Bill Text: IL SB0178 | 2021-2022 | 102nd General Assembly | Introduced
Bill Title: Amends the Public Construction Bond Act. Provides that no retainage may be withheld by a unit of local government from a contractor who furnishes the bond or bond substitute required by the Act, nor may a contractor withhold retainage from its subcontractors.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2022-02-10 - Rule 3-9(a) / Re-referred to Assignments [SB0178 Detail]
Download: Illinois-2021-SB0178-Introduced.html
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning finance.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Public Construction Bond Act is amended by | ||||||||||||||||||||||||
5 | changing Section 1 as follows:
| ||||||||||||||||||||||||
6 | (30 ILCS 550/1) (from Ch. 29, par. 15)
| ||||||||||||||||||||||||
7 | Sec. 1. Except as otherwise provided by this Act, all | ||||||||||||||||||||||||
8 | officials, boards,
commissions, or agents of this State, or of | ||||||||||||||||||||||||
9 | any political subdivision thereof, in making contracts for | ||||||||||||||||||||||||
10 | public work of
any kind costing over $50,000 to be performed | ||||||||||||||||||||||||
11 | for the State, or of any political subdivision thereof,
shall | ||||||||||||||||||||||||
12 | require every contractor for the work to furnish, supply and | ||||||||||||||||||||||||
13 | deliver
a bond to the State, or to the political subdivision | ||||||||||||||||||||||||
14 | thereof entering into
the contract, as the case may be, with | ||||||||||||||||||||||||
15 | good and sufficient sureties. The surety on the bond shall be a | ||||||||||||||||||||||||
16 | company that is licensed by the Department of Insurance | ||||||||||||||||||||||||
17 | authorizing it to execute surety bonds and the company shall | ||||||||||||||||||||||||
18 | have a financial strength rating of at least A- as rated by | ||||||||||||||||||||||||
19 | A.M. Best Company, Inc., Moody's Investors Service, Standard & | ||||||||||||||||||||||||
20 | Poor's Corporation, or a similar rating agency. The
amount of | ||||||||||||||||||||||||
21 | the bond shall be fixed by the officials, boards, commissions,
| ||||||||||||||||||||||||
22 | commissioners or agents, and the bond, among other conditions,
| ||||||||||||||||||||||||
23 | shall be
conditioned for the completion of the contract, for |
| |||||||
| |||||||
1 | the payment of material, apparatus, fixtures, and machinery
| ||||||
2 | used in the work and for all labor performed in the work, | ||||||
3 | whether by
subcontractor or otherwise.
| ||||||
4 | If the contract is for emergency repairs as provided in | ||||||
5 | the Illinois
Procurement
Code, proof of payment for all labor, | ||||||
6 | materials, apparatus, fixtures, and
machinery may be
furnished | ||||||
7 | in lieu of the bond required by this Section.
| ||||||
8 | Each such bond is deemed to contain the following | ||||||
9 | provisions whether
such provisions are inserted in such bond | ||||||
10 | or not:
| ||||||
11 | "The principal and sureties on this bond agree that all | ||||||
12 | the
undertakings, covenants, terms, conditions and agreements | ||||||
13 | of the contract
or contracts entered into between the | ||||||
14 | principal and the State or any
political subdivision thereof | ||||||
15 | will be performed and fulfilled and to pay
all persons, firms | ||||||
16 | and corporations having contracts with the principal or
with | ||||||
17 | subcontractors, all just claims due them under the provisions | ||||||
18 | of such
contracts for labor performed or materials furnished | ||||||
19 | in the performance of
the contract on account of which this | ||||||
20 | bond is given, when such claims are
not satisfied out of the | ||||||
21 | contract price of the contract on account of which
this bond is | ||||||
22 | given, after final settlement between the officer, board,
| ||||||
23 | commission or agent of the State or of any political | ||||||
24 | subdivision thereof
and the principal has been made.". | ||||||
25 | Each bond securing contracts between the Capital | ||||||
26 | Development Board or any board of a public institution of |
| |||||||
| |||||||
1 | higher education and a contractor shall contain the following | ||||||
2 | provisions, whether the provisions are inserted in the bond or | ||||||
3 | not: | ||||||
