Bill Text: IL SB0863 | 2011-2012 | 97th General Assembly | Amended
Bill Title: Amends the Illinois Premise Alert Program (PAP) Act. Makes a technical change in a Section concerning the short title.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2011-05-03 - Third Reading - Lost; 019-030-001 [SB0863 Detail]
Download: Illinois-2011-SB0863-Amended.html
| |||||||
| |||||||
| |||||||
1 | AMENDMENT TO SENATE BILL 863
| ||||||
2 | AMENDMENT NO. ______. Amend Senate Bill 863 by replacing | ||||||
3 | everything after the enacting clause with the following:
| ||||||
4 | "Section 1. Short title. This Act may be cited as the | ||||||
5 | Waukegan Harbor Remedy Facilitation Act.
| ||||||
6 | Section 5. Findings. The General Assembly finds: | ||||||
7 | (a) The Waukegan Port District is a political subdivision, | ||||||
8 | body politic, and municipal corporation created pursuant to the | ||||||
9 | Waukegan Port District Act.
| ||||||
10 | (b) The United States Environmental Protection Agency has | ||||||
11 | made a decision to further remediate the Waukegan Harbor under | ||||||
12 | the provisions of the Comprehensive Environmental Response | ||||||
13 | Compensation and Liability Act, 42 U.S.C.A. §§9601-9675 | ||||||
14 | (CERCLA). The remediation plan is to hydraulically dredge | ||||||
15 | sediment from the harbor. The dredged material is to be placed | ||||||
16 | into a cell for permanent containment. The sediments to be |
| |||||||
| |||||||
1 | dredged would include low-level poly-chlorinated biphenyl | ||||||
2 | contamination.
| ||||||
3 | (c) The cost of on land transport and permanent on land | ||||||
4 | disposal is significantly higher than originally anticipated | ||||||
5 | by the United States, even though the materials are not | ||||||
6 | regarded as toxic or RCRA hazardous wastes.
| ||||||
7 | (d) The Waukegan Port District, in cooperation with the | ||||||
8 | United States Environmental Protection Agency, the United | ||||||
9 | States Secretary of Defense, acting through the U.S. Army Corps | ||||||
10 | of Engineers, the State of Illinois Department of Natural | ||||||
11 | Resources, the Illinois Environmental Protection Agency, the | ||||||
12 | City of Waukegan, and other agencies and persons has developed | ||||||
13 | a plan that would benefit the public and the environment by | ||||||
14 | allowing the further remediation of the Waukegan Harbor, while | ||||||
15 | providing an additional recreational facility for boating, | ||||||
16 | fishing, and other recreation.
| ||||||
17 | (e) The construction of a permanent confined disposal | ||||||
18 | facility (CDF) on approximately 14 acres more or less adjacent | ||||||
19 | to the current South Harbor mooring areas of the Waukegan | ||||||
20 | Harbor is a potential alternative for PCB sediment disposal | ||||||
21 | that would be cost-effective in allowing the dredgings from | ||||||
22 | Waukegan Harbor to be permanently enclosed and sealed from | ||||||
23 | exposure to people, marine life, and the environment.
| ||||||
24 | (f) The further enhancement of Waukegan Harbor by the | ||||||
25 | construction of a permanent CDF in the identified area is in | ||||||
26 | the public interest. Enabling the further remediation of |
| |||||||
| |||||||
1 | Waukegan Harbor to include the provision and use of a confined | ||||||
2 | disposal facility as authorized under this Act would be of | ||||||
3 | great and direct public benefit.
| ||||||
4 | (g) There would be a net benefit to the public by keeping | ||||||
5 | the contaminated soils and sediments that are already in Lake | ||||||
6 | Michigan from further contamination of open waters and also | ||||||
7 | from threatening any on shore release or exposure. Recreational | ||||||
8 | use to be made of the top of the confined and filled area would | ||||||
9 | be of significant public benefit, as well.
| ||||||
10 | (h) No substantial benefit is conferred upon a private | ||||||
11 | interest or firm by reason of the approval of the CDF | ||||||
12 | construction, because the Waukegan Port District is a public | ||||||
13 | body whose activity is for the public benefit and because the | ||||||
14 | contamination in soils and sediments to be disposed of was | ||||||
15 | caused by Outboard Marine Corporation, a bankrupt and defunct | ||||||
16 | concern. Most of the cost of construction of the remedy, | ||||||
17 | including the CDF, will be borne by the United States.
| ||||||
18 | (i) The use of CDFs has already successfully occurred | ||||||
19 | elsewhere on the Great Lakes, including at Calumet Harbor in | ||||||
20 | Illinois, Milwaukee Harbor in Wisconsin, and in Canadian | ||||||
21 | waters. There is a successful confinement in former slip number | ||||||
22 | 3 at Waukegan Harbor, and others are planned.
| ||||||
23 | (j) The CDF will further benefit the public by providing | ||||||
24 | new habitat for natural marine, bird, and other life along its | ||||||
25 | edges, and its top would become a functional space supporting | ||||||
26 | additional mooring, fishing, and other recreation.
|
| |||||||
| |||||||
1 | (k) The use of the designated area as a CDF will provide | ||||||
2 | financial savings to the State of Illinois of an estimated | ||||||
3 | several million dollars through credit for the in-kind | ||||||
4 | provision of the CDF land for the Harbor's further remedy. CDF | ||||||
5 | disposal will also significantly reduce the cost for the United | ||||||
6 | States.
