Bill Text: IL SB3837 | 2021-2022 | 102nd General Assembly | Introduced
Bill Title: Amends the Environmental Protection Act. Provides that the filing fees for specified petitions shall be $250 (rather than $75).
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2022-12-31 - Chief Sponsor Changed to Sen. Don Harmon [SB3837 Detail]
Download: Illinois-2021-SB3837-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning safety.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | |||||||||||||||||||
5 | changing Section 7.5 as follows:
| |||||||||||||||||||
6 | (415 ILCS 5/7.5) (from Ch. 111 1/2, par. 1007.5)
| |||||||||||||||||||
7 | Sec. 7.5. Filing fees. | |||||||||||||||||||
8 | (a) The Board shall collect filing fees
as prescribed in | |||||||||||||||||||
9 | this Act. The fees shall be deposited
in the Pollution Control | |||||||||||||||||||
10 | Board Fund.
The filing fees shall be as follows:
| |||||||||||||||||||
11 | Petition for site-specific regulation, $250 $75 .
| |||||||||||||||||||
12 | Petition for variance, $250 $75 .
| |||||||||||||||||||
13 | Petition for review of permit, $250 $75 .
| |||||||||||||||||||
14 | Petition to contest local government decision pursuant | |||||||||||||||||||
15 | to Section 40.1, $250 $75 .
| |||||||||||||||||||
16 | Petition for an adjusted standard, pursuant to Section | |||||||||||||||||||
17 | 28.1, $250 $75 .
| |||||||||||||||||||
18 | Petition for a time-limited water quality standard, | |||||||||||||||||||
19 | $250 $75 per petitioner. | |||||||||||||||||||
20 | (b) A person who has filed a petition for a variance from a | |||||||||||||||||||
21 | water quality standard and paid the filing fee set forth in | |||||||||||||||||||
22 | subsection (a) of this Section for that petition and whose | |||||||||||||||||||
23 | variance petition is thereafter converted into a petition for |
| |||||||
| |||||||
1 | a time-limited water quality standard under Section 38.5 of | ||||||
2 | this Act shall not be required to pay a separate filing fee | ||||||
3 | upon the conversion of the variance petition into a petition | ||||||
4 | for a time-limited water quality standard. | ||||||
5 | (Source: P.A. 99-937, eff. 2-24-17.)
|