (2) located at the site of a coal mine that has | ||||||
12 | permanently ceased coal production, permanently halted any | ||||||
13 | re-mining operations, and is no longer accepting any coal | ||||||
14 | combustion residues; has both completed all clean-up and | ||||||
15 | remediation obligations under the federal Surface Mining | ||||||
16 | and Reclamation Act of 1977 and all applicable Illinois | ||||||
17 | rules and any other clean-up, remediation, or ongoing | ||||||
18 | monitoring to safeguard the health and well-being of the | ||||||
19 | people of the State of Illinois, as well as demonstrated | ||||||
20 | compliance with all applicable federal and State | ||||||
21 | environmental rules and regulations, including, but not | ||||||
22 | limited, to 35 Ill. Adm. Code Part 845 and any rules for | ||||||
23 | historic fill of coal combustion residuals, including any | ||||||
24 | rules finalized in Subdocket A of Illinois Pollution | ||||||
25 | Control Board docket R2020-019. | ||||||
26 | "Clean coal facility" means an electric generating |
| |||||||
| |||||||
1 | facility that uses primarily coal as a feedstock and that | ||||||
2 | captures and sequesters carbon dioxide emissions at the | ||||||
3 | following levels: at least 50% of the total carbon dioxide | ||||||
4 | emissions that the facility would otherwise emit if, at the | ||||||
5 | time construction commences, the facility is scheduled to | ||||||
6 | commence operation before 2016, at least 70% of the total | ||||||
7 | carbon dioxide emissions that the facility would otherwise | ||||||
8 | emit if, at the time construction commences, the facility is | ||||||
9 | scheduled to commence operation during 2016 or 2017, and at | ||||||
10 | least 90% of the total carbon dioxide emissions that the | ||||||
11 | facility would otherwise emit if, at the time construction | ||||||
12 | commences, the facility is scheduled to commence operation | ||||||
13 | after 2017. The power block of the clean coal facility shall | ||||||
14 | not exceed allowable emission rates for sulfur dioxide, | ||||||
15 | nitrogen oxides, carbon monoxide, particulates and mercury for | ||||||
16 | a natural gas-fired combined-cycle facility the same size as | ||||||
17 | and in the same location as the clean coal facility at the time | ||||||
18 | the clean coal facility obtains an approved air permit. All | ||||||
19 | coal used by a clean coal facility shall have high volatile | ||||||
20 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
21 | million Btu content, unless the clean coal facility does not | ||||||
22 | use gasification technology and was operating as a | ||||||
23 | conventional coal-fired electric generating facility on June | ||||||
24 | 1, 2009 (the effective date of Public Act 95-1027). | ||||||
25 | "Clean coal SNG brownfield facility" means a facility that | ||||||
26 | (1) has commenced construction by July 1, 2015 on an urban |
| |||||||
| |||||||
1 | brownfield site in a municipality with at least 1,000,000 | ||||||
2 | residents; (2) uses a gasification process to produce | ||||||
3 | substitute natural gas; (3) uses coal as at least 50% of the | ||||||
4 | total feedstock over the term of any sourcing agreement with a | ||||||
5 | utility and the remainder of the feedstock may be either | ||||||
6 | petroleum coke or coal, with all such coal having a high | ||||||
7 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
8 | million Btu content unless the facility reasonably determines | ||||||
9 | that it is necessary to use additional petroleum coke to | ||||||
10 | deliver additional consumer savings, in which case the | ||||||
11 | facility shall use coal for at least 35% of the total feedstock | ||||||
12 | over the term of any sourcing agreement; and (4) captures and | ||||||
13 | sequesters at least 85% of the total carbon dioxide emissions | ||||||
14 | that the facility would otherwise emit. | ||||||
15 | "Clean coal SNG facility" means a facility that uses a | ||||||
16 | gasification process to produce substitute natural gas, that | ||||||
17 | sequesters at least 90% of the total carbon dioxide emissions | ||||||
18 | that the facility would otherwise emit, that uses at least 90% | ||||||
19 | coal as a feedstock, with all such coal having a high | ||||||
20 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
21 | million Btu content, and that has a valid and effective permit | ||||||
22 | to construct emission sources and air pollution control | ||||||
23 | equipment and approval with respect to the federal regulations | ||||||
24 | for Prevention of Significant Deterioration of Air Quality | ||||||
25 | (PSD) for the plant pursuant to the federal Clean Air Act; | ||||||
26 | provided, however, a clean coal SNG brownfield facility shall |
| |||||||
| |||||||
1 | not be a clean coal SNG facility. | ||||||
2 | "Clean energy" means energy generation that is 90% or | ||||||
3 | greater free of carbon dioxide emissions. | ||||||
4 | "Commission" means the Illinois Commerce Commission. | ||||||
5 | "Community renewable generation project" means an electric | ||||||
6 | generating facility that: | ||||||
7 | (1) is powered by wind, solar thermal energy, | ||||||
8 | photovoltaic cells or panels, biodiesel, crops and | ||||||
9 | untreated and unadulterated organic waste biomass, and | ||||||
10 | hydropower that does not involve new construction of dams; | ||||||
11 | (2) is interconnected at the distribution system level | ||||||
12 | of an electric utility as defined in this Section, a | ||||||
13 | municipal utility as defined in this Section that owns or | ||||||
14 | operates electric distribution facilities, a public | ||||||
15 | utility as defined in Section 3-105 of the Public | ||||||
16 | Utilities Act, or an electric cooperative, as defined in | ||||||
17 | Section 3-119 of the Public Utilities Act; | ||||||
18 | (3) credits the value of electricity generated by the | ||||||
19 | facility to the subscribers of the facility; and | ||||||
20 | (4) is limited in nameplate capacity to less than or | ||||||
21 | equal to 5,000 kilowatts. | ||||||
22 | "Costs incurred in connection with the development and | ||||||
23 | construction of a facility" means: | ||||||
24 | (1) the cost of acquisition of all real property, | ||||||
25 | fixtures, and improvements in connection therewith and | ||||||
26 | equipment, personal property, and other property, rights, |
| |||||||
| |||||||
1 | and easements acquired that are deemed necessary for the | ||||||
2 | operation and maintenance of the facility; | ||||||
3 | (2) financing costs with respect to bonds, notes, and | ||||||
4 | other evidences of indebtedness of the Agency; | ||||||
5 | (3) all origination, commitment, utilization, | ||||||
6 | facility, placement, underwriting, syndication, credit | ||||||
7 | enhancement, and rating agency fees; | ||||||
8 | (4) engineering, design, procurement, consulting, | ||||||
9 | legal, accounting, title insurance, survey, appraisal, | ||||||
10 | escrow, trustee, collateral agency, interest rate hedging, | ||||||
11 | interest rate swap, capitalized interest, contingency, as | ||||||
12 | required by lenders, and other financing costs, and other | ||||||
13 | expenses for professional services; and | ||||||
14 | (5) the costs of plans, specifications, site study and | ||||||
15 | investigation, installation, surveys, other Agency costs | ||||||
16 | and estimates of costs, and other expenses necessary or | ||||||
17 | incidental to determining the feasibility of any project, | ||||||
18 | together with such other expenses as may be necessary or | ||||||
19 | incidental to the financing, insuring, acquisition, and | ||||||
20 | construction of a specific project and starting up, | ||||||
21 | commissioning, and placing that project in operation. | ||||||
22 | "Delivery services" has the same definition as found in | ||||||
23 | Section 16-102 of the Public Utilities Act. | ||||||
24 | "Delivery year" means the consecutive 12-month period | ||||||
25 | beginning June 1 of a given year and ending May 31 of the | ||||||
26 | following year. |
| |||||||
| |||||||
1 | "Department" means the Department of Commerce and Economic | ||||||
2 | Opportunity. | ||||||
3 | "Director" means the Director of the Illinois Power | ||||||
4 | Agency. | ||||||
5 | "Demand-response" means measures that decrease peak | ||||||
6 | electricity demand or shift demand from peak to off-peak | ||||||
7 | periods. | ||||||
8 | "Distributed renewable energy generation device" means a | ||||||
9 | device that is: | ||||||
10 | (1) powered by wind, solar thermal energy, | ||||||
11 | photovoltaic cells or panels, biodiesel, crops and | ||||||
12 | untreated and unadulterated organic waste biomass, tree | ||||||
13 | waste, and hydropower that does not involve new | ||||||
14 | construction of dams, waste heat to power systems, or | ||||||
15 | qualified combined heat and power systems; | ||||||
16 | (2) interconnected at the distribution system level of | ||||||
17 | either an electric utility as defined in this Section, a | ||||||
18 | municipal utility as defined in this Section that owns or | ||||||
19 | operates electric distribution facilities, or a rural | ||||||
20 | electric cooperative as defined in Section 3-119 of the | ||||||
21 | Public Utilities Act; | ||||||
22 | (3) located on the customer side of the customer's | ||||||
23 | electric meter and is primarily used to offset that | ||||||
24 | customer's electricity load; and | ||||||
25 | (4) (blank). | ||||||
26 | "Energy efficiency" means measures that reduce the amount |
| |||||||
| |||||||
1 | of electricity or natural gas consumed in order to achieve a | ||||||
2 | given end use. "Energy efficiency" includes voltage | ||||||
3 | optimization measures that optimize the voltage at points on | ||||||
4 | the electric distribution voltage system and thereby reduce | ||||||
5 | electricity consumption by electric customers' end use | ||||||
6 | devices. "Energy efficiency" also includes measures that | ||||||
7 | reduce the total Btus of electricity, natural gas, and other | ||||||
8 | fuels needed to meet the end use or uses. | ||||||
9 | "Electric utility" has the same definition as found in | ||||||
10 | Section 16-102 of the Public Utilities Act. | ||||||
11 | "Equity investment eligible community" or "eligible | ||||||
12 | community" are synonymous and mean the geographic areas | ||||||
13 | throughout Illinois which would most benefit from equitable | ||||||
14 | investments by the State designed to combat discrimination. | ||||||
15 | Specifically, the eligible communities shall be defined as the | ||||||
16 | following areas: | ||||||
17 | (1) R3 Areas as established pursuant to Section 10-40 | ||||||
18 | of the Cannabis Regulation and Tax Act, where residents | ||||||
19 | have historically been excluded from economic | ||||||
20 | opportunities, including opportunities in the energy | ||||||
21 | sector; and | ||||||
22 | (2) environmental justice communities, as defined by | ||||||
23 | the Illinois Power Agency pursuant to the Illinois Power | ||||||
24 | Agency Act, where residents have historically been subject | ||||||
25 | to disproportionate burdens of pollution, including | ||||||
26 | pollution from the energy sector. |
| |||||||
| |||||||
1 | "Equity eligible persons" or "eligible persons" means | ||||||
2 | persons who would most benefit from equitable investments by | ||||||
3 | the State designed to combat discrimination, specifically: | ||||||
4 | (1) persons who graduate from or are current or former | ||||||
5 | participants in the Clean Jobs Workforce Network Program, | ||||||
6 | the Clean Energy Contractor Incubator Program, the | ||||||
7 | Illinois Climate Works Preapprenticeship Program, | ||||||
8 | Returning Residents Clean Jobs Training Program, or the | ||||||
9 | Clean Energy Primes Contractor Accelerator Program, and | ||||||
10 | the solar training pipeline and multi-cultural jobs | ||||||
11 | program created in paragraphs (a)(1) and (a)(3) of Section | ||||||
12 | 16-208.12 of the Public Utilities Act; | ||||||
13 | (2) persons who are graduates of or currently enrolled | ||||||
14 | in the foster care system; | ||||||
15 | (3) persons who were formerly incarcerated; | ||||||
16 | (4) persons whose primary residence is in an equity | ||||||
17 | investment eligible community. | ||||||
18 | "Equity eligible contractor" means a business that is | ||||||
19 | majority-owned by eligible persons, or a nonprofit or | ||||||
20 | cooperative that is majority-governed by eligible persons, or | ||||||
21 | is a natural person that is an eligible person offering | ||||||
22 | personal services as an independent contractor. | ||||||
23 | "Facility" means an electric generating unit or a | ||||||
24 | co-generating unit that produces electricity along with | ||||||
25 | related equipment necessary to connect the facility to an | ||||||
26 | electric transmission or distribution system. |
| |||||||
| |||||||
1 | "General contractor" means the entity or organization with | ||||||
2 | main responsibility for the building of a construction project | ||||||
3 | and who is the party signing the prime construction contract | ||||||
4 | for the project. | ||||||
5 | "Governmental aggregator" means one or more units of local | ||||||
6 | government that individually or collectively procure | ||||||
7 | electricity to serve residential retail electrical loads | ||||||
8 | located within its or their jurisdiction. | ||||||
9 | "High voltage direct current converter station" means the | ||||||
10 | collection of equipment that converts direct current energy | ||||||
11 | from a high voltage direct current transmission line into | ||||||
12 | alternating current using Voltage Source Conversion technology | ||||||
13 | and that is interconnected with transmission or distribution | ||||||
14 | assets located in Illinois. | ||||||
15 | "High voltage direct current renewable energy credit" | ||||||
16 | means a renewable energy credit associated with a renewable | ||||||
17 | energy resource where the renewable energy resource has | ||||||
18 | entered into a contract to transmit the energy associated with | ||||||
19 | such renewable energy credit over high voltage direct current | ||||||
20 | transmission facilities. | ||||||
21 | "High voltage direct current transmission facilities" | ||||||
22 | means the collection of installed equipment that converts | ||||||
23 | alternating current energy in one location to direct current | ||||||
24 | and transmits that direct current energy to a high voltage | ||||||
25 | direct current converter station using Voltage Source | ||||||
26 | Conversion technology. "High voltage direct current |
| |||||||
| |||||||
1 | transmission facilities" includes the high voltage direct | ||||||
2 | current converter station itself and associated high voltage | ||||||
3 | direct current transmission lines. Notwithstanding the | ||||||
4 | preceding, after September 15, 2021 (the effective date of | ||||||
5 | Public Act 102-662), an otherwise qualifying collection of | ||||||
6 | equipment does not qualify as high voltage direct current | ||||||
7 | transmission facilities unless its developer entered into a | ||||||
8 | project labor agreement, is capable of transmitting | ||||||
9 | electricity at 525kv with an Illinois converter station | ||||||
10 | located and interconnected in the region of the PJM | ||||||
11 | Interconnection, LLC, and the system does not operate as a | ||||||
12 | public utility, as that term is defined in Section 3-105 of the | ||||||
13 | Public Utilities Act. | ||||||
14 | "Hydropower" means any method of electricity generation or | ||||||
15 | storage that results from the flow of water, including | ||||||
16 | impoundment facilities, diversion facilities, and pumped | ||||||
17 | storage facilities. | ||||||
18 | "Index price" means the real-time energy settlement price | ||||||
19 | at the applicable Illinois trading hub, such as PJM-NIHUB or | ||||||
20 | MISO-IL, for a given settlement period. | ||||||
21 | "Indexed renewable energy credit" means a tradable credit | ||||||
22 | that represents the environmental attributes of one megawatt | ||||||
23 | hour of energy produced from a renewable energy resource, the | ||||||
24 | price of which shall be calculated by subtracting the strike | ||||||
25 | price offered by a new utility-scale wind project or a new | ||||||
26 | utility-scale photovoltaic project from the index price in a |
| |||||||
| |||||||
1 | given settlement period. | ||||||
2 | "Indexed renewable energy credit counterparty" has the | ||||||
3 | same meaning as "public utility" as defined in Section 3-105 | ||||||
4 | of the Public Utilities Act. | ||||||
5 | "Local government" means a unit of local government as | ||||||
6 | defined in Section 1 of Article VII of the Illinois | ||||||
7 | Constitution. | ||||||
8 | "Modernized" or "retooled" means the construction, repair, | ||||||
9 | maintenance, or significant expansion of turbines and existing | ||||||
10 | hydropower dams. | ||||||
11 | "Municipality" means a city, village, or incorporated | ||||||
12 | town. | ||||||
13 | "Municipal utility" means a public utility owned and | ||||||
14 | operated by any subdivision or municipal corporation of this | ||||||
15 | State. | ||||||
16 | "Nameplate capacity" means the aggregate inverter | ||||||
17 | nameplate capacity in kilowatts AC. | ||||||
18 | "Person" means any natural person, firm, partnership, | ||||||
19 | corporation, either domestic or foreign, company, association, | ||||||
20 | limited liability company, joint stock company, or association | ||||||
21 | and includes any trustee, receiver, assignee, or personal | ||||||
22 | representative thereof. | ||||||
23 | "Project" means the planning, bidding, and construction of | ||||||
24 | a facility. | ||||||
25 | "Project labor agreement" means a pre-hire collective | ||||||
26 | bargaining agreement that covers all terms and conditions of |
| |||||||
| |||||||
1 | employment on a specific construction project and must include | ||||||
2 | the following: | ||||||
3 | (1) provisions establishing the minimum hourly wage | ||||||
4 | for each class of labor organization employee; | ||||||
5 | (2) provisions establishing the benefits and other | ||||||
6 | compensation for each class of labor organization | ||||||
7 | employee; | ||||||
8 | (3) provisions establishing that no strike or disputes | ||||||
9 | will be engaged in by the labor organization employees; | ||||||
10 | (4) provisions establishing that no lockout or | ||||||
11 | disputes will be engaged in by the general contractor | ||||||
12 | building the project; and | ||||||
13 | (5) provisions for minorities and women, as defined | ||||||
14 | under the Business Enterprise for Minorities, Women, and | ||||||
15 | Persons with Disabilities Act, setting forth goals for | ||||||
16 | apprenticeship hours to be performed by minorities and | ||||||
17 | women and setting forth goals for total hours to be | ||||||
18 | performed by underrepresented minorities and women. | ||||||
19 | A labor organization and the general contractor building | ||||||
20 | the project shall have the authority to include other terms | ||||||
21 | and conditions as they deem necessary. | ||||||
22 | "Public utility" has the same definition as found in | ||||||
23 | Section 3-105 of the Public Utilities Act. | ||||||
24 | "Qualified combined heat and power systems" means systems | ||||||
25 | that, either simultaneously or sequentially, produce | ||||||
26 | electricity and useful thermal energy from a single fuel |
| |||||||
| |||||||
1 | source. Such systems are eligible for "renewable energy | ||||||
2 | credits" in an amount equal to its total energy output where a | ||||||
3 | renewable fuel is consumed or in an amount equal to the net | ||||||
4 | reduction in nonrenewable fuel consumed on a total energy | ||||||
5 | output basis. | ||||||
6 | "Real property" means any interest in land together with | ||||||
7 | all structures, fixtures, and improvements thereon, including | ||||||
8 | lands under water and riparian rights, any easements, | ||||||
9 | covenants, licenses, leases, rights-of-way, uses, and other | ||||||
10 | interests, together with any liens, judgments, mortgages, or | ||||||
11 | other claims or security interests related to real property. | ||||||
12 | "Renewable energy credit" means a tradable credit that | ||||||
13 | represents the environmental attributes of one megawatt hour | ||||||
14 | of energy produced from a renewable energy resource. | ||||||
15 | "Renewable energy resources" includes energy and its | ||||||
16 | associated renewable energy credit or renewable energy credits | ||||||
17 | from wind, solar thermal energy, photovoltaic cells and | ||||||
18 | panels, biodiesel, anaerobic digestion, crops and untreated | ||||||
19 | and unadulterated organic waste biomass, and hydropower that | ||||||
20 | does not involve new construction of dams, waste heat to power | ||||||
21 | systems, or qualified combined heat and power systems. For | ||||||
22 | purposes of this Act, landfill gas produced in the State is | ||||||
23 | considered a renewable energy resource. "Renewable energy | ||||||
24 | resources" does not include the incineration or burning of | ||||||
25 | tires, garbage, general household, institutional, and | ||||||
26 | commercial waste, industrial lunchroom or office waste, |
| |||||||
| |||||||
1 | landscape waste, railroad crossties, utility poles, or | ||||||
2 | construction or demolition debris, other than untreated and | ||||||
3 | unadulterated waste wood. "Renewable energy resources" also | ||||||
4 | includes high voltage direct current renewable energy credits | ||||||
5 | and the associated energy converted to alternating current by | ||||||
6 | a high voltage direct current converter station to the extent | ||||||
7 | that: (1) the generator of such renewable energy resource | ||||||
8 | contracted with a third party to transmit the energy over the | ||||||
9 | high voltage direct current transmission facilities, and (2) | ||||||
10 | the third-party contracting for delivery of renewable energy | ||||||
11 | resources over the high voltage direct current transmission | ||||||
12 | facilities have ownership rights over the unretired associated | ||||||
13 | high voltage direct current renewable energy credit. | ||||||
14 | "Retail customer" has the same definition as found in | ||||||
15 | Section 16-102 of the Public Utilities Act. | ||||||
16 | "Revenue bond" means any bond, note, or other evidence of | ||||||
17 | indebtedness issued by the Authority, the principal and | ||||||
18 | interest of which is payable solely from revenues or income | ||||||
19 | derived from any project or activity of the Agency. | ||||||
20 | "Sequester" means permanent storage of carbon dioxide by | ||||||
21 | injecting it into a saline aquifer, a depleted gas reservoir, | ||||||
22 | or other pore space or an oil reservoir, directly or through an | ||||||
23 | enhanced oil recovery process that may involve intermediate | ||||||
24 | storage, regardless of whether these activities are conducted | ||||||
25 | by a clean coal facility, a clean coal SNG facility, a clean | ||||||
26 | coal SNG brownfield facility, or a party with which a clean |
| |||||||
| |||||||
1 | coal facility, clean coal SNG facility, or clean coal SNG | ||||||
2 | brownfield facility has contracted for such purposes . | ||||||
3 | "Service area" has the same definition as found in Section | ||||||
4 | 16-102 of the Public Utilities Act. | ||||||
5 | "Settlement period" means the period of time utilized by | ||||||
6 | MISO and PJM and their successor organizations as the basis | ||||||
7 | for settlement calculations in the real-time energy market. | ||||||
8 | "Sourcing agreement" means (i) in the case of an electric | ||||||
9 | utility, an agreement between the owner of a clean coal | ||||||
10 | facility and such electric utility, which agreement shall have | ||||||
11 | terms and conditions meeting the requirements of paragraph (3) | ||||||
12 | of subsection (d) of Section 1-75, (ii) in the case of an | ||||||
13 | alternative retail electric supplier, an agreement between the | ||||||
14 | owner of a clean coal facility and such alternative retail | ||||||
15 | electric supplier, which agreement shall have terms and | ||||||
16 | conditions meeting the requirements of Section 16-115(d)(5) of | ||||||
17 | the Public Utilities Act, and (iii) in case of a gas utility, | ||||||
18 | an agreement between the owner of a clean coal SNG brownfield | ||||||
19 | facility and the gas utility, which agreement shall have the | ||||||
20 | terms and conditions meeting the requirements of subsection | ||||||
21 | (h-1) of Section 9-220 of the Public Utilities Act. | ||||||
22 | "Strike price" means a contract price for energy and | ||||||
23 | renewable energy credits from a new utility-scale wind project | ||||||
24 | or a new utility-scale photovoltaic project. | ||||||
25 | "Subscriber" means a person who (i) takes delivery service | ||||||
26 | from an electric utility, and (ii) has a subscription of no |
| |||||||
| |||||||
1 | less than 200 watts to a community renewable generation | ||||||
2 | project that is located in the electric utility's service | ||||||
3 | area. No subscriber's subscriptions may total more than 40% of | ||||||
4 | the nameplate capacity of an individual community renewable | ||||||
5 | generation project. Entities that are affiliated by virtue of | ||||||
6 | a common parent shall not represent multiple subscriptions | ||||||
7 | that total more than 40% of the nameplate capacity of an | ||||||
8 | individual community renewable generation project. | ||||||
9 | "Subscription" means an interest in a community renewable | ||||||
10 | generation project expressed in kilowatts, which is sized | ||||||
11 | primarily to offset part or all of the subscriber's | ||||||
12 | electricity usage. | ||||||
13 | "Substitute natural gas" or "SNG" means a gas manufactured | ||||||
14 | by gasification of hydrocarbon feedstock, which is | ||||||
15 | substantially interchangeable in use and distribution with | ||||||
16 | conventional natural gas. | ||||||
17 | "Total resource cost test" or "TRC test" means a standard | ||||||
18 | that is met if, for an investment in energy efficiency or | ||||||
19 | demand-response measures, the benefit-cost ratio is greater | ||||||
20 | than one. The benefit-cost ratio is the ratio of the net | ||||||
21 | present value of the total benefits of the program to the net | ||||||
22 | present value of the total costs as calculated over the | ||||||
23 | lifetime of the measures. A total resource cost test compares | ||||||
24 | the sum of avoided electric utility costs, representing the | ||||||
25 | benefits that accrue to the system and the participant in the | ||||||
26 | delivery of those efficiency measures and including avoided |
| |||||||
| |||||||
1 | costs associated with reduced use of natural gas or other | ||||||
2 | fuels, avoided costs associated with reduced water | ||||||
3 | consumption, and avoided costs associated with reduced | ||||||
4 | operation and maintenance costs, as well as other quantifiable | ||||||
5 | societal benefits, to the sum of all incremental costs of | ||||||
6 | end-use measures that are implemented due to the program | ||||||
7 | (including both utility and participant contributions), plus | ||||||
8 | costs to administer, deliver, and evaluate each demand-side | ||||||
9 | program, to quantify the net savings obtained by substituting | ||||||
10 | the demand-side program for supply resources. In calculating | ||||||
11 | avoided costs of power and energy that an electric utility | ||||||
12 | would otherwise have had to acquire, reasonable estimates | ||||||
13 | shall be included of financial costs likely to be imposed by | ||||||
14 | future regulations and legislation on emissions of greenhouse | ||||||
15 | gases. In discounting future societal costs and benefits for | ||||||
16 | the purpose of calculating net present values, a societal | ||||||
17 | discount rate based on actual, long-term Treasury bond yields | ||||||
18 | should be used. Notwithstanding anything to the contrary, the | ||||||
19 | TRC test shall not include or take into account a calculation | ||||||
20 | of market price suppression effects or demand reduction | ||||||
21 | induced price effects. | ||||||
22 | "Utility-scale solar project" means an electric generating | ||||||
23 | facility that: | ||||||
24 | (1) generates electricity using photovoltaic cells; | ||||||
25 | and | ||||||
26 | (2) has a nameplate capacity that is greater than |
| |||||||
| |||||||
1 | 5,000 kilowatts. | ||||||
2 | "Utility-scale wind project" means an electric generating | ||||||
3 | facility that: | ||||||
4 | (1) generates electricity using wind; and | ||||||
5 | (2) has a nameplate capacity that is greater than | ||||||
6 | 5,000 kilowatts. | ||||||
7 | "Waste Heat to Power Systems" means systems that capture | ||||||
8 | and generate electricity from energy that would otherwise be | ||||||
9 | lost to the atmosphere without the use of additional fuel. | ||||||
10 | "Zero emission credit" means a tradable credit that | ||||||
11 | represents the environmental attributes of one megawatt hour | ||||||
12 | of energy produced from a zero emission facility. | ||||||
13 | "Zero emission facility" means a facility that: (1) is | ||||||
14 | fueled by nuclear power; and (2) is interconnected with PJM | ||||||
15 | Interconnection, LLC or the Midcontinent Independent System | ||||||
16 | Operator, Inc., or their successors. | ||||||
17 | (Source: P.A. 102-662, eff. 9-15-21; 103-154, eff. 6-28-23; | ||||||
18 | 103-380, eff. 1-1-24 .)
