Bill Title: Amends the Public Utilities Act. Provides for a waste-to-energy electric generation program. Requires every investor-owned public utility to file with the Illinois Commerce Commission a standard tariff for electricity purchased from an electric generation facility. Provides that the Commission may limit the projects to 2 standard tariffs per territory in Illinois. Provides requirements for the use of the applicable tariffs, and accompanying costs. Provides that the Commission shall adopt any rules necessary to implement the program. Defines "electric generation facility". Effective immediately.
Spectrum: Partisan Bill (Republican 2-0)
Status: (Failed) 2019-01-09 - Session Sine Die [SB1703 Detail]
Download: Illinois-2017-SB1703-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning regulation.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Public Utilities Act is amended by adding | |||||||||||||||||||
5 | Section 16-115E as follows:
| |||||||||||||||||||
6 | (220 ILCS 5/16-115E new) | |||||||||||||||||||
7 | Sec. 16-115E. Waste-to-energy electric generation. | |||||||||||||||||||
8 | (a) As used in this Section, "electric generation facility" | |||||||||||||||||||
9 | means an electric generation facility located within the | |||||||||||||||||||
10 | service territory of, and developed to sell electricity to, an | |||||||||||||||||||
11 | investor-owned public utility that: | |||||||||||||||||||
12 | (1) has an effective capacity of not more than 3 | |||||||||||||||||||
13 | megawatts; | |||||||||||||||||||
14 | (2) is interconnected and operates in parallel with the | |||||||||||||||||||
15 | electrical transmission and distribution grid; | |||||||||||||||||||
16 | (3) is strategically located and interconnected to the | |||||||||||||||||||
17 | electrical transmission and distribution grid in a manner | |||||||||||||||||||
18 | that optimizes the deliverability of electricity generated | |||||||||||||||||||
19 | at the facility to load centers; and | |||||||||||||||||||
20 | (4) is an eligible renewable energy resource. | |||||||||||||||||||
21 | (b) It is the policy of the State of Illinois and the | |||||||||||||||||||
22 | intent of the General Assembly to encourage electrical | |||||||||||||||||||
23 | generation from eligible renewable energy resources. To that |
| |||||||
| |||||||
1 | end, the purpose of this Section is to allow wastewater plants | ||||||
2 | to build turbines to power electricity from their waste fuel in | ||||||
3 | order to produce another viable form of electrical generation | ||||||
4 | for this State. | ||||||
5 | (c) Every investor-owned public utility shall file with the | ||||||
6 | Commission a standard tariff for electricity purchased from an | ||||||
7 | electric generation facility. The Commission may limit the | ||||||
8 | projects to 2 standard tariffs per territory in Illinois. Each | ||||||
9 | tariff shall provide for payment for every kilowatthour of | ||||||
10 | electricity purchased from an electric generation facility for | ||||||
11 | a period of 10, 15, or 20 years, as authorized by the | ||||||
12 | Commission. The payment shall be the market price determined by | ||||||
13 | the Commission, using a methodology developed by the | ||||||
14 | Commission, and shall include all current and anticipated | ||||||
15 | environmental compliance costs, including, but not limited to, | ||||||
16 | mitigation of emissions of greenhouse gases and air pollution | ||||||
17 | offsets associated with the operation of new generating | ||||||
18 | facilities. The tariffs shall be completed within 12 months | ||||||
19 | after the effective date of this amendatory Act of the 100th | ||||||
20 | General Assembly. | ||||||
21 | (d) The Commission shall adopt any rules necessary to | ||||||
22 | implement the program created under this Section.
| ||||||
23 | Section 99. Effective date. This Act takes effect upon | ||||||
24 | becoming law.
|