Bill Text: IL SB1594 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Amends the Prevailing Wage Act. Provides that specified provisions of the Act apply to any survey work performed for construction control, layout, or grade checking.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Failed) 2025-01-07 - Session Sine Die [SB1594 Detail]
Download: Illinois-2023-SB1594-Introduced.html
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
1 | AN ACT concerning employment.
| |||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||||
4 | Section 5. The Prevailing Wage Act is amended by changing | |||||||||||||||||||||
5 | Sections 2 and 3 as follows:
| |||||||||||||||||||||
6 | (820 ILCS 130/2) (from Ch. 48, par. 39s-2)
| |||||||||||||||||||||
7 | Sec. 2. This Act applies to the wages of laborers, | |||||||||||||||||||||
8 | mechanics and
other workers employed in any public works, as | |||||||||||||||||||||
9 | hereinafter defined, by
any public body and to anyone under | |||||||||||||||||||||
10 | contracts for public works. This includes any maintenance, | |||||||||||||||||||||
11 | repair, assembly, or disassembly work performed on equipment | |||||||||||||||||||||
12 | whether owned, leased, or rented. This also includes any | |||||||||||||||||||||
13 | survey work performed for construction control, layout, or | |||||||||||||||||||||
14 | grade checking.
| |||||||||||||||||||||
15 | As used in this Act, unless the context indicates | |||||||||||||||||||||
16 | otherwise:
| |||||||||||||||||||||
17 | "Public works" means all fixed works constructed or | |||||||||||||||||||||
18 | demolished by
any public body,
or paid for wholly or in part | |||||||||||||||||||||
19 | out of public funds. "Public works" as
defined herein includes | |||||||||||||||||||||
20 | all projects financed in whole
or in part with bonds, grants, | |||||||||||||||||||||
21 | loans, or other funds made available by or through the State or | |||||||||||||||||||||
22 | any of its political subdivisions, including but not limited | |||||||||||||||||||||
23 | to: bonds issued under the Industrial Project Revenue Bond
Act |
| |||||||
| |||||||
1 | (Article 11, Division 74 of the Illinois Municipal Code), the | ||||||
2 | Industrial
Building Revenue Bond Act, the Illinois Finance | ||||||
3 | Authority Act,
the Illinois Sports Facilities Authority Act, | ||||||
4 | or the Build Illinois Bond Act; loans or other funds made
| ||||||
5 | available pursuant to the Build Illinois Act; loans or other | ||||||
6 | funds made available pursuant to the Riverfront Development | ||||||
7 | Fund under Section 10-15 of the River Edge Redevelopment Zone | ||||||
8 | Act; or funds from the Fund for
Illinois' Future under Section | ||||||
9 | 6z-47 of the State Finance Act, funds for school
construction | ||||||
10 | under Section 5 of the General Obligation Bond Act, funds
| ||||||
11 | authorized under Section 3 of the School Construction Bond | ||||||
12 | Act, funds for
school infrastructure under Section 6z-45 of | ||||||
13 | the State Finance Act, and funds
for transportation purposes | ||||||
14 | under Section 4 of the General Obligation Bond
Act. "Public | ||||||
15 | works" also includes (i) all projects financed in whole or in | ||||||
16 | part
with funds from the Environmental Protection Agency under | ||||||
17 | the Illinois Renewable Fuels Development Program
Act for which | ||||||
18 | there is no project labor agreement; (ii) all work performed | ||||||
19 | pursuant to a public private agreement under the Public | ||||||
20 | Private Agreements for the Illiana Expressway Act or the | ||||||
21 | Public-Private Agreements for the South Suburban Airport Act; | ||||||
22 | (iii) all projects undertaken under a public-private agreement | ||||||
23 | under the Public-Private Partnerships for Transportation Act; | ||||||
24 | and (iv) all transportation facilities undertaken under a | ||||||
25 | design-build contract or a Construction Manager/General | ||||||
26 | Contractor contract under the Innovations for Transportation |
| |||||||
| |||||||
1 | Infrastructure Act. "Public works" also includes all projects | ||||||
2 | at leased facility property used for airport purposes under | ||||||
3 | Section 35 of the Local Government Facility Lease Act. "Public | ||||||
4 | works" also includes the construction of a new wind power | ||||||
5 | facility by a business designated as a High Impact Business | ||||||
6 | under Section 5.5(a)(3)(E) and the construction of a new | ||||||
7 | utility-scale solar power facility by a business designated as | ||||||
8 | a High Impact Business under Section 5.5(a)(3)(E-5) of the | ||||||
9 | Illinois Enterprise Zone Act.
"Public works" also includes | ||||||
10 | electric vehicle charging station projects financed pursuant | ||||||
11 | to the Electric Vehicle Act and renewable energy projects | ||||||
12 | required to pay the prevailing wage pursuant to the Illinois | ||||||
13 | Power Agency Act. "Public works" does not include work done | ||||||
14 | directly by any public utility company, whether or not done | ||||||
15 | under public supervision or direction, or paid for wholly or | ||||||
16 | in part out of public funds. "Public works" also includes | ||||||
17 | construction projects performed by a third party contracted by | ||||||
18 | any public utility, as described in subsection (a) of Section | ||||||
19 | 2.1, in public rights-of-way, as defined in Section 21-201 of | ||||||
20 | the Public Utilities Act, whether or not done under public | ||||||
21 | supervision or direction, or paid for wholly or in part out of | ||||||
22 | public funds. "Public works" also includes construction | ||||||
23 | projects that exceed 15 aggregate miles of new fiber optic | ||||||
24 | cable, performed by a third party contracted by any public | ||||||
25 | utility, as described in subsection (b) of Section 2.1, in | ||||||
26 | public rights-of-way, as defined in Section 21-201 of the |
| |||||||
| |||||||
1 | Public Utilities Act, whether or not done under public | ||||||
2 | supervision or direction, or paid for wholly or in part out of | ||||||
3 | public funds. "Public works" also includes any corrective | ||||||
4 | action performed pursuant to Title XVI of the Environmental | ||||||
5 | Protection Act for which payment from the Underground Storage | ||||||
6 | Tank Fund is requested. "Public works" does not include | ||||||
7 | projects undertaken by the owner at an owner-occupied | ||||||
8 | single-family residence or at an owner-occupied unit of a | ||||||
9 | multi-family residence. "Public works" does not include work | ||||||
10 | performed for soil and water conservation purposes on | ||||||
11 | agricultural lands, whether or not done under public | ||||||
12 | supervision or paid for wholly or in part out of public funds, | ||||||
13 | done directly by an owner or person who has legal control of | ||||||
14 | those lands.