| ||||||
19 | (20 ILCS 3855/1-80) | ||||||
20 | Sec. 1-80. Resource Development Bureau. Upon its | ||||||
21 | establishment by the Agency, the Resource Development Bureau | ||||||
22 | has the following duties and responsibilities: | ||||||
23 | (a) At the Agency's discretion, conduct feasibility | ||||||
24 | studies on the construction of any facility. Funding for a | ||||||
25 | study shall come from either: |
| |||||||
| |||||||
1 | (i) fees assessed by the Agency on municipal | ||||||
2 | electric systems, governmental aggregators, unit or | ||||||
3 | units of local government, or rural electric | ||||||
4 | cooperatives requesting the feasibility study; or | ||||||
5 | (ii) an appropriation from the General Assembly. | ||||||
6 | (b) If the Agency undertakes the construction of a | ||||||
7 | facility, moneys generated from the sale of revenue bonds | ||||||
8 | by the Authority for the facility shall be used to | ||||||
9 | reimburse the source of the money used for the facility's | ||||||
10 | feasibility study. | ||||||
11 | (c) The Agency may develop, finance, construct, or | ||||||
12 | operate electric generation and co-generation facilities | ||||||
13 | that use indigenous coal or renewable resources , or both, | ||||||
14 | financed with bonds issued by the Authority on behalf of | ||||||
15 | the Agency. Any such facility that uses coal must be a | ||||||
16 | clean coal facility and must be constructed in a location | ||||||
17 | where the geology is suitable for carbon sequestration. | ||||||
18 | The Agency may also develop, finance, construct, or | ||||||
19 | operate a carbon sequestration facility. | ||||||
20 | (1) The Agency may enter into contractual | ||||||
21 | arrangements with private and public entities, | ||||||
22 | including but not limited to municipal electric | ||||||
23 | systems, governmental aggregators, and rural electric | ||||||
24 | cooperatives, to plan, site, construct, improve, | ||||||
25 | rehabilitate, and operate those electric generation | ||||||
26 | and co-generation facilities. No contract shall be |
| |||||||
| |||||||
1 | entered into by the Agency that would jeopardize the | ||||||
2 | tax-exempt status of any bond issued in connection | ||||||
3 | with a project for which the Agency entered into the | ||||||
4 | contract. | ||||||
5 | (2) The Agency shall hold at least one public | ||||||
6 | hearing before entering into any such contractual | ||||||
7 | arrangements. At least 30-days' notice of the hearing | ||||||
8 | shall be given by publication once in each week during | ||||||
9 | that period in 6 newspapers within the State, at least | ||||||
10 | one of which has a circulation area that includes the | ||||||
11 | location of the proposed facility. | ||||||
12 | (3) (Blank). The first facility that the Agency | ||||||
13 | develops, finances, or constructs shall be a facility | ||||||
14 | that uses coal produced in Illinois. The Agency may, | ||||||
15 | however, also develop, finance, or construct renewable | ||||||
16 | energy facilities after work on the first facility has | ||||||
17 | commenced. | ||||||
18 | (4) The Agency may not develop, finance, or | ||||||
19 | construct a nuclear power plant. | ||||||
20 | (5) The Agency shall assess fees to applicants | ||||||
21 | seeking to partner with the Agency on projects. | ||||||
22 | (d) Use of electricity generated by the Agency's | ||||||
23 | facilities. The Agency may supply electricity produced by | ||||||
24 | the Agency's facilities to municipal electric systems, | ||||||
25 | governmental aggregators, or rural electric cooperatives | ||||||
26 | in Illinois. The electricity shall be supplied at cost. |
| |||||||
| |||||||
1 | (1) Contracts to supply power and energy from the | ||||||
2 | Agency's facilities shall provide for the effectuation | ||||||
3 | of the policies set forth in this Act. | ||||||
4 | (2) The contracts shall also provide that, | ||||||
5 | notwithstanding any provision in the Public Utilities | ||||||
6 | Act, entities supplied with power and energy from an | ||||||
7 | Agency facility shall supply the power and energy to | ||||||
8 | retail customers at the same price paid to purchase | ||||||
9 | power and energy from the Agency. | ||||||
10 | (e) Electric utilities shall not be required to purchase | ||||||
11 | electricity directly or indirectly from facilities developed | ||||||
12 | or sponsored by the Agency. | ||||||
13 | (f) The Agency may sell excess capacity and excess energy | ||||||
14 | into the wholesale electric market at prevailing market rates; | ||||||
15 | provided, however, the Agency may not sell excess capacity or | ||||||
16 | excess energy through the procurement process described in | ||||||
17 | Section 16-111.5 of the Public Utilities Act. | ||||||
18 | (g) The Agency shall not directly sell electric power and | ||||||
19 | energy to retail customers. Nothing in this paragraph shall be | ||||||
20 | construed to prohibit sales to municipal electric systems, | ||||||
21 | governmental aggregators, or rural electric cooperatives. | ||||||
22 | (Source: P.A. 99-536, eff. 7-8-16.)
| ||||||
23 | Section 65. The Carbon Dioxide Transportation and | ||||||
24 | Sequestration Act is amended by changing Sections 10, 15, and | ||||||
25 | 20 as follows:
|
| |||||||
| |||||||
1 | (220 ILCS 75/10) | ||||||
2 | Sec. 10. Definitions. As used in this Act: | ||||||
3 | "Carbon dioxide pipeline" or "pipeline" has the meaning | ||||||
4 | given to those terms in Section 10 of the Carbon Dioxide | ||||||
5 | Transport and Storage Protections Act means the in-state | ||||||
6 | portion of a pipeline, including appurtenant facilities, | ||||||
7 | property rights, and easements, that are used exclusively for | ||||||
8 | the purpose of transporting carbon dioxide to a point of sale, | ||||||
9 | storage, enhanced oil recovery, or other carbon management | ||||||
10 | application . | ||||||
11 | "Clean coal facility" has the meaning ascribed to that | ||||||
12 | term in Section 1-10 of the Illinois Power Agency Act. | ||||||
13 | "Clean coal SNG facility" has the meaning ascribed to that | ||||||
14 | term in Section 1-10 of the Illinois Power Agency Act. | ||||||
15 | "Commission" means the Illinois Commerce Commission. | ||||||
16 | "Sequester" has the meaning ascribed to that term in | ||||||
17 | Section 1-10 of the Illinois Power Agency Act. | ||||||
18 | "Transportation" or "transport" has the meaning given to | ||||||
19 | those terms in Section 10 of the Carbon Dioxide Transport and | ||||||
20 | Storage Protections Act means the physical movement of carbon | ||||||
21 | dioxide by pipeline conducted for a person's own use or | ||||||
22 | account or the use or account of another person or persons . | ||||||
23 | (Source: P.A. 97-534, eff. 8-23-11.)
| ||||||
24 | (220 ILCS 75/15) |
| |||||||
| |||||||
1 | Sec. 15. Scope. This Act applies to the application | ||||||
2 | process for the issuance of a certificate of authority by an | ||||||
3 | owner or operator of a pipeline designed, constructed, and | ||||||
4 | operated to transport and to sequester carbon dioxide produced | ||||||
5 | by a clean coal facility, by a clean coal SNG facility, or by | ||||||
6 | any other source that will result in the reduction of carbon | ||||||
7 | dioxide emissions from that source . | ||||||
8 | (Source: P.A. 97-534, eff. 8-23-11.)
| ||||||
9 | (220 ILCS 75/20) | ||||||
10 | Sec. 20. Application. | ||||||
11 | (a) No person or entity may construct, operate, or repair | ||||||
12 | a carbon dioxide pipeline unless the person or entity | ||||||
13 | possesses a certificate of authority. | ||||||
14 | (a-5) Before filing an application for a certificate of | ||||||
15 | authority with the Commission, a person or entity seeking the | ||||||
16 | certificate must: | ||||||
17 | (1) obtain the following documents: | ||||||
18 | (A) a carbon dioxide pipeline routing permit | ||||||
19 | issued by the Illinois Environmental Protection Agency | ||||||
20 | under Section 9.21 of the Environmental Protection | ||||||
21 | Act; | ||||||
22 | (B) if the carbon dioxide to be transported by the | ||||||
23 | pipeline will be sequestered in the State, a carbon | ||||||
24 | dioxide sequestration permit issued by the Illinois | ||||||
25 | Environmental Protection Agency under Section 22.64 of |
| |||||||
| |||||||
1 | the Environmental Protection Act; | ||||||
2 | (C) if the carbon dioxide to be transported by the | ||||||
3 | pipeline will be sequestered outside of the State, a | ||||||
4 | Class VI carbon dioxide injection permit issued by the | ||||||
5 | United States Environmental Protection Agency under | ||||||
6 | the federal Safe Drinking Water Act; | ||||||
7 | (D) if the carbon dioxide to be transported by the | ||||||
8 | pipeline will be obtained, in whole or in part, from a | ||||||
9 | facility in the State, any carbon capture permits for | ||||||
10 | that carbon dioxide issued by the Illinois | ||||||
11 | Environmental Protection Agency under Section 9.21 of | ||||||
12 | the Environmental Protection Act; and | ||||||
13 | (E) if the carbon dioxide to be transported by the | ||||||
14 | pipeline will be obtained, in whole or in part, from a | ||||||
15 | facility or facilities outside the State, | ||||||
16 | documentation that contracts between the pipeline | ||||||
17 | developer and out-of-State capture facility for | ||||||
18 | transport of the carbon dioxide have been finalized; | ||||||
19 | and | ||||||
20 | (2) At least 30 days before filing the application for | ||||||
21 | a Certificate of Authority: | ||||||
22 | (A) send by certified U.S. Mail a notice to all | ||||||
23 | owners of real property within 2 miles of the intended | ||||||
24 | pipeline route or route width of the person or | ||||||
25 | entity's intent to file an application for a | ||||||
26 | Certificate of Authority for the pipeline; the notice |
| |||||||
| |||||||
1 | shall include a map of the intended pipeline route or | ||||||
2 | route width and state that the pipeline is proposed to | ||||||
3 | be located within 2 miles of the property; and | ||||||
4 | (B) provide notice to each unit of local | ||||||
5 | government within 2 miles of the proposed pipeline | ||||||
6 | route or route width and include a map of the proposed | ||||||
7 | pipeline route or route width; the applicant shall | ||||||
8 | also publish notice in a newspaper of general | ||||||
9 | circulation in each county where the pipeline is | ||||||
10 | proposed to be located. | ||||||
11 | (b) The Commission shall not open a docket on an | ||||||
12 | application for a certificate of authority to construct and | ||||||
13 | operate a carbon dioxide pipeline unless and until the | ||||||
14 | applicant has completed all of the following: | ||||||
15 | (1) submitted to the Commission, as part of its | ||||||
16 | application for a Certificate of Authority, the carbon | ||||||
17 | dioxide pipeline routing permit issued by the Illinois | ||||||
18 | Environmental Protection Agency under Section 9.21 of the | ||||||
19 | Environmental Protection Act, together with the | ||||||
20 | application materials submitted for that permit; if the | ||||||
21 | applicant seeks a route width under subsection (d) that | ||||||
22 | would allow the pipeline to be constructed outside of the | ||||||
23 | specific route approved by the Illinois Environmental | ||||||
24 | Protection Agency, it shall include a map of the proposed | ||||||
25 | route width in its application; | ||||||
26 | (2) submitted to the Commission, as part of its |
| |||||||
| |||||||
1 | application for a Certificate of Authority, any and all | ||||||
2 | authorizations to capture and sequester carbon dioxide | ||||||
3 | that the applicant must obtain under subsection (a-5); | ||||||
4 | (3) submitted to the Commission, as part of its | ||||||
5 | application for a Certificate of Authority, proof that it | ||||||
6 | has satisfied the notice requirements of subsection | ||||||
7 | (a-5)(2); | ||||||
8 | (4) demonstrated to the satisfaction of the Commission | ||||||
9 | that the applicant has filed any and all forms required to | ||||||
10 | be filed with the federal Pipeline and Hazardous Materials | ||||||
11 | Safety Administration in advance of constructing a carbon | ||||||
12 | dioxide pipeline; | ||||||
13 | (5) demonstrated to the satisfaction of the Commission | ||||||
14 | that the applicant has filed any and all applications for | ||||||
15 | permits required by the U.S. Army Corps of Engineers in | ||||||
16 | advance of constructing a carbon dioxide pipeline; | ||||||
17 | (6) demonstrated to the satisfaction of the Commission | ||||||
18 | that the applicant has entered into an agreement with the | ||||||
19 | Illinois Department of Agriculture that governs the | ||||||
20 | mitigation of agricultural impacts associated with the | ||||||
21 | construction of the proposed pipeline; | ||||||
22 | (7) submitted to the Commission, as part of its | ||||||
23 | application for a Certificate of Authority, the list | ||||||
24 | required to be complied under subsection (d) of Section | ||||||
25 | 9.21 of the Environmental Protection Act, of all occupied | ||||||
26 | residences, businesses, schools, daycares, healthcare |
| |||||||
| |||||||
1 | facilities and High Consequence Areas located within 2 | ||||||
2 | miles of the proposed pipeline route, together with | ||||||
3 | certification that all units of local government within 2 | ||||||
4 | miles of the proposed pipeline route have been given the | ||||||
5 | list; | ||||||
6 | (8) submitted to the Commission, as part of its | ||||||
7 | application for a Certificate of Authority, proof of | ||||||
8 | insurance to cover injuries, damages, or losses related to | ||||||
9 | a release of carbon dioxide from the pipeline in the | ||||||
10 | amount of at least $250,000,000, from an insurance carrier | ||||||
11 | authorized, licensed, or permitted to provide insurance | ||||||
12 | coverage in this State and that holds at least an A- rating | ||||||
13 | by an American credit rating agency that focuses on the | ||||||
14 | insurance industry; | ||||||
15 | (9) submitted to the Commission, as part of its | ||||||
16 | application for a Certificate of Authority, proof that it | ||||||
17 | has obtained a performance bond or other financial | ||||||
18 | assurance sufficient to cover the cost of emergency | ||||||
19 | response and remediation for any pipeline leak or failure, | ||||||
20 | in the form of a trust fund, a surety bond guaranteeing | ||||||
21 | payment, a surety bond guaranteeing performance, or an | ||||||
22 | irrevocable letter of credit consistent with rules adopted | ||||||
23 | by the Commission; | ||||||
24 | (10) submitted to the Commission, as part of its | ||||||
25 | application for a Certificate of Authority, an economic | ||||||
26 | analysis and supporting documentation identifying any |
| |||||||
| |||||||
1 | economic benefits to local governments or the State | ||||||
2 | associated with the proposed pipeline; the anticipated | ||||||
3 | number of jobs to be created by the pipeline project; and | ||||||
4 | any job commitments, including, but not limited to, | ||||||
5 | contracts or agreements, the applicant has made to local | ||||||
6 | contractors or unions; | ||||||
7 | (11) submitted to the Commission any other documents | ||||||
8 | or information the Commission deems necessary to be | ||||||
9 | included in an application for a Certificate of Authority; | ||||||
10 | and | ||||||
11 | (12) posted its complete application for a Certificate | ||||||
12 | of Authority, including all documents required by this | ||||||
13 | subsection (b), on a public website that must be available | ||||||
14 | to the public without a password, sign-in, or other | ||||||
15 | registration. | ||||||
16 | (b-1) Any entity or person who intervenes, in accordance | ||||||
17 | with the Commission's rules, in the docket of an application | ||||||
18 | for a certificate of authority for a carbon dioxide pipeline, | ||||||
19 | shall be afforded the opportunity to call witnesses to testify | ||||||
20 | during the public hearing referenced in subsection (c). | ||||||
21 | (c) (b) The Commission, after a hearing, may grant an | ||||||
22 | application for a certificate of authority authorizing the | ||||||
23 | construction and operation of a carbon dioxide pipeline if it | ||||||
24 | makes a specific written finding as to each of the following: | ||||||
25 | (1) the application was properly filed; | ||||||
26 | (2) the applicant is fit, willing, and able to |
| |||||||
| |||||||
1 | construct and operate the pipeline in compliance with this | ||||||
2 | Act and with Commission regulations and orders of the | ||||||
3 | Commission or any applicable federal agencies; | ||||||
4 | (3) the applicant has entered into an agreement with a | ||||||
5 | clean coal facility, a clean coal SNG facility, or any | ||||||
6 | other source that will result in the reduction of carbon | ||||||
7 | dioxide emissions from that source; | ||||||
8 | (4) the applicant has submitted all documentation and | ||||||
9 | information required by subsection (b) filed with the | ||||||
10 | Pipeline and Hazardous Materials Safety Administration of | ||||||
11 | the U.S. Department of Transportation all forms required | ||||||
12 | by that agency in advance of constructing a carbon dioxide | ||||||
13 | pipeline ; | ||||||
14 | (5) the applicant has filed with the U.S. Army Corps | ||||||
15 | of Engineers all applications for permits required by that | ||||||
16 | agency in advance of constructing a carbon dioxide | ||||||
17 | pipeline; | ||||||
18 | (6) the applicant has entered into an agreement with | ||||||
19 | the Illinois Department of Agriculture that governs the | ||||||
20 | mitigation of agricultural impacts associated with the | ||||||
21 | construction of the proposed pipeline; | ||||||
22 | (5) (7) the applicant possesses the financial, | ||||||
23 | managerial, legal, and technical qualifications necessary | ||||||
24 | to construct and operate the proposed carbon dioxide | ||||||
25 | pipeline; and | ||||||
26 | (6) the applicant has submitted proof that it has |
| |||||||
| |||||||
1 | obtained an easement, lease, or title from all persons | ||||||
2 | owning any portion of the property the applicant seeks to | ||||||
3 | use for the construction, maintenance, or operation of the | ||||||
4 | proposed carbon dioxide pipeline; | ||||||
5 | (7) the applicant has demonstrated that (8) the | ||||||
6 | proposed pipeline is consistent with the public interest | ||||||
7 | and , public benefit and the benefits of the proposed | ||||||
8 | pipeline exceed any and all risks to residents of the | ||||||
9 | State , and legislative purpose as set forth in this Act . | ||||||
10 | In addition to any other evidence the Commission may | ||||||
11 | consider on this specific finding, the Commission shall | ||||||
12 | consider the following: | ||||||
13 | (A) any evidence of the effect of the pipeline | ||||||
14 | upon the economy, infrastructure, environment, and | ||||||
15 | public safety presented by local governmental units | ||||||
16 | and intervenors that will be affected by the proposed | ||||||
17 | pipeline route; | ||||||
18 | (B) any evidence of the effect of the pipeline | ||||||
19 | upon property values presented by property owners who | ||||||
20 | will be affected by the proposed pipeline or facility, | ||||||
21 | provided that the Commission need not hear evidence as | ||||||
22 | to the actual valuation of property such as that as | ||||||
23 | would be presented to and determined by the courts | ||||||
24 | under the Eminent Domain Act; | ||||||
25 | (C) any evidence presented by the Department of | ||||||
26 | Commerce and Economic Opportunity regarding the |
| |||||||
| |||||||
1 | current and future local, State-wide, or regional | ||||||
2 | economic effect, direct or indirect, of the proposed | ||||||
3 | pipeline or facility including, but not limited to, | ||||||
4 | ability of the State to attract economic growth, meet | ||||||
5 | future energy requirements, and ensure compliance with | ||||||
6 | environmental requirements and goals; | ||||||
7 | (D) any evidence addressing the factors described | ||||||
8 | in items (1) through (7) (8) of this subsection (c) (b) | ||||||
9 | or other relevant factors that is presented by any | ||||||
10 | other State agency, the applicant, a party, or other | ||||||
11 | entity that participates in the proceeding, including | ||||||
12 | evidence presented by the Commission's staff; and | ||||||
13 | (E) written or oral public comments offered at the | ||||||
14 | public hearing or before the deadline set by the | ||||||
15 | Commission under subsection (f); and | ||||||
16 | (F) any evidence presented by any State or federal | ||||||
17 | governmental entity as to how the proposed pipeline | ||||||
18 | will affect the security, stability, and reliability | ||||||
19 | of energy. | ||||||
20 | In its written order, the Commission shall address all of | ||||||
21 | the evidence presented, and if the order is contrary to any of | ||||||
22 | the evidence, the Commission shall state the reasons for its | ||||||
23 | determination with regard to that evidence. | ||||||
24 | (c) (Blank). When an applicant files its application for a | ||||||
25 | certificate of authority with the Commission, it shall provide | ||||||
26 | notice to each local government where the proposed pipeline |
| |||||||
| |||||||
1 | will be located and include a map of the proposed pipeline | ||||||
2 | route. The applicant shall also publish notice in a newspaper | ||||||
3 | of general circulation in each county where the proposed | ||||||
4 | pipeline is located. | ||||||
5 | (d) An application for a certificate of authority filed | ||||||
6 | pursuant to this Section shall request either that the | ||||||
7 | Commission review and approve the route approved by the | ||||||
8 | Illinois Environmental Protection Agency pursuant to Section | ||||||
9 | 9.21 of the Environmental Protection Act a specific route for | ||||||
10 | a carbon dioxide pipeline , or that the Commission review and | ||||||
11 | approve a project route width that authorizes construction of | ||||||
12 | the pipeline within a pipeline right-of-way that extends 100 | ||||||
13 | feet in either direction from the route approved by the | ||||||
14 | Illinois Environmental Protection Agency identifies the areas | ||||||
15 | in which the pipeline would be located, with such width | ||||||
16 | ranging from the minimum width required for a pipeline | ||||||
17 | right-of-way up to 200 feet in width. A map of the route or | ||||||
18 | route width shall be included in the application . The purpose | ||||||
19 | for allowing the option of review and approval of a project | ||||||
20 | route width is to provide increased flexibility during the | ||||||
21 | construction process to accommodate specific landowner | ||||||
22 | requests , avoid environmentally sensitive areas, or address | ||||||
23 | special environmental permitting requirements . | ||||||
24 | (e) The Commission's rules shall ensure that notice of an | ||||||
25 | application for a certificate of authority is provided within | ||||||
26 | 30 days after filing to the landowners along a proposed |
| |||||||
| |||||||
1 | project route, or to the potentially affected landowners | ||||||
2 | within a proposed project route width, using the notification | ||||||
3 | procedures set forth in the Commission's rules. If the | ||||||
4 | Commission grants approval of a project route width as opposed | ||||||
5 | to a specific project route, then the applicant must, at least | ||||||
6 | 14 days in advance of beginning construction on any tract | ||||||
7 | within the project route width as it finalizes the actual | ||||||
8 | pipeline alignment within the project route width , file with | ||||||
9 | the Commission a final revised carbon dioxide pipeline routing | ||||||
10 | permit issued by the Illinois Environmental Protection Agency | ||||||
11 | under Section 9.21 of the Environmental Protection Act, | ||||||
12 | approving the final route, together with its final list of | ||||||
13 | affected landowners with real property within 2 miles of the | ||||||
14 | pipeline route the Commission at least 14 days in advance of | ||||||
15 | beginning construction on any tract within the project route | ||||||
16 | width and also provide the Commission with at least 14 days' | ||||||
17 | notice before filing a complaint for eminent domain in the | ||||||
18 | circuit court with regard to any tract within the project | ||||||
19 | route width . | ||||||
20 | (f) Either during or within 10 days after the evidentiary | ||||||
21 | hearing held on the application for the Certificate of | ||||||
22 | Authority, the Commission shall host a public hearing to | ||||||
23 | receive oral public comments about the application. The | ||||||
24 | hearing shall be scheduled at a time and place that | ||||||
25 | facilitates public participation, and shall begin with a brief | ||||||
26 | presentation by the Commission of the proposed permit and the |
| |||||||
| |||||||
1 | standards for granting a certificate of authority. Time limits | ||||||
2 | for each public comment shall not be less than 10 minutes and | ||||||
3 | the total time for public comment shall not be less than 5 | ||||||
4 | hours, provided, however, that all attendees who arrived | ||||||
5 | during that 5-hour period who wish to offer comment shall be | ||||||
6 | afforded the opportunity to do so. The Commission shall set a | ||||||
7 | deadline of no earlier than 30 days following the public | ||||||
8 | hearing required by this subsection to receive written public | ||||||
9 | comments. | ||||||
10 | (g) (f) The Commission shall make its determination on any | ||||||
11 | application for a certificate of authority filed pursuant to | ||||||
12 | this Section and issue its final order within 11 months after | ||||||
13 | the date that the application is filed. The Commission's | ||||||
14 | failure to act within this time period shall not be deemed an | ||||||
15 | approval or denial of the application. | ||||||
16 | (h) (g) A final order of the Commission granting a | ||||||
17 | certificate of authority pursuant to this Act shall be | ||||||
18 | conditioned upon the applicant obtaining all required permits | ||||||
19 | or approvals from the Pipeline and Hazardous Materials Safety | ||||||
20 | Administration of the U.S. Department of Transportation, U.S. | ||||||
21 | Army Corps of Engineers, and Illinois Department of | ||||||
22 | Agriculture, and Illinois Environmental Protection Agency, in | ||||||
23 | addition to all other permits and approvals necessary for the | ||||||
24 | construction and operation of the pipeline prior to the start | ||||||
25 | of any construction. The final order must specifically | ||||||
26 | prohibit the start of any construction until all such permits |
| |||||||
| |||||||
1 | and approvals have been obtained. | ||||||
2 | (i) Once the Commission has entered an order approving | ||||||
3 | either a specific route or route width under this Section, the | ||||||
4 | holder of the certificate of authority may not deviate from | ||||||
5 | the route approved by the Commission and the Environmental | ||||||
6 | Protection Agency without first: | ||||||
7 | (1) obtaining a revised carbon dioxide routing permit | ||||||
8 | from the Environmental Protection Agency under Section | ||||||
9 | 9.21 of the Environmental Protection Act, approving all | ||||||
10 | proposed route deviations; and | ||||||
11 | (2) filing with the Commission, and receiving | ||||||
12 | Commission approval of, supplemental applications for | ||||||
13 | deviations from the approved project route or route width. | ||||||
14 | Each (h) Within 6 months after the Commission's entry of | ||||||
15 | an order approving either a specific route or a project | ||||||
16 | route width under this Section, the owner or operator of | ||||||
17 | the carbon dioxide pipeline that receives that order may | ||||||
18 | file supplemental applications for minor route deviations | ||||||
19 | outside the approved project route width, allowing for | ||||||
20 | additions or changes to the approved route to address | ||||||
21 | environmental concerns encountered during construction or | ||||||
22 | to accommodate landowner requests. The supplemental | ||||||
23 | application shall specifically detail the environmental | ||||||
24 | concerns or landowner requests prompting the route | ||||||
25 | changes, including the names of any landowners or entities | ||||||
26 | involved. Notice of a supplemental application shall be |
| |||||||
| |||||||
1 | provided to any State agency or unit of local government | ||||||
2 | that appeared in the original proceeding and to any | ||||||
3 | landowner affected by the proposed route deviation at the | ||||||
4 | time that supplemental application is filed. The route | ||||||
5 | deviations shall be approved by the Commission no sooner | ||||||
6 | than 90 days after all interested parties receive notice | ||||||
7 | of the supplemental application, unless a written | ||||||
8 | objection is filed to the supplemental application within | ||||||
9 | 45 days after such notice is received. If a written | ||||||
10 | objection is filed, then the Commission shall issue an | ||||||
11 | order either granting or denying the route deviation | ||||||
12 | within 90 days after the filing of the objection. Hearings | ||||||
13 | on any such supplemental application shall be limited to | ||||||
14 | the reasonableness of the specific variance proposed, and | ||||||
15 | the issues of the public interest and benefit of the | ||||||
16 | project or fitness of the applicant shall be considered | ||||||
17 | only to the extent that the route deviation has raised new | ||||||
18 | concerns with regard to those issues. | ||||||
19 | (j) (i) A certificate of authority to construct and | ||||||
20 | operate a carbon dioxide pipeline issued by the Commission | ||||||
21 | shall contain and include all of the following: (1) a grant of | ||||||
22 | authority to construct and operate a carbon dioxide pipeline | ||||||
23 | as requested in the application, subject to the laws of this | ||||||
24 | State . ; and | ||||||
25 | (2) a limited grant of authority to take and acquire | ||||||
26 | an easement in any property or interest in property for |
| |||||||
| |||||||
1 | the construction, maintenance, or operation of a carbon | ||||||
2 | dioxide pipeline in the manner provided for the exercise | ||||||
3 | of the power of eminent domain under the Eminent Domain | ||||||
4 | Act. The limited grant of authority shall be restricted | ||||||
5 | to, and exercised solely for, the purpose of siting, | ||||||
6 | rights-of-way, and easements appurtenant, including | ||||||
7 | construction and maintenance. The applicant shall not | ||||||
8 | exercise this power until it has used reasonable and good | ||||||
9 | faith efforts to acquire the property or easement thereto. | ||||||
10 | The applicant may thereafter use this power when the | ||||||
11 | applicant determines that the easement is necessary to | ||||||
12 | avoid unreasonable delay or economic hardship to the | ||||||
13 | progress of activities carried out pursuant to the | ||||||
14 | certificate of authority. | ||||||
15 | (k) In any instance where an applicant withdraws its | ||||||
16 | application for a Certificate of Authority and refiles an | ||||||
17 | application proposing the same or substantially similar route, | ||||||
18 | the applicant shall compensate any persons or entities that | ||||||
19 | intervened in the withdrawn proceeding for costs of | ||||||
20 | intervention and filing of any materials that are the same as, | ||||||
21 | or substantially similar to, those already filed by the person | ||||||
22 | or entity in the docket for the withdrawn application. | ||||||
23 | (l) If an applicant withdraws or is denied a permit for a | ||||||
24 | Certificate of Authority, anyone who has granted an easement | ||||||
25 | to the applicant for the construction, maintenance, or | ||||||
26 | operation of the proposed carbon dioxide pipeline shall have |
| |||||||
| |||||||
1 | the right to have the easement interest conveyed back in | ||||||
2 | return for any amounts paid to the applicant. | ||||||
3 | (Source: P.A. 97-534, eff. 8-23-11.)
