Bill Title: Amends the Public Utilities Act. Provides that a gas utility may cease providing service if the Illinois Commerce Commission determines that adequate substitute service is available at a reasonable cost to support the existing end uses of the affected utility customers. Provides for cost-effective energy efficiency measures for natural gas utilities that supersede existing provisions concerning natural gas energy efficiency programs and take effect beginning January 1, 2025. Provides that gas main and gas service extension policies shall be based on the principle that the full incremental cost associated with new development and growth shall be borne by the customers that cause those incremental costs. Provides that, no later than 60 days after the effective date of the amendatory Act, the Commission shall initiate a docketed rulemaking reviewing each gas public utility tariff that provides for gas main and gas service extensions without additional charge to new customers in excess of the default extensions as specified in administrative rule. Adds the Clean Building Heating Law Article to the Act, with provisions concerning emissions standards for heating in buildings, as well as related and other provisions. Adds the 2050 Heat Decarbonization Standard Article to the Act, with provisions concerning options for compliance, measures for customer emission reduction, customer emission reductions, tradable clean heat credits, banking of emission reductions, equity in emission reductions, enforcement, the 2050 Heat Decarbonization Pathways Study, gas infrastructure planning, a study on gas utility financial incentive reform, and reporting requirements. Adds the Statewide Navigator Program Law Article to the Act, with provisions concerning creation of a statewide navigator program, as well as related and other provisions. Amends the Energy Transition Act to add electrification industries to clean energy jobs. Effective immediately.
Spectrum: Partisan Bill (Democrat 4-0)
Status: (Introduced) 2024-05-22 - Added as Co-Sponsor Sen. Laura Fine [SB3935 Detail]
Download: Illinois-2023-SB3935-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning regulation.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Energy Transition Act is amended by | |||||||||||||||||||
5 | changing Section 5-25 as follows:
| |||||||||||||||||||
6 | (20 ILCS 730/5-25) | |||||||||||||||||||
7 | (Section scheduled to be repealed on September 15, 2045) | |||||||||||||||||||
8 | Sec. 5-25. Clean Jobs Curriculum. | |||||||||||||||||||
9 | (a) As used in this Section, "clean energy jobs", subject | |||||||||||||||||||
10 | to administrative rules, means jobs in the solar energy, wind | |||||||||||||||||||
11 | energy, energy efficiency, energy storage, solar thermal, | |||||||||||||||||||
12 | green hydrogen, geothermal, electric vehicle industries, | |||||||||||||||||||
13 | electrification industries, other renewable energy industries, | |||||||||||||||||||
14 | industries achieving emission reductions, and other related | |||||||||||||||||||
15 | sectors including related industries that manufacture, | |||||||||||||||||||
16 | develop, build, maintain, or provide ancillary services to | |||||||||||||||||||
17 | renewable energy resources or energy efficiency products or | |||||||||||||||||||
18 | services, including the manufacture and installation of | |||||||||||||||||||
19 | healthier building materials that contain fewer hazardous | |||||||||||||||||||
20 | chemicals. "Clean energy jobs" includes administrative, sales, | |||||||||||||||||||
21 | other support functions within these industries and other | |||||||||||||||||||
22 | related sector industries. | |||||||||||||||||||
23 | (b) The Department shall convene a comprehensive |
| |||||||
| |||||||
1 | stakeholder process that includes representatives from the | ||||||
2 | State Board of Education, the Illinois Community College | ||||||
3 | Board, the Department of Labor, community-based organizations, | ||||||
4 | workforce development providers, labor unions, building | ||||||
5 | trades, educational institutions, residents of BIPOC and | ||||||
6 | low-income communities, residents of environmental justice | ||||||
7 | communities, clean energy businesses, nonprofit organizations, | ||||||
8 | worker-owned cooperatives, other groups that provide clean | ||||||
9 | energy jobs opportunities, groups that provide construction | ||||||
10 | and building trades job opportunities, and other participants | ||||||
11 | to identify the career pathways and training curriculum needed | ||||||
12 | for participants to be skilled, work ready, and able to enter | ||||||
13 | clean energy jobs. The curriculum shall: | ||||||
14 | (1) identify the core training curricular competency | ||||||
15 | areas needed to prepare workers to enter clean energy and | ||||||
16 | related sector jobs; | ||||||
17 | (2) identify a set of required core cross-training | ||||||
18 | competencies provided in each training area for clean | ||||||
19 | energy jobs with the goal of enabling any trainee to | ||||||
20 | receive a standard set of skills common to multiple | ||||||
21 | training areas that would provide a foundation for | ||||||
22 | pursuing a career composed of multiple clean energy job | ||||||
23 | types; | ||||||
24 | (3) include approaches to integrate broad occupational | ||||||
25 | training to provide career entry into the general | ||||||
26 | construction and building trades sector and any remedial |
| |||||||
| |||||||
1 | education and work readiness support necessary to achieve | ||||||
2 | educational and professional eligibility thresholds; and | ||||||
3 | (4) identify on-the-job training formats, where | ||||||
4 | relevant, and identify suggested trainer certification | ||||||
5 | standards, where relevant. | ||||||
6 | (c) The Department shall publish a report that includes | ||||||
7 | the findings, recommendations, and core curriculum identified | ||||||
8 | by the stakeholder group and shall post a copy of the report on | ||||||
9 | its public website. The Department shall convene the process | ||||||
10 | described to update and modify the recommended curriculum | ||||||
11 | every 3 years to ensure the curriculum contents are current to | ||||||
12 | the evolving clean energy industries, practices, and | ||||||
13 | technologies. | ||||||
14 | (d) Organizations that receive funding to provide training | ||||||
15 | under the Clean Jobs Workforce Network Program, including, but | ||||||
16 | not limited to, community-based and labor-based training | ||||||
17 | providers, and educational institutions must use the core | ||||||
18 | curriculum that is developed under this Section. | ||||||
19 | (Source: P.A. 102-662, eff. 9-15-21.)
| ||||||
20 | Section 10. The Public Utilities Act is amended by | ||||||
21 | changing Sections 1-102, 8-101, 9-229, 9-241, and 16-111.10 | ||||||
22 | and by adding Sections 1-103, 3-127, 8-104B, 9-228.5, 9-235, | ||||||
23 | 9-254, and 9-255, and Articles XXIII, XXIV, and XXV as | ||||||
24 | follows:
|
| |||||||
| |||||||
1 | (220 ILCS 5/1-102) (from Ch. 111 2/3, par. 1-102) | ||||||
2 | Sec. 1-102. Findings and Intent. The General Assembly | ||||||
3 | finds that the health, welfare , and prosperity of all Illinois | ||||||
4 | citizens require the provision of adequate, efficient, | ||||||
5 | reliable , affordable , environmentally safe , and least-cost | ||||||
6 | public utility services at prices which accurately reflect the | ||||||
7 | long-term cost of such services and which are equitable to all | ||||||
8 | citizens. It is therefore declared to be the policy of the | ||||||
9 | State that public utilities shall continue to be regulated | ||||||
10 | effectively and comprehensively. It is further declared that | ||||||
11 | the goals and objectives of such regulation shall be to | ||||||
12 | ensure : | ||||||
13 | (a) Efficiency: the provision of reliable and | ||||||
14 | affordable energy services that meet the State's climate | ||||||
15 | and emissions reduction targets at the lowest societal | ||||||
16 | least possible cost to the citizens of the State; in such | ||||||
17 | manner that: | ||||||
18 | (i) physical, human , and financial resources are | ||||||
19 | allocated efficiently and equitably ; | ||||||
20 | (ii) all supply and demand options are considered | ||||||
21 | and evaluated using comparable terms and methods in | ||||||
22 | order to determine how utilities shall meet State | ||||||
23 | emissions reduction targets and their customers' | ||||||
24 | demands for public utility services at the lowest | ||||||
25 | societal least cost; | ||||||
26 | (iii) utilities are allowed a sufficient return on |
| |||||||
| |||||||
1 | investment so as to enable them to attract capital in | ||||||
2 | financial markets at competitive rates; | ||||||
3 | (iv) tariff rates for the sale of various public | ||||||
4 | utility services are authorized such that they | ||||||
5 | accurately reflect the cost of delivering those | ||||||
6 | services and allow utilities to recover the total | ||||||
7 | costs prudently and reasonably incurred; | ||||||
8 | (v) variation in costs by customer class and time | ||||||
9 | of use is taken into consideration in authorizing | ||||||
10 | rates for each class. | ||||||
11 | (b) Environmental Quality: the protection of the | ||||||
12 | environment , people, and communities from the adverse | ||||||
13 | external costs of public utility services , including | ||||||
14 | environmental costs, so that : | ||||||
15 | (i) environmental costs of proposed actions having | ||||||
16 | a significant impact on the environment and the | ||||||
17 | environmental impact of the alternatives are | ||||||
18 | identified, documented , monetized, included in | ||||||
19 | assessments of cost, and considered in all aspects of | ||||||
20 | the regulatory process; | ||||||
21 | (ii) the prudently and reasonably incurred costs | ||||||
22 | of environmental controls are recovered. | ||||||
23 | (c) Reliability: the ability of utilities to provide | ||||||
24 | consumers with public utility services under varying | ||||||
25 | demand conditions in such manner that suppliers of public | ||||||
26 | utility services are able to provide service at varying |
| |||||||
| |||||||
1 | levels of economic reliability giving appropriate | ||||||
2 | consideration to the costs likely to be incurred as a | ||||||
3 | result of service interruptions, and to the costs of | ||||||
4 | increasing or maintaining current levels of reliability | ||||||
5 | consistent with commitments to consumers. | ||||||
6 | (d) Equity: the fair treatment of consumers , including | ||||||
7 | equity investment eligible persons and equity investment | ||||||
8 | eligible communities, as defined in the Energy Transition | ||||||
9 | Act, and investors in order that | ||||||
10 | (i) the public health, safety , and welfare shall | ||||||
11 | be protected; | ||||||
12 | (ii) the application of rates is based on public | ||||||
13 | understandability and acceptance of the reasonableness | ||||||
14 | of the rate structure and level; | ||||||
15 | (iii) the cost of supplying public utility | ||||||
16 | services is allocated to those who cause the costs to | ||||||
17 | be incurred; | ||||||
18 | (iv) if factors other than cost of service are | ||||||
19 | considered in regulatory decisions, the rationale for | ||||||
20 | these actions is set forth; | ||||||
21 | (v) regulation allows for orderly transition | ||||||
22 | periods to accommodate changes in public utility | ||||||
23 | service markets; | ||||||
24 | (vi) regulation does not result in undue or | ||||||
25 | sustained adverse impact on utility earnings; | ||||||
26 | (vii) the impacts of regulatory actions on all |
| |||||||
| |||||||
1 | sectors of the State are carefully weighed; | ||||||
2 | (viii) the rates for utility services are | ||||||
3 | affordable and , therefore , ensure and preserve the | ||||||
4 | availability and accessibility of such services to all | ||||||
5 | customers, and customers are not energy burdened or | ||||||
6 | severely energy burdened citizens . | ||||||
7 | As used in this subsection (d): | ||||||
8 | (I) "Energy burdened" means, with respect to a | ||||||
9 | customer's household, that the household pays 6% or | ||||||
10 | more of its income toward electricity and gas bills. | ||||||
11 | (II) "Severely energy burdened" means, with | ||||||
12 | respect to a customer's household, that the household | ||||||
13 | pays 10% or more of its income toward electricity and | ||||||
14 | gas bills. | ||||||
15 | (e) Affordability: the ability of utilities to ensure | ||||||
16 | uninterrupted access to essential utility service; to | ||||||
17 | minimize and reduce over time the number of households who | ||||||
18 | are energy burdened and severely energy burdened, as | ||||||
19 | defined in this Act, ideally to zero; and to minimize | ||||||
20 | disconnections to residential customers in a manner which | ||||||
21 | ensures that: | ||||||
22 | (i) all low-income customers, defined as those | ||||||
23 | whose income is less than or equal to 80% of the area | ||||||
24 | median income, as defined by the United States | ||||||
25 | Department of Housing and Urban Development, have | ||||||
26 | access to a discounted utility rate; |
| |||||||
| |||||||
1 | (ii) low-income customers 65 years of age or older | ||||||
2 | are not disconnected from essential utility service | ||||||
3 | due to inability to afford the monthly bill; | ||||||
4 | (iii) low-income customers with children under the | ||||||
5 | age of 6 are not disconnected from essential utility | ||||||
6 | service due to inability to afford the monthly bill; | ||||||
7 | (iv) persons with medical conditions are not | ||||||
8 | disconnected from essential utility service if a | ||||||
9 | medical or qualified professional as described in | ||||||
10 | subsection (b) of Section 8-202.7 certifies that the | ||||||
11 | condition will be exacerbated by disconnection from | ||||||
12 | essential utility service; | ||||||
13 | (v) disconnection of essential utility service is | ||||||
14 | not accelerated based on a utility's payment risk | ||||||
15 | assessment of a customer; and | ||||||
16 | (vi) a utility assesses whether a customer may be | ||||||
17 | eligible for energy assistance programs under the | ||||||
18 | Energy Assistance Act, provides the customer with | ||||||
19 | specific information on where and how to obtain energy | ||||||
20 | assistance, and ceases disconnection activity for 60 | ||||||
21 | days to allow the customer to apply for and establish | ||||||
22 | eligibility for the energy assistance. | ||||||
23 | It is further declared to be the policy of the State that | ||||||
24 | this Act shall not apply in relation to motor carriers and rail | ||||||
25 | carriers as defined in the Illinois Commercial Transportation | ||||||
26 | Law, or to the Commission in the regulation of such carriers. |
| |||||||
| |||||||
1 | Nothing in this Act shall be construed to limit, restrict, | ||||||
2 | or mitigate in any way the power and authority of the State's | ||||||
3 | Attorneys or the Attorney General under the Consumer Fraud and | ||||||
4 | Deceptive Business Practices Act. | ||||||
5 | (Source: P.A. 92-22, eff. 6-30-01.)
| ||||||
6 | (220 ILCS 5/1-103 new) | ||||||
7 | Sec. 1-103. Commission methodologies and metrics. The | ||||||
8 | Commission shall oversee the objectives identified in Section | ||||||
9 | 1-102 by establishing and implementing methodologies for | ||||||
10 | tracking each of the following metrics: | ||||||
11 | (1) Environmental costs: The Commission shall | ||||||
12 | establish a social cost of greenhouse gases, measured in | ||||||
13 | dollars per ton of carbon dioxide equivalent, that shall | ||||||
14 | serve as a monetary estimate of the value of not emitting a | ||||||
15 | ton of greenhouse gas emissions. The Commission shall | ||||||
16 | consider prior or existing estimates of the social cost of | ||||||
17 | carbon issued or adopted by the federal government, | ||||||
18 | appropriate international bodies, or other appropriate and | ||||||
19 | reputable scientific organizations. The social cost of | ||||||
20 | greenhouse gases shall: | ||||||
21 | (A) estimate the emissions for all relevant | ||||||
22 | greenhouse gases, including carbon, methane, nitrous | ||||||
23 | oxide, hydrofluorocarbons and hydrofluoroolefins, | ||||||
24 | perfluorocarbons, sulfur hexafluoride, and nitrogen | ||||||
25 | trifluoride; |
| |||||||
| |||||||
1 | (B) consider the fullest geographic and temporal | ||||||
2 | scope of damages; | ||||||
3 | (C) for the purposes of this Act, the cost of | ||||||
4 | greenhouse gas emissions is no less than the cost per | ||||||
5 | metric ton of carbon dioxide equivalent emissions, | ||||||
6 | using the 2.5% discount rate, listed in Table ES-1 of | ||||||
7 | "Technical Support Document: Social Cost of Carbon, | ||||||
8 | Methane, and Nitrous Oxide Interim Estimates under | ||||||
9 | Executive Order 13990", a report prepared in support | ||||||
10 | of federal Executive Order 13990 and dated February | ||||||
11 | 2021. | ||||||
12 | The Commission must annually adjust the costs | ||||||
13 | established in this Section to reflect the effect of | ||||||
14 | inflation and may, at its discretion, set the price at a | ||||||
15 | higher level than described above, but no lower. | ||||||
16 | (2) Impacts to public health: The Commission shall | ||||||
17 | develop a methodology for measuring and monetizing in cost | ||||||
18 | assessments the public health impacts of pollutants, | ||||||
19 | including impacts of both indoor and outdoor air quality, | ||||||
20 | including carbon monoxide and carbon dioxide, nitrogen | ||||||
21 | oxides, including nitrogen dioxide, particulate matter, | ||||||
22 | formaldehyde, sulfur dioxide, ozone, and lead. The | ||||||
23 | Commission shall integrate its methodology into | ||||||
24 | assessments of utility system planning and supply and | ||||||
25 | demand-side resource selection. | ||||||
26 | It is further declared to be the policy of the State that |
| |||||||
| |||||||
1 | this Section does not apply to motor carriers and rail | ||||||
2 | carriers as defined in the Illinois Commercial Transportation | ||||||
3 | Law or to the Commission in the regulation of such carriers. | ||||||
4 | Nothing in this Section shall be construed to limit, | ||||||
5 | restrict, or mitigate in any way the power and authority of the | ||||||
6 | State's Attorneys or the Attorney General under the Consumer | ||||||
7 | Fraud and Deceptive Business Practices Act.