| ||||||
15 | "Construction" means all work on public works involving | ||||||
16 | laborers,
workers or mechanics. This includes any maintenance, | ||||||
17 | repair, assembly, or disassembly work performed on equipment | ||||||
18 | whether owned, leased, or rented. This also includes any | ||||||
19 | survey work performed for construction control, layout, or | ||||||
20 | grade checking.
| ||||||
21 | "Locality" means the county where the physical work upon | ||||||
22 | public works
is performed, except (1) that if there is not | ||||||
23 | available in the county a
sufficient number of competent | ||||||
24 | skilled laborers, workers and mechanics
to construct the | ||||||
25 | public works efficiently and properly, "locality"
includes any | ||||||
26 | other county nearest the one in which the work or
construction |
| |||||||
| |||||||
1 | is to be performed and from which such persons may be
obtained | ||||||
2 | in sufficient numbers to perform the work and (2) that, with
| ||||||
3 | respect to contracts for highway work with the Department of
| ||||||
4 | Transportation of this State, "locality" may at the discretion | ||||||
5 | of the
Secretary of the Department of Transportation be | ||||||
6 | construed to include
two or more adjacent counties from which | ||||||
7 | workers may be accessible for
work on such construction.
| ||||||
8 | "Public body" means the State or any officer, board or | ||||||
9 | commission of
the State or any political subdivision or | ||||||
10 | department thereof, or any
institution supported in whole or | ||||||
11 | in part by public funds,
and includes every county, city, | ||||||
12 | town,
village, township, school district, irrigation, utility, | ||||||
13 | reclamation
improvement or other district and every other | ||||||
14 | political subdivision,
district or municipality of the state | ||||||
15 | whether such political
subdivision, municipality or district | ||||||
16 | operates under a special charter
or not.
| ||||||
17 | "Labor organization" means an organization that is the | ||||||
18 | exclusive representative of an
employer's employees recognized | ||||||
19 | or certified pursuant to the National Labor Relations Act. | ||||||
20 | The terms "general prevailing rate of hourly wages", | ||||||
21 | "general
prevailing rate of wages" or "prevailing rate of | ||||||
22 | wages" when used in
this Act mean the hourly cash wages plus | ||||||
23 | annualized fringe benefits for training and
apprenticeship | ||||||
24 | programs approved by the U.S. Department of Labor, Bureau of
| ||||||
25 | Apprenticeship and Training, health and welfare, insurance, | ||||||
26 | vacations and
pensions paid generally, in the
locality in |
| |||||||
| |||||||
1 | which the work is being performed, to employees engaged in
| ||||||
2 | work of a similar character on public works.
| ||||||
3 | (Source: P.A. 102-9, eff. 1-1-22; 102-444, eff. 8-20-21; | ||||||
4 | 102-673, eff. 11-30-21; 102-813, eff. 5-13-22; 102-1094, eff. | ||||||
5 | 6-15-22.)
| ||||||
6 | (820 ILCS 130/3) (from Ch. 48, par. 39s-3)
| ||||||
7 | Sec. 3. Not less than the general prevailing rate of | ||||||
8 | hourly wages for
work of a similar character on public works in | ||||||
9 | the locality in which the
work is performed, and not less than | ||||||
10 | the general prevailing rate of
hourly wages for legal holiday | ||||||
11 | and overtime work, shall be paid to all
laborers, workers and | ||||||
12 | mechanics employed by or on behalf of any public
body engaged | ||||||
13 | in the construction or demolition of public works.
This | ||||||
14 | includes any maintenance, repair, assembly, or disassembly | ||||||
15 | work performed on equipment whether owned, leased, or rented. | ||||||
16 | This also includes any survey work performed for construction | ||||||
17 | control, layout, or grade checking. Only such laborers, | ||||||
18 | workers and mechanics as are
directly employed by contractors | ||||||
19 | or subcontractors in actual
construction work on the site of | ||||||
20 | the building or construction job, and
laborers, workers and | ||||||
21 | mechanics engaged in the transportation of
materials and | ||||||
22 | equipment to or from the site, but not including the
| ||||||
23 | transportation by the sellers and suppliers or the manufacture | ||||||
24 | or
processing of materials or equipment, in the execution of | ||||||
25 | any contract
or contracts for public works with any public |
| |||||||
| |||||||
1 | body shall be deemed to be
employed upon public works. The wage | ||||||
2 | for a tradesman performing maintenance
is equivalent to that | ||||||
3 | of a tradesman engaged in construction or demolition.
| ||||||
4 | (Source: P.A. 95-341, eff. 8-21-07; 96-186, eff. 1-1-10.)
|