| ||||||
4 | (220 ILCS 75/5 rep.) | ||||||
5 | Section 70. The Carbon Dioxide Transportation and | ||||||
6 | Sequestration Act is amended by repealing Section 5.
| ||||||
7 | Section 75. The Environmental Protection Act is amended by | ||||||
8 | changing Sections 21, 39, and 40 and by adding Sections 3.121, | ||||||
9 | 3.132, 3.133, 3.134, 3.136, 3.281, 3.446, 3.447, 9.20, 9.21, | ||||||
10 | and 22.64 as follows:
| ||||||
11 | (415 ILCS 5/3.121 new) | ||||||
12 | Sec. 3.121. Area of review. "Area of review" for each | ||||||
13 | sequestration facility, has the same meaning as the "area of | ||||||
14 | review" specified in the Class VI permit issued to that | ||||||
15 | sequestration facility under the federal Safe Drinking Water | ||||||
16 | Act by either the United States Environmental Protection | ||||||
17 | Agency or, if the State obtains primacy, a State agency | ||||||
18 | authorized to issue Class VI permits for sequestration of | ||||||
19 | carbon dioxide.
| ||||||
20 | (415 ILCS 5/3.132 new) | ||||||
21 | Sec. 3.132. Carbon dioxide capture project. "Carbon | ||||||
22 | dioxide capture project" or "capture project" means a project |
| |||||||
| |||||||
1 | or facility that (1) uses equipment to capture a significant | ||||||
2 | quantity of carbon dioxide directly from the ambient air or | ||||||
3 | uses a process to separate carbon dioxide from industrial or | ||||||
4 | energy-related sources, other than oil or gas production from | ||||||
5 | a well, and (2) produces a concentrated fluid of carbon | ||||||
6 | dioxide. "Carbon dioxide capture project" includes carbon | ||||||
7 | dioxide captured as part of a research and development project | ||||||
8 | or a project funded by research and development funds, unless | ||||||
9 | the operator demonstrates to the satisfaction of the Agency | ||||||
10 | that the project meets criteria for exclusion as a research | ||||||
11 | and development project under rules adopted by the Board under | ||||||
12 | paragraph (9) of subsection (g) of Section 9.21.
| ||||||
13 | (415 ILCS 5/3.133 new) | ||||||
14 | Sec. 3.133. Carbon dioxide pipeline. "Carbon dioxide | ||||||
15 | pipeline" has the meaning given to that term in Section 10 of | ||||||
16 | the Carbon Dioxide Transportation and Sequestration Act.
| ||||||
17 | (415 ILCS 5/3.134 new) | ||||||
18 | Sec. 3.134. Concentrated carbon dioxide fluid. | ||||||
19 | "Concentrated carbon dioxide fluid" means a fluid that | ||||||
20 | contains concentrated carbon dioxide that is proportionately | ||||||
21 | greater than the ambient atmospheric concentration of carbon | ||||||
22 | dioxide.
| ||||||
23 | (415 ILCS 5/3.136 new) |
| |||||||
| |||||||
1 | Sec. 3.136. Confining zone. "Confining zone" means a | ||||||
2 | geologic formation, a group of geologic formations, or part of | ||||||
3 | a geologic formation stratigraphically overlying a zone of | ||||||
4 | carbon dioxide injection that acts as a barrier to fluid | ||||||
5 | movement.
| ||||||
6 | (415 ILCS 5/3.281 new) | ||||||
7 | Sec. 3.281. Mahomet Aquifer. "Mahomet Aquifer" means the | ||||||
8 | aquifer designated as a sole-source aquifer by the United | ||||||
9 | States Environmental Protection Agency under the federal Safe | ||||||
10 | Drinking Water Act, together with its upstream areas, as | ||||||
11 | identified by the United States Environmental Protection | ||||||
12 | Agency in the map of the Mahomet Aquifer Project Review Area.
| ||||||
13 | (415 ILCS 5/3.446 new) | ||||||
14 | Sec. 3.446. Sequestration. "Sequestration" has the meaning | ||||||
15 | given to that term in Section 10 of the Carbon Dioxide | ||||||
16 | Transport and Storage Protections Act.
| ||||||
17 | (415 ILCS 5/3.447 new) | ||||||
18 | Sec. 3.447. Sequestration facility. "Sequestration | ||||||
19 | facility" has the meaning given to that term in Section 10 of | ||||||
20 | the Carbon Dioxide Transport and Storage Protections Act.
| ||||||
21 | (415 ILCS 5/9.20 new) | ||||||
22 | Sec. 9.20. Setbacks from carbon dioxide pipelines. |
| |||||||
| |||||||
1 | (a) The General Assembly finds that: | ||||||
2 | (1) Carbon dioxide is an asphyxiant. A carbon dioxide | ||||||
3 | leak from a carbon dioxide pipeline poses a risk of grave | ||||||
4 | harm to human health and the environment. | ||||||
5 | (2) Setbacks from occupied structures and high-density | ||||||
6 | areas are necessary to protect against potential harm from | ||||||
7 | carbon dioxide pipeline leaks. | ||||||
8 | (a-5) The purpose of this Section is to promote a | ||||||
9 | healthful environment, including, but not limited to, clean | ||||||
10 | water, air, and land, meaningful public involvement, and to | ||||||
11 | ensure only responsible pipeline transport of carbon dioxide | ||||||
12 | is conducted in the State to protect public health and to | ||||||
13 | prevent pollution of the environment. | ||||||
14 | (a-10) The provisions of this Section shall be liberally | ||||||
15 | construed to carry out the purposes of this Section. | ||||||
16 | (b) As used in this Section: | ||||||
17 | (1) "Environmental justice community" means the | ||||||
18 | definition of that term based on existing methodologies | ||||||
19 | and findings used and as may be updated by the Illinois | ||||||
20 | Power Agency and its program administrator in the Illinois | ||||||
21 | Solar for All Program. | ||||||
22 | (2) "Geohazards" means any dynamic geologic, edaphic, | ||||||
23 | and meteorological conditions that could affect the | ||||||
24 | stability and safety of a carbon dioxide pipeline, | ||||||
25 | including, but not limited to, slope instability, frost | ||||||
26 | heave, soil settlement, erosion, earthquakes, or mine |
| |||||||
| |||||||
1 | subsidence. | ||||||
2 | (3) "High Consequence Area" means: | ||||||
3 | (A) a High Consequence Area as defined at 49 CFR | ||||||
4 | 195.450; | ||||||
5 | (B) any area that has a concentration of 10 or more | ||||||
6 | residences within a square mile that is located within | ||||||
7 | one mile of the proposed route of a proposed carbon | ||||||
8 | dioxide pipeline; | ||||||
9 | (C) sensitive locations, such as hospitals and | ||||||
10 | other medical facilities, schools and day care | ||||||
11 | centers, nursing homes and other senior living | ||||||
12 | facilities, prisons, and other areas where decreased | ||||||
13 | mobility may require additional time and personnel to | ||||||
14 | evacuate; | ||||||
15 | (D) locations where people congregate, such as | ||||||
16 | commercial and office districts; industry or business | ||||||
17 | parks; recreational facilities such as stadiums, | ||||||
18 | parks, golf courses, and clubs; cultural and | ||||||
19 | governmental facilities; historic areas; transit | ||||||
20 | stations; and places of worship; | ||||||
21 | (E) concentrated animal feeding operations or | ||||||
22 | concentrations of livestock; or | ||||||
23 | (F) national or state-designated wildlife refuge | ||||||
24 | areas or zoos. | ||||||
25 | (c) No person may transport carbon dioxide through a | ||||||
26 | pipeline in the State without first obtaining a carbon dioxide |
| |||||||
| |||||||
1 | pipeline routing permit from the Agency under this Section. | ||||||
2 | (d) Before submitting an application for a carbon dioxide | ||||||
3 | pipeline routing permit to the Agency, any person who seeks to | ||||||
4 | transport carbon dioxide through a pipeline in this State | ||||||
5 | must: | ||||||
6 | (1) compile an accurate, verified list of all occupied | ||||||
7 | residences, businesses, schools, daycares, healthcare | ||||||
8 | facilities and High Consequence Areas located within 2 | ||||||
9 | miles of its proposed pipeline route, which list it shall | ||||||
10 | submit, during the consultation process specified in | ||||||
11 | paragraph (2) of this subsection (d), to all units of | ||||||
12 | local government located within 2 miles of the proposed | ||||||
13 | pipeline route; | ||||||
14 | (2) consult, in open meetings subject to the Open | ||||||
15 | Meetings Act, with the governing bodies of all units of | ||||||
16 | local government, as defined in Article VII of the | ||||||
17 | Illinois Constitution, located within 2 miles of the | ||||||
18 | proposed pipeline route concerning: | ||||||
19 | (A) zoning requirements for the proposed route; | ||||||
20 | (B) future development plans along the proposed | ||||||
21 | route; | ||||||
22 | (C) development projects in process along the | ||||||
23 | proposed route; | ||||||
24 | (D) planned growth along the proposed route, as | ||||||
25 | indicated in a comprehensive land use plan developed | ||||||
26 | by or for that governing body, including any planned |
| |||||||
| |||||||
1 | growth that could not occur if the proposed pipeline | ||||||
2 | were constructed and operated; | ||||||
3 | (E) any mitigation planning for the proposed route | ||||||
4 | by counties or regional planning commissions; | ||||||
5 | (F) any existing emergency response planning for | ||||||
6 | the propose route; | ||||||
7 | (G) road use, any road bonding, and the location | ||||||
8 | of road crossings and road repair along the proposed | ||||||
9 | route; | ||||||
10 | (H) the location of any county and municipal land | ||||||
11 | and right-of-way agreements along the proposed route; | ||||||
12 | (I) any Geohazards along the proposed route; | ||||||
13 | (J) the location of any hazardous liquid or | ||||||
14 | natural gas pipelines along the proposed route; | ||||||
15 | (K) plans for pipeline abandonment or removal once | ||||||
16 | it is no longer in use; and | ||||||
17 | (L) other relevant information as determined by | ||||||
18 | the government body; | ||||||
19 | (3) meet with emergency management personnel of each | ||||||
20 | unit of local government within 2 miles of the pipeline | ||||||
21 | route to present the results of modeling performed in | ||||||
22 | accordance with subsection (e) and discuss any needs to | ||||||
23 | ensure the timely rescue of persons if a rupture or leak of | ||||||
24 | the proposed carbon dioxide pipeline occurs, including, | ||||||
25 | but not limited to: | ||||||
26 | (A) staffing needs; |
| |||||||
| |||||||
1 | (B) training and training material needs; | ||||||
2 | (C) methods to ensure effective and timely | ||||||
3 | communication with the pipeline operator; | ||||||
4 | (D) advanced sensors or other methods of real-time | ||||||
5 | monitoring to allow for prompt identification and | ||||||
6 | closure of any segment of the pipeline where a leak or | ||||||
7 | rupture occurs; | ||||||
8 | (E) alarm systems to alert first responders and | ||||||
9 | the public of a pipeline rupture or leak; | ||||||
10 | (F) emergency response and public evacuation | ||||||
11 | plans; | ||||||
12 | (G) equipment, including, but not limited to, air | ||||||
13 | supply respirators and electric vehicles; and | ||||||
14 | (H) funding needs, as well as source of funding | ||||||
15 | and timing for receipt of funds, to ensure the needs of | ||||||
16 | this subsection (3) are met; and | ||||||
17 | (4) revise its proposed route to account for local | ||||||
18 | ordinances, zoning, and other input provided by units of | ||||||
19 | local government, first responders, and members of the | ||||||
20 | public consulted or who provided comment under this | ||||||
21 | subsection (d). | ||||||
22 | (e) The Board shall adopt rules establishing carbon | ||||||
23 | dioxide pipeline routing permit requirements and routing | ||||||
24 | criteria under this Section. The rules shall be proposed by | ||||||
25 | the Agency not later than 30 months after the effective date of | ||||||
26 | this Act and adopted by the Board not later than 2 years after |
| |||||||
| |||||||
1 | receipt of the Agency's proposal. The rules must, at a | ||||||
2 | minimum: | ||||||
3 | (1) establish routing criteria for carbon dioxide | ||||||
4 | pipelines that ensure pipelines are not constructed in | ||||||
5 | locations where they would pose an undue risk of harm to | ||||||
6 | people or animals; at a minimum, the criteria shall: | ||||||
7 | (A) establish maximum exposure limits, expressed | ||||||
8 | in the form of carbon dioxide concentrations and | ||||||
9 | duration of exposure, based on the carbon dioxide | ||||||
10 | pipeline setback study required by Section 45 of the | ||||||
11 | Carbon Dioxide Transport and Storage Protections Act | ||||||
12 | and other information the Board deems relevant; | ||||||
13 | (B) bar siting of carbon dioxide pipelines within | ||||||
14 | 2 miles of an Environmental Justice Community; and | ||||||
15 | (C) require selection of a pipeline route that | ||||||
16 | avoids previously mined areas and avoids other | ||||||
17 | Geohazards to the maximum extent possible; | ||||||
18 | (2) set standards for conducting computational fluid | ||||||
19 | dynamic modeling, or updated modeling if more accurate | ||||||
20 | modeling is available, of potential ruptures and leaks | ||||||
21 | from each proposed carbon dioxide pipeline, which shall: | ||||||
22 | (A) require that modeling of potential ruptures or | ||||||
23 | leaks be conducted, at a minimum, for areas along the | ||||||
24 | proposed pipeline route that would be located within 2 | ||||||
25 | miles of a High Consequence Area; | ||||||
26 | (B) include a requirement that the modeling domain |
| |||||||
| |||||||
1 | extend, at a minimum, 2 miles in all directions from | ||||||
2 | the proposed pipeline route or to the furthest | ||||||
3 | location where carbon dioxide concentrations could, in | ||||||
4 | a rupture event, reach 30,000 parts per million, | ||||||
5 | whichever is further; | ||||||
6 | (C) ensure that the modeling accounts for pipeline | ||||||
7 | diameter, flow rate, temperature, pressure, the | ||||||
8 | topography of the proposed pipeline route, the built | ||||||
9 | environment along the pipeline route, a range of | ||||||
10 | weather conditions, and other factors the Board deems | ||||||
11 | relevant; | ||||||
12 | (D) provide that the modeling must predict, as | ||||||
13 | accurately as possible, the dispersion of | ||||||
14 | concentrations of carbon dioxide in parts per million | ||||||
15 | and the duration of those concentrations as dispersion | ||||||
16 | occurs; and | ||||||
17 | (E) specify mechanisms to ensure that outdated | ||||||
18 | models are superseded by newer, updated models that | ||||||
19 | more accurately predict carbon dioxide dispersion in | ||||||
20 | the event of a carbon dioxide rupture or leak; | ||||||
21 | (3) establish application requirements for carbon | ||||||
22 | dioxide pipeline routing permits, which shall include, but | ||||||
23 | are not limited to: | ||||||
24 | (A) a map providing an overview of the entire | ||||||
25 | proposed pipeline route; | ||||||
26 | (B) an aerial map of the proposed pipeline route |
| |||||||
| |||||||
1 | and at least 2 miles to each side, with a scale of 1 | ||||||
2 | inch to 400 feet or otherwise sufficient to allow | ||||||
3 | residents an understanding of the relationship between | ||||||
4 | the proposed pipeline and properties; | ||||||
5 | (C) information about the proposed pipeline, | ||||||
6 | including, but not limited to, diameter, flow rate, | ||||||
7 | pressure, temperature, and characteristics of the | ||||||
8 | carbon dioxide being transported therein; | ||||||
9 | (D) temperature and pressure of equipment | ||||||
10 | ancillary to the proposed pipeline, such as booster | ||||||
11 | stations; | ||||||
12 | (E) any geohazards present along the proposed | ||||||
13 | pipeline route; | ||||||
14 | (F) a report providing the assumptions, inputs, | ||||||
15 | and results of computational fluid dynamic dispersion | ||||||
16 | modeling conducted for the proposed pipeline, which | ||||||
17 | shall include a map or maps that: | ||||||
18 | (i) show all areas along the proposed route | ||||||
19 | where concentrations of carbon dioxide may reach | ||||||
20 | 30,000 parts per million (3%); | ||||||
21 | (ii) identify the duration of concentration, | ||||||
22 | (iii) depict how soon after a pipeline rupture | ||||||
23 | or leaks concentrations of carbon dioxide are | ||||||
24 | projected to reach 3% or higher; | ||||||
25 | (iv) specify changes in concentration at 1,000 | ||||||
26 | ppm increments; and |
| |||||||
| |||||||
1 | (v) extend to the furthest location where | ||||||
2 | carbon dioxide concentrations reach 30,000 parts | ||||||
3 | per million or 2 miles from the proposed pipeline | ||||||
4 | route, whichever is further; | ||||||
5 | (G) proposed setbacks from High Concentration | ||||||
6 | Areas, which shall be based on the computational fluid | ||||||
7 | dynamic modeling required by this Section, satisfy the | ||||||
8 | carbon dioxide pipeline routing criteria established | ||||||
9 | under this Section, and be accompanied by a | ||||||
10 | certification by the applicant attesting to the | ||||||
11 | modeling as the basis for proposed setbacks; | ||||||
12 | (H) a narrative explanation of how the setbacks | ||||||
13 | satisfy the routing criteria established under this | ||||||
14 | Section; | ||||||
15 | (I) any emergency response plan for a rupture or | ||||||
16 | leak of the proposed pipeline that the applicant has | ||||||
17 | developed or is developing to satisfy requirements of | ||||||
18 | other federal or state agencies; | ||||||
19 | (J) documents specifying the sources of carbon | ||||||
20 | dioxide to be transported in the proposed pipeline, | ||||||
21 | including, but not limited to, any agreements to | ||||||
22 | transport carbon dioxide and, if the source of carbon | ||||||
23 | dioxide is in-State, any permits for carbon dioxide | ||||||
24 | capture required by this Act; | ||||||
25 | (K) documents specifying the destination of the | ||||||
26 | carbon dioxide to be transported in the proposed |
| |||||||
| |||||||
1 | pipeline, including, but not limited to, any | ||||||
2 | agreements to transport the carbon dioxide to those | ||||||
3 | destinations and, if the carbon dioxide is to be | ||||||
4 | sequestered in the State, any permits for carbon | ||||||
5 | dioxide sequestration required by this Act; | ||||||
6 | (L) the list of occupied residences, businesses, | ||||||
7 | schools, day cares, health care facilities and High | ||||||
8 | Concentration Areas developed under subsection (d); | ||||||
9 | (M) certification of compliance with subsection | ||||||
10 | (d), together with a narrative explanation of how and | ||||||
11 | why the proposed route was changed, or not changed, in | ||||||
12 | response to feedback received during the consultation | ||||||
13 | process; and | ||||||
14 | (N) proof that the full permit application, with | ||||||
15 | all information required by this subsection, has been | ||||||
16 | posted on a public website that must be available to | ||||||
17 | the public without a password, sign-in, or other | ||||||
18 | registration; | ||||||
19 | (4) specify standards for review, approval, and denial | ||||||
20 | by the Agency of applications for a carbon dioxide | ||||||
21 | pipeline routing permit; the standards for denial must | ||||||
22 | include, but are not limited to, failure of the applicant | ||||||
23 | to: | ||||||
24 | (A) satisfy the routing criteria established under | ||||||
25 | this Section; | ||||||
26 | (B) properly implement and interpret the modeling |
| |||||||
| |||||||
1 | required under this Section; | ||||||
2 | (C) satisfy the consultation, permit application, | ||||||
3 | and public participation requirements established | ||||||
4 | under this Section; | ||||||
5 | (D) pay the permit fee established under | ||||||
6 | subsection (f); or | ||||||
7 | (E) demonstrate that the proposed pipeline will | ||||||
8 | not pose an undue risk of harm to humans and animals; | ||||||
9 | (5) specify procedures for meaningful public | ||||||
10 | participation in the issuance of carbon dioxide pipeline | ||||||
11 | routing permits, which shall include, but are not limited | ||||||
12 | to: | ||||||
13 | (A) public notice of the submission of carbon | ||||||
14 | dioxide pipeline routing permit applications, which | ||||||
15 | shall: | ||||||
16 | (i) be provided via notice by newspaper of | ||||||
17 | general circulation in all counties through which | ||||||
18 | the pipeline is proposed to pass; notice by direct | ||||||
19 | mail for all properties on, and within 2 miles of, | ||||||
20 | the proposed pipeline route; notice via email or, | ||||||
21 | where not available, U.S. mail to all units of | ||||||
22 | local government consulted under subsection (d); | ||||||
23 | notice by email to individuals who request to be | ||||||
24 | included on an email notice list for carbon | ||||||
25 | dioxide routing permits; and any other mechanisms | ||||||
26 | determined by the Board; and |
| |||||||
| |||||||
1 | (ii) include general information about the | ||||||
2 | proposed pipeline, including the proposed route of | ||||||
3 | the pipeline, the contents of the proposed | ||||||
4 | pipeline, and the diameter of the pipeline; the | ||||||
5 | public website where application materials have | ||||||
6 | been posted; and the fact that public meetings | ||||||
7 | shall be scheduled to receive input on the | ||||||
8 | proposed application; | ||||||
9 | (B) public meetings hosted by the Agency after the | ||||||
10 | submission of the permit application, in at least 50% | ||||||
11 | of the counties along the proposed pipeline route, | ||||||
12 | which shall: | ||||||
13 | (i) be in-person unless a public health | ||||||
14 | emergency requires otherwise, except for 2 virtual | ||||||
15 | meetings; | ||||||
16 | (ii) be scheduled at different times of the | ||||||
17 | day or evening to facilitate attendance; | ||||||
18 | (iii) be noticed in the same manner as the | ||||||
19 | notice of submission of a permit application under | ||||||
20 | Subsection (A), with the addition of the date, | ||||||
21 | time, and location of the hearing and the | ||||||
22 | opportunity to request interpretation services; | ||||||
23 | (iv) be attended by representatives of the | ||||||
24 | applicant who are knowledgeable about the | ||||||
25 | application; | ||||||
26 | (v) serve to inform the public of the |
| |||||||
| |||||||
1 | application, answer questions about the | ||||||
2 | application and carbon dioxide pipelines, and | ||||||
3 | allow for input relevant to the standards for | ||||||
4 | issuance of a carbon dioxide pipeline routing | ||||||
5 | permit; | ||||||
6 | (vi) provide ample time for public comments | ||||||
7 | and questions, with a maximum time limit of no | ||||||
8 | less than 10 minutes per comment and no limit on | ||||||
9 | the number of comments or questions an attendee | ||||||
10 | may raise; and | ||||||
11 | (vii) be recorded and transcribed, with | ||||||
12 | transcripts posted on a public website that must | ||||||
13 | be available to the public without a password, | ||||||
14 | sign-in, or other registration; | ||||||
15 | (C) an opportunity of no less than 45 days for the | ||||||
16 | submission of public comments on a draft permit or | ||||||
17 | permit denial before the final permitting decision; | ||||||
18 | (D) an opportunity for at least one public hearing | ||||||
19 | for every 100 miles of pipeline on the draft permit or | ||||||
20 | permit denial to provide the Agency oral or written | ||||||
21 | comments for consideration before the final permitting | ||||||
22 | decision; | ||||||
23 | (E) a summary and response of the comments | ||||||
24 | prepared by the Agency; and | ||||||
25 | (F) a requirement that the draft and final | ||||||
26 | permitting actions by the Agency and the Agency's |
| |||||||
| |||||||
1 | response to comments be posted on a public website | ||||||
2 | that must be available to the public without a | ||||||
3 | password, sign-in, or other registration; | ||||||
4 | (6) when a carbon dioxide pipeline is proposed to be | ||||||
5 | located within 2 miles of an area with a significant | ||||||
6 | proportion of residents with limited English proficiency, | ||||||
7 | specify further opportunities for public participation, | ||||||
8 | including, but not limited to, translations of relevant | ||||||
9 | documents into other languages and interpretation services | ||||||
10 | at public meetings and hearings; | ||||||
11 | (7) specify a procedure to identify areas with a | ||||||
12 | significant proportion of residents with limited English | ||||||
13 | proficiency for purposes of this Section; | ||||||
14 | (8) specify the circumstances under which a person | ||||||
15 | issued a carbon dioxide pipeline routing permit under this | ||||||
16 | Section must seek a revised permit, which shall include, | ||||||
17 | but are not limited to, instances where the Commerce | ||||||
18 | Commission has approved a Certificate of Authority for the | ||||||
19 | carbon dioxide pipeline under Section 20 of the Carbon | ||||||
20 | Dioxide Transportation and Sequestration Act with a route | ||||||
21 | that deviates, or may deviate, in any way from the route | ||||||
22 | approved by the Agency; | ||||||
23 | (9) specify the procedures for issuance of a revised | ||||||
24 | permit, which shall include, but are not limited to, | ||||||
25 | satisfaction of all requirements of this Section with | ||||||
26 | respect to any portion of the route that deviates from the |
| |||||||
| |||||||
1 | route approved by the Agency; | ||||||
2 | (10) specify the circumstances under which the Agency | ||||||
3 | may revoke a carbon dioxide pipeline routing permit; | ||||||
4 | (11) set requirements for notification and reporting | ||||||
5 | by the permittee, including, but not limited to: | ||||||
6 | (A) notification and reporting to the Agency of | ||||||
7 | geohazards, infrastructure, or other circumstances | ||||||
8 | that may affect the safe routing of the pipeline that | ||||||
9 | were unknown to or misunderstood by the permittee when | ||||||
10 | submitting the permit application; | ||||||
11 | (B) immediate notification to the Agency and the | ||||||
12 | Illinois Emergency Management Agency of any leak from, | ||||||
13 | or rupture of, the pipeline; | ||||||
14 | (C) notification and reporting to the Agency of | ||||||
15 | any changes in the source of the carbon dioxide | ||||||
16 | transported by the pipeline or the destination of the | ||||||
17 | carbon dioxide transported by the pipeline; and | ||||||
18 | (D) notification and reporting to the Agency of | ||||||
19 | the total annual volume and mass of carbon dioxide | ||||||
20 | transported by the pipeline; and | ||||||
21 | (E) notification to local governments, surface | ||||||
22 | owners, and tenants if, and when, a building, | ||||||
23 | business, or other area of public use is proposed or | ||||||
24 | constructed at a location that, if the pipeline | ||||||
25 | application had not yet been submitted, would result | ||||||
26 | in the pipeline failing to satisfy routing criteria; |
| |||||||
| |||||||
1 | and | ||||||
2 | (12) establish requirements for the decommissioning of | ||||||
3 | carbon dioxide pipelines once they are no longer in use; | ||||||
4 | in doing so, the Board shall consider circumstances where | ||||||
5 | the safest or least disruptive manner of decommissioning | ||||||
6 | is leaving the pipeline in place. | ||||||
7 | (f) Once the rules required by subsection (e) have been | ||||||
8 | adopted, the Agency shall calculate the cost it will bear to | ||||||
9 | implement the carbon dioxide pipeline routing permit program | ||||||
10 | and shall establish a permit fee sufficient to cover those | ||||||
11 | costs, which it may update periodically as the costs of | ||||||
12 | program implementation change. | ||||||
13 | (g) No adjusted standard, variance, or other regulatory | ||||||
14 | relief otherwise available under this Act may be granted for | ||||||
15 | the requirements of this Section.