| ||||||
8 | (220 ILCS 5/3-127 new) | ||||||
9 | Sec. 3-127. Fixed charge. "Fixed charge" means a charge | ||||||
10 | that is assessed by a public utility as part of its rates, is | ||||||
11 | equal across all customers or customers of a certain class, | ||||||
12 | and is not directly proportional to a customer's usage.
| ||||||
13 | (220 ILCS 5/8-101) (from Ch. 111 2/3, par. 8-101) | ||||||
14 | Sec. 8-101. Duties of public utilities; nondiscrimination. | ||||||
15 | A public utility shall furnish, provide, and maintain such | ||||||
16 | service instrumentalities, equipment, and facilities as shall | ||||||
17 | promote the safety, health, comfort, and convenience of its | ||||||
18 | patrons, employees, and public and as shall be in all respects | ||||||
19 | adequate, efficient, just, and reasonable. | ||||||
20 | All rules and regulations made by a public utility | ||||||
21 | affecting or pertaining to its charges or service to the | ||||||
22 | public shall be just and reasonable. | ||||||
23 | An electric A public utility shall, and a gas utility may, | ||||||
24 | upon reasonable notice, furnish to all persons who may apply |
| |||||||
| |||||||
1 | therefor and be reasonably entitled thereto, suitable | ||||||
2 | facilities and service, without discrimination and without | ||||||
3 | delay. Notwithstanding any other provision of law, a gas | ||||||
4 | utility may cease providing service if the Commission | ||||||
5 | determines that adequate substitute service is available at a | ||||||
6 | reasonable cost to support the existing end uses of the | ||||||
7 | affected utility customers. Any applicant for gas service | ||||||
8 | shall receive clear, timely information from the gas utility, | ||||||
9 | written in plain language, and approved by the Commission | ||||||
10 | after stakeholder input on incentives and opportunities for | ||||||
11 | installing, as alternatives to gas, energy-efficient electric | ||||||
12 | technologies and incentives and opportunities for other energy | ||||||
13 | efficiency measures, weatherization, demand management, and | ||||||
14 | distributed energy resource programs. The information provided | ||||||
15 | must include, among other things, information detailing | ||||||
16 | electrification incentives in the Inflation Reduction Act and | ||||||
17 | describing how the applicant can elect to receive the upfront | ||||||
18 | discounts or tax incentives applicable to the applicant's | ||||||
19 | electric purchases. | ||||||
20 | Nothing in this Section shall be construed to prevent a | ||||||
21 | public utility from accepting payment electronically or by the | ||||||
22 | use of a customer-preferred financially accredited credit or | ||||||
23 | debit methodology. | ||||||
24 | (Source: P.A. 92-22, eff. 6-30-01.)
| ||||||
25 | (220 ILCS 5/8-104B new) |
| |||||||
| |||||||
1 | Sec. 8-104B. Gas energy efficiency. | ||||||
2 | (a) As used in this Section: | ||||||
3 | "Benefit-cost ratio" means the ratio of the net present | ||||||
4 | value of the total benefits of the measures to the net present | ||||||
5 | value of the total costs as calculated over the lifetime of the | ||||||
6 | measures. | ||||||
7 | "Cost-effective measure" means a measure that satisfies | ||||||
8 | the total resource cost test. | ||||||
9 | "Energy efficiency measure" means a measure that reduces | ||||||
10 | (i) the total Btus of electricity and natural gas and other | ||||||
11 | utility-delivered gaseous fuels needed to meet an end use or | ||||||
12 | end uses and (ii) the amount of natural gas and other | ||||||
13 | utility-delivered gaseous fuels consumed on site, at the home | ||||||
14 | or business facility, to meet an end use or end uses. | ||||||
15 | "Total resource cost test" means a standard that is met | ||||||
16 | if, for an investment in an energy efficiency measure, the | ||||||
17 | benefit-cost ratio is greater than one. The total resource | ||||||
18 | cost test quantifies the net savings obtained through the | ||||||
19 | substitution of demand-side measures for supply resources by | ||||||
20 | comparing (i) the sum of avoided natural gas utility costs, | ||||||
21 | representing the benefits that accrue to the natural gas | ||||||
22 | system and the participant in the delivery of those energy | ||||||
23 | efficiency measures and including avoided costs associated | ||||||
24 | with the use of electricity or other fuels, avoided costs | ||||||
25 | associated with reduced water consumption, and avoided | ||||||
26 | operation and maintenance costs, as well as other quantifiable |
| |||||||
| |||||||
1 | societal benefits and (ii) the sum of all incremental costs of | ||||||
2 | end-use measures, including both utility and participant | ||||||
3 | contribution costs to administer, deliver, and evaluate each | ||||||
4 | demand-side measure. In calculating avoided costs, reasonable | ||||||
5 | estimates shall be included for financial costs likely to be | ||||||
6 | imposed by future regulation of emissions of greenhouse gases. | ||||||
7 | In discounting future societal costs and benefits for the | ||||||
8 | purpose of calculating net present values, a societal discount | ||||||
9 | rate based on actual, long-term U.S. Treasury bond yields | ||||||
10 | shall be used. The income-qualified measures described in | ||||||
11 | paragraphs (5) and (6) of subsection (d) shall not be required | ||||||
12 | to meet the total resource cost test. | ||||||
13 | (b) It is the policy of the State for gas utilities to be | ||||||
14 | required to use cost-effective energy efficiency measures to | ||||||
15 | reduce delivery load. Requiring investment in cost-effective | ||||||
16 | energy efficiency measures will reduce direct and indirect | ||||||
17 | costs to consumers by decreasing environmental impacts, | ||||||
18 | reducing the amount of natural gas and other utility-delivered | ||||||
19 | gaseous fuels that need to be purchased, and avoiding or | ||||||
20 | delaying the need for new transmission, distribution, storage, | ||||||
21 | and other related infrastructure. Moreover, the public | ||||||
22 | interest is served by allowing gas utilities to recover costs | ||||||
23 | for reasonably and prudently incurred expenditures for energy | ||||||
24 | efficiency measures. | ||||||
25 | (c) This Section applies to all gas distribution utilities | ||||||
26 | in the State and supersedes Section 8-104 beginning January 1, |
| |||||||
| |||||||
1 | 2024. | ||||||
2 | (d) Natural gas utilities shall implement cost-effective | ||||||
3 | energy efficiency measures to achieve all of the following | ||||||
4 | requirements: | ||||||
5 | (1) Total incremental annual savings shall be equal to | ||||||
6 | at least 0.6% of annual sales to distribution customers in | ||||||
7 | 2025, 0.8% of such sales in 2026, and at least 1% of such | ||||||
8 | sales in 2027 and each subsequent year. For the purpose of | ||||||
9 | calculating savings as a percent of sales to distribution | ||||||
10 | customers for a given program year, the denominator of | ||||||
11 | sales to distribution customers shall be annual average | ||||||
12 | sales over the second, third, and fourth full calendar | ||||||
13 | years prior to the beginning of the program year. | ||||||
14 | (2) The savings achieved must have an average life of | ||||||
15 | at least 12 years. | ||||||
16 | (3) Savings may not be applied toward achievement of | ||||||
17 | utility savings goals if the savings arise from the | ||||||
18 | installation of efficient new gas furnaces, gas boilers, | ||||||
19 | gas water heaters, or other gas-consuming equipment in a | ||||||
20 | residential building, such as a single-family, | ||||||
21 | individually metered multifamily building or a | ||||||
22 | master-metered multifamily building. | ||||||
23 | (4) At least 50% of the entire budget for efficiency | ||||||
24 | programs shall be spent on energy efficiency measures that | ||||||
25 | reduce space heating needs through improvements to the | ||||||
26 | efficiency of building envelopes, including, but not |
| |||||||
| |||||||
1 | limited to, insulation measures and efficient windows and | ||||||
2 | energy efficiency measures that reduce air leakage through | ||||||
3 | improvements to systems for distributing heat, including, | ||||||
4 | but not limited to, duct leakage reduction, duct | ||||||
5 | insulation, or pipe insulation in buildings or through | ||||||
6 | improved heating systems controls, including, but not | ||||||
7 | limited to, advanced thermostats and demand control | ||||||
8 | ventilation. Spending on efficient furnaces, efficient | ||||||
9 | boilers, or other efficient heating systems is permitted | ||||||
10 | within business efficiency programs but does not count | ||||||
11 | toward this minimum requirement for spending on building | ||||||
12 | envelope, heating distribution, and control efficiencies. | ||||||
13 | Spending on income-qualified building envelope measures, | ||||||
14 | heating distribution system measures, and heating controls | ||||||
15 | does count toward this requirement. The portion of | ||||||
16 | portfolio spending on program marketing, training of | ||||||
17 | installers, audits of buildings, inspections of work | ||||||
18 | performed, and other administrative and technical expenses | ||||||
19 | that are clearly tied to promotion or installation of | ||||||
20 | building envelope or heating distribution system measures | ||||||
21 | shall count toward this requirement. If this minimum | ||||||
22 | requirement is not met, any performance incentive earned | ||||||
23 | under subsection (h) should be reduced by the percentage | ||||||
24 | point level of shortfall in meeting this requirement. | ||||||
25 | (5) The portion of the entire budget for efficiency | ||||||
26 | programs that is spent on efficiency measures for |
| |||||||
| |||||||
1 | income-qualified households shall be the greater of 20% or | ||||||
2 | 5 percentage points more than the proportion of total | ||||||
3 | residential and business customer gas sales going to | ||||||
4 | income-qualified households. For purposes of this Section, | ||||||
5 | households at or below 80% of area median income are | ||||||
6 | income-qualified. At least 80% of spending on measures in | ||||||
7 | programs targeted at income-qualified households shall be | ||||||
8 | delivered through whole building weatherization programs | ||||||
9 | and spent on measures that reduce space heating needs | ||||||
10 | through improvements to the building envelope, heating | ||||||
11 | distribution systems, or heating controls. The utilities | ||||||
12 | shall invest in health and safety measures appropriate and | ||||||
13 | necessary for comprehensively weatherizing the homes and | ||||||
14 | multifamily buildings of income-qualified households, with | ||||||
15 | up to 15% of income-qualified program spending made | ||||||
16 | available for such purposes. The ratio of spending on | ||||||
17 | efficiency programs targeted at multifamily buildings of | ||||||
18 | income-qualified households to spending on energy | ||||||
19 | efficiency programs targeted at single-family buildings of | ||||||
20 | income-qualified households shall be designed to achieve | ||||||
21 | levels of savings from each building type that are | ||||||
22 | approximately proportional to the magnitude of | ||||||
23 | cost-effective lifetime savings potential in each building | ||||||
24 | type. The gas utilities shall participate in a Low-Income | ||||||
25 | Energy Efficiency Accountability Committee as established | ||||||
26 | in Section 8-103B. |
| |||||||
| |||||||
1 | Gas utilities must conduct customer outreach and | ||||||
2 | education efforts in equity investment eligible | ||||||
3 | communities in order to provide notice of and explanations | ||||||
4 | concerning the following types of programs: | ||||||
5 | (A) energy efficiency programs, the Illinois Solar | ||||||
6 | for All Program, and whole home retrofit programs that | ||||||
7 | reduce natural gas usage; | ||||||
8 | (B) income-qualified financial assistance | ||||||
9 | programs, including rebate programs from the federal | ||||||
10 | government; and | ||||||
11 | (C) general education programs designed to explain | ||||||
12 | utility bills and the decisions customers can make to | ||||||
13 | lower energy usage. | ||||||
14 | These outreach and education efforts must be brought | ||||||
15 | to communities in a diversity of ways, must be created | ||||||
16 | with input from members of the communities, and must be | ||||||
17 | provided through, among other things: | ||||||
18 | (i) information on customers' bills in the main | ||||||
19 | languages spoken in the communities; | ||||||
20 | (ii) a quarterly posting in local newspapers that | ||||||
21 | cover the service area; | ||||||
22 | (iii) a dedicated section on the investor-owned | ||||||
23 | utility's website; and | ||||||
24 | (iv) in-person and virtual educational sessions | ||||||
25 | that take place in the income-qualified and Justice40 | ||||||
26 | community, provide food and child care for |
| |||||||
| |||||||
1 | participating customers, and are codesigned with | ||||||
2 | interested community-based organization | ||||||
3 | representatives. | ||||||
4 | (6) Implementation of energy efficiency measures and | ||||||
5 | programs targeted at income-qualified households shall be | ||||||
6 | contracted, when practicable, to independent third parties | ||||||
7 | that have demonstrated the capability of serving those | ||||||
8 | households, with a preference for not-for-profit entities | ||||||
9 | and government agencies that have existing relationships | ||||||
10 | with, experience serving, or working directly within and | ||||||
11 | alongside income-qualified communities in the State. Each | ||||||
12 | gas utility shall develop and implement reporting | ||||||
13 | procedures that address and assist in determining the | ||||||
14 | amount of energy savings that can be applied to the | ||||||
15 | income-qualified procurement and expenditure requirements | ||||||
16 | set forth in this paragraph. | ||||||
17 | (7) A minimum of 10% of the utility's entire portfolio | ||||||
18 | funding level for a given year shall be used to procure | ||||||
19 | cost-effective energy efficiency measures from units of | ||||||
20 | local government, municipal corporations, school | ||||||
21 | districts, public housing, community college districts, | ||||||
22 | and nonprofit-owned buildings as long as a minimum | ||||||
23 | percentage of available funds shall be used to procure | ||||||
24 | energy efficiency from public housing, which percentage | ||||||
25 | shall be, at a minimum, equal to public housing's share of | ||||||
26 | public building energy consumption. Spending on public |
| |||||||
| |||||||
1 | housing may count toward minimum spending requirements on | ||||||
2 | efficiency improvements for income-qualified households. | ||||||
3 | (e) Notwithstanding any other provision of law, a utility | ||||||
4 | providing approved energy efficiency measures in the State may | ||||||
5 | recover all reasonable and prudently incurred costs of those | ||||||
6 | measures from its retail customers. However, nothing in this | ||||||
7 | subsection permits the double recovery of such costs from | ||||||
8 | customers. | ||||||
9 | (f) Beginning in 2024, each gas utility shall file an | ||||||
10 | energy efficiency plan with the Commission to meet the energy | ||||||
11 | efficiency standards in subsection (d) for the next applicable | ||||||
12 | multiyear period beginning January 1 of the year following the | ||||||
13 | filing, according to the schedule set forth in paragraphs (1) | ||||||
14 | through (4). If a utility does not file such a plan on or | ||||||
15 | before the applicable filing deadline for the plan, the | ||||||
16 | utility shall be liable for a civil penalty of $100,000 per day | ||||||
17 | until the plan is filed. | ||||||
18 | (1) No later than 120 days after the effective date of | ||||||
19 | this amendatory Act of the 103rd General Assembly, each | ||||||
20 | gas utility shall file an energy efficiency plan to | ||||||
21 | supersede its previously filed energy efficiency plan for | ||||||
22 | calendar year 2025 that is designed to achieve through | ||||||
23 | implementation of energy efficiency measures the | ||||||
24 | incremental annual savings goals, minimum average savings | ||||||
25 | life, and other requirements specified in paragraphs (1) | ||||||
26 | through (7) of subsection (d). An energy efficiency plan |
| |||||||
| |||||||
1 | submitted by a gas utility under this paragraph supersedes | ||||||
2 | any energy efficiency plan previously filed by the gas | ||||||
3 | utility for calendar year 2025. | ||||||
4 | (2) No later than March 1, 2025, each gas utility | ||||||
5 | shall file a 4-year energy efficiency plan that takes | ||||||
6 | effect on January 1, 2026 and is designed to achieve, | ||||||
7 | through implementation of emergency efficiency measures, | ||||||
8 | the incremental annual savings goals, minimum average | ||||||
9 | savings life, and other requirements specified in | ||||||
10 | paragraphs (1) through (7) of subsection (d). However, the | ||||||
11 | incremental annual savings goals may be reduced if the | ||||||
12 | plan's analysis and forecasts of the utility's ability to | ||||||
13 | acquire energy savings demonstrate by clear and convincing | ||||||
14 | evidence and through independent analysis that achievement | ||||||
15 | of such goals is not cost-effective. In no event may | ||||||
16 | incremental annual savings goals for any year be reduced | ||||||
17 | to levels below (i) those actually achieved in calendar | ||||||
18 | year 2024, (ii) those forecast to be achieved in calendar | ||||||
19 | year 2025, or (iii) 0.75% of sales. The Commission shall | ||||||
20 | review any proposed goal reduction as part of its review | ||||||
