Bill Text: IL SB0263 | 2017-2018 | 100th General Assembly | Engrossed
Bill Title: Amends the Broadband Access on Passenger Rail Law. Makes a technical change in a Section concerning the short title.
Spectrum: Strong Partisan Bill (Democrat 23-2)
Status: (Failed) 2019-01-09 - Session Sine Die [SB0263 Detail]
Download: Illinois-2017-SB0263-Engrossed.html
| |||||||
| |||||||
| |||||||
1 | AN ACT concerning State government.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Department of Transportation Law of the
| ||||||
5 | Civil Administrative Code of Illinois is amended by changing | ||||||
6 | Section 2705-595 and by adding Section 2705-607 as follows:
| ||||||
7 | (20 ILCS 2705/2705-595)
| ||||||
8 | Sec. 2705-595. Prequalification of minority-owned and | ||||||
9 | women-owned contractors. | ||||||
10 | (a) The Department shall, within 30 days after the | ||||||
11 | effective date of this amendatory Act of the 96th General | ||||||
12 | Assembly, establish a committee to review the rules for | ||||||
13 | prequalification of contractors adopted by the Department at 44 | ||||||
14 | Illinois Administrative Code 650. The purpose of the review is | ||||||
15 | to determine whether the rules for prequalification operate as | ||||||
16 | a barrier to minority-owned and women-owned contractors | ||||||
17 | becoming prequalified to bid on or make proposals for | ||||||
18 | Department contracts. The committee shall, in addition to | ||||||
19 | Department staff, be constituted with membership representing | ||||||
20 | the construction industry and minority-owned and women-owned | ||||||
21 | contractors. The committee shall complete its work and make | ||||||
22 | recommendations for any changes to the rules for | ||||||
23 | prequalification to the Secretary of Transportation within 180 |
| |||||||
| |||||||
1 | days after the effective date of this amendatory Act of the | ||||||
2 | 96th General Assembly.
| ||||||
3 | (b) The Department, in conjunction with the Capital | ||||||
4 | Development Board, shall hold 2 public hearings to determine | ||||||
5 | whether a more effective, efficient, and less burdensome method | ||||||
6 | exists to prequalify an architect, engineer, or contractor. The | ||||||
7 | hearings shall also specifically determine how the Department | ||||||
8 | can obtain greater participation in the bidding process of | ||||||
9 | small contractors and minority, female, disabled, and veteran | ||||||
10 | architects, engineers, and contractors. The Department and the | ||||||
11 | Capital Development Board shall collect data to review at the | ||||||
12 | hearings, which shall include, but is not limited to, | ||||||
13 | percentages and the number of minority, female, disabled, and | ||||||
14 | veteran employees who are hired for each trade necessary for | ||||||
15 | each project. The Department and the Capital Development Board | ||||||
16 | shall issue their joint findings and recommendations to the | ||||||
17 | Governor and the General Assembly no later than January 1, | ||||||
18 | 2018. | ||||||
19 | (Source: P.A. 96-795, eff. 7-1-10 (see Section 5 of P.A. 96-793 | ||||||
20 | for the effective date of P.A. 96-795) .)
| ||||||
21 | (20 ILCS 2705/2705-607 new) | ||||||
22 | Sec. 2705-607. Performance evaluation; contractor. | ||||||
23 | (a) For purposes of this Section, "Performance Factor" | ||||||
24 | means a numerical value determined by the contractor's | ||||||
25 | performance evaluation in a work category during the previous |
| |||||||
| |||||||
1 | year. | ||||||
2 | (b) At the close of each construction season, the | ||||||
3 | Department, other State agencies or authorities using | ||||||
4 | contractors based on the prequalification standards of the | ||||||
5 | Department, and officials of a unit of local government | ||||||
6 | administering a contract approved for award by the Department, | ||||||
7 | shall evaluate each contractor who performed work for them | ||||||
8 | during the previous year as either a prime contractor or a | ||||||
9 | subcontractor. The information shall be submitted on the | ||||||
10 | Contractor's Annual Performance Report and shall be subject to | ||||||
11 | disclosure under the Freedom of Information Act. The | ||||||
12 | performance evaluation shall be based upon: | ||||||
13 | (1) the quality of work performed for each work | ||||||
14 | category under 44 Ill. Admin. Code 650; and | ||||||
15 | (2) the overall execution of work measured by: | ||||||
16 | (A) organization and prosecution of work; | ||||||
17 | (B) cooperation with public agency personnel | ||||||
18 | responsible for contract administration and | ||||||
19 | inspection; | ||||||
20 | (C) traffic control and site protection under | ||||||