| ||||||
16 | (415 ILCS 5/9.21 new) | ||||||
17 | Sec. 9.21. Carbon dioxide capture. | ||||||
18 | (a) The General Assembly finds that: | ||||||
19 | (1) The capture of carbon dioxide from industrial | ||||||
20 | facilities, including, but not limited to, ethanol plants, | ||||||
21 | methane processing facilities, and electric-generation | ||||||
22 | facilities requires a significant amount of power to | ||||||
23 | undertake, the generation of which can increase harmful | ||||||
24 | air and water pollutants. | ||||||
25 | (2) The capture of carbon dioxide generally requires |
| |||||||
| |||||||
1 | significant volumes of water that could be used for | ||||||
2 | domestic, agricultural, recreational, or industrial uses. | ||||||
3 | (3) The capture of carbon dioxide from industrial and | ||||||
4 | electric-generation facilities has often failed to meet | ||||||
5 | objectives for capture and thus allowed more carbon | ||||||
6 | dioxide pollution into the atmosphere than proposed. | ||||||
7 | (4) The State has a long-standing policy to restore, | ||||||
8 | protect, and enhance the environment, including the purity | ||||||
9 | of the air, land, and waters, such as groundwaters, of | ||||||
10 | this State. | ||||||
11 | (5) A clean environment is essential to the growth and | ||||||
12 | well-being of this State. | ||||||
13 | (6) The capture of carbon dioxide from industrial and | ||||||
14 | electric-generation facilities will not achieve the | ||||||
15 | State's long-standing policy to restore, protect, and | ||||||
16 | enhance the environment unless clear standards are adopted | ||||||
17 | to require the reduction of air and water pollution | ||||||
18 | associated with carbon capture, to limit water use when | ||||||
19 | other important uses are in jeopardy, and to ensure that | ||||||
20 | carbon capture does not interfere with the State reaching | ||||||
21 | its clean energy goals. | ||||||
22 | (7) Meaningful participation of State residents, | ||||||
23 | especially vulnerable populations who may be affected by | ||||||
24 | regulatory actions, is critical to ensure that | ||||||
25 | environmental justice considerations are incorporated in | ||||||
26 | the development of, decision-making related to, and |
| |||||||
| |||||||
1 | implementation of environmental laws and rules that | ||||||
2 | protect and improve the well-being of communities in this | ||||||
3 | State that bear disproportionate burdens imposed by | ||||||
4 | environmental pollution. | ||||||
5 | (a-5) The purpose of this Section is to promote a | ||||||
6 | healthful environment, including clean water, air, and land, | ||||||
7 | meaningful public involvement, and to ensure only the | ||||||
8 | responsible capture of carbon dioxide occurs in the State so | ||||||
9 | as to protect public health and to prevent pollution of the | ||||||
10 | environment. | ||||||
11 | (a-10) The provisions of this Section shall be liberally | ||||||
12 | construed to carry out the purpose of this Section as stated in | ||||||
13 | subsection (a-5). | ||||||
14 | (b) A person who seeks to construct or operate a carbon | ||||||
15 | dioxide capture project in this State must first obtain a | ||||||
16 | permit from the Agency in accordance with the rules adopted | ||||||
17 | under subsection (g). | ||||||
18 | (c) A person who seeks to capture carbon dioxide from an | ||||||
19 | industrial or electric-generation facility in this State must, | ||||||
20 | before seeking a permit in accordance with the rules adopted | ||||||
21 | under subsection (g), first conduct an environmental impact | ||||||
22 | analysis. The environmental impact analysis must: | ||||||
23 | (1) include a statement of the purpose of and need for | ||||||
24 | the proposed carbon capture project; | ||||||
25 | (2) include a greenhouse gas (GHG) inventory analysis, | ||||||
26 | including, but not limited to, Scope 1, 2, and 3 emissions |
| |||||||
| |||||||
1 | set forth in guidance published by the United States | ||||||
2 | Environmental Protection Agency, of the total GHG | ||||||
3 | emissions associated with the capture, transportation, and | ||||||
4 | sequestration of the carbon dioxide proposed to be | ||||||
5 | captured, which emissions shall be expressed as carbon | ||||||
6 | dioxide equivalent, consistent with the United States | ||||||
7 | Environmental Protection Agency rules and guidance; | ||||||
8 | (3) demonstrate that the total Scope 1, 2, and 3 | ||||||
9 | emissions associated with the capture, transportation, and | ||||||
10 | sequestration of the carbon dioxide proposed to be | ||||||
11 | captured, converted into carbon dioxide equivalent | ||||||
12 | consistent with United States Environmental Protection | ||||||
13 | Agency rules and guidance, will not exceed the total | ||||||
14 | amount of carbon dioxide from the capture project that is | ||||||
15 | sequestered over the life of the capture project; | ||||||
16 | (4) include a water impact analysis that details: | ||||||
17 | (A) the water sources likely to be impacted by the | ||||||
18 | capture of carbon dioxide from the facility; | ||||||
19 | (B) current uses of those water sources; | ||||||
20 | (C) potential or certain impacts to those water | ||||||
21 | sources from capture of carbon dioxide from the | ||||||
22 | facility, including, but not limited to, impacts on | ||||||
23 | water quantity, quality, and current uses of water; | ||||||
24 | (D) the duration of the impacts to water | ||||||
25 | associated with the capture of carbon dioxide from the | ||||||
26 | facility; and |
| |||||||
| |||||||
1 | (E) methods the applicant will use to minimize | ||||||
2 | both water use and impacts to water quality associated | ||||||
3 | with the carbon capture project. | ||||||
4 | If the person has previously submitted any of the | ||||||
5 | information required by this subsection to any State | ||||||
6 | agency in accordance with another State law, the person | ||||||
7 | may resubmit those documents, together with any associated | ||||||
8 | permits, to the Agency so long as the documents are | ||||||
9 | updated and remain accurate. | ||||||
10 | (5) include an alternatives analysis that evaluates | ||||||
11 | other reasonable alternatives for reducing the same | ||||||
12 | quantity of carbon dioxide as is proposed to be captured | ||||||
13 | at the facility while fulfilling the purpose and need for | ||||||
14 | the facility, including, but not limited to: | ||||||
15 | (A) if the carbon dioxide is proposed to be | ||||||
16 | captured at a facility that generates electricity, | ||||||
17 | energy-generation alternatives such as renewable | ||||||
18 | energy, energy storage, or energy efficiency; | ||||||
19 | (B) if the carbon dioxide is proposed to be | ||||||
20 | captured at a facility that produces fuel for motor | ||||||
21 | vehicles, aircraft, or equipment, alternatives such as | ||||||
22 | the use of electric vehicles, electric aircraft, or | ||||||
23 | alternative fuels; and | ||||||
24 | (C) if the carbon dioxide is proposed to be | ||||||
25 | captured at an industrial facility, alternative | ||||||
26 | processes that could reduce the amount of carbon |
| |||||||
| |||||||
1 | dioxide generated from that industry. | ||||||
2 | For each alternative identified under this paragraph, | ||||||
3 | the person seeking to capture carbon dioxide shall | ||||||
4 | complete a greenhouse gas emissions inventory analysis | ||||||
5 | consistent with paragraph (2) and a water impacts analysis | ||||||
6 | addressing the factors set out in paragraph (4); and | ||||||
7 | (6) be developed with public input, including, but not | ||||||
8 | limited to, by making a draft version of the analysis | ||||||
9 | available on a public website for not less than 60 days and | ||||||
10 | accepting comments on the proposed analysis for the | ||||||
11 | entirety of that 60-day period, together with a public | ||||||
12 | meeting at least 14 days after the posting of the draft on | ||||||
13 | the public website that provides a meaningful opportunity | ||||||
14 | for the public to ask questions, have those questions | ||||||
15 | answered, and provide comment on the draft; the final | ||||||
16 | environmental analysis must include responses to public | ||||||
17 | comments, identify all changes to the analysis made in | ||||||
18 | response to those comments, and be made available to the | ||||||
19 | public on a public website. | ||||||
20 | (d) No permit for the capture of carbon dioxide may be | ||||||
21 | issued unless: | ||||||
22 | (1) the Illinois State Water Survey has reviewed the | ||||||
23 | water impact analysis required under subsection (c) and, | ||||||
24 | taking into consideration that analysis, information | ||||||
25 | concerning water supply and uses, and public comments, has | ||||||
26 | concluded that the proposed carbon capture project will |
| |||||||
| |||||||
1 | not have significant adverse effects on water supply or | ||||||
2 | current or future potential uses of the water source; and | ||||||
3 | (2) the permit includes conditions, developed in | ||||||
4 | consultation with the Illinois State Water Survey and | ||||||
5 | taking public comments into consideration, under which the | ||||||
6 | project must reduce the volume or rate of water that may be | ||||||
7 | used for the capture of carbon dioxide, up to and | ||||||
8 | including the cessation of water usage for carbon capture. | ||||||
9 | (e) No permit for the capture of carbon dioxide may be | ||||||
10 | issued unless the permit applicant demonstrates that there | ||||||
11 | will be zero non-carbon dioxide air pollution emissions | ||||||
12 | associated with the carbon dioxide capture project; these | ||||||
13 | emissions include non-carbon dioxide air pollution emitted | ||||||
14 | directly by the operation of the carbon dioxide capture | ||||||
15 | equipment, and any increase in non-carbon dioxide air | ||||||
16 | pollution emissions at the facility, relative to the baseline, | ||||||
17 | following installation of the carbon dioxide capture | ||||||
18 | equipment. The applicant may meet this requirement by | ||||||
19 | demonstrating that: | ||||||
20 | (1) pollution control technology will be installed and | ||||||
21 | operated, or existing control technology will be operated, | ||||||
22 | so as to eliminate any non-carbon dioxide air emissions | ||||||
23 | associated with the use of carbon capture; or | ||||||
24 | (2) the facility will reduce operations sufficient to | ||||||
25 | eliminate any non-carbon dioxide air emissions associated | ||||||
26 | with the use of carbon capture. |
| |||||||
| |||||||
1 | The Board shall establish requirements by rule for | ||||||
2 | determining baseline emissions from each industrial or | ||||||
3 | electric-generation facility for purposes of determining which | ||||||
4 | non-carbon dioxide air emissions are associated with the use | ||||||
5 | of carbon capture at those facilities. For existing | ||||||
6 | facilities, the baseline shall be calculated using the | ||||||
7 | 12-month average of emissions for the 3 12-month periods | ||||||
8 | before January 31, 2024. For new facilities, the baseline | ||||||
9 | shall be determined using the Best Available Control | ||||||
10 | Technology, as defined in Section 169 of the federal Clean Air | ||||||
11 | Act, for the relevant air pollutants and facility and assuming | ||||||
12 | fuel consumption and hours of operation of the facility | ||||||
13 | consistent with that of facilities of similar size. | ||||||
14 | (e-1) If the applicant proposes to use amines to capture | ||||||
15 | carbon dioxide, the applicant must demonstrate that it will: | ||||||
16 | (1) install and operate the Best Available Control | ||||||
17 | Technology, as defined in Section 169 of the federal Clean | ||||||
18 | Air Act, for nitrogen oxides, sulfur dioxide, particulate | ||||||
19 | matter, and any other pollutant that may combine with | ||||||
20 | amines to become a nitramine or nitrosamine, either in the | ||||||
21 | flue gas or once emitted into the atmosphere; and | ||||||
22 | (2) install and operate equipment or processes that | ||||||
23 | ensure that no amines, nitramines, or nitrosamines will be | ||||||
24 | released into the atmosphere. | ||||||
25 | (f) No permit for a carbon dioxide capture project may be | ||||||
26 | issued unless: |
| |||||||
| |||||||
1 | (1) the applicant identifies the end use or | ||||||
2 | destination of all carbon dioxide streams from the | ||||||
3 | proposed project; | ||||||
4 | (2) if the destination includes sequestration within | ||||||
5 | the State, the applicant demonstrates that the | ||||||
6 | sequestration site is permitted in accordance with Section | ||||||
7 | 22.64; | ||||||
8 | (3) the applicant demonstrates that the project will | ||||||
9 | capture an annual average of no less than 90% of the total | ||||||
10 | carbon dioxide emissions from the facility, and the permit | ||||||
11 | disallows any capture rate lower than the rate | ||||||
12 | demonstrated by the applicant; and | ||||||
13 | (4) the permit disallows all non-carbon dioxide air | ||||||
14 | emissions associated with the use of carbon capture and | ||||||
15 | specifies each mechanism by which the applicant must meet | ||||||
16 | that condition. | ||||||
17 | (g) The Board shall adopt rules establishing permit | ||||||
18 | requirements under this Section and other standards for carbon | ||||||
19 | dioxide capture projects. The rules shall be proposed by the | ||||||
20 | Agency not later than one year after the effective date of this | ||||||
21 | Act and adopted by the Board not later than 2 years after | ||||||
22 | receipt of the Agency's proposal. The rules must, at a | ||||||
23 | minimum: | ||||||
24 | (1) be no less protective than federal requirements | ||||||
25 | for air pollution and water pollution that are in effect | ||||||
26 | on the effective date of this Act and any amendments to |
| |||||||
| |||||||
1 | those requirements that may be more protective; | ||||||
2 | (2) specify the minimum content of applications for a | ||||||
3 | permit to capture carbon dioxide, which shall include, but | ||||||
4 | shall not be limited to: | ||||||
5 | (A) the environmental impacts analyses required | ||||||
6 | under subsection (c); | ||||||
7 | (B) identification of whether the proposed carbon | ||||||
8 | capture project would take place in an area with a | ||||||
9 | significant proportion of residents with limited | ||||||
10 | English proficiency; and | ||||||
11 | (C) documentation and analyses sufficient to | ||||||
12 | demonstrate compliance with this Section and all | ||||||
13 | applicable rules adopted under this Section for the | ||||||
14 | capture of carbon dioxide; | ||||||
15 | (3) specify: | ||||||
16 | (A) the frequency at which permits for the capture | ||||||
17 | of carbon dioxide expire and must be renewed; | ||||||
18 | (B) the circumstances under which a permittee must | ||||||
19 | seek a permit modification; and | ||||||
20 | (C) the circumstances under which the Agency may | ||||||
21 | temporarily or permanently revoke a permit for the | ||||||
22 | capture of carbon dioxide; | ||||||
23 | (4) specify standards for review, approval, and denial | ||||||
24 | of applications for a permit to capture carbon dioxide by | ||||||
25 | the Agency; the standards for denial must include, but are | ||||||
26 | not limited to, failure of the applicant to submit an |
| |||||||
| |||||||
1 | application that meets the requirements of this Section or | ||||||
2 | to satisfy the requirements of subsections (d), (e), | ||||||
3 | (e-1), or (f); | ||||||
4 | (5) specify procedures for meaningful public | ||||||
5 | participation in the issuance of permits for the capture | ||||||
6 | of carbon dioxide, including, but not limited to: | ||||||
7 | (A) public notice of the submission of permit | ||||||
8 | applications, including, but not limited to, notice by | ||||||
9 | email for interested persons; | ||||||
10 | (B) a public meeting, hosted by the Agency, to | ||||||
11 | inform residents about the application and answer | ||||||
12 | questions about the application and carbon dioxide | ||||||
13 | capture projects; | ||||||
14 | (C) posting the full permit application, the draft | ||||||
15 | and final permitting actions by the Agency, and the | ||||||
16 | Agency's response to comments on a public website that | ||||||
17 | must be available to the public without a password, | ||||||
18 | sign-in, or other registration; | ||||||
19 | (D) an opportunity for the submission of public | ||||||
20 | comments on a draft permit or permit denial before the | ||||||
21 | final permitting decision; | ||||||
22 | (E) an opportunity for a public hearing on the | ||||||
23 | draft permit or permit denial before the final | ||||||
24 | permitting decision; and | ||||||
25 | (F) a summary of and response to the comments | ||||||
26 | prepared by the Agency; |
| |||||||
| |||||||
1 | (6) when the capture of carbon dioxide is proposed to | ||||||
2 | take place in an area with a significant proportion of | ||||||
3 | residents with limited English proficiency, specify | ||||||
4 | further opportunities for public participation, including, | ||||||
5 | but not limited to, translations of relevant documents | ||||||
6 | into other languages and interpretation services at public | ||||||
7 | meetings and hearings; | ||||||
8 | (7) specify a procedure to identify areas with a | ||||||
9 | significant proportion of residents with limited English | ||||||
10 | proficiency for purposes of this Section; | ||||||
11 | (8) establish minimum carbon capture efficiency rates | ||||||
12 | at or above 90% for different industries from which | ||||||
13 | applicants may seek to capture carbon dioxide, including | ||||||
14 | rates above 90% for industries in which carbon capture at | ||||||
15 | rates above 90% is technically achievable and has been | ||||||
16 | demonstrated; | ||||||
17 | (9) set out requirements for comprehensive and, where | ||||||
18 | technically available, continuous monitoring by | ||||||
19 | permittees, including, but not limited to, monitoring of: | ||||||
20 | (A) GHG pollution emissions; | ||||||
21 | (B) non-GHG air pollution emissions, including, | ||||||
22 | but not limited to, nitrogen oxides, sulfur dioxide, | ||||||
23 | particulate matter, amines, and nitrosamines; and | ||||||
24 | (C) water use; | ||||||
25 | (10) set out requirements for frequent, comprehensive | ||||||
26 | reporting by permittees to the Agency, including, but not |
| |||||||
| |||||||
1 | limited to: | ||||||
2 | (A) the non-carbon dioxide air emissions | ||||||
3 | associated with the use of carbon capture, including, | ||||||
4 | but not limited to, those emissions resulting from the | ||||||
5 | use of fuel to power the carbon capture process; | ||||||
6 | (B) GHG emissions associated with the use of | ||||||
7 | carbon capture; | ||||||
8 | (C) the total amount, in tons, of carbon dioxide | ||||||
9 | captured at the facility; | ||||||
10 | (D) the total amount, in tons, of carbon dioxide | ||||||
11 | not captured and released into the atmosphere at the | ||||||
12 | facility; | ||||||
13 | (E) the carbon dioxide capture rate achieved by | ||||||
14 | the facility; | ||||||
15 | (F) the date, time, duration, cause, and amount of | ||||||
16 | carbon dioxide released rather than captured as a | ||||||
17 | result of all outages or downtime of capture equipment | ||||||
18 | at the facility; | ||||||
19 | (G) information concerning water use and impacts | ||||||
20 | to water supply and uses associated with the use of | ||||||
21 | carbon capture at the facility; and | ||||||
22 | (H) the end use and destination of all carbon | ||||||
23 | dioxide streams from the project; | ||||||
24 | (11) establish criteria for the exclusion from | ||||||
25 | permitting requirements of carbon capture projects | ||||||
26 | performed for the purpose of, or financed by funding for, |
| |||||||
| |||||||
1 | research and development; the criteria shall ensure that | ||||||
2 | only those projects that capture small amounts of carbon | ||||||
3 | dioxide and pose minimal risk to human health and the | ||||||
4 | environment qualify for the exclusion; | ||||||
5 | (12) establish requirements for determining setbacks | ||||||
6 | from homes, schools, daycares, hospitals, and other | ||||||
7 | sensitive locations for capture projects that capture | ||||||
8 | carbon dioxide directly from the ambient air; and | ||||||
9 | (13) specify whether the permit requirements for | ||||||
10 | carbon dioxide capture set out in the rules may be added to | ||||||
11 | the requirements for a permit that a carbon dioxide | ||||||
12 | capture permit applicant is otherwise required to obtain, | ||||||
13 | or whether the applicant must obtain a separate permit for | ||||||
14 | the capture of carbon dioxide. | ||||||
15 | (h) Once the rules required by subsection (g) have been | ||||||
16 | adopted, the Agency shall calculate the cost it will bear to | ||||||
17 | implement the carbon capture permit program and shall | ||||||
18 | establish a permit fee sufficient to cover those costs, which | ||||||
19 | it may update periodically as the costs of program | ||||||
20 | implementation change. | ||||||
21 | (i) The permit requirements set forth in this Section are | ||||||
22 | in addition to any requirements set forth under any other | ||||||
23 | State or federal law, including, but not limited to, the | ||||||
24 | federal Clean Air Act, the federal Clean Water Act, the | ||||||
25 | federal Resource Conservation and Recovery Act, and the | ||||||
26 | federal Safe Drinking Water Act. |
| |||||||
| |||||||
1 | (j) Every 5 years, the Agency shall conduct a review to | ||||||
2 | identify the carbon dioxide capture efficiency rates being | ||||||
3 | achieved by different industries and, if higher rates have | ||||||
4 | become technologically feasible, propose to the Board | ||||||
5 | revisions to the minimum carbon capture efficiency rates set | ||||||
6 | out in the rules adopted under this Section. | ||||||
7 | (k) No adjusted standard, variance, or other regulatory | ||||||
8 | relief otherwise available under this Act may be granted from | ||||||
9 | the requirements of this Section.