21 | and approval of the utility's proposed plan. | ||||||
22 | (3) Beginning in 2029 and every 4 years thereafter, | ||||||
23 | each gas utility shall file by no later than March 1 of the | ||||||
24 | applicable year, a 4-year energy efficiency plan that | ||||||
25 | takes effect on the following January 1 and is designed to | ||||||
26 | achieve, through implementation of energy efficiency |
| |||||||
| |||||||
1 | measures, the incremental annual savings goals, minimum | ||||||
2 | average savings life, and other requirements specified in | ||||||
3 | paragraphs (1) through (7) of subsection (d). However, the | ||||||
4 | incremental annual savings goals may be reduced if the | ||||||
5 | plan's analysis and forecasts of the utility's ability to | ||||||
6 | acquire energy savings demonstrate by clear and convincing | ||||||
7 | evidence and through independent analysis that achievement | ||||||
8 | of such goals is not cost-effective. In no event may | ||||||
9 | incremental annual savings goals for any year be reduced | ||||||
10 | to levels below (i) those actually achieved in the | ||||||
11 | calendar year before the plan filing, (ii) those forecast | ||||||
12 | to be achieved in the calendar year in which the plan | ||||||
13 | filing is made, or (iii) 0.75% of sales. The Commission | ||||||
14 | shall review any proposed goal reduction as part of its | ||||||
15 | review and approval of the utility's proposed plan. | ||||||
16 | (4) Each utility's plan shall set forth the utility's | ||||||
17 | proposals to meet the energy efficiency standards | ||||||
18 | identified in subsection (d). The Commission shall seek | ||||||
19 | public comment on each plan that takes effect on January | ||||||
20 | 1, 2024 and before January 1, 2026 and shall issue an order | ||||||
21 | approving or disapproving the plan no later than November | ||||||
22 | 30, 2023, or 225 days after the effective date of this | ||||||
23 | amendatory Act of the 103rd General Assembly, whichever is | ||||||
24 | later. The Commission shall seek public comment on each | ||||||
25 | plan that takes effect on January 1, 2026 and shall issue | ||||||
26 | an order approving or disapproving the plan within 6 |
| |||||||
| |||||||
1 | months after its submission. If the Commission disapproves | ||||||
2 | a plan, the Commission shall, within 30 days, describe in | ||||||
3 | detail the reasons for the disapproval and describe a path | ||||||
4 | by which the utility may file a revised draft of the plan | ||||||
5 | to address the Commission's concerns satisfactorily. If | ||||||
6 | the utility does not refile with the Commission within 60 | ||||||
7 | days, the utility shall be subject to civil penalties at a | ||||||
8 | rate of $100,000 per day until the plan is refiled. This | ||||||
9 | process shall continue, and penalties shall accrue, until | ||||||
10 | the utility has successfully filed a portfolio of energy | ||||||
11 | efficiency measures. Penalties shall be deposited into the | ||||||
12 | Energy Efficiency Trust Fund. | ||||||
13 | (g) In submitting proposed plans and funding levels under | ||||||
14 | subsection (f) to meet the savings goals identified in | ||||||
15 | subsection (d), the utility shall: | ||||||
16 | (1) demonstrate that its proposed energy efficiency | ||||||
17 | measures will achieve the requirements that are identified | ||||||
18 | in subsection (d); | ||||||
19 | (2) demonstrate consideration of program options for | ||||||
20 | supporting efforts to improve compliance with new building | ||||||
21 | codes, appliance standards, and municipal regulations as | ||||||
22 | potentially cost-effective means of acquiring energy | ||||||
23 | savings to count toward energy savings goals; | ||||||
24 | (3) demonstrate that its overall portfolio of measures | ||||||
25 | and programs, not including income-qualified programs | ||||||
26 | described in subsection (d), is cost-effective using the |
| |||||||
| |||||||
1 | total resource cost test and represents a diverse cross | ||||||
2 | section of opportunities for customers of all rate classes | ||||||
3 | to participate in programs. Individual measures need not | ||||||
4 | be cost-effective; | ||||||
5 | (4) demonstrate that the utility's plan integrates the | ||||||
6 | delivery of energy efficiency programs with electric | ||||||
7 | efficiency programs, programs promoting demand response, | ||||||
8 | and other efforts to address bill payment issues, | ||||||
9 | including, but not limited to, the Low Income Home Energy | ||||||
10 | Assistance Program and the Percentage of Income Payment | ||||||
11 | Plans; | ||||||
12 | (5) include a proposed or revised cost-recovery | ||||||
13 | mechanism to fund the proposed energy efficiency measures | ||||||
14 | and ensure the recovery of the prudently and reasonably | ||||||
15 | incurred costs of Commission-approved programs; | ||||||
16 | (6) provide, using not more than 3% of portfolio | ||||||
17 | resources in any given year, an annual independent | ||||||
18 | evaluation of the performance and cost-effectiveness of | ||||||
19 | the utility's portfolio of measures and programs; | ||||||
20 | (7) demonstrate how it will ensure that program | ||||||
21 | implementation contractors and energy efficiency | ||||||
22 | installation vendors will promote workforce equity and | ||||||
23 | quality jobs. Utilities shall collect, and make publicly | ||||||
24 | available at least quarterly, data necessary to | ||||||
25 | demonstrate how efforts are advancing workforce equity. | ||||||
26 | Utilities shall work with relevant vendors providing |
| |||||||
| |||||||
1 | education, training, and other resources needed to ensure | ||||||
2 | compliance and, where necessary, adjusting or terminating | ||||||
3 | work with vendors that cannot assist with compliance; and | ||||||
4 | (8) include any plans for research, development, or | ||||||
5 | pilot deployment of new measures or program approaches. | ||||||
6 | For utilities with unmodified savings goals, no more than | ||||||
7 | 4% of energy efficiency portfolio spending may be | ||||||
8 | allocated for such purposes. For utilities with modified | ||||||
9 | savings goals, no more than 2% of energy efficiency | ||||||
10 | portfolio spending may be allocated for such purposes. | ||||||
11 | Utilities shall work with interested stakeholders to | ||||||
12 | formulate a plan for how any proposed funds should be | ||||||
13 | spent, incorporate statewide approaches for these | ||||||
14 | allocations whenever such approaches would be more | ||||||
15 | effective or cost-efficient, and demonstrate such | ||||||
16 | collaboration in the utilities' plans. | ||||||
17 | (h) Each gas utility shall be eligible to earn a | ||||||
18 | shareholder incentive for effective implementation of its | ||||||
19 | efficiency programs. The incentive shall be tied to each | ||||||
20 | utility's annual energy efficiency spending and its savings. | ||||||
21 | There shall be no incentive if the independent evaluator | ||||||
22 | determines the utility either (i) failed to achieve the | ||||||
23 | minimum average savings life specified in paragraph (2) of | ||||||
24 | subsection (d), (ii) did not fully meet all of the | ||||||
25 | requirements specified in paragraphs (3) through (7) of | ||||||
26 | subsection (d), or (iii) failed to achieve incremental annual |
| |||||||
| |||||||
1 | savings equal to at least 90% of the incremental savings goal | ||||||
2 | specified in paragraph (1) of subsection (d). If a utility | ||||||
3 | meets all of the requirements specified in paragraphs (2) | ||||||
4 | through (7) of subsection (d), it can earn an incentive equal | ||||||
5 | 0.5% of total annual efficiency spending in the year being | ||||||
6 | evaluated for every one percentage point above 90% of its | ||||||
7 | incremental annual savings goal that it achieves for that | ||||||
8 | year, with a maximum incentive of 15% for achieving 120% of its | ||||||
9 | incremental annual savings goal. | ||||||
10 | (i) The utility shall submit energy savings data to the | ||||||
11 | independent evaluator no later than 30 days after the close of | ||||||
12 | the plan year. The independent evaluator shall determine the | ||||||
13 | incremental annual savings and average savings life, as well | ||||||
14 | as an estimate of the job impacts and other macroeconomic | ||||||
15 | impacts of the efficiency programs for that year, achieved no | ||||||
16 | later than 120 days after the close of the plan year. The | ||||||
17 | utility shall submit an informational filing to the Commission | ||||||
18 | no later than 160 days after the close of the plan year that | ||||||
19 | attaches the independent evaluator's final report identifying | ||||||
20 | the incremental annual savings for the year, identifying | ||||||
21 | average savings life for the year, documenting compliance with | ||||||
22 | other requirements in subsection (d), and, as applicable, the | ||||||
23 | magnitude of any shareholder incentive which the utility has | ||||||
24 | earned. | ||||||
25 | (j) Gas utilities shall report annually to the Commission | ||||||
26 | and General Assembly on how hiring, contracting, job training, |
| |||||||
| |||||||
1 | and other practices related to its energy efficiency programs | ||||||
2 | enhance the diversity of vendors working on such programs. | ||||||
3 | These reports must include data on vendor and employee | ||||||
4 | diversity. | ||||||
5 | (k) The independent evaluator shall follow the guidelines | ||||||
6 | and use the savings set forth in Commission-approved energy | ||||||
7 | efficiency policy manuals and technical reference manuals, as | ||||||
8 | each may be updated from time to time. Until measure life | ||||||
9 | values for energy efficiency measures implemented for | ||||||
10 | income-qualified households are separately incorporated into | ||||||
11 | such Commission-approved manuals, the income-qualified | ||||||
12 | measures shall have the same measure life values that are | ||||||
13 | established for the same measures implemented in households | ||||||
14 | that are not income-qualified households.
| ||||||
15 | (220 ILCS 5/9-228.5 new) | ||||||
16 | Sec. 9-228.5. Consideration of gas main and gas service | ||||||
17 | extension costs. Gas main and gas service extension policies | ||||||
18 | shall be based on the principle that the full incremental cost | ||||||
19 | associated with new development and growth shall be borne by | ||||||
20 | the customers that cause those incremental costs. Gas main and | ||||||
21 | gas service extension policies, procedures, and conditions | ||||||
22 | shall align with the greenhouse gas emission reduction goals | ||||||
23 | established in Article XXIV.
| ||||||
24 | (220 ILCS 5/9-229) |
| |||||||
| |||||||
1 | Sec. 9-229. Consideration of attorney and expert | ||||||
2 | compensation as an expense and intervenor compensation fund. | ||||||
3 | (a) The Commission shall specifically assess the justness | ||||||
4 | and reasonableness of any amount expended by a public utility | ||||||
5 | to compensate attorneys or technical experts to prepare and | ||||||
6 | litigate a general rate case filing. This issue shall be | ||||||
7 | expressly addressed in the Commission's final order. | ||||||
8 | (b) The State of Illinois shall create a Consumer | ||||||
9 | Intervenor Compensation Fund subject to the following: | ||||||
10 | (1) Provision of compensation for Consumer Interest | ||||||
11 | Representatives that intervene in Illinois Commerce | ||||||
12 | Commission proceedings will increase public engagement, | ||||||
13 | encourage additional transparency, expand the information | ||||||
14 | available to the Commission, and improve decision-making. | ||||||
15 | (2) As used in this Section, " consumer Consumer | ||||||
16 | interest representative" means: | ||||||
17 | (A) a residential utility customer or group of | ||||||
18 | residential utility customers represented by a | ||||||
19 | not-for-profit group or organization registered with | ||||||
20 | the Illinois Attorney General under the Solicitation | ||||||
21 | for of Charity Act; | ||||||
22 | (B) representatives of not-for-profit groups or | ||||||
23 | organizations whose membership is limited to | ||||||
24 | residential utility customers; or | ||||||
25 | (C) representatives of not-for-profit groups or | ||||||
26 | organizations whose membership includes Illinois |
| |||||||
| |||||||
1 | residents and that address the community, economic, | ||||||
2 | environmental, or social welfare of Illinois | ||||||
3 | residents, except government agencies or intervenors | ||||||
4 | specifically authorized by Illinois law to participate | ||||||
5 | in Commission proceedings on behalf of Illinois | ||||||
6 | consumers. | ||||||
7 | (3) A consumer interest representative is eligible to | ||||||
8 | receive compensation from the consumer intervenor | ||||||
9 | compensation fund if its participation included lay or | ||||||
10 | expert testimony or legal briefing and argument concerning | ||||||
11 | the expenses, investments, rate design, rate impact, or | ||||||
12 | other matters affecting the pricing, rates, costs or other | ||||||
13 | charges associated with utility service, the Commission | ||||||
14 | adopts a material recommendation related to a significant | ||||||
15 | issue in the docket, and participation caused a | ||||||
16 | significant financial cost hardship to the participant; | ||||||
17 | however, no consumer interest representative shall be | ||||||
18 | eligible to receive an award pursuant to this Section if | ||||||
19 | the consumer interest representative receives any | ||||||
20 | compensation, funding, or donations, directly or | ||||||
21 | indirectly, from parties that have a financial interest in | ||||||
22 | the outcome of the proceeding. | ||||||
23 | (4) Within 30 days after September 15, 2021 ( the | ||||||
24 | effective date of Public Act 102-662) this amendatory Act | ||||||
25 | of the 102nd General Assembly , each utility that files a | ||||||
26 | request for an increase in rates under Article IX or |
| |||||||
| |||||||
1 | Article XVI shall deposit an amount equal to one half of | ||||||
2 | the rate case attorney and expert expense allowed by the | ||||||
3 | Commission, but not to exceed $500,000, into the fund | ||||||
4 | within 35 days of the date of the Commission's Final final | ||||||
5 | Order in the rate case or 20 days after the denial of | ||||||
6 | rehearing under Section 10-113 of this Act, whichever is | ||||||
7 | later. The Consumer Intervenor Compensation Fund shall be | ||||||
8 | used to provide payment to consumer interest | ||||||
9 | representatives as described in this Section. | ||||||
10 | (5) An electric public utility with 3,000,000 or more | ||||||
11 | retail customers shall contribute $450,000 to the Consumer | ||||||
12 | Intervenor Compensation Fund within 60 days after | ||||||
13 | September 15, 2021 ( the effective date of Public Act | ||||||
14 | 102-662) this amendatory Act of the 102nd General | ||||||
15 | Assembly . A combined electric and gas public utility | ||||||
16 | serving fewer than 3,000,000 but more than 500,000 retail | ||||||
17 | customers shall contribute $225,000 to the Consumer | ||||||
18 | Intervenor Compensation Fund within 60 days after | ||||||
19 | September 15, 2021 ( the effective date of Public Act | ||||||
20 | 102-662) this amendatory Act of the 102nd General | ||||||
21 | Assembly . A gas public utility with 1,500,000 or more | ||||||
22 | retail customers that is not a combined electric and gas | ||||||
23 | public utility shall contribute $225,000 to the Consumer | ||||||
24 | Intervenor Compensation Fund within 60 days after | ||||||
25 | September 15, 2021 ( the effective date of Public Act | ||||||
26 | 102-662) this amendatory Act of the 102nd General |
| |||||||
| |||||||
1 | Assembly . A gas public utility with fewer than 1,500,000 | ||||||
2 | retail customers but more than 300,000 retail customers | ||||||
3 | that is not a combined electric and gas public utility | ||||||
4 | shall contribute $80,000 to the Consumer Intervenor | ||||||
5 | Compensation Fund within 60 days after September 15, 2021 | ||||||
6 | ( the effective date of Public Act 102-662) this amendatory | ||||||
7 | Act of the 102nd General Assembly . A gas public utility | ||||||
8 | with fewer than 300,000 retail customers that is not a | ||||||
9 | combined electric and gas public utility shall contribute | ||||||
10 | $20,000 to the Consumer Intervenor Compensation Fund | ||||||
11 | within 60 days after September 15, 2021 ( the effective | ||||||
12 | date of Public Act 102-662) this amendatory Act of the | ||||||
13 | 102nd General Assembly . A combined electric and gas public | ||||||
14 | utility serving fewer than 500,000 retail customers shall | ||||||
15 | contribute $20,000 to the Consumer Intervenor Compensation | ||||||
16 | Fund within 60 days after September 15, 2021 ( the | ||||||
17 | effective date of Public Act 102-662) this amendatory Act | ||||||
18 | of the 102nd General Assembly . A water or sewer public | ||||||
19 | utility serving more than 100,000 retail customers shall | ||||||
20 | contribute $80,000, and a water or sewer public utility | ||||||
21 | serving fewer than 100,000 but more than 10,000 retail | ||||||
22 | customers shall contribute $20,000. | ||||||
23 | (6)(A) Prior to the entry of a Final Order in a | ||||||
24 | docketed case, the Commission Administrator shall provide | ||||||
25 | a payment to a consumer interest representative that | ||||||
26 | demonstrates through a verified application for funding |
| |||||||
| |||||||
1 | that the consumer interest representative's participation | ||||||
2 | or intervention without an award of fees or costs imposes | ||||||
3 | a significant financial hardship based on a schedule to be | ||||||