21 | contract requirements; | ||||||
22 | (D) compliance with the Equal Employment | ||||||
23 | Opportunity program and labor requirements; | ||||||
24 | (E) erosion control; and | ||||||
25 | (F) the contractor's ability to meet the Quality | ||||||
26 | Control plan and Quality Assurance plan under contract |
| |||||||
| |||||||
1 | requirements for materials production and construction | ||||||
2 | quality control. | ||||||
3 | (c) The performance evaluation scale is a rating from 0 to | ||||||
4 | 8 in accordance with the following definitions: | ||||||
5 | (1) "8" means excellent; | ||||||
6 | (2) "7" means good; | ||||||
7 | (3) "6" means satisfactory; | ||||||
8 | (4) "3" means marginal; and | ||||||
9 | (5) "0" means poor. | ||||||
10 | (d) The quality and evaluating categories under execution | ||||||
11 | of work are rated as follows: | ||||||
12 | (1) to determine the contractor's quality of | ||||||
13 | performance, the Department shall consider the project's | ||||||
14 | durability and appearance, knowledge of supervisory | ||||||
15 | personnel, and compliance with contract requirements and | ||||||
16 | shall evaluate the performance based on the following | ||||||
17 | scale: | ||||||
18 | (A) if the contractor exceeded project | ||||||
19 | requirements in all areas considered, he or she shall | ||||||
20 | receive an 8; | ||||||
21 | (B) if the contractor exceeded project | ||||||
22 | requirements in a majority of areas considered, he or | ||||||
23 | she shall receive a 7; | ||||||
24 | (C) if the contractor met project requirements in | ||||||
25 | all areas considered, he or she shall receive a 6; | ||||||
26 | (D) if the contractor did not meet project |
| |||||||
| |||||||
1 | requirements in one area considered, he or she shall | ||||||
2 | receive a 3; and | ||||||
3 | (E) if the contractor did not meet project | ||||||
4 | requirements in 2 or more areas considered, he or she | ||||||
5 | shall receive a 0; | ||||||
6 | (2) to determine the contractor's organization and | ||||||
7 | prosecution, the Department shall consider the | ||||||
8 | contractor's ability to diligently prosecute work by | ||||||
9 | planning and scheduling labor, materials, and the work of | ||||||
10 | subcontractors on the project site and shall evaluate the | ||||||
11 | organization and prosecution based on the following scale: | ||||||
12 | (A) if the contractor exceeded project | ||||||
13 | requirements in all areas considered and completed the | ||||||
14 | project well ahead of schedule, he or she shall receive | ||||||
15 | an 8; | ||||||
16 | (B) if the contractor exceeded project | ||||||
17 | requirements in a majority of areas considered and the | ||||||
18 | project was completed slightly ahead of schedule, he or | ||||||
19 | she shall receive a 7; | ||||||
20 | (C) if the contractor met project requirements in | ||||||
21 | all areas considered and the scheduled completion date | ||||||
22 | was met, he or she shall receive a 6; | ||||||
23 | (D) if the contractor did not meet project | ||||||
24 | requirements in one area considered and occasionally | ||||||
25 | did not work when conditions permitted and the | ||||||
26 | scheduled completion date was met, he or she shall |
| |||||||
| |||||||
1 | receive a 3; and | ||||||
2 | (E) if the contractor did not meet project | ||||||
3 | requirements in 2 or more areas considered and the | ||||||
4 | scheduled completion date was not met, he or she shall | ||||||
5 | receive a 0; | ||||||
6 | (3) to determine the contractor's cooperation, the | ||||||
7 | Department shall consider the contractor's willingness to | ||||||
8 | negotiate contract disputes, to respond to reasonable | ||||||
9 | requests by the resident engineer, and to respond to | ||||||
10 | various correspondence from the Department and shall | ||||||
11 | evaluate the cooperation based on the following scale: | ||||||
12 | (A) if the contractor exceeded project | ||||||
13 | requirements in all areas considered, he or she shall | ||||||
14 | receive an 8; | ||||||
15 | (B) if the contractor exceeded project | ||||||
16 | requirements in a majority of areas considered, he or | ||||||
17 | she shall receive a 7; | ||||||
18 | (C) if the contractor met project requirements in | ||||||
19 | all areas considered, he or she shall receive a 6; | ||||||
20 | (D) if the contractor did not meet project | ||||||
21 | requirements in one area considered, he or she shall | ||||||
22 | receive a 3; and | ||||||
23 | (E) if the contractor did not meet project | ||||||
24 | requirements in 2 or more areas considered, he or she | ||||||
25 | shall receive a 0; | ||||||
26 | (4) to determine the project's traffic control and site |
| |||||||
| |||||||
