Bill Text: IL SB1352 | 2011-2012 | 97th General Assembly | Chaptered
Bill Title: Amends the Illinois Procurement Code. In a Section requiring building construction contracts to specify the 5 subdivisions of work to be performed, provides that, until a date 5 years (now, 4 years) after January 1, 2009, the requirements do not apply to certain construction projects for which the Capital Development Board is the construction agency and the project budget is at least $5,000,000 (now, $20,000,000). Provides that, with regard to these construction projects, the Capital Development Board may award in each year contracts with an aggregate total value of no more than $200,000,000 (now, $100,000,000). Deletes a sentence providing that, if certain conditions are met, the requirements do not apply to the Capitol Building HVAC upgrade project. Effective immediately.
Spectrum: Partisan Bill (Democrat 2-0)
Status: (Passed) 2011-07-22 - Public Act . . . . . . . . . 97-0182 [SB1352 Detail]
Download: Illinois-2011-SB1352-Chaptered.html
| ||||
Public Act 097-0182 | ||||
| ||||
| ||||
AN ACT concerning finance.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 5. The Illinois Procurement Code is amended by | ||||
changing Section 30-30 as follows:
| ||||
(30 ILCS 500/30-30)
| ||||
Sec. 30-30. Contracts in excess of $250,000. For
building | ||||
construction contracts in excess of
$250,000, separate | ||||
specifications shall be prepared for all
equipment, labor, and | ||||
materials in
connection with the following 5 subdivisions of | ||||
the work to be
performed:
| ||||
(1) plumbing;
| ||||
(2) heating, piping, refrigeration, and automatic
| ||||
temperature control systems,
including the testing and | ||||
balancing of those systems;
| ||||
(3) ventilating and distribution systems for
| ||||
conditioned air, including the testing
and balancing of | ||||
those systems;
| ||||
(4) electric wiring; and
| ||||
(5) general contract work.
| ||||
The specifications must be so drawn as to permit separate | ||||
and
independent bidding upon
each of the 5 subdivisions of | ||||
work. All contracts awarded
for any part thereof shall
award |
the 5 subdivisions of work separately to responsible and
| ||
reliable persons, firms, or
corporations engaged in these | ||
classes of work. The contracts, at
the discretion of the
| ||
construction agency, may be assigned to the successful bidder | ||
on
the general contract work or
to the successful bidder on the | ||
subdivision of work designated by
the construction agency | ||
before
the bidding as the prime subdivision of work, provided | ||
that all
payments will be made directly
to the contractors for | ||
the 5 subdivisions of work upon compliance
with the conditions | ||
of the
contract. A contract may be let for one or more | ||
buildings in any
project to the same contractor.
The | ||
specifications shall require, however, that unless the
| ||
buildings are identical, a separate price
shall be submitted | ||
for each building. The contract may be awarded
to the lowest | ||
responsible
bidder for each or all of the buildings included in | ||
the
specifications.
| ||
Until a date 4 years after July 1, 2011 January 1, 2009 | ||
(the effective date of Public Act 95-758) , the requirements of | ||
this Section do not apply to a construction project for which | ||
the Capital Development Board is the construction agency if: | ||
(i) the project budget is at least $15,000,000 $20,000,000 ; | ||
(ii) the Capital Development Board has submitted to the | ||
Procurement Policy Board a written request for a public hearing | ||
on waiver of the application of the requirements of this | ||
Section to that project, including its reasons for seeking the | ||
waiver and why the waiver is in the best interest of the State; |
(iii) the Capital Development Board has posted notice of the | ||
waiver hearing on its procurement web page and on the online | ||
Procurement Bulletin at least 15 working days before the | ||
hearing;
(iv) the Procurement Policy Board, after conducting | ||
the public hearing on the waiver request, reviews and approves | ||
the request in writing before the award of the contract; (v) | ||
the successful low bidder has prequalified with the Capital | ||
Development Board; (vi) the bid of the successful low bidder | ||
identifies the name of the subcontractor, if any, and the bid | ||
proposal costs for each of the 5 subdivisions of work set forth | ||
in this Section; and (vii) the contract entered into with the | ||
successful bidder provides that no identified subcontractor | ||
may be terminated without the written consent of the Capital | ||
Development Board.
With respect to any construction project | ||
described in this paragraph, the Capital Development Board | ||
shall: (i) provide to the Auditor General an affidavit that the | ||
waiver of the application of the requirements of this Section | ||
is in the best interest of the State; (ii) specify in writing | ||
as a public record that the project shall comply with the | ||
disadvantaged business practices of the Business Enterprise | ||
for Minorities, Females, and Persons with Disabilities Act and | ||
the equal employment practices of Section 2-105 of the Illinois | ||
Human Rights Act; and (iii) report annually to the Governor and | ||
the General Assembly on the bidding, award, and performance. On | ||
and after January 1, 2009 (the effective date of Public Act | ||
95-758), the Capital Development Board may award in each year |
contracts with an aggregate total value of no more than | ||
$200,000,000 $100,000,000 with respect to construction | ||
projects described in this paragraph. | ||
Until a date 11 years after November 29, 2005 (the | ||
effective date of Public Act 94-699), the requirements of this | ||
Section do not apply to the Capitol Building HVAC upgrade | ||
project if (i) the bid of the successful bidder identifies the | ||
name of the subcontractor, if any, and the bid proposal costs | ||
for each of the 5 subdivisions of work set forth in this | ||
Section, and (ii) the contract entered into with the successful | ||
bidder provides that no identified subcontractor may be | ||
terminated without the written consent of the Capital | ||
Development Board.
| ||
(Source: P.A. 95-758, eff. 1-1-09; 96-1204, eff. 7-22-10; | ||
96-1486, eff. 12-30-10.)
| ||
Section 99. Effective date. This Act takes effect upon | ||
becoming law.
|