4 | developed by the Commission. The Administrator may require | ||||||
5 | verification of costs incurred, including statements of | ||||||
6 | hours spent, as a condition to paying the consumer | ||||||
7 | interest representative prior to the entry of a Final | ||||||
8 | Order in a docketed case. | ||||||
9 | (B) If the Commission adopts a material recommendation | ||||||
10 | related to a significant issue in the docket and | ||||||
11 | participation caused a significant financial cost hardship | ||||||
12 | to the participant, then the consumer interest | ||||||
13 | representative shall be allowed payment for some or all of | ||||||
14 | the consumer interest representative's reasonable | ||||||
15 | attorney's or advocate's fees, reasonable expert witness | ||||||
16 | fees, and other reasonable costs of preparation for and | ||||||
17 | participation in a hearing or proceeding. Expenses related | ||||||
18 | to travel or meals shall not be compensable. | ||||||
19 | (C) The consumer interest representative shall submit | ||||||
20 | an itemized request for compensation to the Consumer | ||||||
21 | Intervenor Compensation Fund, including the advocate's or | ||||||
22 | attorney's reasonable fee rate, the number of hours | ||||||
23 | expended, reasonable expert and expert witness fees, and | ||||||
24 | other reasonable costs for the preparation for and | ||||||
25 | participation in the hearing and briefing within 30 days | ||||||
26 | of the Commission's final order after denial or decision |
| |||||||
| |||||||
1 | on rehearing, if any. | ||||||
2 | (7) Administration of the Fund. | ||||||
3 | (A) The Consumer Intervenor Compensation Fund is | ||||||
4 | created as a special fund in the State treasury. All | ||||||
5 | disbursements from the Consumer Intervenor Compensation | ||||||
6 | Fund shall be made only upon warrants of the Comptroller | ||||||
7 | drawn upon the Treasurer as custodian of the Fund upon | ||||||
8 | vouchers signed by the Executive Director of the | ||||||
9 | Commission or by the person or persons designated by the | ||||||
10 | Director for that purpose. The Comptroller is authorized | ||||||
11 | to draw the warrant upon vouchers so signed. The Treasurer | ||||||
12 | shall accept all warrants so signed and shall be released | ||||||
13 | from liability for all payments made on those warrants. | ||||||
14 | The Consumer Intervenor Compensation Fund shall be | ||||||
15 | administered by an Administrator that is a person or | ||||||
16 | entity that is independent of the Commission. The | ||||||
17 | administrator will be responsible for the prudent | ||||||
18 | management of the Consumer Intervenor Compensation Fund | ||||||
19 | and for recommendations for the award of consumer | ||||||
20 | intervenor compensation from the Consumer Intervenor | ||||||
21 | Compensation Fund. The Commission shall issue a request | ||||||
22 | for qualifications for a third-party program administrator | ||||||
23 | to administer the Consumer Intervenor Compensation Fund. | ||||||
24 | The third-party administrator shall be chosen through a | ||||||
25 | competitive bid process based on selection criteria and | ||||||
26 | requirements developed by the Commission. The Illinois |
| |||||||
| |||||||
1 | Procurement Code does not apply to the hiring or payment | ||||||
2 | of the Administrator. All Administrator costs may be paid | ||||||
3 | for using monies from the Consumer Intervenor Compensation | ||||||
4 | Fund, but the Program Administrator shall strive to | ||||||
5 | minimize costs in the implementation of the program. | ||||||
6 | (B) The computation of compensation awarded from the | ||||||
7 | fund shall take into consideration the market rates paid | ||||||
8 | to persons of comparable training and experience who offer | ||||||
9 | similar services, but may not exceed the comparable market | ||||||
10 | rate for services paid by the public utility as part of its | ||||||
11 | rate case expense. | ||||||
12 | (C)(1) Recommendations on the award of compensation by | ||||||
13 | the administrator shall include consideration of whether | ||||||
14 | the participation raised Commission adopted a material | ||||||
15 | recommendation related to a significant issue in the | ||||||
16 | docket and whether participation caused a significant | ||||||
17 | financial cost hardship to the participant and the payment | ||||||
18 | of compensation is fair, just , and reasonable. | ||||||
19 | (2) Recommendations on the award of compensation by | ||||||
20 | the administrator shall be submitted to the Commission for | ||||||
21 | approval. Unless the Commission initiates an investigation | ||||||
22 | within 45 days after the notice to the Commission, the | ||||||
23 | award of compensation shall be allowed 45 days after | ||||||
24 | notice to the Commission. Such notice shall be given by | ||||||
25 | filing with the Commission on the Commission's e-docket | ||||||
26 | system, and keeping open for public inspection the award |
| |||||||
| |||||||
1 | for compensation proposed by the Administrator. The | ||||||
2 | Commission shall have power, and it is hereby given | ||||||
3 | authority, either upon complaint or upon its own | ||||||
4 | initiative without complaint, at once, and if it so | ||||||
5 | orders, without answer or other formal pleadings, but upon | ||||||
6 | reasonable notice, to enter upon a hearing concerning the | ||||||
7 | propriety of the award. | ||||||
8 | (c) The Commission may adopt rules to implement this | ||||||
9 | Section. | ||||||
10 | (Source: P.A. 102-662, eff. 9-15-21; revised 1-20-24.)
| ||||||
11 | (220 ILCS 5/9-235 new) | ||||||
12 | Sec. 9-235. Tariffed gas main and gas service extension | ||||||
13 | provisions. No later than 60 days after the effective date of | ||||||
14 | this amendatory Act of the 103rd General Assembly, the | ||||||
15 | Commission shall initiate a docketed rulemaking reviewing each | ||||||
16 | gas public utility tariff that provides for gas main and gas | ||||||
17 | service extensions without additional charge to new customers | ||||||
18 | in excess of the default extensions without charge as | ||||||
19 | specified in 83 Ill. Adm. Code 501. The focus of the rulemaking | ||||||
20 | shall be to modify each gas utility's gas main and gas service | ||||||
21 | extension tariff to align with the provisions set forth in | ||||||
22 | Section 9-228.5.
| ||||||
23 | (220 ILCS 5/9-241) (from Ch. 111 2/3, par. 9-241) | ||||||
24 | Sec. 9-241. No public utility shall, as to rates or other |
| |||||||
| |||||||
1 | charges, services, facilities , or in other respect, make or | ||||||
2 | grant any preference or advantage to any corporation or person | ||||||
3 | or subject any corporation or person to any prejudice or | ||||||
4 | disadvantage. No public utility shall establish or maintain | ||||||
5 | any unreasonable difference as to rates or other charges, | ||||||
6 | services, facilities, or in any other respect, either as | ||||||
7 | between localities or as between classes of service. | ||||||
8 | However, nothing in this Section shall be construed as | ||||||
9 | limiting the authority of the Commission to permit the | ||||||
10 | establishment of economic development rates as incentives to | ||||||
11 | economic development either in enterprise zones as designated | ||||||
12 | by the State of Illinois or in other areas of a utility's | ||||||
13 | service area. Such rates should be available to existing | ||||||
14 | businesses which demonstrate an increase to existing load as | ||||||
15 | well as new businesses which create new load for a utility so | ||||||
16 | as to create a more balanced utilization of generating | ||||||
17 | capacity. The Commission shall ensure that such rates are | ||||||
18 | established at a level which provides a net benefit to | ||||||
19 | customers within a public utility's service area. | ||||||
20 | On or before January 1, 2025 2023 , the Commission shall | ||||||
21 | conduct a comprehensive study to assess whether low-income | ||||||
22 | discount rates for electric and natural gas residential | ||||||
23 | customers are appropriate and the potential design and | ||||||
24 | implementation of any such rates. The Commission shall include | ||||||
25 | its findings, together with the appropriate recommendations, | ||||||
26 | in a report to be provided to the General Assembly. Upon |
| |||||||
| |||||||
1 | completion of the study, the Commission shall have the | ||||||
2 | authority to permit or require electric and natural gas | ||||||
3 | utilities to file a tariff establishing low-income discount | ||||||
4 | rates. | ||||||
5 | Such study shall assess, at a minimum, the following: | ||||||
6 | (1) customer eligibility requirements, including | ||||||
7 | income-based eligibility and eligibility based on | ||||||
8 | participation in or eligibility for certain public | ||||||
9 | assistance programs; | ||||||
10 | (2) appropriate rate structures, including | ||||||
11 | consideration of tiered discounts for different income | ||||||
12 | levels; | ||||||
13 | (3) appropriate recovery mechanisms, including the | ||||||
14 | consideration of volumetric charges and customer charges; | ||||||
15 | (4) appropriate verification mechanisms; | ||||||
16 | (5) measures to ensure customer confidentiality and | ||||||
17 | data safeguards; | ||||||
18 | (6) outreach and consumer education procedures; and | ||||||
19 | (7) the impact that a low-income discount rate would | ||||||
20 | have on the affordability of delivery service to | ||||||
21 | low-income customers and customers overall. | ||||||
22 | On or before January 1, 2026, the Commission shall begin a | ||||||
23 | docketed rulemaking process to implement low-income discount | ||||||
24 | rates for electric and natural gas residential customers, | ||||||
25 | incorporating the recommendations of the report required by | ||||||
26 | this Section, released by the Commission in December 2022 and |
| |||||||
| |||||||
1 | titled the "Illinois Commerce Commission Low-Income Discount | ||||||
2 | Rate Study Report to the Illinois General Assembly". | ||||||
3 | The Commission shall adopt rules requiring utility | ||||||
4 | companies to produce information, in the form of a mailing, | ||||||
5 | and other approved methods of distribution, to its consumers, | ||||||
6 | to inform the consumers of available rebates, discounts, | ||||||
7 | credits, and other cost-saving mechanisms that can help them | ||||||
8 | lower their monthly utility bills, and send out such | ||||||
9 | information semi-annually, unless otherwise provided by this | ||||||
10 | Article. | ||||||
11 | Prior to October 1, 1989, no public utility providing | ||||||
12 | electrical or gas service shall consider the use of solar or | ||||||
13 | other nonconventional renewable sources of energy by a | ||||||
14 | customer as a basis for establishing higher rates or charges | ||||||
15 | for any service or commodity sold to such customer; nor shall a | ||||||
16 | public utility subject any customer utilizing such energy | ||||||
17 | source or sources to any other prejudice or disadvantage on | ||||||
18 | account of such use. No public utility shall without the | ||||||
19 | consent of the Commission, charge or receive any greater | ||||||
20 | compensation in the aggregate for a lesser commodity, product, | ||||||
21 | or service than for a greater commodity, product , or service | ||||||
22 | of like character. | ||||||
23 | The Commission, in order to expedite the determination of | ||||||
24 | rate questions, or to avoid unnecessary and unreasonable | ||||||
25 | expense, or to avoid unjust or unreasonable discrimination | ||||||
26 | between classes of customers, or, whenever in the judgment of |
| |||||||
| |||||||
1 | the Commission public interest so requires, may, for rate | ||||||
2 | making and accounting purposes, or either of them, consider | ||||||
3 | one or more municipalities either with or without the adjacent | ||||||
4 | or intervening rural territory as a regional unit where the | ||||||
5 | same public utility serves such region under substantially | ||||||
6 | similar conditions, and may within such region prescribe | ||||||
7 | uniform rates for consumers or patrons of the same class. | ||||||
8 | Any public utility, with the consent and approval of the | ||||||
9 | Commission, may as a basis for the determination of the | ||||||
10 | charges made by it classify its service according to the | ||||||
11 | amount used, the time when used, the purpose for which used, | ||||||
12 | and other relevant factors. | ||||||
13 | (Source: P.A. 102-662, eff. 9-15-21.)
| ||||||
14 | (220 ILCS 5/9-254 new) | ||||||
15 | Sec. 9-254. Independent gas system assessment. | ||||||
16 | (a) The General Assembly finds that an independent audit | ||||||
17 | of the current state of the gas distribution system, and of the | ||||||
18 | expenditures made since 2012, will need to be made. | ||||||
19 | Specifically, the General Assembly finds: | ||||||
20 | (1) Pursuant to 2013 legislation establishing the | ||||||
21 | qualifying infrastructure plant charge, gas utilities in | ||||||
22 | this State that serve over 700,000 retail customers have | ||||||
23 | spent significant amounts of ratepayer dollars on system | ||||||
24 | investments purporting to refurbish, rebuild, modernize, | ||||||
25 | and expand gas system infrastructure. |
| |||||||
| |||||||
1 | (2) The qualifying infrastructure plant charge is set | ||||||
2 | to conclude at its statutory deadline of December 31, | ||||||
3 | 2023, and it is in the interest of this State and in the | ||||||
4 | interest of gas utilities' customers to understand the | ||||||
5 | benefits of these investments to the gas system and to | ||||||
6 | customers and to evaluate the current condition of the gas | ||||||
7 | system. | ||||||
8 | (3) It is also necessary for gas utilities, the | ||||||
9 | Commission, and stakeholders to have an independently | ||||||
10 | verified set of data to draw upon for future gas rate cases | ||||||
11 | and any other proposed gas system spending. | ||||||
12 | (4) Meeting the State's climate goals will require an | ||||||
13 | ordered transition away from gas, and toward electric | ||||||
14 | heating and appliances, for all or nearly all buildings, | ||||||
15 | and planning this transition will require a thorough | ||||||
16 | understanding of the current state of the gas system. | ||||||
17 | (5) The Commission has authority to order and | ||||||
18 | implement the requirements of this Section under Section | ||||||
19 | 8-102. | ||||||
20 | (b) Terms used in this Section shall have the meanings | ||||||
21 | given to them in Section 19-105. | ||||||
22 | (c) Within 30 days after the effective date of this | ||||||
23 | amendatory Act of the 103rd General Assembly, the Commission | ||||||
24 | shall issue an order initiating an audit of each gas utility | ||||||
25 | serving over 700,000 retail customers in the State, which | ||||||
26 | shall examine the following: |
| |||||||
| |||||||
1 | (1) An assessment of the gas distribution system, as | ||||||
2 | described in paragraph (2) of subsection (a). The | ||||||
3 | Commission shall have the authority to require additional | ||||||
4 | items that it deems necessary. | ||||||
5 | (2) An analysis of the utility's capital projects | ||||||
6 | placed into service in the preceding 10 years, including, | ||||||
7 | but not limited to, an assessment of the value and safety | ||||||
8 | impact of pipe replacement, increased system pressure, and | ||||||
9 | pipe capacity expansion. | ||||||
10 | (3) An assessment of the utility's emissions | ||||||
11 | reductions to date and what preparations the utility has | ||||||
12 | made to meet the terms of the Paris Climate Agreement, | ||||||
13 | with which it is the policy of the State to comply. | ||||||
14 | (4) The creation of a visual, geographic map of the | ||||||
15 | gas system displaying the level of risk of various | ||||||
16 | pipelines and showing the areas where pipelines have | ||||||
17 | already been replaced. | ||||||
18 | (5) The identifying areas of the gas system where the | ||||||
19 | cost to replace pipeline is likely to be high, including, | ||||||
20 | but not limited to, identifying places where | ||||||
21 | decommissioning a portion of the gas system and planning | ||||||
22 | to provide for electric heating and appliance needs in | ||||||
23 | that area may be preferable, considering the costs and | ||||||
24 | benefits for affordability, health, and climate. | ||||||
25 | (d) It is contemplated that the auditor will use materials | ||||||
26 | filed with the Commission by the utilities with respect to the |
| |||||||
| |||||||
1 | auditor's expenditures in the preceding 10 years; however, the | ||||||
2 | auditor may also, with Commission approval, assess other | ||||||
3 | information deemed necessary to make its report. The results | ||||||
4 | of the audit described in this Section shall be reflected in a | ||||||
5 | report delivered to the Commission, describing the information | ||||||
6 | specified in this Section. The report is to be delivered no | ||||||
7 | later than 180 days after the Commission enters its order | ||||||
8 | under subsection (c). It is understood that any public report | ||||||
9 | may not contain items that are confidential or proprietary. | ||||||
10 | (e) The costs of a gas utility's audit described in this | ||||||
11 | Section shall not exceed $500,000 and shall be paid for by the | ||||||
12 | electric utility that is the subject of the audit. Such costs | ||||||
13 | shall be a recoverable expense. | ||||||
14 | (f) The Commission shall have the authority to retain the | ||||||
15 | services of an auditor to assist with the distribution | ||||||
16 | planning process, as well as in docketed proceedings. Such | ||||||
17 | expenses for these activities shall also be borne by the | ||||||
18 | Commission.