| ||||||
10 | (415 ILCS 5/21) (from Ch. 111 1/2, par. 1021) | ||||||
11 | Sec. 21. Prohibited acts. No person shall: | ||||||
12 | (a) Cause or allow the open dumping of any waste. | ||||||
13 | (b) Abandon, dump, or deposit any waste upon the public | ||||||
14 | highways or other public property, except in a sanitary | ||||||
15 | landfill approved by the Agency pursuant to regulations | ||||||
16 | adopted by the Board. | ||||||
17 | (c) Abandon any vehicle in violation of the "Abandoned | ||||||
18 | Vehicles Amendment to the Illinois Vehicle Code", as enacted | ||||||
19 | by the 76th General Assembly. | ||||||
20 | (d) Conduct any waste-storage, waste-treatment, or | ||||||
21 | waste-disposal operation: | ||||||
22 | (1) without a permit granted by the Agency or in | ||||||
23 | violation of any conditions imposed by such permit, | ||||||
24 | including periodic reports and full access to adequate | ||||||
25 | records and the inspection of facilities, as may be |
| |||||||
| |||||||
1 | necessary to assure compliance with this Act and with | ||||||
2 | regulations and standards adopted thereunder; provided, | ||||||
3 | however, that, except for municipal solid waste landfill | ||||||
4 | units that receive waste on or after October 9, 1993, and | ||||||
5 | CCR surface impoundments, no permit shall be required for | ||||||
6 | (i) any person conducting a waste-storage, | ||||||
7 | waste-treatment, or waste-disposal operation for wastes | ||||||
8 | generated by such person's own activities which are | ||||||
9 | stored, treated, or disposed within the site where such | ||||||
10 | wastes are generated, (ii) until one year after the | ||||||
11 | effective date of rules adopted by the Board under | ||||||
12 | subsection (n) of Section 22.38, a facility located in a | ||||||
13 | county with a population over 700,000 as of January 1, | ||||||
14 | 2000, operated and located in accordance with Section | ||||||
15 | 22.38 of this Act, and used exclusively for the transfer, | ||||||
16 | storage, or treatment of general construction or | ||||||
17 | demolition debris, provided that the facility was | ||||||
18 | receiving construction or demolition debris on August 24, | ||||||
19 | 2009 (the effective date of Public Act 96-611), or (iii) | ||||||
20 | any person conducting a waste transfer, storage, | ||||||
21 | treatment, or disposal operation, including, but not | ||||||
22 | limited to, a waste transfer or waste composting | ||||||
23 | operation, under a mass animal mortality event plan | ||||||
24 | created by the Department of Agriculture; | ||||||
25 | (2) in violation of any regulations or standards | ||||||
26 | adopted by the Board under this Act; |
| |||||||
| |||||||
1 | (3) which receives waste after August 31, 1988, does | ||||||
2 | not have a permit issued by the Agency, and is (i) a | ||||||
3 | landfill used exclusively for the disposal of waste | ||||||
4 | generated at the site, (ii) a surface impoundment | ||||||
5 | receiving special waste not listed in an NPDES permit, | ||||||
6 | (iii) a waste pile in which the total volume of waste is | ||||||
7 | greater than 100 cubic yards or the waste is stored for | ||||||
8 | over one year, or (iv) a land treatment facility receiving | ||||||
9 | special waste generated at the site; without giving notice | ||||||
10 | of the operation to the Agency by January 1, 1989, or 30 | ||||||
11 | days after the date on which the operation commences, | ||||||
12 | whichever is later, and every 3 years thereafter. The form | ||||||
13 | for such notification shall be specified by the Agency, | ||||||
14 | and shall be limited to information regarding: the name | ||||||
15 | and address of the location of the operation; the type of | ||||||
16 | operation; the types and amounts of waste stored, treated | ||||||
17 | or disposed of on an annual basis; the remaining capacity | ||||||
18 | of the operation; and the remaining expected life of the | ||||||
19 | operation. | ||||||
20 | Item (3) of this subsection (d) shall not apply to any | ||||||
21 | person engaged in agricultural activity who is disposing of a | ||||||
22 | substance that constitutes solid waste, if the substance was | ||||||
23 | acquired for use by that person on his own property, and the | ||||||
24 | substance is disposed of on his own property in accordance | ||||||
25 | with regulations or standards adopted by the Board. | ||||||
26 | This subsection (d) shall not apply to hazardous waste. |
| |||||||
| |||||||
1 | (e) Dispose, treat, store or abandon any waste, or | ||||||
2 | transport any waste into this State for disposal, treatment, | ||||||
3 | storage or abandonment, except at a site or facility which | ||||||
4 | meets the requirements of this Act and of regulations and | ||||||
5 | standards thereunder. | ||||||
6 | (f) Conduct any hazardous waste-storage, hazardous | ||||||
7 | waste-treatment or hazardous waste-disposal operation: | ||||||
8 | (1) without a RCRA permit for the site issued by the | ||||||
9 | Agency under subsection (d) of Section 39 of this Act, or | ||||||
10 | in violation of any condition imposed by such permit, | ||||||
11 | including periodic reports and full access to adequate | ||||||
12 | records and the inspection of facilities, as may be | ||||||
13 | necessary to assure compliance with this Act and with | ||||||
14 | regulations and standards adopted thereunder; or | ||||||
15 | (2) in violation of any regulations or standards | ||||||
16 | adopted by the Board under this Act; or | ||||||
17 | (3) in violation of any RCRA permit filing requirement | ||||||
18 | established under standards adopted by the Board under | ||||||
19 | this Act; or | ||||||
20 | (4) in violation of any order adopted by the Board | ||||||
21 | under this Act. | ||||||
22 | Notwithstanding the above, no RCRA permit shall be | ||||||
23 | required under this subsection or subsection (d) of Section 39 | ||||||
24 | of this Act for any person engaged in agricultural activity | ||||||
25 | who is disposing of a substance which has been identified as a | ||||||
26 | hazardous waste, and which has been designated by Board |
| |||||||
| |||||||
1 | regulations as being subject to this exception, if the | ||||||
2 | substance was acquired for use by that person on his own | ||||||
3 | property and the substance is disposed of on his own property | ||||||
4 | in accordance with regulations or standards adopted by the | ||||||
5 | Board. | ||||||
6 | (g) Conduct any hazardous waste-transportation operation: | ||||||
7 | (1) without registering with and obtaining a special | ||||||
8 | waste hauling permit from the Agency in accordance with | ||||||
9 | the regulations adopted by the Board under this Act; or | ||||||
10 | (2) in violation of any regulations or standards | ||||||
11 | adopted by the Board under this Act. | ||||||
12 | (h) Conduct any hazardous waste-recycling or hazardous | ||||||
13 | waste-reclamation or hazardous waste-reuse operation in | ||||||
14 | violation of any regulations, standards or permit requirements | ||||||
15 | adopted by the Board under this Act. | ||||||
16 | (i) Conduct any process or engage in any act which | ||||||
17 | produces hazardous waste in violation of any regulations or | ||||||
18 | standards adopted by the Board under subsections (a) and (c) | ||||||
19 | of Section 22.4 of this Act. | ||||||
20 | (j) Conduct any special waste-transportation operation in | ||||||
21 | violation of any regulations, standards or permit requirements | ||||||
22 | adopted by the Board under this Act. However, sludge from a | ||||||
23 | water or sewage treatment plant owned and operated by a unit of | ||||||
24 | local government which (1) is subject to a sludge management | ||||||
25 | plan approved by the Agency or a permit granted by the Agency, | ||||||
26 | and (2) has been tested and determined not to be a hazardous |
| |||||||
| |||||||
1 | waste as required by applicable State and federal laws and | ||||||
2 | regulations, may be transported in this State without a | ||||||
3 | special waste hauling permit, and the preparation and carrying | ||||||
4 | of a manifest shall not be required for such sludge under the | ||||||
5 | rules of the Pollution Control Board. The unit of local | ||||||
6 | government which operates the treatment plant producing such | ||||||
7 | sludge shall file an annual report with the Agency identifying | ||||||
8 | the volume of such sludge transported during the reporting | ||||||
9 | period, the hauler of the sludge, and the disposal sites to | ||||||
10 | which it was transported. This subsection (j) shall not apply | ||||||
11 | to hazardous waste. | ||||||
12 | (k) Fail or refuse to pay any fee imposed under this Act. | ||||||
13 | (l) Locate a hazardous waste disposal site above an active | ||||||
14 | or inactive shaft or tunneled mine or within 2 miles of an | ||||||
15 | active fault in the earth's crust. In counties of population | ||||||
16 | less than 225,000 no hazardous waste disposal site shall be | ||||||
17 | located (1) within 1 1/2 miles of the corporate limits as | ||||||
18 | defined on June 30, 1978, of any municipality without the | ||||||
19 | approval of the governing body of the municipality in an | ||||||
20 | official action; or (2) within 1000 feet of an existing | ||||||
21 | private well or the existing source of a public water supply | ||||||
22 | measured from the boundary of the actual active permitted site | ||||||
23 | and excluding existing private wells on the property of the | ||||||
24 | permit applicant. The provisions of this subsection do not | ||||||
25 | apply to publicly owned sewage works or the disposal or | ||||||
26 | utilization of sludge from publicly owned sewage works. |
| |||||||
| |||||||
1 | (m) Transfer interest in any land which has been used as a | ||||||
2 | hazardous waste disposal site without written notification to | ||||||
3 | the Agency of the transfer and to the transferee of the | ||||||
4 | conditions imposed by the Agency upon its use under subsection | ||||||
5 | (g) of Section 39. | ||||||
6 | (n) Use any land which has been used as a hazardous waste | ||||||
7 | disposal site except in compliance with conditions imposed by | ||||||
8 | the Agency under subsection (g) of Section 39. | ||||||
9 | (o) Conduct a sanitary landfill operation which is | ||||||
10 | required to have a permit under subsection (d) of this | ||||||
11 | Section, in a manner which results in any of the following | ||||||
12 | conditions: | ||||||
13 | (1) refuse in standing or flowing waters; | ||||||
14 | (2) leachate flows entering waters of the State; | ||||||
15 | (3) leachate flows exiting the landfill confines (as | ||||||
16 | determined by the boundaries established for the landfill | ||||||
17 | by a permit issued by the Agency); | ||||||
18 | (4) open burning of refuse in violation of Section 9 | ||||||
19 | of this Act; | ||||||
20 | (5) uncovered refuse remaining from any previous | ||||||
21 | operating day or at the conclusion of any operating day, | ||||||
22 | unless authorized by permit; | ||||||
23 | (6) failure to provide final cover within time limits | ||||||
24 | established by Board regulations; | ||||||
25 | (7) acceptance of wastes without necessary permits; | ||||||
26 | (8) scavenging as defined by Board regulations; |
| |||||||
| |||||||
1 | (9) deposition of refuse in any unpermitted portion of | ||||||
2 | the landfill; | ||||||
3 | (10) acceptance of a special waste without a required | ||||||
4 | manifest; | ||||||
5 | (11) failure to submit reports required by permits or | ||||||
6 | Board regulations; | ||||||
7 | (12) failure to collect and contain litter from the | ||||||
8 | site by the end of each operating day; | ||||||
9 | (13) failure to submit any cost estimate for the site | ||||||
10 | or any performance bond or other security for the site as | ||||||
11 | required by this Act or Board rules. | ||||||
12 | The prohibitions specified in this subsection (o) shall be | ||||||
13 | enforceable by the Agency either by administrative citation | ||||||
14 | under Section 31.1 of this Act or as otherwise provided by this | ||||||
15 | Act. The specific prohibitions in this subsection do not limit | ||||||
16 | the power of the Board to establish regulations or standards | ||||||
17 | applicable to sanitary landfills. | ||||||
18 | (p) In violation of subdivision (a) of this Section, cause | ||||||
19 | or allow the open dumping of any waste in a manner which | ||||||
20 | results in any of the following occurrences at the dump site: | ||||||
21 | (1) litter; | ||||||
22 | (2) scavenging; | ||||||
23 | (3) open burning; | ||||||
24 | (4) deposition of waste in standing or flowing waters; | ||||||
25 | (5) proliferation of disease vectors; | ||||||
26 | (6) standing or flowing liquid discharge from the dump |
| |||||||
| |||||||
1 | site; | ||||||
2 | (7) deposition of: | ||||||
3 | (i) general construction or demolition debris as | ||||||
4 | defined in Section 3.160(a) of this Act; or | ||||||
5 | (ii) clean construction or demolition debris as | ||||||
6 | defined in Section 3.160(b) of this Act. | ||||||
7 | The prohibitions specified in this subsection (p) shall be | ||||||
8 | enforceable by the Agency either by administrative citation | ||||||
9 | under Section 31.1 of this Act or as otherwise provided by this | ||||||
10 | Act. The specific prohibitions in this subsection do not limit | ||||||
11 | the power of the Board to establish regulations or standards | ||||||
12 | applicable to open dumping. | ||||||
13 | (q) Conduct a landscape waste composting operation without | ||||||
14 | an Agency permit, provided, however, that no permit shall be | ||||||
15 | required for any person: | ||||||
16 | (1) conducting a landscape waste composting operation | ||||||
17 | for landscape wastes generated by such person's own | ||||||
18 | activities which are stored, treated, or disposed of | ||||||
19 | within the site where such wastes are generated; or | ||||||
20 | (1.5) conducting a landscape waste composting | ||||||
21 | operation that (i) has no more than 25 cubic yards of | ||||||
22 | landscape waste, composting additives, composting | ||||||
23 | material, or end-product compost on-site at any one time | ||||||
24 | and (ii) is not engaging in commercial activity; or | ||||||
25 | (2) applying landscape waste or composted landscape | ||||||
26 | waste at agronomic rates; or |
| |||||||
| |||||||
1 | (2.5) operating a landscape waste composting facility | ||||||
2 | at a site having 10 or more occupied non-farm residences | ||||||
3 | within 1/2 mile of its boundaries, if the facility meets | ||||||
4 | all of the following criteria: | ||||||
5 | (A) the composting facility is operated by the | ||||||
6 | farmer on property on which the composting material is | ||||||
7 | utilized, and the composting facility constitutes no | ||||||
8 | more than 2% of the site's total acreage; | ||||||
9 | (A-5) any composting additives that the composting | ||||||
10 | facility accepts and uses at the facility are | ||||||
11 | necessary to provide proper conditions for composting | ||||||
12 | and do not exceed 10% of the total composting material | ||||||
13 | at the facility at any one time; | ||||||
14 | (B) the property on which the composting facility | ||||||
15 | is located, and any associated property on which the | ||||||
16 | compost is used, is principally and diligently devoted | ||||||
17 | to the production of agricultural crops and is not | ||||||
18 | owned, leased, or otherwise controlled by any waste | ||||||
19 | hauler or generator of nonagricultural compost | ||||||
20 | materials, and the operator of the composting facility | ||||||
21 | is not an employee, partner, shareholder, or in any | ||||||
22 | way connected with or controlled by any such waste | ||||||
23 | hauler or generator; | ||||||
24 | (C) all compost generated by the composting | ||||||
25 | facility, except incidental sales of finished compost, | ||||||
26 | is applied at agronomic rates and used as mulch, |
| |||||||
| |||||||
1 | fertilizer, or soil conditioner on land actually | ||||||
2 | farmed by the person operating the composting | ||||||
3 | facility, and the finished compost is not stored at | ||||||
4 | the composting site for a period longer than 18 months | ||||||
5 | prior to its application as mulch, fertilizer, or soil | ||||||
6 | conditioner; | ||||||
7 | (D) no fee is charged for the acceptance of | ||||||
8 | materials to be composted at the facility; and | ||||||
9 | (E) the owner or operator, by January 1, 2014 (or | ||||||
10 | the January 1 following commencement of operation, | ||||||
11 | whichever is later) and January 1 of each year | ||||||
12 | thereafter, registers the site with the Agency, (ii) | ||||||
13 | reports to the Agency on the volume of composting | ||||||
14 | material received and used at the site; (iii) | ||||||
15 | certifies to the Agency that the site complies with | ||||||
16 | the requirements set forth in subparagraphs (A), | ||||||
17 | (A-5), (B), (C), and (D) of this paragraph (2.5); and | ||||||
18 | (iv) certifies to the Agency that all composting | ||||||
19 | material was placed more than 200 feet from the | ||||||
20 | nearest potable water supply well, was placed outside | ||||||
21 | the boundary of the 10-year floodplain or on a part of | ||||||
22 | the site that is floodproofed, was placed at least 1/4 | ||||||
23 | mile from the nearest residence (other than a | ||||||
24 | residence located on the same property as the | ||||||
25 | facility) or a lesser distance from the nearest | ||||||
26 | residence (other than a residence located on the same |
| |||||||
| |||||||
1 | property as the facility) if the municipality in which | ||||||
2 | the facility is located has by ordinance approved a | ||||||
3 | lesser distance than 1/4 mile, and was placed more | ||||||
4 | than 5 feet above the water table; any ordinance | ||||||
5 | approving a residential setback of less than 1/4 mile | ||||||
6 | that is used to meet the requirements of this | ||||||
7 | subparagraph (E) of paragraph (2.5) of this subsection | ||||||
8 | must specifically reference this paragraph; or | ||||||
9 | (3) operating a landscape waste composting facility on | ||||||
10 | a farm, if the facility meets all of the following | ||||||
11 | criteria: | ||||||
12 | (A) the composting facility is operated by the | ||||||
13 | farmer on property on which the composting material is | ||||||
14 | utilized, and the composting facility constitutes no | ||||||
15 | more than 2% of the property's total acreage, except | ||||||
16 | that the Board may allow a higher percentage for | ||||||
17 | individual sites where the owner or operator has | ||||||
18 | demonstrated to the Board that the site's soil | ||||||
19 | characteristics or crop needs require a higher rate; | ||||||
20 | (A-1) the composting facility accepts from other | ||||||
21 | agricultural operations for composting with landscape | ||||||
22 | waste no materials other than uncontaminated and | ||||||
23 | source-separated (i) crop residue and other | ||||||
24 | agricultural plant residue generated from the | ||||||
25 | production and harvesting of crops and other customary | ||||||
26 | farm practices, including, but not limited to, stalks, |
| |||||||
| |||||||
1 | leaves, seed pods, husks, bagasse, and roots and (ii) | ||||||
2 | plant-derived animal bedding, such as straw or | ||||||
3 | sawdust, that is free of manure and was not made from | ||||||
4 | painted or treated wood; | ||||||
5 | (A-2) any composting additives that the composting | ||||||
6 | facility accepts and uses at the facility are | ||||||
7 | necessary to provide proper conditions for composting | ||||||
8 | and do not exceed 10% of the total composting material | ||||||
9 | at the facility at any one time; | ||||||
10 | (B) the property on which the composting facility | ||||||
11 | is located, and any associated property on which the | ||||||
12 | compost is used, is principally and diligently devoted | ||||||
13 | to the production of agricultural crops and is not | ||||||
14 | owned, leased or otherwise controlled by any waste | ||||||
15 | hauler or generator of nonagricultural compost | ||||||
16 | materials, and the operator of the composting facility | ||||||
17 | is not an employee, partner, shareholder, or in any | ||||||
18 | way connected with or controlled by any such waste | ||||||
19 | hauler or generator; | ||||||
20 | (C) all compost generated by the composting | ||||||
21 | facility, except incidental sales of finished compost, | ||||||
22 | is applied at agronomic rates and used as mulch, | ||||||
23 | fertilizer or soil conditioner on land actually farmed | ||||||
24 | by the person operating the composting facility, and | ||||||
25 | the finished compost is not stored at the composting | ||||||
26 | site for a period longer than 18 months prior to its |
| |||||||
| |||||||
1 | application as mulch, fertilizer, or soil conditioner; | ||||||
2 | (D) the owner or operator, by January 1 of each | ||||||
3 | year, (i) registers the site with the Agency, (ii) | ||||||
4 | reports to the Agency on the volume of composting | ||||||
5 | material received and used at the site and the volume | ||||||
6 | of material comprising the incidental sale of finished | ||||||
7 | compost under this subsection (q), (iii) certifies to | ||||||
8 | the Agency that the site complies with the | ||||||
9 | requirements set forth in subparagraphs (A), (A-1), | ||||||
10 | (A-2), (B), and (C) of this paragraph (q)(3), and (iv) | ||||||
11 | certifies to the Agency that all composting material: | ||||||
12 | (I) was placed more than 200 feet from the | ||||||
13 | nearest potable water supply well; | ||||||
14 | (II) was placed outside the boundary of the | ||||||
15 | 10-year floodplain or on a part of the site that is | ||||||
16 | floodproofed; | ||||||
17 | (III) was placed either (aa) at least 1/4 mile | ||||||
18 | from the nearest residence (other than a residence | ||||||
19 | located on the same property as the facility) and | ||||||
20 | there are not more than 10 occupied non-farm | ||||||
21 | residences within 1/2 mile of the boundaries of | ||||||
22 | the site on the date of application or (bb) a | ||||||
23 | lesser distance from the nearest residence (other | ||||||
24 | than a residence located on the same property as | ||||||
25 | the facility) provided that the municipality or | ||||||
26 | county in which the facility is located has by |
| |||||||
| |||||||
1 | ordinance approved a lesser distance than 1/4 mile | ||||||
2 | and there are not more than 10 occupied non-farm | ||||||
3 | residences within 1/2 mile of the boundaries of | ||||||
4 | the site on the date of application; and | ||||||
5 | (IV) was placed more than 5 feet above the | ||||||
6 | water table. | ||||||
7 | Any ordinance approving a residential setback of | ||||||
8 | less than 1/4 mile that is used to meet the | ||||||
9 | requirements of this subparagraph (D) must | ||||||
10 | specifically reference this subparagraph. | ||||||
11 | For the purposes of this subsection (q), "agronomic rates" | ||||||
12 | means the application of not more than 20 tons per acre per | ||||||
13 | year, except that the Board may allow a higher rate for | ||||||
14 | individual sites where the owner or operator has demonstrated | ||||||
15 | to the Board that the site's soil characteristics or crop | ||||||
16 | needs require a higher rate. | ||||||
17 | For the purposes of this subsection (q), "incidental sale | ||||||
18 | of finished compost" means the sale of finished compost that | ||||||
19 | meets general use compost standards and is no more than 20% or | ||||||
20 | 300 cubic yards, whichever is less, of the total compost | ||||||
21 | created annually by a private landowner for the landowner's | ||||||
22 | own use. | ||||||
23 | (r) Cause or allow the storage or disposal of coal | ||||||
24 | combustion waste unless: | ||||||
25 | (1) such waste is stored or disposed of at a site or | ||||||
26 | facility for which a permit has been obtained or is not |
| |||||||
| |||||||
1 | otherwise required under subsection (d) of this Section; | ||||||
2 | or | ||||||
3 | (2) such waste is stored or disposed of as a part of | ||||||
4 | the design and reclamation of a site or facility which is | ||||||
5 | an abandoned mine site in accordance with the Abandoned | ||||||
6 | Mined Lands and Water Reclamation Act; or | ||||||
7 | (3) such waste is stored or disposed of at a site or | ||||||
8 | facility which is operating under NPDES and Subtitle D | ||||||
9 | permits issued by the Agency pursuant to regulations | ||||||
10 | adopted by the Board for mine-related water pollution and | ||||||
11 | permits issued pursuant to the federal Surface Mining | ||||||
12 | Control and Reclamation Act of 1977 (P.L. 95-87) or the | ||||||
13 | rules and regulations thereunder or any law or rule or | ||||||
14 | regulation adopted by the State of Illinois pursuant | ||||||
15 | thereto, and the owner or operator of the facility agrees | ||||||
16 | to accept the waste; and either: | ||||||
17 | (i) such waste is stored or disposed of in | ||||||
18 | accordance with requirements applicable to refuse | ||||||
19 | disposal under regulations adopted by the Board for | ||||||
20 | mine-related water pollution and pursuant to NPDES and | ||||||
21 | Subtitle D permits issued by the Agency under such | ||||||
22 | regulations; or | ||||||
23 | (ii) the owner or operator of the facility | ||||||
24 | demonstrates all of the following to the Agency, and | ||||||
25 | the facility is operated in accordance with the | ||||||
26 | demonstration as approved by the Agency: (1) the |
| |||||||
| |||||||
1 | disposal area will be covered in a manner that will | ||||||
2 | support continuous vegetation, (2) the facility will | ||||||
3 | be adequately protected from wind and water erosion, | ||||||
4 | (3) the pH will be maintained so as to prevent | ||||||
5 | excessive leaching of metal ions, and (4) adequate | ||||||
6 | containment or other measures will be provided to | ||||||
7 | protect surface water and groundwater from | ||||||
8 | contamination at levels prohibited by this Act, the | ||||||
9 | Illinois Groundwater Protection Act, or regulations | ||||||
10 | adopted pursuant thereto. | ||||||
11 | Notwithstanding any other provision of this Title, the | ||||||
12 | disposal of coal combustion waste pursuant to item (2) or (3) | ||||||
13 | of this subdivision (r) shall be exempt from the other | ||||||
14 | provisions of this Title V, and notwithstanding the provisions | ||||||
15 | of Title X of this Act, the Agency is authorized to grant | ||||||
16 | experimental permits which include provision for the disposal | ||||||
17 | of wastes from the combustion of coal and other materials | ||||||
18 | pursuant to items (2) and (3) of this subdivision (r). | ||||||
19 | (s) After April 1, 1989, offer for transportation, | ||||||
20 | transport, deliver, receive or accept special waste for which | ||||||
21 | a manifest is required, unless the manifest indicates that the | ||||||
22 | fee required under Section 22.8 of this Act has been paid. | ||||||
23 | (t) Cause or allow a lateral expansion of a municipal | ||||||
24 | solid waste landfill unit on or after October 9, 1993, without | ||||||
25 | a permit modification, granted by the Agency, that authorizes | ||||||
26 | the lateral expansion. |
| |||||||
| |||||||
1 | (u) Conduct any vegetable by-product treatment, storage, | ||||||
2 | disposal or transportation operation in violation of any | ||||||
3 | regulation, standards or permit requirements adopted by the | ||||||
4 | Board under this Act. However, no permit shall be required | ||||||
5 | under this Title V for the land application of vegetable | ||||||
6 | by-products conducted pursuant to Agency permit issued under | ||||||
7 | Title III of this Act to the generator of the vegetable | ||||||
8 | by-products. In addition, vegetable by-products may be | ||||||
9 | transported in this State without a special waste hauling | ||||||
10 | permit, and without the preparation and carrying of a | ||||||
11 | manifest. | ||||||
12 | (v) (Blank). | ||||||
13 | (w) Conduct any generation, transportation, or recycling | ||||||
14 | of construction or demolition debris, clean or general, or | ||||||
15 | uncontaminated soil generated during construction, remodeling, | ||||||
16 | repair, and demolition of utilities, structures, and roads | ||||||
17 | that is not commingled with any waste, without the maintenance | ||||||
18 | of documentation identifying the hauler, generator, place of | ||||||
19 | origin of the debris or soil, the weight or volume of the | ||||||
20 | debris or soil, and the location, owner, and operator of the | ||||||
21 | facility where the debris or soil was transferred, disposed, | ||||||
22 | recycled, or treated. This documentation must be maintained by | ||||||
23 | the generator, transporter, or recycler for 3 years. This | ||||||
24 | subsection (w) shall not apply to (1) a permitted pollution | ||||||
25 | control facility that transfers or accepts construction or | ||||||
26 | demolition debris, clean or general, or uncontaminated soil |
| |||||||
| |||||||
1 | for final disposal, recycling, or treatment, (2) a public | ||||||
2 | utility (as that term is defined in the Public Utilities Act) | ||||||
3 | or a municipal utility, (3) the Illinois Department of | ||||||
4 | Transportation, or (4) a municipality or a county highway | ||||||
5 | department, with the exception of any municipality or county | ||||||
6 | highway department located within a county having a population | ||||||
7 | of over 3,000,000 inhabitants or located in a county that is | ||||||
8 | contiguous to a county having a population of over 3,000,000 | ||||||
9 | inhabitants; but it shall apply to an entity that contracts | ||||||
10 | with a public utility, a municipal utility, the Illinois | ||||||
11 | Department of Transportation, or a municipality or a county | ||||||
12 | highway department. The terms "generation" and "recycling", as | ||||||
13 | used in this subsection, do not apply to clean construction or | ||||||
14 | demolition debris when (i) used as fill material below grade | ||||||
15 | outside of a setback zone if covered by sufficient | ||||||
16 | uncontaminated soil to support vegetation within 30 days of | ||||||
17 | the completion of filling or if covered by a road or structure, | ||||||
18 | (ii) solely broken concrete without protruding metal bars is | ||||||
19 | used for erosion control, or (iii) milled asphalt or crushed | ||||||
20 | concrete is used as aggregate in construction of the shoulder | ||||||
21 | of a roadway. The terms "generation" and "recycling", as used | ||||||
22 | in this subsection, do not apply to uncontaminated soil that | ||||||
23 | is not commingled with any waste when (i) used as fill material | ||||||
24 | below grade or contoured to grade, or (ii) used at the site of | ||||||
25 | generation. | ||||||
26 | (x) Conduct any carbon sequestration operation: |
| |||||||
| |||||||
1 | (1) without a permit granted by the Agency in | ||||||
2 | accordance with Section 22.64 and any rules adopted under | ||||||
3 | that Section, or in violation of any condition imposed by | ||||||
4 | the permit, including periodic reports and full access to | ||||||
5 | adequate records and the inspection of facilities as may | ||||||
6 | be necessary to ensure compliance with this Act and any | ||||||
7 | rules or standards adopted under this Act; | ||||||
8 | (2) in violation of this Act or any rules or standards | ||||||
9 | adopted by the Board under this Act; | ||||||
10 | (3) in violation of any order adopted by the Board | ||||||
11 | under this Act; | ||||||
12 | (4) which sequesters carbon dioxide in, or where | ||||||
13 | carbon dioxide is injected into a well that passes | ||||||
14 | through, a sole-source aquifer designated by the United | ||||||
15 | States Environmental Protection Agency under the federal | ||||||
16 | Safe Drinking Water Act, including, but not limited to, | ||||||
17 | the Mahomet Aquifer; | ||||||
18 | (5) where the area of review is less than 6.2 miles in | ||||||
19 | any direction from the epicenter of any recorded | ||||||
20 | earthquake, natural or induced, with a magnitude of 3.0 or | ||||||
21 | greater; | ||||||
22 | (6) using an injection well that is or was classified | ||||||
23 | as a Class II well, as defined in 40 CFR Part 146; or | ||||||
24 | (7) in any pore space within an area of review | ||||||
25 | underlying any federal, State, or local protected areas, | ||||||
26 | including, but not limited to, areas designed as a: |
| |||||||
| |||||||
1 | (A) National Park; | ||||||
2 | (B) National Forest; | ||||||
3 | (C) National Grassland; | ||||||
4 | (D) National Wildlife Refuge; | ||||||
5 | (E) National Historic Site; | ||||||
6 | (F) U.S. Wilderness Area; | ||||||
7 | (G) U.S. Fish and Wildlife Service protected area; | ||||||
8 | (H) U.S. Army Corps of Engineers protected area; | ||||||
9 | (I) State Park; | ||||||
10 | (J) State Recreation Area; | ||||||
11 | (K) State Forest; | ||||||
12 | (L) State Historic Site; | ||||||
13 | (M) State Fish and Wildlife Area; | ||||||
14 | (N) State Nature Preserve; | ||||||
15 | (O) State Wildlife Management Area; | ||||||
16 | (P) State Memorial; | ||||||
17 | (Q) County Forest Preserve district; | ||||||
18 | (R) County park; or | ||||||
19 | (S) County, State, or private zoo. | ||||||
20 | (y) Inject any concentrated carbon dioxide fluid produced | ||||||
21 | by a carbon dioxide capture project into a Class II well for | ||||||
22 | purposes of enhanced oil or gas recovery, including, but not | ||||||
23 | limited to, the facilitation of enhanced oil or gas recovery | ||||||
24 | from another well. | ||||||
25 | (z) Sell or transport concentrated carbon dioxide fluid | ||||||
26 | produced by a carbon dioxide capture project for use in |
| |||||||
| |||||||
1 | enhanced oil or gas recovery. | ||||||
2 | (aa) Conduct any activity, including, but not limited to, | ||||||
3 | operating a Class II or any other injection well, performing | ||||||
4 | hydraulic fracturing, or engaging in conventional oil or gas | ||||||
5 | drilling or operations within or outside the area of review of | ||||||
6 | a sequestration facility, that may affect the pore-pressure of | ||||||
7 | a formation used for geological storage of carbon dioxide | ||||||
8 | without notifying the Agency and demonstrating to the | ||||||
9 | satisfaction of the Agency that the activity shall not expand | ||||||
10 | the area of review, compromise the integrity of well | ||||||
11 | penetrations and the confining zone within the area of review, | ||||||
12 | or induce seismicity within or outside the area of review to a | ||||||
13 | degree that could cause damage to well penetrations or | ||||||
14 | confining layers within the area of review. | ||||||
15 | (Source: P.A. 102-216, eff. 1-1-22; 102-310, eff. 8-6-21; | ||||||
16 | 102-558, eff. 8-20-21; 102-813, eff. 5-13-22; 103-342, eff. | ||||||
17 | 1-1-24 .)