| ||||||
7 | (l) Irrespective of whether the CDF is used to contain the | ||||||
8 | low level PCB dredging, a CDF and associated breakwater | ||||||
9 | construction will allow the Waukegan Port District to | ||||||
10 | economically provide additional recreational boating and | ||||||
11 | fishing opportunity to the general public by dredging and | ||||||
12 | filling the CDF with uncontaminated sediments for an expanded | ||||||
13 | marina area.
| ||||||
14 | (m) Final decisions on the components of the Waukegan | ||||||
15 | Harbor further remediation are the responsibility of the United | ||||||
16 | States Environmental Protection Agency (USEPA) pursuant to | ||||||
17 | CERCLA.
| ||||||
18 | (n) Provision of the lakebed land for construction of the | ||||||
19 | CDF authorized by this Act is in the public interests and | ||||||
20 | consistent with the public trust.
| ||||||
21 | Section 10. Authorization and use of a confined disposal | ||||||
22 | facility. | ||||||
23 | (a) The CDF may be constructed by the United States if the | ||||||
24 | United States determines that use of the CDF for permanent | ||||||
25 | disposal of low-level PCB sediments is to be part of the |
| |||||||
| |||||||
1 | further remediation of Waukegan Harbor. | ||||||
2 | (b) If the USEPA decides to employ a CDF at Waukegan Harbor | ||||||
3 | for its further remediation pursuant to CERCLA, the Department | ||||||
4 | of Natural Resources is directed to review and to determine, in | ||||||
5 | cooperation with USEPA and the Waukegan Port District, the | ||||||
6 | location of the approximately 14-acre area upon which a CDF | ||||||
7 | shall be best placed. | ||||||
8 | (c) The Department of Natural Resources shall also receive | ||||||
9 | and act appropriately to grant permission to the Waukegan Port | ||||||
10 | District or the United States to construct a breakwater wall | ||||||
11 | that will be designed to protect moored vessels and the CDF | ||||||
12 | from heavy wave action or seiche action on Lake Michigan. | ||||||
13 | (d) Under Section 18 of the Rivers, Lakes, and Streams Act, | ||||||
14 | the building of a harbor or mooring facility shall not commence | ||||||
15 | without a permit from the Department of Natural Resources, and | ||||||
16 | the facilities shall be confined to those areas recommended by | ||||||
17 | the Department of Natural Resources, authorized by the General | ||||||
18 | Assembly, and approved by the Governor and shall be in aid of | ||||||
19 | and not an interference with the public interest or navigation. | ||||||
20 | (e) The Department of Natural Resources is also authorized | ||||||
21 | to allow the establishment of moorings, boat slips, dockage, | ||||||
22 | and other improvements by the Waukegan Port District in the | ||||||
23 | area generally to be within the partly sheltered waters formed | ||||||
24 | by the new breakwater and the CDF, east of the existing South | ||||||
25 | Harbor and south of the entrance channel, provided acceptable | ||||||
26 | permit applications are submitted by the Waukegan Port |
| |||||||
| |||||||
1 | District.
| ||||||
2 | (f) The jurisdiction and control of the Department of | ||||||
3 | Natural Resources over the bed of Lake Michigan under the | ||||||
4 | Rivers, Lakes, and Streams Act shall not be diminished or | ||||||
5 | limited by the authorization and approval granted under this | ||||||
6 | Act, title to the bed of Lake Michigan in both the harbor and | ||||||
7 | mooring area shall remain in the State of Illinois, and no | ||||||
8 | improvements, other than those authorized and approved | ||||||
9 | pursuant to this Act, shall be made without the further | ||||||
10 | authorization and approval of the Department.
| ||||||
11 | Section 15. Power and Duties. | ||||||
12 | (a) Subject to the Waukegan Port District obtaining all | ||||||
13 | required permissions, the Waukegan Port District is authorized | ||||||
14 | to expand its existing South Harbor boating and recreational | ||||||
15 | facilities to the east, south of the existing channel | ||||||
16 | breakwater, to include new boat slips, a new breakwater, | ||||||
17 | suitable public recreational space, ancillary boating service, | ||||||
18 | and other suitable improvements atop of the enclosed surface | ||||||
19 | area of a CDF.
| ||||||
20 | (b) The Waukegan Port District shall continue to cooperate | ||||||
21 | with the United States as it deems reasonable and appropriate | ||||||
22 | respecting the Waukegan Harbor further remediation. The | ||||||
23 | Waukegan Port District may contract with the United States for | ||||||
24 | operation and maintenance obligations respecting the CDF, | ||||||
25 | provided that the United States assumes any and all liability |
| |||||||
| |||||||
1 | for the construction, maintenance, and operation of the CDF or, | ||||||
2 | alternatively, provided the United States extends to the State | ||||||
3 | of Illinois and Waukegan Port District contribution protection | ||||||
4 | under CERCLA and other protection acceptable to the Waukegan | ||||||
5 | Port District and the State from all claims arising from the | ||||||
6 | construction, maintenance, and operation of the CDF.
| ||||||
7 | (c) The expanded South Harbor facilities shall otherwise be | ||||||
8 | managed and maintained in accordance with the Waukegan Port | ||||||
9 | District Act.
| ||||||
10 | Section 99. Effective date. This Act takes effect upon | ||||||
11 | becoming law.".
|