| ||||||
19 | (220 ILCS 5/9-255 new) | ||||||
20 | Sec. 9-255. Phase-out of gas fixed changes. Beginning | ||||||
21 | January 1, 2035, a public utility providing gas service may | ||||||
22 | not assess fixed charges as part of its rates. Beginning | ||||||
23 | January 1, 2030, a public utility providing gas service must | ||||||
24 | limit, for each customer class, any fixed charges in its rates | ||||||
25 | to no greater than 50% of the average of monthly fixed charges |
| |||||||
| |||||||
1 | for that customer class during the period January 1, 2019 to | ||||||
2 | December 31, 2021.
| ||||||
3 | (220 ILCS 5/16-111.10) | ||||||
4 | Sec. 16-111.10. Equitable Energy Upgrade Program. | ||||||
5 | (a) The General Assembly finds and declares that Illinois | ||||||
6 | homes and businesses can contribute to the creation of a clean | ||||||
7 | energy economy, conservation of natural resources, and | ||||||
8 | reliability of the electricity grid through the installation | ||||||
9 | of cost-effective renewable energy generation, energy | ||||||
10 | efficiency and demand response equipment, and energy storage | ||||||
11 | systems. Further, a large portion of Illinois residents and | ||||||
12 | businesses that would benefit from the installation of energy | ||||||
13 | efficiency, storage, and renewable energy generation systems | ||||||
14 | are unable to purchase systems due to capital or credit | ||||||
15 | barriers. This State should pursue options to enable many more | ||||||
16 | Illinoisans to access the health, environmental, and financial | ||||||
17 | benefits of new clean energy technology. | ||||||
18 | (b) As used in this Section: | ||||||
19 | "Commission" means the Illinois Commerce Commission. | ||||||
20 | "Energy project" means renewable energy generation | ||||||
21 | systems, including solar projects, energy efficiency upgrades, | ||||||
22 | decarbonization and electrification measures, energy storage | ||||||
23 | systems, demand response equipment, or any combination | ||||||
24 | thereof. | ||||||
25 | "Fund" means the Clean Energy Jobs and Justice Fund |
| |||||||
| |||||||
1 | established in the Clean Energy Jobs and Justice Fund Act. | ||||||
2 | "Program" means the Equitable Energy Upgrade Program | ||||||
3 | established under subsection (c). | ||||||
4 | "Utility" means electric public utilities providing | ||||||
5 | services to 500,000 or more customers under this Act. | ||||||
6 | (c) The Commission shall open an investigation into and | ||||||
7 | direct all electric and gas public utilities in this State to | ||||||
8 | adopt an Equitable Energy Upgrade Program that permits | ||||||
9 | customers to finance the construction of energy projects | ||||||
10 | through an optional tariff payable directly through their | ||||||
11 | utility bill, modeled after the Pay As You Save system, | ||||||
12 | developed by the Energy Efficiency Institute. The Program | ||||||
13 | model shall enable utilities to offer to make investments in | ||||||
14 | energy projects to customer properties with low-cost capital | ||||||
15 | and use an opt-in tariff to recover the costs. The Program | ||||||
16 | shall be designed to provide customers with immediate | ||||||
17 | financial savings if they choose to participate. The Program | ||||||
18 | shall allow residential electric and gas utility customers | ||||||
19 | that own the property, or renters that have permission of the | ||||||
20 | property owner, for which they subscribe to utility service to | ||||||
21 | agree to the installation of an energy project. The Program | ||||||
22 | shall ensure: | ||||||
23 | (1) eligible projects do not require upfront payments; | ||||||
24 | however, customers may pay down the costs for projects | ||||||
25 | with a payment to the installing contractor in order to | ||||||
26 | qualify projects that would otherwise require upfront |
| |||||||
| |||||||
1 | payments; | ||||||
2 | (2) eligible projects have sufficient estimated | ||||||
3 | savings and estimated life span to produce significant, | ||||||
4 | immediate net savings; | ||||||
5 | (3) participants shall agree the utility can recover | ||||||
6 | its costs for the projects at their location by paying for | ||||||
7 | the project through an optional tariff directly through | ||||||
8 | the participant's utility electricity bill, allowing | ||||||
9 | participants to benefit from installation of energy | ||||||
10 | projects without traditional loans; | ||||||
11 | (4) accessibility by lower-income residents and | ||||||
12 | environmental justice community residents; and | ||||||
13 | (5) the utility must ensure that customers who are | ||||||
14 | interested in participating are notified that if they are | ||||||
15 | income qualified, they may also be eligible for the | ||||||
16 | Percentage of Income Payment Plan program and free energy | ||||||
17 | improvements through other programs and facilitate | ||||||
18 | interested customers' enrollment in those programs; and | ||||||
19 | provide contact information. | ||||||
20 | (6) coordination with existing utility, state, and | ||||||
21 | federal energy efficiency, solar, electrification, and | ||||||
22 | other energy savings funding and implementation programs. | ||||||
23 | (d) The Commission shall establish Program guidelines with | ||||||
24 | the anticipated schedule of Program availability as follows: | ||||||
25 | (1) Year 1: Beginning in the first year of operation, | ||||||
26 | each utility with greater than 100,000 retail customers is |
| |||||||
| |||||||
1 | required to obtain low-cost capital of at least | ||||||
2 | $20,000,000 annually for investments in energy projects. | ||||||
3 | (2) Year 2: Beginning in the second year of operation, | ||||||
4 | each utility with greater than 100,000 retail customers is | ||||||
5 | required to obtain low-cost capital for investments in | ||||||
6 | energy projects of at least $40,000,000 annually. | ||||||
7 | (3) Year 3: Beginning in the third year of operation, | ||||||
8 | each utility with greater than 100,000 retail customers is | ||||||
9 | required to obtain low-cost capital for investments in as | ||||||
10 | many systems as customers demand, subject to available | ||||||
11 | capital provided by the utility, State, or other lenders. | ||||||
12 | (e) In the design of the Program, the Commission shall: | ||||||
13 | (1) Within 90 days after the effective date of this | ||||||
14 | amendatory Act of the 103rd General Assembly, begin a | ||||||
15 | process to update the Program guidelines for | ||||||
16 | implementation of the Program. Any such process shall | ||||||
17 | allow for participation from interested stakeholders. | ||||||
18 | Within 270 days after the effective date of this | ||||||
19 | amendatory Act of the 102nd General Assembly, convene a | ||||||
20 | workshop during which interested participants may discuss | ||||||
21 | issues and submit comments related to the Program. | ||||||
22 | (2) Establish Program guidelines for implementation of | ||||||
23 | the Program in accordance with the Pay As You Save | ||||||
24 | Essential Elements and Minimum Program Requirements that | ||||||
25 | electric and gas utilities must abide by when implementing | ||||||
26 | the Program. Program guidelines established by the |
| |||||||
| |||||||
1 | Commission shall include the following elements: | ||||||
2 | (A) The Commission shall establish conditions | ||||||
3 | under which utilities secure capital to fund the | ||||||
4 | energy projects. The Commission may allow utilities to | ||||||
5 | raise capital independently, work with third-party | ||||||
6 | lenders to secure the capital for participants, or a | ||||||
7 | combination thereof. Any process the Commission | ||||||
8 | approves must use a market mechanism to identify the | ||||||
9 | least costly sources of capital funds so as to pass on | ||||||
10 | maximum savings to participants. The State or the | ||||||
11 | Clean Energy Jobs and Justice Fund may also provide | ||||||
12 | capital for the Program. | ||||||
13 | (B) Customer protection guidelines should be | ||||||
14 | designed consistent with Pay As You Save Essential | ||||||
15 | Elements and Minimum Program Requirements. | ||||||
16 | (C) The Commission shall establish conditions by | ||||||
17 | which utilities may connect Program participants to | ||||||
18 | energy project vendors. In setting conditions for | ||||||
19 | connection, the Commission may prioritize vendors that | ||||||
20 | have a history of good relations with the State, | ||||||
21 | including vendors that have hired participants from | ||||||
22 | State-created job training programs. | ||||||
23 | (D) Guarantee that conservative estimates of | ||||||
24 | financial savings will immediately and significantly | ||||||
25 | exceed estimated Program costs for Program | ||||||
26 | participants. |
| |||||||
| |||||||
1 | (E) Require any customer data sharing between | ||||||
2 | electric and gas utilities and third-party vendors | ||||||
3 | needed to evaluate the energy and demand saving and | ||||||
4 | energy services revenue opportunities of all customers | ||||||
5 | and otherwise facilitate a positive customer | ||||||
6 | experience. Such data sharing may include but shall | ||||||
7 | not be limited to historical and ongoing customer | ||||||
8 | usage data and billing rates. The Commission may allow | ||||||
9 | utilities to recover the costs associated with data | ||||||
10 | sharing from all customers. | ||||||
11 | (F) Notwithstanding the method used to estimate | ||||||
12 | site-specific energy savings or measure direct energy | ||||||
13 | savings for Program participants, the utility will | ||||||
14 | report aggregate savings to the Commission for | ||||||
15 | regulatory filings in the same or a similar manner as | ||||||
16 | other energy efficiency or clean energy programs. | ||||||
17 | (f) Within 90 120 days after the Commission releases the | ||||||
18 | Program conditions established under this Section, each | ||||||
19 | utility subject to the requirements of this Section shall | ||||||
20 | submit an informational filing to the Commission that | ||||||
21 | describes its plan for implementing the provisions of this | ||||||
22 | Section. If the Commission finds that the submission does not | ||||||
23 | properly comply with the statutory or regulatory requirements | ||||||
24 | of the Program, the Commission may require that the utility | ||||||
25 | make modifications to its filing. | ||||||
26 | (g) An independent process evaluation shall be conducted |
| |||||||
| |||||||
1 | after one year of the Program's operation. An independent | ||||||
2 | impact evaluation shall be conducted after 3 years of | ||||||
3 | operation, excluding one-time startup costs and results from | ||||||
4 | the first 12 months of the Program. The Commission shall | ||||||
5 | convene an advisory council of stakeholders, including | ||||||
6 | representation of low-income and environmental justice | ||||||
7 | community members to make recommendations in response to the | ||||||
8 | findings of the independent evaluation. | ||||||
9 | (h) The Program shall be designed using the Pay As You Save | ||||||
10 | system guidelines to be cost-effective for customers. Only | ||||||
11 | projects that are deemed to be cost-effective and can be | ||||||
12 | reasonably expected to ensure customer savings are eligible | ||||||
13 | for funding through the Program, unless, as specified in | ||||||
14 | paragraph (1) of subsection (c), customers able to make | ||||||
15 | upfront copayments to installers buy down the cost of projects | ||||||
16 | so it can be deemed cost-effective. | ||||||
17 | (i) Eligible customers must be: | ||||||
18 | (1) property renters with permission of the property | ||||||
19 | owner; or | ||||||
20 | (2) property owners. | ||||||
21 | (j) The calculation of project cost-effectiveness shall be | ||||||
22 | based upon the Pay As You Save system requirements. | ||||||
23 | (1) The calculation of cost-effectiveness must be | ||||||
24 | conducted by an objective process approved by the | ||||||
25 | Commission and based on rates in effect at the time of | ||||||
26 | installation. |
| |||||||
| |||||||
1 | (2) A project shall be considered cost-effective only | ||||||
2 | if it is estimated to produce significant immediate net | ||||||
3 | savings, not counting copayments voluntarily made by | ||||||
4 | customers. The Commission may establish guidelines by | ||||||
5 | which this required savings is estimated. | ||||||
6 | (3) Net savings shall include savings across all fuel | ||||||
7 | sources, not limited to electricity and natural gas. | ||||||
8 | (4) The calculation of project cost-effectiveness | ||||||
9 | shall not exclude projects that: | ||||||
10 | (A) would raise customer costs in a particular | ||||||
11 | month so long as customers see annual project savings; | ||||||
12 | or | ||||||
13 | (B) increase electric load and accompanying costs | ||||||
14 | when a heating electrification project results in the | ||||||
15 | ability to cool part or all of a home that was not | ||||||
16 | previously cooled. In such cases, the increased | ||||||
17 | electricity consumption associated with that added | ||||||
18 | cooling shall not be included in calculations of net | ||||||
19 | savings. Extreme heat poses an increasing risk to | ||||||
20 | Illinois communities. As such, it is in the public | ||||||
21 | interest to mitigate that risk through the addition of | ||||||
22 | building cooling systems. | ||||||
23 | However, any expected increase in electric load and | ||||||
24 | customer costs should be clearly communicated to impacted | ||||||
25 | customers, along with any options for mitigating that | ||||||
26 | increase. |
| |||||||
| |||||||
1 | (k) The Program should be modeled after the Pay As You Save | ||||||
2 | system, by which Program participants finance energy projects | ||||||
3 | using the savings that the energy project creates with a | ||||||
4 | tariffed on-bill program. Eligible projects shall not create | ||||||
5 | personal debt for the customer, result in a lien in the event | ||||||
6 | of nonpayment, or require customers to pay monthly charges for | ||||||
7 | any upgrade that fails and is not repaired within 21 days. The | ||||||
8 | utility may restart charges once the upgrade is repaired and | ||||||
9 | functioning and extend the term of payments to recover its | ||||||
10 | costs for missed payments and deferred cost recovery, | ||||||
11 | providing the upgrade continues to function. | ||||||
12 | (l) Any energy project that is defective or damaged due to | ||||||
13 | no fault of the participant must be either replaced or | ||||||
14 | repaired with parts that meet industry standards at the cost | ||||||
15 | of the utility or vendor, as specified by the Commission, and | ||||||
16 | charges shall be suspended until repairs or replacement is | ||||||
17 | completed. The Commission may establish, increase, or replace | ||||||
18 | the requirements imposed in this subsection. The Commission | ||||||
19 | may determine that this responsibility is best handled by | ||||||
20 | participating project vendors in the form of insurance, | ||||||
21 | contractual guarantees, or other mechanisms, and issue rules | ||||||
22 | detailing this requirement. Customers shall not be charged | ||||||
23 | monthly payments for upgrades that are no longer functioning. | ||||||
24 | (m) In the event of nonpayment, the remaining balance due | ||||||
25 | to pay off the system shall remain with the utility meter at an | ||||||
26 | upgraded location. The Commission shall establish conditions |
| |||||||
| |||||||
1 | subject to this constraint in the event of nonpayment that are | ||||||
2 | in accordance with the Pay As You Save system. | ||||||
3 | (n) The utility shall make every effort to ensure that | ||||||
4 | customers who are income-qualified for free energy upgrade | ||||||
5 | programs take full advantage of those programs first before | ||||||
6 | using the Equitable Energy Upgrade Program. If the demand by | ||||||
7 | utility customers exceeds the Program capital supply in a | ||||||
8 | given year, utilities shall ensure that 50% of participants | ||||||
9 | are: | ||||||
10 | (1) customers in neighborhoods where a majority of | ||||||
11 | households make 150% or less of area median income; or | ||||||
12 | (2) residents of environmental justice communities. | ||||||
13 | (o) Utilities shall endeavor to inform customers about the | ||||||
14 | availability of the Program, their potential eligibility for | ||||||
15 | participation in the Program, and whether they are likely to | ||||||
16 | save money on the basis of an estimate conducted using | ||||||
17 | variables consistent with the Program that the utility has at | ||||||
18 | its disposal. The Commission may establish guidelines by which | ||||||
19 | utilities must abide by this directive and alternatives if the | ||||||
20 | Commission deems utilities' efforts as inadequate. | ||||||
21 | (p) Subject to Commission specifications under subsection | ||||||
22 | (c), each utility shall work with certified project vendors | ||||||
23 | selected using a request for proposals process to establish | ||||||
24 | the terms and processes under which a utility can install | ||||||
25 | eligible renewable energy generation and energy storage | ||||||
26 | systems using the capital to fit the Equitable Energy Upgrade |
| |||||||
| |||||||
1 | model. The utility certified project vendor shall explain and | ||||||
2 | offer the approved upgrades to customers and shall assist | ||||||
3 | customers in applying for financing through the Program. As | ||||||
4 | part of the process, utilities vendors shall also provide | ||||||
5 | participants with information about any other relevant | ||||||
6 | incentives that may be available and customer service | ||||||
7 | regarding the effective use of the upgrades . | ||||||
8 | Nothing shall preclude gas and electric utilities that | ||||||
9 | have overlapping service territories from jointly implementing | ||||||
10 | and delivering the Program. | ||||||
11 | (q) A participating An electric utility shall recover all | ||||||
12 | of the prudently incurred costs of offering a program approved | ||||||
13 | by the Commission under this Section. For investor-owned | ||||||
14 | utilities, shareholder incentives will be proportional to | ||||||
15 | meeting Commission approved thresholds for the number of | ||||||
16 | customers served and the amount of its investments in those | ||||||
17 | locations. | ||||||
18 | (r) The Commission shall adopt all rules necessary for the | ||||||
19 | administration of this Section. | ||||||
20 | (Source: P.A. 102-662, eff. 9-15-21.)