1 | protection, the Department shall consider the appearance | ||||||
2 | of traffic control devices, the response to repair | ||||||
3 | deficient devices, and the contractor's willingness to | ||||||
4 | comply with the Traffic Control Plan and shall evaluate | ||||||
5 | based on the following scale: | ||||||
6 | (A) if the contractor exceeded project | ||||||
7 | requirements in all areas considered, he or she shall | ||||||
8 | receive an 8; | ||||||
9 | (B) if the contractor exceeded project | ||||||
10 | requirements in a majority of areas considered, he or | ||||||
11 | she shall receive a 7; | ||||||
12 | (C) if the contractor met project requirements in | ||||||
13 | all areas considered, he or she shall receive a 6; | ||||||
14 | (D) if the contractor did not meet project | ||||||
15 | requirements in one area considered, he or she shall | ||||||
16 | receive a 3; and | ||||||
17 | (E) if the contractor did not meet project | ||||||
18 | requirements in 2 or more areas considered or the | ||||||
19 | contractor committed an act or omission which | ||||||
20 | seriously compromised the safety of the public, he or | ||||||
21 | she shall receive a 0; | ||||||
22 | (5) to determine the contractor's compliance with the | ||||||
23 | Equal Employment Opportunity program and labor | ||||||
24 | requirements, the Department shall evaluate the compliance | ||||||
25 | based on the following scale: | ||||||
26 | (A) if the contractor exceeded project |
| |||||||
| |||||||
1 | requirements, he or she shall receive an 8; | ||||||
2 | (B) if the contractor met project requirements | ||||||
3 | through extraordinary effort and initiative, he or she | ||||||
4 | shall receive a 7; | ||||||
5 | (C) if the contractor met project requirements | ||||||
6 | with minimum effort and initiative, he or she shall | ||||||
7 | receive a 6; | ||||||
8 | (D) if the contractor met project requirements, | ||||||
9 | but had to be motivated by Department personnel, he or | ||||||
10 | she shall receive a 3; and | ||||||
11 | (E) if the contractor did not meet project | ||||||
12 | requirements, he or she shall receive a 0; | ||||||
13 | (6) to determine the project's erosion control, the | ||||||
14 | Department shall consider the contractor's compliance with | ||||||
15 | the project's erosion control plan and all pertinent | ||||||
16 | federal and State laws, permits, rules, and regulations and | ||||||
17 | shall evaluate based on the following scale: | ||||||
18 | (A) if the contractor exceeded project | ||||||
19 | requirements, he or she shall receive an 8; | ||||||
20 | (B) if the contractor exceeded project | ||||||
21 | requirements in a majority of the areas, he or she | ||||||
22 | shall receive a 7; | ||||||
23 | (C) if the contractor met project requirements in | ||||||
24 | all areas, he or she shall receive a 6; | ||||||
25 | (D) if the contractor did not meet the project | ||||||
26 | requirements in one area considered, he or she shall |
| |||||||
| |||||||
1 | receive a 3; and | ||||||
2 | (E) if the contractor did not meet the contract | ||||||
3 | requirements in 2 or more areas, he or she shall | ||||||
4 | receive a 0; | ||||||
5 | (7) to determine the contractor's ability to meet the | ||||||
6 | Quality Control plan and Quality Assurance plan, the | ||||||
7 | Department shall consider the contractor's ability to meet | ||||||
8 | a Quality Control plan and Quality Assurance plan | ||||||
9 | inspection, testing, and documentation requirements, to | ||||||
10 | take control of the product, to take corrective action, and | ||||||
11 | to communicate production and construction issued to | ||||||
12 | Department personnel and shall evaluate based on the | ||||||
13 | following scale: | ||||||
14 | (A) if the contractor exceeded Quality Control | ||||||
15 | plan and Quality Assurance plan requirements in all | ||||||
16 | areas considered, he or she shall receive an 8; | ||||||
17 | (B) if the contractor exceeded Quality Control | ||||||
18 | plan and Quality Assurance plan requirements in a | ||||||
19 | majority of areas considered, he or she shall receive a | ||||||
20 | 7; | ||||||
21 | (C) if the contractor met Quality Control plan and | ||||||
22 | Quality Assurance plan requirements in all areas | ||||||
23 | considered, he or she shall receive a 6; | ||||||
24 | (D) if the contractor did not meet Quality Control | ||||||
25 | plan and Quality Assurance plan requirements in one | ||||||
26 | area considered, he or she shall receive a 3; and |
| |||||||
| |||||||
1 | (E) if the contractor did not meet Quality Control | ||||||
2 | plan and Quality Assurance plan requirements in 2 or | ||||||
3 | more areas considered, he or she shall receive a 0. | ||||||
4 | (e) The Department shall calculate the Performance Factor | ||||||