| ||||||
18 | (415 ILCS 5/22.64 new) | ||||||
19 | Sec. 22.64. Carbon sequestration. | ||||||
20 | (a) The General Assembly finds that: | ||||||
21 | (1) The State has a long-standing policy to restore, | ||||||
22 | protect, and enhance the environment, including the purity | ||||||
23 | of the air, land, and waters, including groundwaters, of | ||||||
24 | this State. | ||||||
25 | (2) A clean environment is essential to the growth and |
| |||||||
| |||||||
1 | well-being of this State. | ||||||
2 | (3) The sequestration of carbon in underground | ||||||
3 | formations poses a significant and long-term risk to the | ||||||
4 | air, land, and waters, including groundwater, of the State | ||||||
5 | unless the State adopts clear standards to ensure that no | ||||||
6 | sequestered carbon escapes the underground formation into | ||||||
7 | which it is injected. | ||||||
8 | (4) Meaningful participation of State residents, | ||||||
9 | especially vulnerable populations who may be affected by | ||||||
10 | regulatory actions, is critical to ensure that | ||||||
11 | environmental justice considerations are incorporated in | ||||||
12 | the development of, decision-making related to, and | ||||||
13 | implementation of environmental laws and rulemaking that | ||||||
14 | protects and improves the well-being of communities in | ||||||
15 | this State that bear disproportionate burdens imposed by | ||||||
16 | environmental pollution. | ||||||
17 | (a-5) The purpose of this Section is to promote a | ||||||
18 | healthful environment, including clean water, air, and land, | ||||||
19 | meaningful public involvement, and to ensure only responsible | ||||||
20 | sequestration of carbon dioxide occurs in the State so as to | ||||||
21 | protect public health and to prevent pollution of the | ||||||
22 | environment. | ||||||
23 | (a-10) The provisions of this Section shall be liberally | ||||||
24 | construed to carry out the purposes of this Section. | ||||||
25 | (b) Any person seeking to sequester carbon dioxide in this | ||||||
26 | State must first obtain a carbon sequestration permit from the |
| |||||||
| |||||||
1 | Agency in accordance with the rules developed under subsection | ||||||
2 | (g). | ||||||
3 | (c) Except for persons who seek to sequester carbon | ||||||
4 | dioxide captured only from capture projects located in the | ||||||
5 | State, any person seeking to sequester carbon dioxide in this | ||||||
6 | State must, before seeking a carbon sequestration permit in | ||||||
7 | accordance with the rules developed under subsection (g), | ||||||
8 | first conduct an environmental impact analysis. The | ||||||
9 | environmental impact analysis must: | ||||||
10 | (1) include a statement of purpose and need for the | ||||||
11 | proposed carbon sequestration project; | ||||||
12 | (2) include a GHG inventory analysis, including, but | ||||||
13 | not limited to, Scope 1, 2, and 3 emissions set forth in | ||||||
14 | guidance published by the United States Environmental | ||||||
15 | Protection Agency, of the total GHG emissions associated | ||||||
16 | with the capture, transportation, and sequestration of the | ||||||
17 | carbon dioxide proposed to be sequestered, which emissions | ||||||
18 | shall be expressed as carbon dioxide equivalent, | ||||||
19 | consistent with United States Environmental Protection | ||||||
20 | Agency rules and guidance; | ||||||
21 | (3) demonstrate that the total Scope 1, 2, and 3 GHG | ||||||
22 | emissions associated with the capture, transport, and | ||||||
23 | sequestration of the carbon dioxide proposed to be | ||||||
24 | sequestered, converted into carbon dioxide equivalent | ||||||
25 | consistent with United States Environmental Protection | ||||||
26 | Agency rules and guidance, will not exceed the total |
| |||||||
| |||||||
1 | amount of carbon dioxide that is sequestered over the life | ||||||
2 | of the sequestration project; | ||||||
3 | (4) include an alternatives analysis that evaluates | ||||||
4 | other reasonable alternatives for achieving the same | ||||||
5 | volume of carbon dioxide emissions reductions as are | ||||||
6 | proposed to be achieved through carbon sequestration, | ||||||
7 | including, but not limited to: | ||||||
8 | (A) if the carbon dioxide was captured at a | ||||||
9 | facility that generates electricity, energy-generation | ||||||
10 | alternatives such as renewable energy, energy storage, | ||||||
11 | or energy efficiency; | ||||||
12 | (B) if the carbon dioxide was captured at a | ||||||
13 | facility that produces fuel for motor vehicles, | ||||||
14 | aircraft, or equipment, alternatives such as the use | ||||||
15 | of electric vehicles, electric aircraft, or | ||||||
16 | alternative fuels; and | ||||||
17 | (C) if the carbon dioxide was captured at an | ||||||
18 | industrial facility, alternative processes that could | ||||||
19 | reduce the amount of carbon dioxide generated. | ||||||
20 | For each alternative identified under this paragraph, | ||||||
21 | the person seeking to sequester carbon dioxide shall | ||||||
22 | complete a GHG inventory analysis of the alternative | ||||||
23 | consistent with paragraph (2); and | ||||||
24 | (5) be developed with public input, including by | ||||||
25 | making a draft version of the analysis available on a | ||||||
26 | public website for not less than 60 days and accepting |
| |||||||
| |||||||
1 | comments on the proposed analysis for the entirety of that | ||||||
2 | 60-day period, together with a public meeting at least 14 | ||||||
3 | days after the posting of the draft on the public website | ||||||
4 | that provides a meaningful opportunity for the public to | ||||||
5 | ask questions, have those questions answered, and provide | ||||||
6 | comment on the draft; the final environmental analysis | ||||||
7 | must include responses to public comments, identify all | ||||||
8 | changes to the analysis made in response to those | ||||||
9 | comments, and be made available to the public on a public | ||||||
10 | website. | ||||||
11 | (d) Any person seeking to sequester carbon dioxide in this | ||||||
12 | State must, before seeking a carbon sequestration permit in | ||||||
13 | accordance with the rules developed under subsection (g), | ||||||
14 | first: | ||||||
15 | (1) conduct an area of review analysis that identifies | ||||||
16 | any faults, fractures, cracks, abandoned or operating | ||||||
17 | wells, seismic activity, or other features of the area of | ||||||
18 | review that could interfere with containment of carbon | ||||||
19 | dioxide and, if any such feature is present, demonstrates | ||||||
20 | that the feature will not interfere with carbon dioxide | ||||||
21 | containment; and | ||||||
22 | (2) at least 30 days before filing the application for | ||||||
23 | a carbon sequestration permit in accordance with this | ||||||
24 | Section, send by certified U.S. Mail a notice to all | ||||||
25 | owners of real property overlying the Area of Review of | ||||||
26 | the person or entity's intent to file an application for a |
| |||||||
| |||||||
1 | carbon sequestration permit; the notice shall include a | ||||||
2 | map of the Area of Review identifying the intended | ||||||
3 | location of the carbon dioxide injection well and | ||||||
4 | confining zone, together with the link to the public | ||||||
5 | website at which the permit application will be posted. | ||||||
6 | (e) Any person who applies for or is granted a permit for | ||||||
7 | carbon sequestration under this Section shall post with the | ||||||
8 | Agency a performance bond or other security in accordance with | ||||||
9 | this Act and the rules developed under subsection (g). The | ||||||
10 | only acceptable forms of financial assurance are a trust fund, | ||||||
11 | a surety bond guaranteeing payment, a surety bond guaranteeing | ||||||
12 | performance, or an irrevocable letter of credit. Financial | ||||||
13 | assurance must be sufficient to cover the cost of actions set | ||||||
14 | out in 40 CFR 146.85(a)(2)-(3) and must be maintained by the | ||||||
15 | permittee until the end of the post-injection site care | ||||||
16 | period. | ||||||
17 | The Agency may enter into contracts and agreements it | ||||||
18 | deems necessary to carry out the purposes of this Section, | ||||||
19 | including, but not limited to, interagency agreements with the | ||||||
20 | Illinois State Geological Society, Illinois Department of | ||||||
21 | Natural Resources, or other agencies of the State. Neither the | ||||||
22 | State nor any State employee shall be liable for any damages or | ||||||
23 | injuries arising out of or resulting from any action taken | ||||||
24 | under this Section. | ||||||
25 | The Agency may approve or disapprove any performance bond | ||||||
26 | or other security posted under this subsection. Any person |
| |||||||
| |||||||
1 | whose performance bond or other security is disapproved by the | ||||||
2 | Agency may contest the disapproval as a permit denial appeal | ||||||
3 | under Section 40. | ||||||
4 | (f) Every applicant for a permit for carbon sequestration | ||||||
5 | under this Section shall first register with the Agency at | ||||||
6 | least 60 days before applying for a permit. The Agency shall | ||||||
7 | make available a registration form within 90 days after the | ||||||
8 | effective date of this Act. The registration form shall | ||||||
9 | require the following information: | ||||||
10 | (1) the name and address of the registrant and any | ||||||
11 | parent, subsidiary, or affiliate thereof; | ||||||
12 | (2) disclosure of all findings of a serious violation | ||||||
13 | or an equivalent violation under federal or State laws, | ||||||
14 | rules, or regulations concerning the development or | ||||||
15 | operation of a carbon dioxide injection well, a carbon | ||||||
16 | dioxide pipeline, or an oil or gas exploration or | ||||||
17 | production site, by the applicant or any parent, | ||||||
18 | subsidiary, or affiliate thereof within the previous 5 | ||||||
19 | years; and | ||||||
20 | (3) proof of insurance to cover injuries, damages, or | ||||||
21 | losses related to a release of carbon dioxide from the | ||||||
22 | confining zone in the amount of at least $250,000,000, | ||||||
23 | from an insurance carrier authorized, licensed, or | ||||||
24 | permitted to do business in this State and that holds at | ||||||
25 | least an A- rating by an American credit rating agency | ||||||
26 | that focuses on the insurance industry. |
| |||||||
| |||||||
1 | A registrant must notify the Department of any change in | ||||||
2 | the information identified in paragraph (1), (2), or (3) no | ||||||
3 | later than one month after the change, or sooner upon request | ||||||
4 | of the Agency. | ||||||
5 | If granted a carbon sequestration permit under this | ||||||
6 | Section, the permittee must maintain insurance in accordance | ||||||
7 | with paragraph (3) throughout the period during which carbon | ||||||
8 | dioxide is injected into the sequestration site and at least | ||||||
9 | 100 years thereafter. | ||||||
10 | (g) The Board shall adopt rules establishing permit | ||||||
11 | requirements and other standards for carbon sequestration. The | ||||||
12 | Board's rules shall address, but are not limited to, the | ||||||
13 | following issues: applicability; required permit information; | ||||||
14 | minimum criteria for siting; corrective action; financial | ||||||
15 | responsibility; testing and monitoring requirements; reporting | ||||||
16 | requirements; post-injection site care and site closure; | ||||||
17 | emergency and remedial response; and security protections for | ||||||
18 | injection wells, monitors, and other associated infrastructure | ||||||
19 | to prevent tampering with sequestration-related equipment. | ||||||
20 | Not later than one year after the effective date of this | ||||||
21 | Act the Agency shall propose, and not later than 2 years after | ||||||
22 | receipt of the Agency's proposal the Board shall adopt, the | ||||||
23 | rules required under this Section. The rules must, at a | ||||||
24 | minimum: | ||||||
25 | (1) be at least as protective as federal rules and | ||||||
26 | regulations governing Class VI injection wells, that were |
| |||||||
| |||||||
1 | published in the Federal Register on December 10, 2010, by | ||||||
2 | the Administrator of the United States Environmental | ||||||
3 | Protection Agency and codified at 40 CFR 146; | ||||||
4 | (2) specify the minimum contents of carbon | ||||||
5 | sequestration permit applications, which shall include: | ||||||
6 | (A) where applicable, the environmental impact | ||||||
7 | analyses required under subsection (c) and the area of | ||||||
8 | review analysis required under subsection (d); | ||||||
9 | (B) the Class VI permit, issued by the United | ||||||
10 | States Environmental Protection Agency or a State | ||||||
11 | agency authorized to issue Class VI permits for carbon | ||||||
12 | dioxide sequestration, for the sequestration facility | ||||||
13 | seeking a carbon sequestration permit; | ||||||
14 | (C) a proposed seismic monitoring plan in | ||||||
15 | accordance with the rules developed under subsection | ||||||
16 | (k) and a probabilistic seismic hazard analysis, | ||||||
17 | including, but not limited to, a review of prior | ||||||
18 | induced seismicity in the area of review associated | ||||||
19 | with injection of fluids or gasses within or outside | ||||||
20 | the area of review, together with predictions, | ||||||
21 | produced by computer modeling, of the induced | ||||||
22 | seismicity likely to result from the proposed | ||||||
23 | sequestration project in addition to seismicity | ||||||
24 | already occurring or likely to occur at the site due to | ||||||
25 | other activities or natural forces within or outside | ||||||
26 | the area of review; |
| |||||||
| |||||||
1 | (D) computer simulation data and report | ||||||
2 | demonstrating that the sequestration project will | ||||||
3 | satisfy the permanence standard required by this | ||||||
4 | Section; and | ||||||
5 | (E) documentation and analyses sufficient to | ||||||
6 | demonstrate compliance with all applicable rules for | ||||||
7 | carbon sequestration adopted under this Section. | ||||||
8 | (3) specify the frequency at which carbon | ||||||
9 | sequestration permits expire and must be renewed, the | ||||||
10 | circumstances under which a permittee must seek a permit | ||||||
11 | modification, and the circumstances under which the Agency | ||||||
12 | may temporarily or permanently revoke a carbon | ||||||
13 | sequestration permit; | ||||||
14 | (4) specify the circumstances under which a carbon | ||||||
15 | sequestration permit may be transferred, including, but | ||||||
16 | not limited to: (A) prohibiting the transfer of a carbon | ||||||
17 | sequestration permit unless (i) the transferee has | ||||||
18 | demonstrated, to the satisfaction of the Agency, that it | ||||||
19 | has met the financial assurance and insurance requirements | ||||||
20 | set out in this Section and that it has the capacity to | ||||||
21 | carry out the requirements of the permit; and (B) | ||||||
22 | requiring the transferee to provide notice by direct mail | ||||||
23 | to all surface owners above the area of review for a | ||||||
24 | sequestration facility of any transfers of the carbon | ||||||
25 | sequestration permit for that facility; | ||||||
26 | (5) specify standards for review, approval, and denial |
| |||||||
| |||||||
1 | by the Agency of carbon sequestration permit applications; | ||||||
2 | (6) specify meaningful public participation procedures | ||||||
3 | for the issuance of carbon sequestration permits, | ||||||
4 | including, but not limited to: | ||||||
5 | (A) public notice of the submission of permit | ||||||
6 | applications; | ||||||
7 | (B) posting of the full permit application, all | ||||||
8 | documentation and analyses the applicant relied on to | ||||||
9 | come to any calculations or judgments asserted or | ||||||
10 | implied in the permit application, the draft and final | ||||||
11 | permitting actions by the Agency, and the Agency's | ||||||
12 | response to comments on a public website that must be | ||||||
13 | available to the public without a password, sign-in, | ||||||
14 | or other registration; | ||||||
15 | (C) an opportunity for the submission of public | ||||||
16 | comments; | ||||||
17 | (D) an opportunity for a public hearing prior to | ||||||
18 | permit issuance; and | ||||||
19 | (E) a summary and response of the comments | ||||||
20 | prepared by the Agency; when the sequestration is | ||||||
21 | proposed to take place in an area with a significant | ||||||
22 | proportion of residents with limited English | ||||||
23 | proficiency, or otherwise of environmental justice | ||||||
24 | concern, the rules shall specify further opportunities | ||||||
25 | for public participation, including, but not limited | ||||||
26 | to, public meetings, translations of relevant |
| |||||||
| |||||||
1 | documents into other languages, and interpretation | ||||||
2 | services at public meetings and hearings; | ||||||
3 | (7) prescribe the type and amount of the performance | ||||||
4 | bonds or other securities required under subsection (e) | ||||||
5 | and the conditions under which the State is entitled to | ||||||
6 | collect moneys from such performance bonds or other | ||||||
7 | securities; | ||||||
8 | (8) specify a procedure to identify areas with a | ||||||
9 | significant proportion of residents with limited English | ||||||
10 | proficiency proximate to sequestration facilities; | ||||||
11 | (9) prohibit carbon dioxide sequestration unless the | ||||||
12 | permit applicant demonstrates that: | ||||||
13 | (A) the area of review in which the applicant | ||||||
14 | proposes to sequester carbon dioxide is not in a | ||||||
15 | location in which carbon sequestration could pose an | ||||||
16 | undue risk of harm to human health or the environment, | ||||||
17 | taking into account the cumulative risks posed by the | ||||||
18 | proposed sequestration project in conjunction with | ||||||
19 | other existing or proposed sequestration projects, | ||||||
20 | injection wells, oil or gas extraction wells, | ||||||
21 | underground natural gas storage projects, or other | ||||||
22 | activities affecting subsurface pressure; | ||||||
23 | (B) the area of review in which the applicant | ||||||
24 | proposes to sequester carbon dioxide does not | ||||||
25 | intersect with an aquifer containing groundwater | ||||||
26 | classified as Class 1, Class 2, or Class 3 under 35 |
| |||||||
| |||||||
1 | Ill. Adm. Code Part 620, Subpart B; | ||||||
2 | (C) the area of review in which the applicant | ||||||
3 | proposes to sequester carbon dioxide does not | ||||||
4 | intersect with any aquifer that is hydraulically | ||||||
5 | connected to aquifers containing groundwater | ||||||
6 | classified as Class I, II, III under 35 Ill. Adm. Code | ||||||
7 | Part 620, Subpart B; | ||||||
8 | (D) the area of review in which the applicant | ||||||
9 | proposes to sequester carbon dioxide does not contain | ||||||
10 | any faults, fractures, well penetrations, mine shafts, | ||||||
11 | quarries, or other features that could interfere with | ||||||
12 | containment of carbon dioxide; and | ||||||
13 | (E) the sequestration project, in combination with | ||||||
14 | any natural seismicity and other activities that | ||||||
15 | create induced seismicity, will not create a level of | ||||||
16 | seismic activity that poses a risk of harm to public | ||||||
17 | health and safety, either directly or indirectly via | ||||||
18 | damage to well penetrations, equipment, confining | ||||||
19 | layers, or other infrastructure or geology that plays | ||||||
20 | a role in keeping carbon dioxide within the area of | ||||||
21 | review; | ||||||
22 | (F) submits all documentation and analyses the | ||||||
23 | applicant relies on in making the demonstrations | ||||||
24 | required by this paragraph (9); | ||||||
25 | (10) require that monitoring of carbon sequestration | ||||||
26 | facilities be conducted by a third-party contractor; |
| |||||||
| |||||||
1 | (11) establish minimum qualifications for third-party | ||||||
2 | contractors to conduct monitoring; | ||||||
3 | (12) specify the types of monitors and frequency of | ||||||
4 | monitoring to be performed at carbon sequestration | ||||||
5 | facilities, which, in addition to monitoring required | ||||||
6 | under 40 CFR 146, shall include: (i) surface air | ||||||
7 | monitoring, soil gas monitoring, seismicity monitoring, | ||||||
8 | and any other types of monitoring the Board determines are | ||||||
9 | appropriate to protect health and the environment and (ii) | ||||||
10 | after a sequestration facility receives authorization for | ||||||
11 | site closure from the Administrator of the United States | ||||||
12 | Environmental Protection Agency or a State agency | ||||||
13 | authorized to issue Class VI permits under the federal | ||||||
14 | Safe Drinking Water Act, annual imaging of the carbon | ||||||
15 | dioxide plume to determine the location of the injected | ||||||
16 | carbon dioxide; | ||||||
17 | (13) setting out requirements to ensure that carbon | ||||||
18 | dioxide injection wells are located far enough away from | ||||||
19 | residences, schools, daycare facilities, hospitals or | ||||||
20 | other healthcare facilities, places of worship, | ||||||
21 | businesses, or other facilities where many people | ||||||
22 | congregate, to minimize damage and ensure that persons in | ||||||
23 | those locations have adequate time to evacuate or be | ||||||
24 | rescued in the event of an injection well blowout or leak; | ||||||
25 | the requirements shall include, but are not limited to, a | ||||||
26 | requirement that sequestration permit applicants use |
| |||||||
| |||||||
1 | computerized fluid dynamic modeling or more accurate | ||||||
2 | modeling to predict the impacts of a well blowout or leak; | ||||||
3 | (14) establish a permanence standard of no more than | ||||||
4 | 1% of carbon dioxide leakage from the confining zone over | ||||||
5 | a thousand-year period, together with mandates for | ||||||
6 | corrective measures, including, but not limited to, | ||||||
7 | cessation of injection, when monitoring or modeling | ||||||
8 | indicate exceedance of the permanence standard is likely | ||||||
9 | or has already occurred; | ||||||
10 | (15) set out requirements for computer simulations, to | ||||||
11 | be completed every time the area of review is reevaluated | ||||||
12 | or every 5 years, whichever is more frequent, to project | ||||||
13 | whether the sequestration project will meet the permanence | ||||||
14 | standard; | ||||||
15 | (16) set the minimum duration of the post-injection | ||||||
16 | site care period at no fewer than 100 years; and | ||||||
17 | (17) establish reporting requirements for carbon | ||||||
18 | sequestration permittees, which shall include, but are not | ||||||
19 | limited to, the mass of carbon dioxide transported to the | ||||||
20 | sequestration facility; the facilities from which that | ||||||
21 | carbon dioxide was captured; seismic events of 1.0 or | ||||||
22 | greater on the Richter scale; and malfunctions or downtime | ||||||
23 | of any monitors. | ||||||
24 | (h) If the United States Environmental Protection Agency | ||||||
25 | revises 40 CFR 146 to be less protective than the rules | ||||||
26 | published in the Federal Register on December 10, 2010, the |
| |||||||
| |||||||
1 | Agency must (i) immediately halt the issuance of carbon | ||||||
2 | sequestration permits and (ii) within 3 months of the | ||||||
3 | effective date of such revision, notify the Board of that | ||||||
4 | revision and propose rules requiring compliance with the | ||||||
5 | December 10, 2010 version of any amended provision. Within 18 | ||||||
6 | months of the Agency's proposal, the Board shall amend the | ||||||
7 | rules issued under subsection (g) to incorporate the Agency's | ||||||
8 | proposal or an equally protective provision. The Agency may | ||||||
9 | reinitiate issuance of carbon sequestration permits after the | ||||||
10 | effective date of the amended rules required by this | ||||||
11 | subsection. | ||||||
12 | (i) Within 60 days after a sequestration operator has | ||||||
13 | obtained a carbon sequestration permit under this Section and | ||||||
14 | begun injecting carbon dioxide into the sequestration | ||||||
15 | facility, the sequestration operator shall record, with the | ||||||
16 | Recorder of Deeds in the county in which the property is | ||||||
17 | located, documents stating that (i) the pore space within the | ||||||
18 | sequestration facility will be used to sequester carbon | ||||||
19 | dioxide, and (ii) the pore space within the area of review may | ||||||
20 | be used to sequester carbon dioxide. | ||||||
21 | (j) If monitoring reveals that the carbon dioxide plume | ||||||
22 | has migrated outside of the confining zone, the sequestration | ||||||
23 | operator shall: | ||||||
24 | (A) immediately halt injection of carbon dioxide and | ||||||
25 | assess measures to restore the carbon dioxide to the | ||||||
26 | confining zone; |
| |||||||
| |||||||
1 | (B) promptly notify the owners of the surface estate | ||||||
2 | overlying the pore space into which the carbon dioxide has | ||||||
3 | migrated of that migration; | ||||||
4 | (C) promptly determine whether the movement of the | ||||||
5 | carbon dioxide plume may cause an endangerment to an | ||||||
6 | aquifer defined by the United States Environmental | ||||||
7 | Protection Agency as an Underground Source of Drinking | ||||||
8 | Water, and if so: | ||||||
9 | (i) immediately commence emergency response | ||||||
10 | measures required under federal Class VI regulations; | ||||||
11 | and | ||||||
12 | (ii) promptly assess whether any sources of | ||||||
13 | drinking water have been contaminated as a result of | ||||||
14 | the movement of carbon dioxide and, if so, provide an | ||||||
15 | immediate replacement source of drinking water to | ||||||
16 | affected residents that satisfies all drinking water | ||||||
17 | standards set by the United States Environmental | ||||||
18 | Protection Agency under the federal Safe Drinking | ||||||
19 | Water Act; all assessments required by this subsection | ||||||
20 | shall be made available to potentially affected | ||||||
21 | residents upon completion, without delay; and | ||||||
22 | (D) if the migration is lateral, record with the | ||||||
23 | Recorder of Deeds of the county in which the property is | ||||||
24 | located documents stating that that the pore space | ||||||
25 | underlying the surface estate has been used to sequester | ||||||
26 | carbon dioxide. |
| |||||||
| |||||||
1 | (k) Once the rules required by subsection (g) have been | ||||||
2 | adopted | ||||||
, the Agency shall calculate the cost it will bear to | |||||||
3 | implement the carbon dioxide sequestration permit program and | ||||||
4 | shall establish a permit fee sufficient to cover those costs, | ||||||
5 | which it may update periodically as the costs of program | ||||||
6 | implementation change. | ||||||
7 | (l) Seismicity requirements for sequestration facilities. | ||||||
8 | (A) For purposes of this Section, "induced seismicity" | ||||||
9 | means seismicity above background that is recorded by a | ||||||
10 | seismic monitoring network and is attributable to the | ||||||
11 | injection or sequestration of carbon dioxide in the | ||||||
12 | subsurface. | ||||||
13 | (B) Within 2 years of the effective date of this | ||||||
14 | Section, the Agency shall, in consultation with the | ||||||
15 | Illinois State Geological Survey, propose, and the Board | ||||||
16 | shall adopt, rules establishing a protocol for monitoring | ||||||
17 | seismic activity and controlling operational activity of | ||||||
18 | sequestration facilities in an instance of induced | ||||||
19 | seismicity or seismic activity within the area of review | ||||||
20 | that measures at least 1.0 in magnitude. | ||||||
21 | (C) The rules adopted by the Board under this | ||||||
22 | subsection shall: (i) set out seismicity monitoring | ||||||
23 | requirements extending throughout the area of review of | ||||||
24 | carbon dioxide sequestration projects, which shall be | ||||||
25 | capable of detecting seismic activity of a magnitude of | ||||||
26 | 0.7 or greater, and shall be calibrated with check-shots, |
| |||||||
| |||||||
1 | sonic logs, or other local velocity information; and (ii) | ||||||
2 | employ a "traffic light" control system allowing for low | ||||||
3 | levels of seismicity while including additional monitoring | ||||||
4 | and mitigation requirements when events of induced | ||||||
5 | seismicity or seismicity, measuring 1.5 or greater in | ||||||
6 | magnitude, occur within the area of review. Those | ||||||
7 | additional mitigation requirements shall include, but are | ||||||
8 | not limited to, (i) immediate cessation of injection | ||||||
9 | operations and inspection and evaluation of any and all | ||||||
10 | damage to all injection wells, monitoring wells, or other | ||||||
11 | plugged or unplugged well penetrations or equipment | ||||||
12 | associated with the sequestration facility, with injection | ||||||
13 | reinitiated only if the Agency deems that injection will | ||||||
14 | not pose an undue risk to health or the environment; and | ||||||
15 | (ii) when induced seismicity appears to be the cause of | ||||||
16 | the seismic event, mandates to scale back carbon dioxide | ||||||
17 | injection operations with monitoring for establishment of | ||||||
18 | a potentially safe operation level. | ||||||
19 | (m)_No adjusted standard, variance, or other regulatory | ||||||
20 | relief otherwise available under this Act may be granted from | ||||||
21 | the requirements of this Section.