| ||||||
21 | (220 ILCS 5/Art. XXIII heading new) | ||||||
22 | ARTICLE XXIII. CLEAN BUILDING HEATING LAW | ||||||
23 | (220 ILCS 5/23-101 new) | ||||||
24 | Sec. 23-101. Short title. This Article may be cited as the |
| |||||||
| |||||||
1 | Clean Building Heating Law. References in this Article to | ||||||
2 | "this Act" mean this Article.
| ||||||
3 | (220 ILCS 5/23-102 new) | ||||||
4 | Sec. 23-102. Findings. The General Assembly finds that the | ||||||
5 | adoption and use of clean, zero-pollution space and water | ||||||
6 | heating appliances in residential and commercial buildings | ||||||
7 | would benefit the State by (i) protecting the air that | ||||||
8 | Illinoisans breathe through reducing unhealthy levels of smog | ||||||
9 | and ozone, (ii) minimizing health risks associated with air | ||||||
10 | pollution, including respiratory ailments, cardiovascular | ||||||
11 | illnesses, and premature death, which are linked to exposure | ||||||
12 | to fine particulate matter and nitrogen dioxide, (iii) | ||||||
13 | assisting the State in achieving attainment of federal | ||||||
14 | National Ambient Air Quality Standards for ozone and meeting | ||||||
15 | the State's obligations under the federal Regional Haze Rule, | ||||||
16 | (iv) reducing climate pollution in service to the State's | ||||||
17 | net-zero greenhouse gas goals, and (v) contributing to the | ||||||
18 | State's economy through building and mobilizing a trained and | ||||||
19 | competitive workforce to install and maintain newly purchased | ||||||
20 | appliances.
| ||||||
21 | (220 ILCS 5/23-103 new) | ||||||
22 | Sec. 23-103. Definitions. As used in this Article: | ||||||
23 | "Annual fuel utilization efficiency" or "AFUE" means the | ||||||
24 | efficiency as defined by Section 4.2.35 of the Code of Federal |
| |||||||
| |||||||
1 | Regulations, Title 10, Part 430, Subpart B, Appendix N. | ||||||
2 | "Boiler" or "water heater" means a product used to heat | ||||||
3 | water or produce steam and that is not exclusively used to | ||||||
4 | produce electricity for sale. "Boiler" does not include any | ||||||
5 | waste heat recovery boiler that is used to recover sensible | ||||||
6 | heat from the exhaust of a combustion turbine or any unfired | ||||||
7 | waste heat recovery boiler that is used to recover sensible | ||||||
8 | heat from the exhaust of any combustion equipment. | ||||||
9 | "Btu" means British thermal unit, which is a scientific | ||||||
10 | unit of measurement equal to the quantity of heat required to | ||||||
11 | raise the temperature of one pound of water by one degree | ||||||
12 | Fahrenheit at approximately 60 degrees Fahrenheit. | ||||||
13 | "Director" means the Director of the Environmental | ||||||
14 | Protection Agency or the Director's designee. | ||||||
15 | "Fan-type central furnace" means a self-contained space | ||||||
16 | heater providing for circulation of heated air at pressures | ||||||
17 | other than atmospheric through ducts more than 25 cm (10 in) in | ||||||
18 | length. | ||||||
19 | "Furnace" means a product designed to be a source of | ||||||
20 | interior space heating. | ||||||
21 | "Heat input" means the heat released by the combustion of | ||||||
22 | fuels in a unit based on the higher heating value of fuel, | ||||||
23 | excluding the enthalpy of incoming combustion air. | ||||||
24 | "Heat output" means the product obtained by multiplying | ||||||
25 | the recovery efficiency, as defined by Section 6.1.3 of the | ||||||
26 | Code of Federal Regulation, Title 10, Part 430, Subpart B, |
| |||||||
| |||||||
1 | Appendix E, by the input rating of the unit. | ||||||
2 | "NO x " and "NO x emissions" means the sum of nitric oxide and | ||||||
3 | nitrogen dioxide in the unit's flue gas, collectively | ||||||
4 | expressed as nitrogen dioxide. | ||||||
5 | "Rated heat input capacity" means the heat input capacity | ||||||
6 | specified on the nameplate of the combustion unit. If a unit | ||||||
7 | has been altered or modified such that its maximum heat input | ||||||
8 | is different from the heat input capacity specified on the | ||||||
9 | nameplate, the new maximum heat input is the unit's rated heat | ||||||
10 | input capacity. | ||||||
11 | "Useful heat delivered to the heated space" means the | ||||||
12 | annual fuel utilization efficiency (expressed as a fraction) | ||||||
13 | multiplied by the heat input.
| ||||||
14 | (220 ILCS 5/23-104 new) | ||||||
15 | Sec. 23-104. Applicability. This Article applies to any | ||||||
16 | person who sells, installs, offers for sale, leases, or offers | ||||||
17 | for lease the following products in this State, as well as any | ||||||
18 | manufacturer who intends to sell or distribute for sale or | ||||||
19 | installation the following products in this State: (i) new | ||||||
20 | water heaters and boilers with a rated heat input capacity of | ||||||
21 | 2,000,000 Btus per hour or less; and (ii) new furnaces with a | ||||||
22 | rated heat input capacity of 175,000 Btus per hour or less, | ||||||
23 | and, in the case of combination heating and cooling units, a | ||||||
24 | cooling rate of 65,000 Btus per hour or less.
|
| |||||||
| |||||||
1 | (220 ILCS 5/23-105 new) | ||||||
2 | Sec. 23-105. Emissions standards for new building heating | ||||||
3 | and water heating appliances. | ||||||
4 | (a) On and after January 1, 2025, a person shall not sell, | ||||||
5 | install, offer for sale, lease, or offer for lease, and a | ||||||
6 | manufacturer shall not sell or distribute for sale or | ||||||
7 | installation, the following new products in this State: | ||||||
8 | (1) water heaters with a rated heat input capacity of | ||||||
9 | 75,000 Btus per hour or less, and any water heaters with | ||||||
10 | power assist, that emit more than 10 nanograms of NO x per | ||||||
11 | joule of heat output; | ||||||
12 | (2) water heaters and boilers with a rated heat input | ||||||
13 | capacity from 75,001 to 2,000,000 Btus per hour, | ||||||
14 | inclusive, that emit more than 14 nanograms of NO x per | ||||||
15 | joule of heat output; or | ||||||
16 | (3) fan-type central furnaces with a rated heat input | ||||||
17 | capacity of 175,000 Btus per hour or less that emit more | ||||||
18 | than 14 nanograms of NO x per joule of heat output. | ||||||
19 | (b) On and after January 1, 2030, a person shall not sell, | ||||||
20 | install, offer for sale, lease, or offer for lease, and a | ||||||
21 | manufacturer shall not sell or distribute for sale or | ||||||
22 | installation, the following new products in this State: | ||||||
23 | (1) water heaters and boilers with a rated heat input | ||||||
24 | capacity of 2,000,000 Btus per hour or less that emit more | ||||||
25 | than 0.0 nanograms of NO x per joule of heat output; or | ||||||
26 | (2) furnaces with a rated heat input capacity of |
| |||||||
| |||||||
1 | 175,000 Btus per hour or less that emit more than 0.0 | ||||||
2 | nanograms of NO x per joule of heat output. This includes | ||||||
3 | non-central installations, such as wall furnaces, as well | ||||||
4 | as units installed in non-residential applications.
| ||||||
5 | (220 ILCS 5/23-106 new) | ||||||
6 | Sec. 23-106. Certification and identification of compliant | ||||||
7 | products. | ||||||
8 | (a) The manufacturer shall obtain confirmation from an | ||||||
9 | independent testing laboratory that each water heater, boiler, | ||||||
10 | or furnace model that is subject to the requirements of this | ||||||
11 | Article and that the manufacturer intends to sell or | ||||||
12 | distribute for sale or installation into the State has been | ||||||
13 | tested in accordance with the procedures in Section 23-107. | ||||||
14 | This confirmation shall include the following statement signed | ||||||
15 | and dated by the person responsible for the report at the | ||||||
16 | independent testing laboratory: "Based on my inquiry of those | ||||||
17 | individuals with primary responsibility for obtaining the | ||||||
18 | information, I certify that the statements and information in | ||||||
19 | this source test report are to the best of my knowledge and | ||||||
20 | belief true, accurate, and complete. I am aware that there are | ||||||
21 | significant civil and criminal penalties for submitting false | ||||||
22 | statements or information or omitting required statements or | ||||||
23 | information, including the possibility of fine or | ||||||
24 | imprisonment." | ||||||
25 | (b) For each such product model, the manufacturer shall |
| |||||||
| |||||||
1 | submit to the Director either of the following: | ||||||
2 | (1) A statement that each product model meets the | ||||||
3 | emission standards set forth in Section 23-105. The | ||||||
4 | statement must: | ||||||
5 | (A) provide the following general information: | ||||||
6 | name and address of manufacturer, brand name, trade | ||||||
7 | name, model number, and rated heat input capacity; | ||||||
8 | (B) provide a description of the model being | ||||||
9 | certified; | ||||||
10 | (C) include a complete certification source test | ||||||
11 | report demonstrating that the product model was tested | ||||||
12 | in accordance with procedures in Section 23-107 and a | ||||||
13 | written statement that the model complies with Section | ||||||
14 | 23-105; | ||||||
15 | (D) include the following statement signed and | ||||||
16 | dated by a managerial level employee responsible for | ||||||
17 | the certification request at the manufacturer: "Based | ||||||
18 | on my inquiry of those individuals with primary | ||||||
19 | responsibility for obtaining the information, I | ||||||
20 | certify that the statements and information in this | ||||||
21 | request for certification are to the best of my | ||||||
22 | knowledge and belief true, accurate, and complete. I | ||||||
23 | am aware that there are significant civil and criminal | ||||||
24 | penalties for submitting false statements or | ||||||
25 | information or omitting required statements or | ||||||
26 | information, including the possibility of fine or |
| |||||||
| |||||||
1 | imprisonment."; | ||||||
2 | (E) be submitted to the Director no more than 90 | ||||||
3 | days after the date of the emissions compliance test | ||||||
4 | conducted in accordance with Section 23-107; and | ||||||
5 | (F) be submitted to the Director no less than 90 | ||||||
6 | days before the intention to sell or distribute a new | ||||||
7 | product model within the State or no less than 90 days | ||||||
8 | before the dates described in Section 23-105. | ||||||
9 | (2) An approved South Coast Air Quality Management | ||||||
10 | District (SCAQMD) certification for each product model | ||||||
11 | issued pursuant to SCAQMD Rules 1111, 1121, or 1146.2, to | ||||||
12 | demonstrate compliance with subsection (a) of Section | ||||||
13 | 23-105. | ||||||
14 | (c) The manufacturer shall display the model number and | ||||||
15 | the certification status of a product complying with this | ||||||
16 | Article on the shipping carton and rating plate of each unit.
| ||||||
17 | (220 ILCS 5/23-107 new) | ||||||
18 | Sec. 23-107. Determination of emissions. Emissions from | ||||||
19 | products subject to the requirements of this Article shall be | ||||||
20 | tested in accordance with the following provisions: | ||||||
21 | (1) Each product model shall receive certification | ||||||
22 | based on emission tests of a randomly selected unit of | ||||||
23 | that model. | ||||||
24 | (2) The measurement of NO x emissions shall be | ||||||
25 | conducted in accordance with EPA Reference Method 7 (40 |
| |||||||
| |||||||
1 | CFR Part 60, Appendix A), Test Methods 7A-7E. | ||||||
2 | (3) Each tested water heater shall be operated in | ||||||
3 | accordance with Section 2.4 of American National Standards | ||||||
4 | ANSI Z21.10.1-1990 at normal test pressure, input rates, | ||||||
5 | and with a 5-foot exhaust stack installed during the NO x | ||||||
6 | emissions tests. | ||||||
7 | (4) Each tested furnace shall be operated in | ||||||
8 | accordance with the procedures specified in Section 3.1 of | ||||||
9 | the Code of Federal Regulations, Title 10, Part 430, | ||||||
10 | Subpart B, Appendix N. | ||||||
11 | (5) One of the 2 following formulas shall be used to | ||||||
12 | calculate the NO x emission rate in nanograms of NO x per | ||||||
13 | joule of heat output: | ||||||
14 | N=4.566×104PUHCE | ||||||
15 | or | ||||||
16 | N=3.655×1010P20.9-YZE | ||||||
17 | Where: | ||||||
18 | N = Calculated mass emissions of NO x per unit of useful | ||||||
19 | heat (nanograms per joule of useful heat delivered to the | ||||||
20 | heated space). | ||||||
21 | P = Measured concentration of NO x in flue gas (parts | ||||||
22 | per million by volume). | ||||||
23 | Y = Measured concentration of O 2 in flue gas | ||||||
24 | (percentage by volume). | ||||||
25 | Z = Gross heating value of gas (joules per cubic meter | ||||||
26 | at 0.0 degrees Celsius, 1 atm). |
| |||||||
| |||||||
1 | E = AFUE (percentage), as defined in Section 23-103. | ||||||
2 | U = Concentration of CO 2 in water-free flue gas for | ||||||
3 | stoichiometric combustion (percentage by volume). | ||||||
4 | H = Gross heating value of the fuel (Btu per cubic | ||||||
5 | foot, 60 degrees Fahrenheit, 30-in Hg). | ||||||
6 | C = Measured concentration of CO 2 in flue gas | ||||||
7 | (percentage by volume).
| ||||||
8 | (220 ILCS 5/23-108 new) | ||||||
9 | Sec. 23-108. Enforcement and penalties. | ||||||
10 | (a) The Director may require the emission test results to | ||||||
11 | be provided when deemed necessary to verify compliance and may | ||||||
12 | periodically conduct on-site inspections and tests as are | ||||||
13 | deemed necessary to ensure compliance. Such verifications | ||||||
14 | shall be conducted at least once within 2 years of the date | ||||||
15 | described in subsection (a) of Section 23-105 and again at | ||||||
16 | least once every 5 years thereafter. | ||||||
17 | (b) If the Director determines that a manufacturer, | ||||||
18 | distributor, retailer, installer, or other person is in | ||||||
19 | violation of any provision of this Act, that violation is | ||||||
20 | subject to fines and penalties according to the Director's | ||||||
21 | authority. | ||||||
22 | (c) For purposes of this Section, fines or penalties may | ||||||
23 | be levied against an installer who installs a product covered | ||||||
24 | by this Article in violation of this Article, however they | ||||||
25 | shall not be levied against such installer's nonmanagerial |
| |||||||
| |||||||
1 | employees, if any, who perform such installation. | ||||||
2 | (d) Fines and penalties collected under this Section may | ||||||
3 | be used for supplemental environmental programs to offset the | ||||||
4 | cost of furnace and water heater replacements in low-income | ||||||
5 | and moderate-income households or households in environmental | ||||||
6 | justice communities, according to the Director's authority to | ||||||
7 | use fines and penalties. | ||||||
8 | (e) On or before the date described in subsection (a) of | ||||||
9 | Section 23-105, the Director shall establish a process whereby | ||||||
10 | individuals may anonymously report potential violations of | ||||||
11 | this Act. The Director shall investigate any such reported | ||||||
12 | potential violations.