5 | by first determining the Project Cost Ratio for the relevant | ||||||
6 | work category. The Project Cost Ratio is the ratio of the value | ||||||
7 | of all contracts being evaluated to the value of all contracts | ||||||
8 | performed. The Department shall establish a weighted | ||||||
9 | performance evaluation value for each performance evaluation | ||||||
10 | completed by determining the product of the Project Cost Ratio, | ||||||
11 | the rating for quality given on the relevant performance | ||||||
12 | evaluation, and the averaged ratings for the execution given on | ||||||
13 | the relevant performance evaluation divided by 6. Finally, the | ||||||
14 | Department shall divide the summation of all weighted | ||||||
15 | performance evaluation values by 6 to arrive at the Performance | ||||||
16 | Factor. | ||||||
17 | (f) A work rating shall be subject to denial or revocation | ||||||
18 | if the summation of all weighted performance evaluation values | ||||||
19 | for a work rating category is less than 6 for 2 successive | ||||||
20 | years. A work rating shall be subject to denial or revocation | ||||||
21 | if the summation of all weighted performance evaluation values | ||||||
22 | for a work rating category is less than 3 for one year. | ||||||
23 | (g) The Department shall evaluate performance on any | ||||||
24 | individual contract or group of contracts for purposes of | ||||||
25 | determining the current responsibility of a contractor when the | ||||||
26 | Engineer of Construction has determined that performance on any |
| |||||||
| |||||||
1 | contract or contracts may not be acceptable and that an | ||||||
2 | immediate evaluation is necessary to assess the responsibility | ||||||
3 | of a contractor in order to protect the interests of the State | ||||||
4 | in sound procurement practices. If the evaluation ordered by | ||||||
5 | the Engineer of Construction results in the quality of work or | ||||||
6 | the average overall execution of work ratings being rated at | ||||||
7 | less than 3, the work ratings shall be revoked. | ||||||
8 | (h) If a contractor receives a Quality of Work Rating of 0 | ||||||
9 | for any work category being evaluated on any one contract, the | ||||||
10 | work rating shall be revoked. | ||||||
11 | (i) The Department shall notify the contractor of the | ||||||
12 | performance evaluation in writing within 14 days of completion | ||||||
13 | of the evaluation with a detailed explanation of any | ||||||
14 | substandard items. If a performance evaluation results in a | ||||||
15 | denied, reduced, or revoked work rating, the contractor may | ||||||
16 | proceed with the review procedures under 44 Ill. Admin. Code | ||||||
17 | 650.150. | ||||||
18 | (j) If an applicant did not have a contract with the | ||||||
19 | Department in the previous year, the last evaluation issued | ||||||
20 | within a 5-year period shall be used. If an applicant has not | ||||||
21 | had an evaluation in the last 5 years or is applying for an | ||||||
22 | initial rating in a category and lists no public agencies or | ||||||
23 | private customers as references, a Performance Factor of "1" | ||||||
24 | shall be used until an actual evaluation is made. | ||||||
25 | (k) As a component of the Auditor's General biennial | ||||||
26 | compliance examination of the Department, the Auditor General |
| |||||||
| |||||||
1 | shall review the Department's compliance with the requirements | ||||||
2 | under this Section. Upon completion of the examination and | ||||||
3 | release of the results to the Department, the Auditor General | ||||||
4 | shall publish the results on its website.
| ||||||
5 | Section 10. The Criminal Code of 2012 is amended by adding | ||||||
6 | Section 33E-15.5 as follows:
| ||||||
7 | (720 ILCS 5/33E-15.5 new) | ||||||
8 | Sec. 33E-15.5. Manipulation of work ratings. | ||||||
9 | (a) Any person who knowingly manipulates a work rating | ||||||
10 | factor for a contractor or subcontractor under Section 2705-907 | ||||||
11 | of the Department of Transportation Law of the Civil | ||||||
12 | Administrative Code of Illinois that results in a rating | ||||||
13 | disqualifying or qualifying a contractor or subcontractor who | ||||||
14 | would have been otherwise qualified or disqualified commits | ||||||
15 | manipulation of work ratings. A charge of manipulation of work | ||||||
16 | ratings under this Section shall be investigated by the | ||||||
17 | Department of Transportation Division of Internal | ||||||
18 | Investigation. | ||||||
19 | (b) Sentence. Manipulation of work ratings is a Class 4 | ||||||
20 | felony.
| ||||||
21 | Section 99. Effective date. This Act takes effect upon | ||||||
22 | becoming law.
|