| ||||||
22 | (415 ILCS 5/39) (from Ch. 111 1/2, par. 1039) | ||||||
23 | Sec. 39. Issuance of permits; procedures. | ||||||
24 | (a) When the Board has by regulation required a permit for | ||||||
25 | the construction, installation, or operation of any type of |
| |||||||
| |||||||
1 | facility, equipment, vehicle, vessel, or aircraft, the | ||||||
2 | applicant shall apply to the Agency for such permit and it | ||||||
3 | shall be the duty of the Agency to issue such a permit upon | ||||||
4 | proof by the applicant that the facility, equipment, vehicle, | ||||||
5 | vessel, or aircraft will not cause a violation of this Act or | ||||||
6 | of regulations hereunder. The Agency shall adopt such | ||||||
7 | procedures as are necessary to carry out its duties under this | ||||||
8 | Section. In making its determinations on permit applications | ||||||
9 | under this Section the Agency may consider prior adjudications | ||||||
10 | of noncompliance with this Act by the applicant that involved | ||||||
11 | a release of a contaminant into the environment. In granting | ||||||
12 | permits, the Agency may impose reasonable conditions | ||||||
13 | specifically related to the applicant's past compliance | ||||||
14 | history with this Act as necessary to correct, detect, or | ||||||
15 | prevent noncompliance. The Agency may impose such other | ||||||
16 | conditions as may be necessary to accomplish the purposes of | ||||||
17 | this Act, and as are not inconsistent with the regulations | ||||||
18 | promulgated by the Board hereunder. Except as otherwise | ||||||
19 | provided in this Act, a bond or other security shall not be | ||||||
20 | required as a condition for the issuance of a permit. If the | ||||||
21 | Agency denies any permit under this Section, the Agency shall | ||||||
22 | transmit to the applicant within the time limitations of this | ||||||
23 | Section specific, detailed statements as to the reasons the | ||||||
24 | permit application was denied. Such statements shall include, | ||||||
25 | but not be limited to, the following: | ||||||
26 | (i) the Sections of this Act which may be violated if |
| |||||||
| |||||||
1 | the permit were granted; | ||||||
2 | (ii) the provision of the regulations, promulgated | ||||||
3 | under this Act, which may be violated if the permit were | ||||||
4 | granted; | ||||||
5 | (iii) the specific type of information, if any, which | ||||||
6 | the Agency deems the applicant did not provide the Agency; | ||||||
7 | and | ||||||
8 | (iv) a statement of specific reasons why the Act and | ||||||
9 | the regulations might not be met if the permit were | ||||||
10 | granted. | ||||||
11 | If there is no final action by the Agency within 90 days | ||||||
12 | after the filing of the application for permit, the applicant | ||||||
13 | may deem the permit issued; except that this time period shall | ||||||
14 | be extended to 180 days when (1) notice and opportunity for | ||||||
15 | public hearing are required by State or federal law or | ||||||
16 | regulation, (2) the application which was filed is for any | ||||||
17 | permit to develop a landfill subject to issuance pursuant to | ||||||
18 | this subsection, or (3) the application that was filed is for a | ||||||
19 | MSWLF unit required to issue public notice under subsection | ||||||
20 | (p) of Section 39. The 90-day and 180-day time periods for the | ||||||
21 | Agency to take final action do not apply to NPDES permit | ||||||
22 | applications under subsection (b) of this Section, to RCRA | ||||||
23 | permit applications under subsection (d) of this Section, to | ||||||
24 | UIC permit applications under subsection (e) of this Section, | ||||||
25 | or to CCR surface impoundment applications under subsection | ||||||
26 | (y) of this Section. |
| |||||||
| |||||||
1 | The Agency shall publish notice of all final permit | ||||||
2 | determinations for development permits for MSWLF units and for | ||||||
3 | significant permit modifications for lateral expansions for | ||||||
4 | existing MSWLF units one time in a newspaper of general | ||||||
5 | circulation in the county in which the unit is or is proposed | ||||||
6 | to be located. | ||||||
7 | After January 1, 1994 and until July 1, 1998, operating | ||||||
8 | permits issued under this Section by the Agency for sources of | ||||||
9 | air pollution permitted to emit less than 25 tons per year of | ||||||
10 | any combination of regulated air pollutants, as defined in | ||||||
11 | Section 39.5 of this Act, shall be required to be renewed only | ||||||
12 | upon written request by the Agency consistent with applicable | ||||||
13 | provisions of this Act and regulations promulgated hereunder. | ||||||
14 | Such operating permits shall expire 180 days after the date of | ||||||
15 | such a request. The Board shall revise its regulations for the | ||||||
16 | existing State air pollution operating permit program | ||||||
17 | consistent with this provision by January 1, 1994. | ||||||
18 | After June 30, 1998, operating permits issued under this | ||||||
19 | Section by the Agency for sources of air pollution that are not | ||||||
20 | subject to Section 39.5 of this Act and are not required to | ||||||
21 | have a federally enforceable State operating permit shall be | ||||||
22 | required to be renewed only upon written request by the Agency | ||||||
23 | consistent with applicable provisions of this Act and its | ||||||
24 | rules. Such operating permits shall expire 180 days after the | ||||||
25 | date of such a request. Before July 1, 1998, the Board shall | ||||||
26 | revise its rules for the existing State air pollution |
| |||||||
| |||||||
1 | operating permit program consistent with this paragraph and | ||||||
2 | shall adopt rules that require a source to demonstrate that it | ||||||
3 | qualifies for a permit under this paragraph. | ||||||
4 | (b) The Agency may issue NPDES permits exclusively under | ||||||
5 | this subsection for the discharge of contaminants from point | ||||||
6 | sources into navigable waters, all as defined in the Federal | ||||||
7 | Water Pollution Control Act, as now or hereafter amended, | ||||||
8 | within the jurisdiction of the State, or into any well. | ||||||
9 | All NPDES permits shall contain those terms and | ||||||
10 | conditions, including, but not limited to, schedules of | ||||||
11 | compliance, which may be required to accomplish the purposes | ||||||
12 | and provisions of this Act. | ||||||
13 | The Agency may issue general NPDES permits for discharges | ||||||
14 | from categories of point sources which are subject to the same | ||||||
15 | permit limitations and conditions. Such general permits may be | ||||||
16 | issued without individual applications and shall conform to | ||||||
17 | regulations promulgated under Section 402 of the Federal Water | ||||||
18 | Pollution Control Act, as now or hereafter amended. | ||||||
19 | The Agency may include, among such conditions, effluent | ||||||
20 | limitations and other requirements established under this Act, | ||||||
21 | Board regulations, the Federal Water Pollution Control Act, as | ||||||
22 | now or hereafter amended, and regulations pursuant thereto, | ||||||
23 | and schedules for achieving compliance therewith at the | ||||||
24 | earliest reasonable date. | ||||||
25 | The Agency shall adopt filing requirements and procedures | ||||||
26 | which are necessary and appropriate for the issuance of NPDES |
| |||||||
| |||||||
1 | permits, and which are consistent with the Act or regulations | ||||||
2 | adopted by the Board, and with the Federal Water Pollution | ||||||
3 | Control Act, as now or hereafter amended, and regulations | ||||||
4 | pursuant thereto. | ||||||
5 | The Agency, subject to any conditions which may be | ||||||
6 | prescribed by Board regulations, may issue NPDES permits to | ||||||
7 | allow discharges beyond deadlines established by this Act or | ||||||
8 | by regulations of the Board without the requirement of a | ||||||
9 | variance, subject to the Federal Water Pollution Control Act, | ||||||
10 | as now or hereafter amended, and regulations pursuant thereto. | ||||||
11 | (c) Except for those facilities owned or operated by | ||||||
12 | sanitary districts organized under the Metropolitan Water | ||||||
13 | Reclamation District Act, no permit for the development or | ||||||
14 | construction of a new pollution control facility may be | ||||||
15 | granted by the Agency unless the applicant submits proof to | ||||||
16 | the Agency that the location of the facility has been approved | ||||||
17 | by the county board of the county if in an unincorporated area, | ||||||
18 | or the governing body of the municipality when in an | ||||||
19 | incorporated area, in which the facility is to be located in | ||||||
20 | accordance with Section 39.2 of this Act. For purposes of this | ||||||
21 | subsection (c), and for purposes of Section 39.2 of this Act, | ||||||
22 | the appropriate county board or governing body of the | ||||||
23 | municipality shall be the county board of the county or the | ||||||
24 | governing body of the municipality in which the facility is to | ||||||
25 | be located as of the date when the application for siting | ||||||
26 | approval is filed. |
| |||||||
| |||||||
1 | In the event that siting approval granted pursuant to | ||||||
2 | Section 39.2 has been transferred to a subsequent owner or | ||||||
3 | operator, that subsequent owner or operator may apply to the | ||||||
4 | Agency for, and the Agency may grant, a development or | ||||||
5 | construction permit for the facility for which local siting | ||||||
6 | approval was granted. Upon application to the Agency for a | ||||||
7 | development or construction permit by that subsequent owner or | ||||||
8 | operator, the permit applicant shall cause written notice of | ||||||
9 | the permit application to be served upon the appropriate | ||||||
10 | county board or governing body of the municipality that | ||||||
11 | granted siting approval for that facility and upon any party | ||||||
12 | to the siting proceeding pursuant to which siting approval was | ||||||
13 | granted. In that event, the Agency shall conduct an evaluation | ||||||
14 | of the subsequent owner or operator's prior experience in | ||||||
15 | waste management operations in the manner conducted under | ||||||
16 | subsection (i) of Section 39 of this Act. | ||||||
17 | Beginning August 20, 1993, if the pollution control | ||||||
18 | facility consists of a hazardous or solid waste disposal | ||||||
19 | facility for which the proposed site is located in an | ||||||
20 | unincorporated area of a county with a population of less than | ||||||
21 | 100,000 and includes all or a portion of a parcel of land that | ||||||
22 | was, on April 1, 1993, adjacent to a municipality having a | ||||||
23 | population of less than 5,000, then the local siting review | ||||||
24 | required under this subsection (c) in conjunction with any | ||||||
25 | permit applied for after that date shall be performed by the | ||||||
26 | governing body of that adjacent municipality rather than the |
| |||||||
| |||||||
1 | county board of the county in which the proposed site is | ||||||
2 | located; and for the purposes of that local siting review, any | ||||||
3 | references in this Act to the county board shall be deemed to | ||||||
4 | mean the governing body of that adjacent municipality; | ||||||
5 | provided, however, that the provisions of this paragraph shall | ||||||
6 | not apply to any proposed site which was, on April 1, 1993, | ||||||
7 | owned in whole or in part by another municipality. | ||||||
8 | In the case of a pollution control facility for which a | ||||||
9 | development permit was issued before November 12, 1981, if an | ||||||
10 | operating permit has not been issued by the Agency prior to | ||||||
11 | August 31, 1989 for any portion of the facility, then the | ||||||
12 | Agency may not issue or renew any development permit nor issue | ||||||
13 | an original operating permit for any portion of such facility | ||||||
14 | unless the applicant has submitted proof to the Agency that | ||||||
15 | the location of the facility has been approved by the | ||||||
16 | appropriate county board or municipal governing body pursuant | ||||||
17 | to Section 39.2 of this Act. | ||||||
18 | After January 1, 1994, if a solid waste disposal facility, | ||||||
19 | any portion for which an operating permit has been issued by | ||||||
20 | the Agency, has not accepted waste disposal for 5 or more | ||||||
21 | consecutive calendar years, before that facility may accept | ||||||
22 | any new or additional waste for disposal, the owner and | ||||||
23 | operator must obtain a new operating permit under this Act for | ||||||
24 | that facility unless the owner and operator have applied to | ||||||
25 | the Agency for a permit authorizing the temporary suspension | ||||||
26 | of waste acceptance. The Agency may not issue a new operation |
| |||||||
| |||||||
1 | permit under this Act for the facility unless the applicant | ||||||
2 | has submitted proof to the Agency that the location of the | ||||||
3 | facility has been approved or re-approved by the appropriate | ||||||
4 | county board or municipal governing body under Section 39.2 of | ||||||
5 | this Act after the facility ceased accepting waste. | ||||||
6 | Except for those facilities owned or operated by sanitary | ||||||
7 | districts organized under the Metropolitan Water Reclamation | ||||||
8 | District Act, and except for new pollution control facilities | ||||||
9 | governed by Section 39.2, and except for fossil fuel mining | ||||||
10 | facilities, the granting of a permit under this Act shall not | ||||||
11 | relieve the applicant from meeting and securing all necessary | ||||||
12 | zoning approvals from the unit of government having zoning | ||||||
13 | jurisdiction over the proposed facility. | ||||||
14 | Before beginning construction on any new sewage treatment | ||||||
15 | plant or sludge drying site to be owned or operated by a | ||||||
16 | sanitary district organized under the Metropolitan Water | ||||||
17 | Reclamation District Act for which a new permit (rather than | ||||||
18 | the renewal or amendment of an existing permit) is required, | ||||||
19 | such sanitary district shall hold a public hearing within the | ||||||
20 | municipality within which the proposed facility is to be | ||||||
21 | located, or within the nearest community if the proposed | ||||||
22 | facility is to be located within an unincorporated area, at | ||||||
23 | which information concerning the proposed facility shall be | ||||||
24 | made available to the public, and members of the public shall | ||||||
25 | be given the opportunity to express their views concerning the | ||||||
26 | proposed facility. |
| |||||||
| |||||||
1 | The Agency may issue a permit for a municipal waste | ||||||
2 | transfer station without requiring approval pursuant to | ||||||
3 | Section 39.2 provided that the following demonstration is | ||||||
4 | made: | ||||||
5 | (1) the municipal waste transfer station was in | ||||||
6 | existence on or before January 1, 1979 and was in | ||||||
7 | continuous operation from January 1, 1979 to January 1, | ||||||
8 | 1993; | ||||||
9 | (2) the operator submitted a permit application to the | ||||||
10 | Agency to develop and operate the municipal waste transfer | ||||||
11 | station during April of 1994; | ||||||
12 | (3) the operator can demonstrate that the county board | ||||||
13 | of the county, if the municipal waste transfer station is | ||||||
14 | in an unincorporated area, or the governing body of the | ||||||
15 | municipality, if the station is in an incorporated area, | ||||||
16 | does not object to resumption of the operation of the | ||||||
17 | station; and | ||||||
18 | (4) the site has local zoning approval. | ||||||
19 | (d) The Agency may issue RCRA permits exclusively under | ||||||
20 | this subsection to persons owning or operating a facility for | ||||||
21 | the treatment, storage, or disposal of hazardous waste as | ||||||
22 | defined under this Act. Subsection (y) of this Section, rather | ||||||
23 | than this subsection (d), shall apply to permits issued for | ||||||
24 | CCR surface impoundments. | ||||||
25 | All RCRA permits shall contain those terms and conditions, | ||||||
26 | including, but not limited to, schedules of compliance, which |
| |||||||
| |||||||
1 | may be required to accomplish the purposes and provisions of | ||||||
2 | this Act. The Agency may include among such conditions | ||||||
3 | standards and other requirements established under this Act, | ||||||
4 | Board regulations, the Resource Conservation and Recovery Act | ||||||
5 | of 1976 (P.L. 94-580), as amended, and regulations pursuant | ||||||
6 | thereto, and may include schedules for achieving compliance | ||||||
7 | therewith as soon as possible. The Agency shall require that a | ||||||
8 | performance bond or other security be provided as a condition | ||||||
9 | for the issuance of a RCRA permit. | ||||||
10 | In the case of a permit to operate a hazardous waste or PCB | ||||||
11 | incinerator as defined in subsection (k) of Section 44, the | ||||||
12 | Agency shall require, as a condition of the permit, that the | ||||||
13 | operator of the facility perform such analyses of the waste to | ||||||
14 | be incinerated as may be necessary and appropriate to ensure | ||||||
15 | the safe operation of the incinerator. | ||||||
16 | The Agency shall adopt filing requirements and procedures | ||||||
17 | which are necessary and appropriate for the issuance of RCRA | ||||||
18 | permits, and which are consistent with the Act or regulations | ||||||
19 | adopted by the Board, and with the Resource Conservation and | ||||||
20 | Recovery Act of 1976 (P.L. 94-580), as amended, and | ||||||
21 | regulations pursuant thereto. | ||||||
22 | The applicant shall make available to the public for | ||||||
23 | inspection all documents submitted by the applicant to the | ||||||
24 | Agency in furtherance of an application, with the exception of | ||||||
25 | trade secrets, at the office of the county board or governing | ||||||
26 | body of the municipality. Such documents may be copied upon |
| |||||||
| |||||||
1 | payment of the actual cost of reproduction during regular | ||||||
2 | business hours of the local office. The Agency shall issue a | ||||||
3 | written statement concurrent with its grant or denial of the | ||||||
4 | permit explaining the basis for its decision. | ||||||
5 | (e) The Agency may issue UIC permits exclusively under | ||||||
6 | this subsection to persons owning or operating a facility for | ||||||
7 | the underground injection of contaminants as defined under | ||||||
8 | this Act , except that the Agency shall issue any permits for | ||||||
9 | underground injection wells for the sequestration of carbon | ||||||
10 | dioxide under Section 22.64 . | ||||||
11 | All UIC permits shall contain those terms and conditions, | ||||||
12 | including, but not limited to, schedules of compliance, which | ||||||
13 | may be required to accomplish the purposes and provisions of | ||||||
14 | this Act. The Agency may include among such conditions | ||||||
15 | standards and other requirements established under this Act, | ||||||
16 | Board regulations, the Safe Drinking Water Act (P.L. 93-523), | ||||||
17 | as amended, and regulations pursuant thereto, and may include | ||||||
18 | schedules for achieving compliance therewith. The Agency shall | ||||||
19 | require that a performance bond or other security be provided | ||||||
20 | as a condition for the issuance of a UIC permit. | ||||||
21 | The Agency shall adopt filing requirements and procedures | ||||||
22 | which are necessary and appropriate for the issuance of UIC | ||||||
23 | permits, and which are consistent with the Act or regulations | ||||||
24 | adopted by the Board, and with the Safe Drinking Water Act | ||||||
25 | (P.L. 93-523), as amended, and regulations pursuant thereto. | ||||||
26 | The applicant shall make available to the public for |
| |||||||
| |||||||
1 | inspection all documents submitted by the applicant to the | ||||||
2 | Agency in furtherance of an application, with the exception of | ||||||
3 | trade secrets, at the office of the county board or governing | ||||||
4 | body of the municipality. Such documents may be copied upon | ||||||
5 | payment of the actual cost of reproduction during regular | ||||||
6 | business hours of the local office. The Agency shall issue a | ||||||
7 | written statement concurrent with its grant or denial of the | ||||||
8 | permit explaining the basis for its decision. | ||||||
9 | (f) In making any determination pursuant to Section 9.1 of | ||||||
10 | this Act: | ||||||
11 | (1) The Agency shall have authority to make the | ||||||
12 | determination of any question required to be determined by | ||||||
13 | the Clean Air Act, as now or hereafter amended, this Act, | ||||||
14 | or the regulations of the Board, including the | ||||||
15 | determination of the Lowest Achievable Emission Rate, | ||||||
16 | Maximum Achievable Control Technology, or Best Available | ||||||
17 | Control Technology, consistent with the Board's | ||||||
18 | regulations, if any. | ||||||
19 | (2) The Agency shall adopt requirements as necessary | ||||||
20 | to implement public participation procedures, including, | ||||||
21 | but not limited to, public notice, comment, and an | ||||||
22 | opportunity for hearing, which must accompany the | ||||||
23 | processing of applications for PSD permits. The Agency | ||||||
24 | shall briefly describe and respond to all significant | ||||||
25 | comments on the draft permit raised during the public | ||||||
26 | comment period or during any hearing. The Agency may group |
| |||||||
| |||||||
1 | related comments together and provide one unified response | ||||||
2 | for each issue raised. | ||||||
3 | (3) Any complete permit application submitted to the | ||||||
4 | Agency under this subsection for a PSD permit shall be | ||||||
5 | granted or denied by the Agency not later than one year | ||||||
6 | after the filing of such completed application. | ||||||
7 | (4) The Agency shall, after conferring with the | ||||||
8 | applicant, give written notice to the applicant of its | ||||||
9 | proposed decision on the application, including the terms | ||||||
10 | and conditions of the permit to be issued and the facts, | ||||||
11 | conduct, or other basis upon which the Agency will rely to | ||||||
12 | support its proposed action. | ||||||
13 | (g) The Agency shall include as conditions upon all | ||||||
14 | permits issued for hazardous waste disposal sites such | ||||||
15 | restrictions upon the future use of such sites as are | ||||||
16 | reasonably necessary to protect public health and the | ||||||
17 | environment, including permanent prohibition of the use of | ||||||
18 | such sites for purposes which may create an unreasonable risk | ||||||
19 | of injury to human health or to the environment. After | ||||||
20 | administrative and judicial challenges to such restrictions | ||||||
21 | have been exhausted, the Agency shall file such restrictions | ||||||
22 | of record in the Office of the Recorder of the county in which | ||||||
23 | the hazardous waste disposal site is located. | ||||||
24 | (h) A hazardous waste stream may not be deposited in a | ||||||
25 | permitted hazardous waste site unless specific authorization | ||||||
26 | is obtained from the Agency by the generator and disposal site |
| |||||||
| |||||||
1 | owner and operator for the deposit of that specific hazardous | ||||||
2 | waste stream. The Agency may grant specific authorization for | ||||||
3 | disposal of hazardous waste streams only after the generator | ||||||
4 | has reasonably demonstrated that, considering technological | ||||||
5 | feasibility and economic reasonableness, the hazardous waste | ||||||
6 | cannot be reasonably recycled for reuse, nor incinerated or | ||||||
7 | chemically, physically, or biologically treated so as to | ||||||
8 | neutralize the hazardous waste and render it nonhazardous. In | ||||||
9 | granting authorization under this Section, the Agency may | ||||||
10 | impose such conditions as may be necessary to accomplish the | ||||||
11 | purposes of the Act and are consistent with this Act and | ||||||
12 | regulations promulgated by the Board hereunder. If the Agency | ||||||
13 | refuses to grant authorization under this Section, the | ||||||
14 | applicant may appeal as if the Agency refused to grant a | ||||||
15 | permit, pursuant to the provisions of subsection (a) of | ||||||
16 | Section 40 of this Act. For purposes of this subsection (h), | ||||||
17 | the term "generator" has the meaning given in Section 3.205 of | ||||||
18 | this Act, unless: (1) the hazardous waste is treated, | ||||||
19 | incinerated, or partially recycled for reuse prior to | ||||||
20 | disposal, in which case the last person who treats, | ||||||
21 | incinerates, or partially recycles the hazardous waste prior | ||||||
22 | to disposal is the generator; or (2) the hazardous waste is | ||||||
23 | from a response action, in which case the person performing | ||||||
24 | the response action is the generator. This subsection (h) does | ||||||
25 | not apply to any hazardous waste that is restricted from land | ||||||
26 | disposal under 35 Ill. Adm. Code 728. |
| |||||||
| |||||||
1 | (i) Before issuing any RCRA permit, any permit for a waste | ||||||
2 | storage site, sanitary landfill, waste disposal site, waste | ||||||
3 | transfer station, waste treatment facility, waste incinerator, | ||||||
4 | or any waste-transportation operation, any permit or interim | ||||||
5 | authorization for a clean construction or demolition debris | ||||||
6 | fill operation, or any permit required under subsection (d-5) | ||||||
7 | of Section 55, the Agency shall conduct an evaluation of the | ||||||
8 | prospective owner's or operator's prior experience in waste | ||||||
9 | management operations, clean construction or demolition debris | ||||||
10 | fill operations, and tire storage site management. The Agency | ||||||
11 | may deny such a permit, or deny or revoke interim | ||||||
12 | authorization, if the prospective owner or operator or any | ||||||
13 | employee or officer of the prospective owner or operator has a | ||||||
14 | history of: | ||||||
15 | (1) repeated violations of federal, State, or local | ||||||
16 | laws, regulations, standards, or ordinances in the | ||||||
17 | operation of waste management facilities or sites, clean | ||||||
18 | construction or demolition debris fill operation | ||||||
19 | facilities or sites, or tire storage sites; or | ||||||
20 | (2) conviction in this or another State of any crime | ||||||
21 | which is a felony under the laws of this State, or | ||||||
22 | conviction of a felony in a federal court; or conviction | ||||||
23 | in this or another state or federal court of any of the | ||||||
24 | following crimes: forgery, official misconduct, bribery, | ||||||
25 | perjury, or knowingly submitting false information under | ||||||
26 | any environmental law, regulation, or permit term or |
| |||||||
| |||||||
1 | condition; or | ||||||
2 | (3) proof of gross carelessness or incompetence in | ||||||
3 | handling, storing, processing, transporting, or disposing | ||||||
4 | of waste, clean construction or demolition debris, or used | ||||||
5 | or waste tires, or proof of gross carelessness or | ||||||
6 | incompetence in using clean construction or demolition | ||||||
7 | debris as fill. | ||||||
8 | (i-5) Before issuing any permit or approving any interim | ||||||
9 | authorization for a clean construction or demolition debris | ||||||
10 | fill operation in which any ownership interest is transferred | ||||||
11 | between January 1, 2005, and the effective date of the | ||||||
12 | prohibition set forth in Section 22.52 of this Act, the Agency | ||||||
13 | shall conduct an evaluation of the operation if any previous | ||||||
14 | activities at the site or facility may have caused or allowed | ||||||
15 | contamination of the site. It shall be the responsibility of | ||||||
16 | the owner or operator seeking the permit or interim | ||||||
17 | authorization to provide to the Agency all of the information | ||||||
18 | necessary for the Agency to conduct its evaluation. The Agency | ||||||