| ||||||
13 | (220 ILCS 5/23-109 new) | ||||||
14 | Sec. 23-109. Additional regulation. The Director may adopt | ||||||
15 | rules as necessary to ensure the proper implementation and | ||||||
16 | enforcement of this Article.
| ||||||
17 | (220 ILCS 5/23-111 new) | ||||||
18 | Sec. 23-111. Revisions to building codes to comply with | ||||||
19 | greenhouse gas emissions reduction requirements. | ||||||
20 | (a) Beginning no later than July 1, 2025, to support the | ||||||
21 | State's achievement of its greenhouse gas emissions | ||||||
22 | requirements and to improve public health outcomes, the State | ||||||
23 | building code shall require that the site energy use intensity | ||||||
24 | between minimally compliant but otherwise similar buildings of |
| |||||||
| |||||||
1 | differing fuel types shall not be significantly unequal in all | ||||||
2 | new construction statewide. Beginning no later than July 1, | ||||||
3 | 2025, to the fullest extent feasible, the building code shall | ||||||
4 | require that any area or service within a project where | ||||||
5 | infrastructure, building systems, or equipment used for the | ||||||
6 | combustion of fossil fuels are installed must be all-electric | ||||||
7 | ready. | ||||||
8 | (b) Requirements for all-electric ready new construction | ||||||
9 | for residential buildings shall include: | ||||||
10 | (1) a heat pump space heater ready. Systems using gas | ||||||
11 | or propane furnaces to serve individual dwelling units | ||||||
12 | shall include the following: | ||||||
13 | (A) a dedicated 240 volt branch circuit wiring | ||||||
14 | shall be installed within 3 feet from the furnace and | ||||||
15 | accessible to the furnace with no obstructions. The | ||||||
16 | branch circuit conductors shall be rated at 30 amps | ||||||
17 | minimum. The blank cover shall be identified as "240V | ||||||
18 | ready"; and | ||||||
19 | (B) the main electrical service panel shall have a | ||||||
20 | reserved space to allow for the installation of a | ||||||
21 | double pole circuit breaker for a future heat pump | ||||||
22 | space heater installation. The reserved space shall be | ||||||
23 | permanently marked as "For Future 240V use"; | ||||||
24 | (2) an electric cooktop ready. Systems using gas or | ||||||
25 | propane cooktops to serve individual dwelling units shall | ||||||
26 | include the following: |
| |||||||
| |||||||
1 | (A) a dedicated 240 volt branch circuit wiring | ||||||
2 | shall be installed within 3 feet from the cooktop and | ||||||
3 | accessible to the cooktop with no obstructions. The | ||||||
4 | branch circuit conductors shall be rated at 50 amps | ||||||
5 | minimum. The blank cover shall be identified as "240V | ||||||
6 | ready"; and | ||||||
7 | (B) the main electrical service panel shall have a | ||||||
8 | reserved space to allow for the installation of a | ||||||
9 | double pole circuit breaker for a future electric | ||||||
10 | cooktop installation. The reserved space shall be | ||||||
11 | permanently marked as "For Future 240V Use"; | ||||||
12 | (3) an electric clothes dryer ready. Clothes dryer | ||||||
13 | locations with gas or propane plumbing shall include the | ||||||
14 | following: | ||||||
15 | (A) systems serving individual dwelling units | ||||||
16 | shall include: | ||||||
17 | (i) a dedicated 240 volt branch circuit wiring | ||||||
18 | shall be installed within 3 feet from the clothes | ||||||
19 | dryer location and accessible to the clothes dryer | ||||||
20 | location with no obstructions. The branch circuit | ||||||
21 | conductors shall be rated at 30 amps minimum. The | ||||||
22 | blank cover shall be identified as "240V ready"; | ||||||
23 | and | ||||||
24 | (ii) the main electrical service panel shall | ||||||
25 | have a reserved space to allow for the | ||||||
26 | installation of a double pole circuit breaker for |
| |||||||
| |||||||
1 | a future electric clothes dryer installation. The | ||||||
2 | reserved space shall be permanently marked as "For | ||||||
3 | Future 240V Use"; and | ||||||
4 | (B) systems in common use areas shall include | ||||||
5 | conductors or raceway shall be installed with | ||||||
6 | termination points at the main electrical panel, via | ||||||
7 | subpanels if applicable, to a location no more than 3 | ||||||
8 | feet from each gas outlet or a designated location of | ||||||
9 | future electric replacement equipment. Both ends of | ||||||
10 | the conductors or raceway shall be labeled "Future | ||||||
11 | 240V Use". The conductors or raceway and any | ||||||
12 | intervening subpanels, panelboards, switchboards, and | ||||||
13 | busbars shall be sized to meet the future electric | ||||||
14 | power requirements, at the service voltage to the | ||||||
15 | point at which the conductors serving the building | ||||||
16 | connect to the utility distribution system. The | ||||||
17 | capacity requirements may be adjusted for demand | ||||||
18 | factors. Gas flow rates shall be determined in | ||||||
19 | accordance with State plumbing code. Capacity shall be | ||||||
20 | one of the following: | ||||||
21 | (i) 0.24 amps at 208/240 volts per clothes | ||||||
22 | dryer; | ||||||
23 | (ii) 2.6 kVA for each 10,000 Btu per hour of | ||||||
24 | rated gas input or gas pipe capacity; or | ||||||
25 | (iii) the electrical power required to provide | ||||||
26 | equivalent functionality of the gas-powered |
| |||||||
| |||||||
1 | equipment as calculated and documented by the | ||||||
2 | responsible person associated with the project; | ||||||
3 | and | ||||||
4 | (4) a heat pump water heater ready. Systems using gas | ||||||
5 | or propane service water heaters to serve individual | ||||||
6 | dwelling units shall include the following: | ||||||
7 | (A) a dedicated 240 volt branch circuit wiring | ||||||
8 | shall be installed within 3 feet from the furnace and | ||||||
9 | accessible to the furnace with no obstructions. The | ||||||
10 | branch circuit conductors shall be rated at 30 amps | ||||||
11 | minimum. The blank cover shall be identified as "240V | ||||||
12 | ready"; | ||||||
13 | (B) the main electrical service panel shall have a | ||||||
14 | reserved space to allow for the installation of a | ||||||
15 | double pole circuit breaker for a future heat pump | ||||||
16 | water heater installation. The reserved space shall be | ||||||
17 | permanently marked as "For Future 240V use"; and | ||||||
18 | (C) an indoor space that is at least 3 feet by 3 | ||||||
19 | feet by 7 feet high shall be available surrounding or | ||||||
20 | within 3 feet of the installed water heater, except | ||||||
21 | where a tankless water heater is installed. | ||||||
22 | (c) Newly constructed commercial buildings shall meet the | ||||||
23 | requirements of Appendix CH of the 2024 version of the | ||||||
24 | International Energy Conservation Code. | ||||||
25 | (d) Beginning no later than January 1, 2026, the State | ||||||
26 | building code must include a prescriptive requirement for |
| |||||||
| |||||||
1 | central air conditioning systems that are being removed due to | ||||||
2 | equipment failure or as part of a larger renovation project, | ||||||
3 | that they must be replaced with a heat pump capable of both | ||||||
4 | heating and cooling in accordance with the following | ||||||
5 | requirements: | ||||||
6 | (1) Requirements for residential buildings: | ||||||
7 | (A) If an existing central air conditioner is | ||||||
8 | removed from a natural gas, propane, or fuel oil | ||||||
9 | forced air system that is to remain in place, the | ||||||
10 | replacement heat pump must be sized to meet the | ||||||
11 | cooling load of the home with controls allowing the | ||||||
12 | heat pump to provide the primary heating and furnace | ||||||
13 | as "backup" heating. | ||||||
14 | (B) If an existing central air conditioner is | ||||||
15 | connected to a natural gas, propane, or fuel oil | ||||||
16 | forced air system that is to also be replaced, the | ||||||
17 | replacement heat pump must be sized to meet all loads | ||||||
18 | of the home. Exceptions may be given for replacement | ||||||
19 | systems that require the main electrical service panel | ||||||
20 | to be upgraded. | ||||||
21 | (C) If an existing central air conditioner and its | ||||||
22 | accompanying ductwork are replaced, the replacement | ||||||
23 | heat pump must be sized to meet all loads of the home. | ||||||
24 | (2) Requirements for commercial buildings: If an | ||||||
25 | existing rooftop packaged unit is removed, the replacement | ||||||
26 | unit must be a heat pump. This requirement only applies to |
| |||||||
| |||||||
1 | existing rooftop packaged units that are 65,000 Btu/h or | ||||||
2 | less. Exceptions may be given for replacement systems that | ||||||
3 | require the main electrical service panel to be upgraded.
| ||||||
4 | (220 ILCS 5/23-112 new) | ||||||
5 | Sec. 23-112. Revisions to gas service line extensions to | ||||||
6 | comply with greenhouse gas emissions reduction requirements. | ||||||
7 | (a) To support the State's achievement of its greenhouse | ||||||
8 | gas emissions requirements, and to improve public health | ||||||
9 | outcomes, no gas company may furnish or supply gas service, | ||||||
10 | instrumentalities, and facilities to any commercial or | ||||||
11 | residential location that did not receive gas service or did | ||||||
12 | not file applications for gas service on or before June 30, | ||||||
13 | 2027. | ||||||
14 | (b) The following locations are exempt from the | ||||||
15 | requirements of subsection (a): | ||||||
16 | (1) buildings that require gas systems for emergency | ||||||
17 | backup power; and | ||||||
18 | (2) buildings specifically designated for occupancy by | ||||||
19 | a commercial food establishment, laboratory, laundromat, | ||||||
20 | hospital, or crematorium.
| ||||||
21 | (220 ILCS 5/23-301 new) | ||||||
22 | Sec. 23-301. Severability. If any provision of this | ||||||
23 | Article or the application of this Article to any person or | ||||||
24 | circumstance is held invalid, such invalidity does not affect |
| |||||||
| |||||||
1 | other provisions or applications of the Article that can be | ||||||
2 | given effect without the invalid provision or application, and | ||||||
3 | to this end the provisions of this Article are declared to be | ||||||
4 | severable.
| ||||||
5 | (220 ILCS 5/Art. XXIV heading new) | ||||||
6 | ARTICLE XXIV. 2050 HEAT DECARBONIZATION STANDARD | ||||||
7 | (220 ILCS 5/24-101 new) | ||||||
8 | Sec. 24-101. Legislative policy. To provide the highest | ||||||
9 | quality of life for the residents of this State and to provide | ||||||
10 | for a clean and healthy environment, it is the policy of this | ||||||
11 | State that natural gas utilities, otherwise referred to as | ||||||
12 | "obligated parties", shall transition to 100% zero emissions | ||||||
13 | by 2050. Under the heat decarbonization standard, each gas | ||||||
14 | utility has an annual obligation, beginning in 2030, to reduce | ||||||
15 | the greenhouse gas emissions resulting from the combustion of | ||||||
16 | the fuels it delivers to its customers. The emission reduction | ||||||
17 | obligation for 2030 shall be 20% relative to each utility's | ||||||
18 | 2020 greenhouse gas emissions levels on a weather-normalized | ||||||
19 | basis. The emission reduction obligation shall grow by 4 | ||||||
20 | percentage points per year every year thereafter, such that | ||||||
21 | the annual emission reduction requirement will reach 24% in | ||||||
22 | 2031, 28% in 2032, 32% in 2033, 36% in 2034, 40% by 2035, 44% | ||||||
23 | by 2036, 48% by 2037, 52% by 2038, 56% by 2039, 60% by 2040, | ||||||
24 | 64% by 2041, 68% by 2042, 72% by 2043, 76% by 2044, 80% by |
| |||||||
| |||||||
1 | 2045, 84% by 2046, 88% by 2047, 92% by 2048, 96% by 2049, and | ||||||
2 | 100% by 2050. This obligation shall be referred to as the "heat | ||||||
3 | decarbonization standard". The heat decarbonization standard | ||||||
4 | must be met by the lowest societal cost combination of supply | ||||||
5 | and demand-side resources. References in this Article to "this | ||||||
6 | Act" means this Article.
| ||||||
7 | (220 ILCS 5/24-102 new) | ||||||
8 | Sec. 24-102. Options for compliance. | ||||||
9 | (a) Obligated parties must demonstrate compliance with the | ||||||
10 | heat decarbonization standard using a combination of: | ||||||
11 | (1) emission reductions achieved from the obligated | ||||||
12 | parties' own customers; and | ||||||
13 | (2) clean heat credits purchased from other gas | ||||||
14 | utilities that are also obligated parties in this State. | ||||||
15 | (b) Prior to 2035, at least 70% of each obligated party's | ||||||
16 | emission reduction obligation must be met through emission | ||||||
17 | reductions achieved from its own customers, with no more than | ||||||
18 | 30% of the emission reduction obligation in any year met | ||||||
19 | through the purchase of clean heat credits. From 2035 through | ||||||
20 | 2040, at least 80% of each obligated party's emission | ||||||
21 | reduction requirement must be met through emission reductions | ||||||
22 | from its own customers, with no more than 20% met through the | ||||||
23 | purchase of clean heat credits. After 2040, at least 90% of | ||||||
24 | each obligated party's emission reduction requirement must be | ||||||
25 | met through emission reductions achieved from its own |
| |||||||
| |||||||
1 | customers, with no more than 10% met through the purchase of | ||||||
2 | clean heat credits.
| ||||||
3 | (220 ILCS 5/24-103 new) | ||||||
4 | Sec. 24-103. Measures for customer emission reduction. | ||||||
5 | Emissions must be achieved through improvements in customers' | ||||||
6 | energy conservation practices, improvements in customers' | ||||||
7 | end-use efficiency, full or partial electrification of any end | ||||||
8 | use, or switching from fossil methane to lower-emitting liquid | ||||||
9 | or gaseous fuels that are delivered by the obligated party and | ||||||
10 | directly consumed by end-use customers at the customers' homes | ||||||
11 | or businesses. Lower-emitting liquid or gaseous fuels may | ||||||
12 | include biomethane, but lower-emitting liquid or gaseous fuels | ||||||
13 | may not include hydrogen except for industrial applications. | ||||||
14 | For emission reductions from lower-emitting liquid or gaseous | ||||||
15 | fuels to be counted toward an obligated party's emission | ||||||
16 | reduction obligation, the obligated party must both acquire | ||||||
17 | the lower-emitting fuel, including its environmental | ||||||
18 | attributes, and demonstrate a contractual pathway for the | ||||||
19 | physical delivery of the fuel from the point of injection into | ||||||
20 | a pipeline to the obligated party's delivery system. Gas | ||||||
21 | utilities may not use reductions in emissions from sources | ||||||
22 | unrelated to combustion of fossil gas at customers' homes and | ||||||
23 | businesses in this State as emissions offsets or alternatives | ||||||
24 | to reductions in the customers' own emissions. | ||||||
25 | Obligated parties must meet the heat decarbonization |
| |||||||
| |||||||
1 | standard with the lowest societal cost combination of | ||||||
2 | resources, where societal cost includes infrastructure costs, | ||||||
3 | utility return on capital, the social cost of greenhouse gas | ||||||
4 | emissions and leakage, and the cost of health impacts | ||||||
5 | attributable to pollution from a given measure.