4 | "Upon the default of the principal with respect to | ||||||
5 | undertakings, covenants, terms, conditions, and agreements, | ||||||
6 | the termination of the contractor's right to proceed with the | ||||||
7 | work, and written notice of that default and termination by | ||||||
8 | the State or any political subdivision to the surety | ||||||
9 | ("Notice"), the surety shall promptly remedy the default by | ||||||
10 | taking one of the following actions: | ||||||
11 | (1) The surety shall complete the work pursuant to a | ||||||
12 | written takeover agreement, using a completing contractor | ||||||
13 | jointly selected by the surety and the State or any | ||||||
14 | political subdivision; or | ||||||
15 | (2) The surety shall pay a sum of money to the obligee, | ||||||
16 | up to the penal sum of the bond, that represents the | ||||||
17 | reasonable cost to complete the work that exceeds the | ||||||
18 | unpaid balance of the contract sum. | ||||||
19 | The surety shall respond to the Notice within 15 working | ||||||
20 | days of receipt indicating the course of action that it | ||||||
21 | intends to take or advising that it requires more time to | ||||||
22 | investigate the default and select a course of action. If the | ||||||
23 | surety requires more than 15 working days to investigate the | ||||||
24 | default and select a course of action or if the surety elects | ||||||
25 | to complete the work with a completing contractor that is not | ||||||
26 | prepared to commence performance within 15 working days after |
| |||||||
| |||||||
1 | receipt of Notice, and if the State or any political | ||||||
2 | subdivision determines it is in the best interest of the State | ||||||
3 | to maintain the progress of the work, the State or any | ||||||
4 | political subdivision may continue to work until the | ||||||
5 | completing contractor is prepared to commence performance. | ||||||
6 | Unless otherwise agreed to by the procuring agency, in no case | ||||||
7 | may the surety take longer than 30 working days to advise the | ||||||
8 | State or political subdivision on the course of action it | ||||||
9 | intends to take. The surety shall be liable for reasonable | ||||||
10 | costs incurred by the State or any political subdivision to | ||||||
11 | maintain the progress to the extent the costs exceed the | ||||||
12 | unpaid balance of the contract sum, subject to the penal sum of | ||||||
13 | the bond.".
| ||||||
14 | The surety bond required by this Section may be acquired | ||||||
15 | from the
company, agent or broker of the contractor's choice. | ||||||
16 | The bond and sureties
shall
be subject to the right of | ||||||
17 | reasonable approval or disapproval, including
suspension, by | ||||||
18 | the State or political subdivision thereof concerned. In the
| ||||||
19 | case of State construction contracts, a contractor shall not | ||||||
20 | be required to
post a cash bond or letter of credit in addition | ||||||
21 | to or as a substitute for the
surety bond required by this | ||||||
22 | Section.
| ||||||
23 | No retainage may be withheld by a unit of local | ||||||
24 | government, as specified under Section 2 of the Local | ||||||
25 | Government Prompt Payment Act, from a contractor who furnishes | ||||||
26 | the bond or bond substitute required by this Act, nor may a |
| |||||||
| |||||||
1 | contractor withhold retainage from its subcontractors. | ||||||
2 | When other than motor fuel tax funds, federal-aid funds, | ||||||
3 | or other
funds received from the State are used, a political | ||||||
4 | subdivision may allow
the contractor to provide a | ||||||
5 | non-diminishing irrevocable bank letter of
credit, in lieu of | ||||||
6 | the bond required by this Section, on contracts under
$100,000 | ||||||
7 | to comply with the requirements of this Section. Any such bank
| ||||||
8 | letter of credit shall contain all provisions required for | ||||||
9 | bonds by this
Section.
| ||||||
10 | For the purposes of this Section, the terms "material", | ||||||
11 | "labor", "apparatus", "fixtures", and "machinery" include | ||||||
12 | those rented items that are on the construction site and those | ||||||
13 | rented tools that are used or consumed on the construction | ||||||
14 | site in the performance of the contract on account of which the | ||||||
15 | bond is given. | ||||||
16 | (Source: P.A. 101-65, eff. 1-1-20 .)
|