19 | may deny a permit or interim authorization if previous | ||||||
20 | activities at the site may have caused or allowed | ||||||
21 | contamination at the site, unless such contamination is | ||||||
22 | authorized under any permit issued by the Agency. | ||||||
23 | (j) The issuance under this Act of a permit to engage in | ||||||
24 | the surface mining of any resources other than fossil fuels | ||||||
25 | shall not relieve the permittee from its duty to comply with | ||||||
26 | any applicable local law regulating the commencement, |
| |||||||
| |||||||
1 | location, or operation of surface mining facilities. | ||||||
2 | (k) A development permit issued under subsection (a) of | ||||||
3 | Section 39 for any facility or site which is required to have a | ||||||
4 | permit under subsection (d) of Section 21 shall expire at the | ||||||
5 | end of 2 calendar years from the date upon which it was issued, | ||||||
6 | unless within that period the applicant has taken action to | ||||||
7 | develop the facility or the site. In the event that review of | ||||||
8 | the conditions of the development permit is sought pursuant to | ||||||
9 | Section 40 or 41, or permittee is prevented from commencing | ||||||
10 | development of the facility or site by any other litigation | ||||||
11 | beyond the permittee's control, such two-year period shall be | ||||||
12 | deemed to begin on the date upon which such review process or | ||||||
13 | litigation is concluded. | ||||||
14 | (l) No permit shall be issued by the Agency under this Act | ||||||
15 | for construction or operation of any facility or site located | ||||||
16 | within the boundaries of any setback zone established pursuant | ||||||
17 | to this Act, where such construction or operation is | ||||||
18 | prohibited. | ||||||
19 | (m) The Agency may issue permits to persons owning or | ||||||
20 | operating a facility for composting landscape waste. In | ||||||
21 | granting such permits, the Agency may impose such conditions | ||||||
22 | as may be necessary to accomplish the purposes of this Act, and | ||||||
23 | as are not inconsistent with applicable regulations | ||||||
24 | promulgated by the Board. Except as otherwise provided in this | ||||||
25 | Act, a bond or other security shall not be required as a | ||||||
26 | condition for the issuance of a permit. If the Agency denies |
| |||||||
| |||||||
1 | any permit pursuant to this subsection, the Agency shall | ||||||
2 | transmit to the applicant within the time limitations of this | ||||||
3 | subsection specific, detailed statements as to the reasons the | ||||||
4 | permit application was denied. Such statements shall include | ||||||
5 | but not be limited to the following: | ||||||
6 | (1) the Sections of this Act that may be violated if | ||||||
7 | the permit were granted; | ||||||
8 | (2) the specific regulations promulgated pursuant to | ||||||
9 | this Act that may be violated if the permit were granted; | ||||||
10 | (3) the specific information, if any, the Agency deems | ||||||
11 | the applicant did not provide in its application to the | ||||||
12 | Agency; and | ||||||
13 | (4) a statement of specific reasons why the Act and | ||||||
14 | the regulations might be violated if the permit were | ||||||
15 | granted. | ||||||
16 | If no final action is taken by the Agency within 90 days | ||||||
17 | after the filing of the application for permit, the applicant | ||||||
18 | may deem the permit issued. Any applicant for a permit may | ||||||
19 | waive the 90-day limitation by filing a written statement with | ||||||
20 | the Agency. | ||||||
21 | The Agency shall issue permits for such facilities upon | ||||||
22 | receipt of an application that includes a legal description of | ||||||
23 | the site, a topographic map of the site drawn to the scale of | ||||||
24 | 200 feet to the inch or larger, a description of the operation, | ||||||
25 | including the area served, an estimate of the volume of | ||||||
26 | materials to be processed, and documentation that: |
| |||||||
| |||||||
1 | (1) the facility includes a setback of at least 200 | ||||||
2 | feet from the nearest potable water supply well; | ||||||
3 | (2) the facility is located outside the boundary of | ||||||
4 | the 10-year floodplain or the site will be floodproofed; | ||||||
5 | (3) the facility is located so as to minimize | ||||||
6 | incompatibility with the character of the surrounding | ||||||
7 | area, including at least a 200 foot setback from any | ||||||
8 | residence, and in the case of a facility that is developed | ||||||
9 | or the permitted composting area of which is expanded | ||||||
10 | after November 17, 1991, the composting area is located at | ||||||
11 | least 1/8 mile from the nearest residence (other than a | ||||||
12 | residence located on the same property as the facility); | ||||||
13 | (4) the design of the facility will prevent any | ||||||
14 | compost material from being placed within 5 feet of the | ||||||
15 | water table, will adequately control runoff from the site, | ||||||
16 | and will collect and manage any leachate that is generated | ||||||
17 | on the site; | ||||||
18 | (5) the operation of the facility will include | ||||||
19 | appropriate dust and odor control measures, limitations on | ||||||
20 | operating hours, appropriate noise control measures for | ||||||
21 | shredding, chipping and similar equipment, management | ||||||
22 | procedures for composting, containment and disposal of | ||||||
23 | non-compostable wastes, procedures to be used for | ||||||
24 | terminating operations at the site, and recordkeeping | ||||||
25 | sufficient to document the amount of materials received, | ||||||
26 | composted, and otherwise disposed of; and |
| |||||||
| |||||||
1 | (6) the operation will be conducted in accordance with | ||||||
2 | any applicable rules adopted by the Board. | ||||||
3 | The Agency shall issue renewable permits of not longer | ||||||
4 | than 10 years in duration for the composting of landscape | ||||||
5 | wastes, as defined in Section 3.155 of this Act, based on the | ||||||
6 | above requirements. | ||||||
7 | The operator of any facility permitted under this | ||||||
8 | subsection (m) must submit a written annual statement to the | ||||||
9 | Agency on or before April 1 of each year that includes an | ||||||
10 | estimate of the amount of material, in tons, received for | ||||||
11 | composting. | ||||||
12 | (n) The Agency shall issue permits jointly with the | ||||||
13 | Department of Transportation for the dredging or deposit of | ||||||
14 | material in Lake Michigan in accordance with Section 18 of the | ||||||
15 | Rivers, Lakes, and Streams Act. | ||||||
16 | (o) (Blank). | ||||||
17 | (p) (1) Any person submitting an application for a permit | ||||||
18 | for a new MSWLF unit or for a lateral expansion under | ||||||
19 | subsection (t) of Section 21 of this Act for an existing MSWLF | ||||||
20 | unit that has not received and is not subject to local siting | ||||||
21 | approval under Section 39.2 of this Act shall publish notice | ||||||
22 | of the application in a newspaper of general circulation in | ||||||
23 | the county in which the MSWLF unit is or is proposed to be | ||||||
24 | located. The notice must be published at least 15 days before | ||||||
25 | submission of the permit application to the Agency. The notice | ||||||
26 | shall state the name and address of the applicant, the |
| |||||||
| |||||||
1 | location of the MSWLF unit or proposed MSWLF unit, the nature | ||||||
2 | and size of the MSWLF unit or proposed MSWLF unit, the nature | ||||||
3 | of the activity proposed, the probable life of the proposed | ||||||
4 | activity, the date the permit application will be submitted, | ||||||
5 | and a statement that persons may file written comments with | ||||||
6 | the Agency concerning the permit application within 30 days | ||||||
7 | after the filing of the permit application unless the time | ||||||
8 | period to submit comments is extended by the Agency. | ||||||
9 | When a permit applicant submits information to the Agency | ||||||
10 | to supplement a permit application being reviewed by the | ||||||
11 | Agency, the applicant shall not be required to reissue the | ||||||
12 | notice under this subsection. | ||||||
13 | (2) The Agency shall accept written comments concerning | ||||||
14 | the permit application that are postmarked no later than 30 | ||||||
15 | days after the filing of the permit application, unless the | ||||||
16 | time period to accept comments is extended by the Agency. | ||||||
17 | (3) Each applicant for a permit described in part (1) of | ||||||
18 | this subsection shall file a copy of the permit application | ||||||
19 | with the county board or governing body of the municipality in | ||||||
20 | which the MSWLF unit is or is proposed to be located at the | ||||||
21 | same time the application is submitted to the Agency. The | ||||||
22 | permit application filed with the county board or governing | ||||||
23 | body of the municipality shall include all documents submitted | ||||||
24 | to or to be submitted to the Agency, except trade secrets as | ||||||
25 | determined under Section 7.1 of this Act. The permit | ||||||
26 | application and other documents on file with the county board |
| |||||||
| |||||||
1 | or governing body of the municipality shall be made available | ||||||
2 | for public inspection during regular business hours at the | ||||||
3 | office of the county board or the governing body of the | ||||||
4 | municipality and may be copied upon payment of the actual cost | ||||||
5 | of reproduction. | ||||||
6 | (q) Within 6 months after July 12, 2011 (the effective | ||||||
7 | date of Public Act 97-95), the Agency, in consultation with | ||||||
8 | the regulated community, shall develop a web portal to be | ||||||
9 | posted on its website for the purpose of enhancing review and | ||||||
10 | promoting timely issuance of permits required by this Act. At | ||||||
11 | a minimum, the Agency shall make the following information | ||||||
12 | available on the web portal: | ||||||
13 | (1) checklist Checklists and guidance relating to the | ||||||
14 | completion of permit applications, developed pursuant to | ||||||
15 | subsection (s) of this Section, which may include, but are | ||||||
16 | not limited to, existing instructions for completing the | ||||||
17 | applications and examples of complete applications ; as . | ||||||
18 | As the Agency develops new checklists and develops | ||||||
19 | guidance, it shall supplement the web portal with those | ||||||
20 | materials ; . | ||||||
21 | (2) within Within 2 years after July 12, 2011 (the | ||||||
22 | effective date of Public Act 97-95), permit application | ||||||
23 | forms or portions of permit applications that can be | ||||||
24 | completed and saved electronically, and submitted to the | ||||||
25 | Agency electronically with digital signatures ; and . | ||||||
26 | (3) within Within 2 years after July 12, 2011 (the |
| |||||||
| |||||||
1 | effective date of Public Act 97-95), an online tracking | ||||||
2 | system where an applicant may review the status of its | ||||||
3 | pending application, including the name and contact | ||||||
4 | information of the permit analyst assigned to the | ||||||
5 | application ; until . Until the online tracking system has | ||||||
6 | been developed, the Agency shall post on its website | ||||||
7 | semi-annual permitting efficiency tracking reports that | ||||||
8 | include statistics on the timeframes for Agency action on | ||||||
9 | the following types of permits received after July 12, | ||||||
10 | 2011 (the effective date of Public Act 97-95) , | ||||||
11 | specifically mandating and consisting of : air | ||||||
12 | construction permits, new NPDES permits and associated | ||||||
13 | water construction permits, and modifications of major | ||||||
14 | NPDES permits and associated water construction permits ; | ||||||
15 | the . The reports must be posted by February 1 and August 1 | ||||||
16 | each year and shall include: | ||||||
17 | (A) the number of applications received for each | ||||||
18 | type of permit, the number of applications on which | ||||||
19 | the Agency has taken action, and the number of | ||||||
20 | applications still pending; and | ||||||
21 | (B) for those applications where the Agency has | ||||||
22 | not taken action in accordance with the timeframes set | ||||||
23 | forth in this Act, the date the application was | ||||||
24 | received and the reasons for any delays, which may | ||||||
25 | include, but shall not be limited to, (i) the | ||||||
26 | application being inadequate or incomplete, (ii) |
| |||||||
| |||||||
1 | scientific or technical disagreements with the | ||||||
2 | applicant, USEPA, or other local, state, or federal | ||||||
3 | agencies involved in the permitting approval process, | ||||||
4 | (iii) public opposition to the permit, or (iv) Agency | ||||||
5 | staffing shortages ; to . To the extent practicable, | ||||||
6 | the tracking report shall provide approximate dates | ||||||
7 | when cause for delay was identified by the Agency, | ||||||
8 | when the Agency informed the applicant of the problem | ||||||
9 | leading to the delay, and when the applicant remedied | ||||||
10 | the reason for the delay. | ||||||
11 | (r) Upon the request of the applicant, the Agency shall | ||||||
12 | notify the applicant of the permit analyst assigned to the | ||||||
13 | application upon its receipt. | ||||||
14 | (s) The Agency is authorized to prepare and distribute | ||||||
15 | guidance documents relating to its administration of this | ||||||
16 | Section and procedural rules implementing this Section. | ||||||
17 | Guidance documents prepared under this subsection shall not be | ||||||
18 | considered rules and shall not be subject to the Illinois | ||||||
19 | Administrative Procedure Act. Such guidance shall not be | ||||||
20 | binding on any party. | ||||||
21 | (t) Except as otherwise prohibited by federal law or | ||||||
22 | regulation, any person submitting an application for a permit | ||||||
23 | may include with the application suggested permit language for | ||||||
24 | Agency consideration. The Agency is not obligated to use the | ||||||
25 | suggested language or any portion thereof in its permitting | ||||||
26 | decision. If requested by the permit applicant, the Agency |
| |||||||
| |||||||
1 | shall meet with the applicant to discuss the suggested | ||||||
2 | language. | ||||||
3 | (u) If requested by the permit applicant, the Agency shall | ||||||
4 | provide the permit applicant with a copy of the draft permit | ||||||
5 | prior to any public review period. | ||||||
6 | (v) If requested by the permit applicant, the Agency shall | ||||||
7 | provide the permit applicant with a copy of the final permit | ||||||
8 | prior to its issuance. | ||||||
9 | (w) An air pollution permit shall not be required due to | ||||||
10 | emissions of greenhouse gases, as specified by Section 9.15 of | ||||||
11 | this Act. | ||||||
12 | (x) If, before the expiration of a State operating permit | ||||||
13 | that is issued pursuant to subsection (a) of this Section and | ||||||
14 | contains federally enforceable conditions limiting the | ||||||
15 | potential to emit of the source to a level below the major | ||||||
16 | source threshold for that source so as to exclude the source | ||||||
17 | from the Clean Air Act Permit Program, the Agency receives a | ||||||
18 | complete application for the renewal of that permit, then all | ||||||
19 | of the terms and conditions of the permit shall remain in | ||||||
20 | effect until final administrative action has been taken on the | ||||||
21 | application for the renewal of the permit. | ||||||
22 | (y) The Agency may issue permits exclusively under this | ||||||
23 | subsection to persons owning or operating a CCR surface | ||||||
24 | impoundment subject to Section 22.59. | ||||||
25 | (z) If a mass animal mortality event is declared by the | ||||||
26 | Department of Agriculture in accordance with the Animal |
| |||||||
| |||||||
1 | Mortality Act: | ||||||
2 | (1) the owner or operator responsible for the disposal | ||||||
3 | of dead animals is exempted from the following: | ||||||
4 | (i) obtaining a permit for the construction, | ||||||
5 | installation, or operation of any type of facility or | ||||||
6 | equipment issued in accordance with subsection (a) of | ||||||
7 | this Section; | ||||||
8 | (ii) obtaining a permit for open burning in | ||||||
9 | accordance with the rules adopted by the Board; and | ||||||
10 | (iii) registering the disposal of dead animals as | ||||||
11 | an eligible small source with the Agency in accordance | ||||||
12 | with Section 9.14 of this Act; | ||||||
13 | (2) as applicable, the owner or operator responsible | ||||||
14 | for the disposal of dead animals is required to obtain the | ||||||
15 | following permits: | ||||||
16 | (i) an NPDES permit in accordance with subsection | ||||||
17 | (b) of this Section; | ||||||
18 | (ii) a PSD permit or an NA NSR permit in accordance | ||||||
19 | with Section 9.1 of this Act; | ||||||
20 | (iii) a lifetime State operating permit or a | ||||||
21 | federally enforceable State operating permit, in | ||||||
22 | accordance with subsection (a) of this Section; or | ||||||
23 | (iv) a CAAPP permit, in accordance with Section | ||||||
24 | 39.5 of this Act. | ||||||
25 | All CCR surface impoundment permits shall contain those | ||||||
26 | terms and conditions, including, but not limited to, schedules |
| |||||||
| |||||||
1 | of compliance, which may be required to accomplish the | ||||||
2 | purposes and provisions of this Act, Board regulations, the | ||||||
3 | Illinois Groundwater Protection Act and regulations pursuant | ||||||
4 | thereto, and the Resource Conservation and Recovery Act and | ||||||
5 | regulations pursuant thereto, and may include schedules for | ||||||
6 | achieving compliance therewith as soon as possible. | ||||||
7 | The Board shall adopt filing requirements and procedures | ||||||
8 | that are necessary and appropriate for the issuance of CCR | ||||||
9 | surface impoundment permits and that are consistent with this | ||||||
10 | Act or regulations adopted by the Board, and with the RCRA, as | ||||||
11 | amended, and regulations pursuant thereto. | ||||||
12 | The applicant shall make available to the public for | ||||||
13 | inspection all documents submitted by the applicant to the | ||||||
14 | Agency in furtherance of an application, with the exception of | ||||||
15 | trade secrets, on its public internet website as well as at the | ||||||
16 | office of the county board or governing body of the | ||||||
17 | municipality where CCR from the CCR surface impoundment will | ||||||
18 | be permanently disposed. Such documents may be copied upon | ||||||
19 | payment of the actual cost of reproduction during regular | ||||||
20 | business hours of the local office. | ||||||
21 | The Agency shall issue a written statement concurrent with | ||||||
22 | its grant or denial of the permit explaining the basis for its | ||||||
23 | decision. | ||||||
24 | (Source: P.A. 101-171, eff. 7-30-19; 102-216, eff. 1-1-22; | ||||||
25 | 102-558, eff. 8-20-21; 102-813, eff. 5-13-22.)
|
| |||||||
| |||||||
1 | (415 ILCS 5/40) (from Ch. 111 1/2, par. 1040) | ||||||
2 | Sec. 40. Appeal of permit denial. | ||||||
3 | (a)(1) If the Agency refuses to grant or grants with | ||||||
4 | conditions a permit under Section 39 of this Act, the | ||||||
5 | applicant may, within 35 days after the date on which the | ||||||
6 | Agency served its decision on the applicant, petition for a | ||||||
7 | hearing before the Board to contest the decision of the | ||||||
8 | Agency. However, the 35-day period for petitioning for a | ||||||
9 | hearing may be extended for an additional period of time not to | ||||||
10 | exceed 90 days by written notice provided to the Board from the | ||||||
11 | applicant and the Agency within the initial appeal period. The | ||||||
12 | Board shall give 21 days' notice to any person in the county | ||||||
13 | where is located the facility in issue who has requested | ||||||
14 | notice of enforcement proceedings and to each member of the | ||||||
15 | General Assembly in whose legislative district that | ||||||
16 | installation or property is located; and shall publish that | ||||||
17 | 21-day notice in a newspaper of general circulation in that | ||||||
18 | county. The Agency shall appear as respondent in such hearing. | ||||||
19 | At such hearing the rules prescribed in Section 32 and | ||||||
20 | subsection (a) of Section 33 of this Act shall apply, and the | ||||||
21 | burden of proof shall be on the petitioner. If, however, the | ||||||
22 | Agency issues an NPDES permit that imposes limits which are | ||||||
23 | based upon a criterion or denies a permit based upon | ||||||
24 | application of a criterion, then the Agency shall have the | ||||||
25 | burden of going forward with the basis for the derivation of | ||||||
26 | those limits or criterion which were derived under the Board's |
| |||||||
| |||||||
1 | rules. | ||||||
2 | (2) Except as provided in paragraph (a)(3), if there is no | ||||||
3 | final action by the Board within 120 days after the date on | ||||||
4 | which it received the petition, the petitioner may deem the | ||||||
5 | permit issued under this Act, provided, however, that that | ||||||
6 | period of 120 days shall not run for any period of time, not to | ||||||
7 | exceed 30 days, during which the Board is without sufficient | ||||||
8 | membership to constitute the quorum required by subsection (a) | ||||||
9 | of Section 5 of this Act, and provided further that such 120 | ||||||
10 | day period shall not be stayed for lack of quorum beyond 30 | ||||||
11 | days regardless of whether the lack of quorum exists at the | ||||||
12 | beginning of such 120-day period or occurs during the running | ||||||
13 | of such 120-day period. | ||||||
14 | (3) Paragraph (a)(2) shall not apply to any permit which | ||||||
15 | is subject to subsection (b), (d) or (e) of Section 39. If | ||||||
16 | there is no final action by the Board within 120 days after the | ||||||
17 | date on which it received the petition, the petitioner shall | ||||||
18 | be entitled to an Appellate Court order pursuant to subsection | ||||||
19 | (d) of Section 41 of this Act. | ||||||
20 | (b) If the Agency grants a RCRA permit for a hazardous | ||||||
21 | waste disposal site, a third party, other than the permit | ||||||
22 | applicant or Agency, may, within 35 days after the date on | ||||||
23 | which the Agency issued its decision, petition the Board for a | ||||||
24 | hearing to contest the issuance of the permit. Unless the | ||||||
25 | Board determines that such petition is duplicative or | ||||||
26 | frivolous, or that the petitioner is so located as to not be |
| |||||||
| |||||||
1 | affected by the permitted facility, the Board shall hear the | ||||||
2 | petition in accordance with the terms of subsection (a) of | ||||||
3 | this Section and its procedural rules governing denial | ||||||
4 | appeals, such hearing to be based exclusively on the record | ||||||
5 | before the Agency. The burden of proof shall be on the | ||||||
6 | petitioner. The Agency and the permit applicant shall be named | ||||||
7 | co-respondents. | ||||||
8 | The provisions of this subsection do not apply to the | ||||||
9 | granting of permits issued for the disposal or utilization of | ||||||
10 | sludge from publicly owned sewage works. | ||||||
11 | (c) Any party to an Agency proceeding conducted pursuant | ||||||
12 | to Section 39.3 of this Act may petition as of right to the | ||||||
13 | Board for review of the Agency's decision within 35 days from | ||||||
14 | the date of issuance of the Agency's decision, provided that | ||||||
15 | such appeal is not duplicative or frivolous. However, the | ||||||
16 | 35-day period for petitioning for a hearing may be extended by | ||||||
17 | the applicant for a period of time not to exceed 90 days by | ||||||
18 | written notice provided to the Board from the applicant and | ||||||
19 | the Agency within the initial appeal period. If another person | ||||||
20 | with standing to appeal wishes to obtain an extension, there | ||||||
21 | must be a written notice provided to the Board by that person, | ||||||
22 | the Agency, and the applicant, within the initial appeal | ||||||
23 | period. The decision of the Board shall be based exclusively | ||||||
24 | on the record compiled in the Agency proceeding. In other | ||||||
25 | respects the Board's review shall be conducted in accordance | ||||||
26 | with subsection (a) of this Section and the Board's procedural |
| |||||||
| |||||||
1 | rules governing permit denial appeals. | ||||||
2 | (d) In reviewing the denial or any condition of a NA NSR | ||||||
3 | permit issued by the Agency pursuant to rules and regulations | ||||||
4 | adopted under subsection (c) of Section 9.1 of this Act, the | ||||||
5 | decision of the Board shall be based exclusively on the record | ||||||
6 | before the Agency including the record of the hearing, if any, | ||||||
7 | unless the parties agree to supplement the record. The Board | ||||||
8 | shall, if it finds the Agency is in error, make a final | ||||||
9 | determination as to the substantive limitations of the permit | ||||||
10 | including a final determination of Lowest Achievable Emission | ||||||
11 | Rate. | ||||||
12 | (e)(1) If the Agency grants or denies a permit under | ||||||
13 | subsection (b) of Section 39 of this Act, a third party, other | ||||||
14 | than the permit applicant or Agency, may petition the Board | ||||||
15 | within 35 days from the date of issuance of the Agency's | ||||||
16 | decision, for a hearing to contest the decision of the Agency. | ||||||
17 | (2) A petitioner shall include the following within a | ||||||
18 | petition submitted under subdivision (1) of this subsection: | ||||||
19 | (A) a demonstration that the petitioner raised the | ||||||
20 | issues contained within the petition during the public | ||||||
21 | notice period or during the public hearing on the NPDES | ||||||
22 | permit application, if a public hearing was held; and | ||||||
23 | (B) a demonstration that the petitioner is so situated | ||||||
24 | as to be affected by the permitted facility. | ||||||
25 | (3) If the Board determines that the petition is not | ||||||
26 | duplicative or frivolous and contains a satisfactory |
| |||||||
| |||||||
1 | demonstration under subdivision (2) of this subsection, the | ||||||
2 | Board shall hear the petition (i) in accordance with the terms | ||||||
3 | of subsection (a) of this Section and its procedural rules | ||||||
4 | governing permit denial appeals and (ii) exclusively on the | ||||||
5 | basis of the record before the Agency. The burden of proof | ||||||
6 | shall be on the petitioner. The Agency and permit applicant | ||||||
7 | shall be named co-respondents. | ||||||
8 | (f) Any person who files a petition to contest the | ||||||
9 | issuance of a permit by the Agency shall pay a filing fee. | ||||||
10 | (g) If the Agency grants or denies a permit under | ||||||
11 | subsection (y) of Section 39, a third party, other than the | ||||||
12 | permit applicant or Agency, may appeal the Agency's decision | ||||||
13 | as provided under federal law for CCR surface impoundment | ||||||
14 | permits. | ||||||
15 | (h) If the Agency grants or denies a permit for the capture | ||||||
16 | of carbon dioxide under Section 9.21 or a permit for | ||||||
17 | sequestration of carbon dioxide under Section 22.64, | ||||||
18 | including, but not limited to, the disapproval of financial | ||||||
19 | assurance under subsection (e) of Section 22.64, any person | ||||||
20 | may petition the Board, within 35 days after the date of | ||||||
21 | issuance of the Agency's decision, for a hearing to contest | ||||||
22 | the grant or denial. | ||||||
23 | (Source: P.A. 101-171, eff. 7-30-19; 102-558, eff. 8-20-21.)
| ||||||
24 | Section 97. Severability. The provisions of this Act are | ||||||
25 | severable under Section 1.31 of the Statute on Statutes.
|
| ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
1 | Section 99. Effective date. This Act takes effect upon | |||||||||||||||||||||||||
2 | becoming law. | |||||||||||||||||||||||||
|