| ||||||
6 | (220 ILCS 5/24-104 new) | ||||||
7 | Sec. 24-104. Demonstrating customer emission reductions. | ||||||
8 | (a) Each obligated party's emissions in each year shall be | ||||||
9 | calculated as: | ||||||
10 | (1) a weather-normalized estimate of emissions from | ||||||
11 | the actual amount of fossil methane consumed by its | ||||||
12 | customers in the year, plus; | ||||||
13 | (2) a weather-normalized estimate of emissions from | ||||||
14 | the leakage of methane, hydrogen, or other greenhouse | ||||||
15 | gases from front or behind-the-meter sources in a given | ||||||
16 | year, plus; | ||||||
17 | (3) a weather-normalized estimate of the magnitude of | ||||||
18 | remaining emissions resulting from switching from fossil | ||||||
19 | methane to lower-emitting liquid or gaseous fuels that are | ||||||
20 | delivered by the obligated party and directly consumed by | ||||||
21 | customers at the customers' homes or businesses in the | ||||||
22 | year. The magnitude of remaining emissions resulting from | ||||||
23 | switching from fossil methane to lower-emitting liquid or | ||||||
24 | gaseous fuels shall be calculated as (i) the magnitude of | ||||||
25 | emissions that would have occurred had fossil methane |
| |||||||
| |||||||
1 | continued to be consumed, multiplied by (ii) one minus the | ||||||
2 | percent reduction in life cycle emissions resulting from | ||||||
3 | the fuel substitution. Life cycle emission calculations | ||||||
4 | shall account for emissions associated with the entire | ||||||
5 | pathway of a fuel, including extraction, production, | ||||||
6 | transportation, distribution, and combustion of the fuel | ||||||
7 | by the consumer. | ||||||
8 | (b) Obligated parties shall calculate these figures | ||||||
9 | annually, and electronically submit the figures in an easily | ||||||
10 | accessible digital format, such as .PDF, .DOCX, or XLSX, to | ||||||
11 | the Environmental Protection Agency, the Commission, the | ||||||
12 | Governor, and the General Assembly. | ||||||
13 | (c) The Environmental Protection Agency shall post these | ||||||
14 | figures for each utility on a website readily accessible to | ||||||
15 | the public, within 30 days of obligated parties submitting the | ||||||
16 | figures to the Agency, and shall maintain all previous years' | ||||||
17 | records for similar public access. | ||||||
18 | (d) The Environmental Protection Agency shall also assess | ||||||
19 | the emissions figures submitted by obligated parties to assess | ||||||
20 | those parties' compliance or lack thereof with the heat | ||||||
21 | decarbonization standard. If an obligated party does not | ||||||
22 | comply, the obligated party shall be subject to enforcement | ||||||
23 | mechanisms described in Section 24-108.
| ||||||
24 | (220 ILCS 5/24-105 new) | ||||||
25 | Sec. 24-105. Tradable clean heat credits. A tradable clean |
| |||||||
| |||||||
1 | heat credit is a tradable, intangible commodity that | ||||||
2 | represents an amount of greenhouse gas reduction, measured in | ||||||
3 | tons of CO 2 , achieved by a gas utility from its customers in | ||||||
4 | this State. An obligated party must achieve excess emission | ||||||
5 | reductions, over and above its annual obligation, to sell | ||||||
6 | tradable clean heat credits to another obligated party. The | ||||||
7 | number of tradable clean heat credits sold by an obligated | ||||||
8 | party in any year may not exceed the magnitude of the obligated | ||||||
9 | party's excess emission reductions in that year.
| ||||||
10 | (220 ILCS 5/24-106 new) | ||||||
11 | Sec. 24-106. Banking of emission reductions. An obligated | ||||||
12 | party that achieves emission reductions in a given year that | ||||||
13 | are in excess of its emission reduction obligation in that | ||||||
14 | year may, in lieu of selling them to another obligated party, | ||||||
15 | bank them. Emission reductions that are banked in a given year | ||||||
16 | may be used to comply with emission reduction obligations in | ||||||
17 | any of the following 3 years. Excess emission reductions may | ||||||
18 | not be banked for more than 3 years or used as part of an | ||||||
19 | obligated party's annual compliance more than 3 years after | ||||||
20 | they were generated. No obligated party may achieve more than | ||||||
21 | 20% of any annual emission reduction obligation using banked | ||||||
22 | emission reductions.
| ||||||
23 | (220 ILCS 5/24-107 new) | ||||||
24 | Sec. 24-107. Equity in emission reductions. |
| |||||||
| |||||||
1 | (a) As used in this Section: | ||||||
2 | "Equity investment eligible communities" has the meaning | ||||||
3 | given to that term in the Energy Transition Act. | ||||||
4 | "Income-qualified households" means those households whose | ||||||
5 | annual incomes are at or below 80% of the area median income. | ||||||
6 | (b) Each obligated party must achieve real emission | ||||||
7 | reductions from income-qualified households and environmental | ||||||
8 | justice communities that are at least 5 percentage points | ||||||
9 | greater than a proportional percentage of the annual gas | ||||||
10 | consumption of such customers multiplied by each obligated | ||||||
11 | party's annual emissions reduction requirements. At least half | ||||||
12 | of the emission reductions from equity investment eligible | ||||||
13 | communities shall be from measures that require capital | ||||||
14 | investments in homes, have expected lives of at least 10 | ||||||
15 | years, and are estimated to lower annual energy bills. | ||||||
16 | Emission reductions in equity investment eligible communities | ||||||
17 | shall include codelivery and coordinated implementation of all | ||||||
18 | relevant programs, measures, and complementary services. This | ||||||
19 | includes, but is not limited to, pairing high efficiency | ||||||
20 | electrification measures and programs with energy efficiency, | ||||||
21 | building envelope improvements, the Illinois Solar for All | ||||||
22 | Program, energy assistance, health and safety improvements, | ||||||
23 | and federal incentives targeted to disadvantaged communities. | ||||||
24 | Emission reductions from income-qualified and environmental | ||||||
25 | justice communities, including efforts to codeliver and | ||||||
26 | coordinate other programs and services, shall be reported on |
| |||||||
| |||||||
1 | at least annually to the Commission. Tradable clean heat | ||||||
2 | credits cannot be used to fulfill this requirement.
| ||||||
3 | (220 ILCS 5/24-108 new) | ||||||
4 | Sec. 24-108. Enforcement. | ||||||
5 | (a) The Commission shall order an obligated party that | ||||||
6 | fails to achieve its emission reduction obligation in a given | ||||||
7 | year, including required amounts from income-qualified | ||||||
8 | customers and front-line communities, to make a noncompliance | ||||||
9 | payment. The noncompliance payment shall be equal to 3 times | ||||||
10 | the estimated cost per unit of emission reduction incurred by | ||||||
11 | all obligated parties in the State for the emission reductions | ||||||
12 | the obligated parties achieved in the prior year. | ||||||
13 | (b) The Commission may waive the noncompliance payment if: | ||||||
14 | (1) it finds that the obligated party made a good | ||||||
15 | faith effort to achieve the required amount of emission | ||||||
16 | reduction and its failure to achieve the required | ||||||
17 | reduction resulted from market factors beyond its control, | ||||||
18 | that could not have reasonably been anticipated, and for | ||||||
19 | which the obligated party could not have planned; and | ||||||
20 | (2) it directs the obligated party to add the | ||||||
21 | difference between its obligated level of emission | ||||||
22 | reduction and actual emission reduction achieved to its | ||||||
23 | required emission reduction amount in subsequent years, | ||||||
24 | with the shortfall being made up in no more than 3 years. | ||||||
25 | (c) Payments received pursuant to the noncompliance |
| |||||||
| |||||||
1 | penalty shall be directed to the Commission. | ||||||
2 | (d) The Commission shall use any noncompliance payments to | ||||||
3 | contract with an independent third party to achieve emission | ||||||
4 | reductions in the service territory of the noncomplying | ||||||
5 | utility. The Commission shall prioritize achieving such | ||||||
6 | reductions from weatherization or electrification of | ||||||
7 | income-qualified households, to the extent that such | ||||||
8 | reductions would lower annual energy bills.
| ||||||
9 | (220 ILCS 5/24-109 new) | ||||||
10 | Sec. 24-109. 2050 Heat Decarbonization Pathways Study. | ||||||
11 | (a) In order to ensure sufficient planning for achieving | ||||||
12 | this goal, the Commission shall complete a 2050 Heat | ||||||
13 | Decarbonization Pathways Study by June 1, 2025, to examine | ||||||
14 | feasible and practical pathways for investor-owned natural gas | ||||||
15 | utilities to achieve the State's decarbonization requirement | ||||||
16 | to be net zero by 2050, and the impacts of decarbonization on | ||||||
17 | customers and the electric and natural gas utilities that | ||||||
18 | serve the customers. | ||||||
19 | (b) The Commission shall host the study in collaboration | ||||||
20 | with a technical working group whose members are appointed by | ||||||
21 | the Governor and a consultant selected by the technical | ||||||
22 | working group. The Commission and technical working group | ||||||
23 | shall host a public process for stakeholder input regarding | ||||||
24 | (i) the proposed scope of the study, (ii) initial draft | ||||||
25 | assumptions for the study, (iii) draft study results, and (iv) |
| |||||||
| |||||||
1 | the draft study report. The technical working group shall | ||||||
2 | consist of the following members: | ||||||
3 | (1) one representative of natural gas utilities; | ||||||
4 | (2) one representative of electric utilities; | ||||||
5 | (3) the chair of the Commission, or the chair's | ||||||
6 | designee; | ||||||
7 | (4) one representative of the Office of | ||||||
8 | Decarbonization Planning within the Illinois Commerce | ||||||
9 | Commission; | ||||||
10 | (5) one representative of the Environmental Protection | ||||||
11 | Agency; | ||||||
12 | (6) one representative of an environmental advocacy | ||||||
13 | group; | ||||||
14 | (7) one representative of a labor organization; | ||||||
15 | (8) one representative of commercial and industrial | ||||||
16 | gas customers; | ||||||
17 | (9) one representative of an organization that | ||||||
18 | represents residential ratepayer advocates; | ||||||
19 | (10) one representative of a group that represents | ||||||
20 | environmental justice or front-line communities; | ||||||
21 | (11) one representative of a group that represents | ||||||
22 | low-income residents; | ||||||
23 | (12) one representative of an organization that | ||||||
24 | focuses on access to and promotion of energy efficiency; | ||||||
25 | and | ||||||
26 | (13) one climate scientist from a national laboratory |
| |||||||
| |||||||
1 | or institution of higher education in the State. | ||||||
2 | (c) The 2050 Heat Decarbonization Pathways Study shall | ||||||
3 | consider: | ||||||
4 | (1) future clean heating strategies for residential, | ||||||
5 | commercial, and industrial customers, including | ||||||
6 | electrification, geothermal heat and thermal networks, and | ||||||
7 | energy efficiency that would comply with each gas | ||||||
8 | utility's obligation under the heat decarbonization | ||||||
9 | standard; | ||||||
10 | (2) a comparative assessment of the marginal | ||||||
11 | greenhouse gas abatement cost curve of resources and | ||||||
12 | technologies, including electrification, that are | ||||||
13 | available for helping the utility meet its heat | ||||||
14 | decarbonization standard requirements; | ||||||
15 | (3) how a reduction in natural gas and other | ||||||
16 | utility-delivered gaseous fuels throughput will impact | ||||||
17 | customer gas and electric rates, considering various price | ||||||
18 | scenarios for electricity, natural gas, and other gaseous | ||||||
19 | fuels and reference medium and high electrification | ||||||
20 | scenarios; | ||||||
21 | (4) strategies to ensure equitable prioritization of | ||||||
22 | decarbonization measures and programs in income-qualified | ||||||
23 | and environmental justice communities while minimizing | ||||||
24 | energy transition costs on ratepayers, with an emphasis on | ||||||
25 | an accessible and affordable transition for low-income | ||||||
26 | residents, fixed-income residents, and residents within |
| |||||||
| |||||||
1 | equity investment eligible communities; | ||||||
2 | (5) an assessment of demand-side resource potential, | ||||||
3 | including load management, energy efficiency, | ||||||
4 | conservation, demand response, and fuel switching, | ||||||
5 | including electrification, available federal, State, | ||||||
6 | county, local, and private incentives, or financing | ||||||
7 | options related to building electrification and | ||||||
8 | efficiency; | ||||||
9 | (6) that the federal incentives analysis must include | ||||||
10 | ways that investor-owned utilities can leverage rebates | ||||||
11 | and tax incentives in the Inflation Reduction Act and | ||||||
12 | Infrastructure Investment and Jobs Act; in addition, the | ||||||
13 | assessment must include ways for the investor-owned | ||||||
14 | utilities to maximize low-income qualified households' | ||||||
15 | participation in the electrification incentive programs; | ||||||
16 | (7) the impacts of building and vehicle | ||||||
17 | electrification on the electric grid and strategies to | ||||||
18 | integrate gas and electric system planning and resource | ||||||
19 | optimization; | ||||||
20 | (8) specific natural gas end uses that may be suitable | ||||||
21 | for the use of alternative fuels, such as biomethane and | ||||||
22 | green hydrogen, and an assessment of the natural gas end | ||||||
23 | uses' commercial availability, social cost, and life cycle | ||||||
24 | emissions; | ||||||
25 | (9) a comparative evaluation of the cost of natural | ||||||
26 | gas purchasing strategies, storage options, delivery |
| |||||||
| |||||||
1 | resources, and improvements in demand-side resources using | ||||||
2 | a consistent method to calculate cost-effectiveness; and | ||||||
3 | (10) an evaluation of employment metrics associated | ||||||
4 | with each alternative, including a projection of gas | ||||||
5 | distribution jobs affected by a given alternative and jobs | ||||||
6 | made available through the alternative, a description of | ||||||
7 | opportunities to transition any affected gas distribution | ||||||
8 | jobs to the alternative, and an explanation of how | ||||||
9 | employment impacts associated with each alternative could | ||||||
10 | affect equity investment eligible communities. Given its | ||||||
11 | findings, the study will create a Just Transition Plan, | ||||||
12 | inclusive of funding needs, for the current gas workforce. | ||||||
13 | (d) The Chair of the Commission, or the Chair's designee, | ||||||
14 | will also serve as the Chair of the Technical Working Group.
| ||||||
15 | (220 ILCS 5/24-110 new) | ||||||
16 | Sec. 24-110. Gas infrastructure planning. | ||||||
17 | (a) This Article creates the Office of Decarbonization | ||||||
18 | Planning within the Commission to manage an iterative | ||||||
19 | statewide heat decarbonization plan located within the | ||||||
20 | Commission. On a timeline concurrent with the 2050 Heat | ||||||
21 | Decarbonization Pathways Study, the Office of Decarbonization | ||||||
22 | Planning shall adopt rules for implementing the heat | ||||||
23 | decarbonization plans. | ||||||
24 | (b) As used in this Section: | ||||||
25 | "Environmental justice communities" has the meaning given |
| |||||||
| |||||||
1 | to that term in the Illinois Power Agency Act. | ||||||
2 | "Lowest reasonable cost" means the least-cost, least-risk | ||||||
3 | mix of demand-side, supply-side, and electrification resources | ||||||
4 | determined through a detailed and consistent analysis of a | ||||||
5 | wide range of commercially available sources. At a minimum, | ||||||
6 | this analysis must consider resource costs, resource | ||||||
7 | availability, market-volatility risks, the risks imposed on | ||||||
8 | ratepayers, resource effect on system operations, public | ||||||
9 | policies regarding resource preferences, the cost of risks | ||||||
10 | associated with environmental effects, including emissions of | ||||||
11 | carbon dioxide, the ability to scale to meet 2050 goals, air | ||||||
12 | pollution and resulting public health impacts, equity impacts, | ||||||
13 | and the need for security of supply. | ||||||
14 | "Planned project" means any programmatic expense or | ||||||
15 | related group of programmatic expenses with a defined scope of | ||||||
16 | work and associated cost estimate that exceeds $1,000,000 in | ||||||
17 | 2020 dollars or $500,000 in 2020 dollars for gas utilities | ||||||
18 | with less than 50,000 full service customers, as adjusted | ||||||
19 | annually for inflation. | ||||||
20 | "Resources" means both demand-side and supply-side | ||||||
21 | resources, including, but not limited to, natural gas, | ||||||
22 | biomethane, green hydrogen for industrial application, | ||||||
23 | conservation, energy efficiency, demand response, and | ||||||
24 | electrification. | ||||||
25 | (c) Each natural gas utility regulated by the Commission | ||||||
26 | has the responsibility to meet system demand and public policy |
| |||||||
| |||||||
1 | requirements, including the State's heat decarbonization | ||||||
2 | standard, with the lowest reasonable cost and most feasible | ||||||
3 | mix of resources. In furtherance of that responsibility, each | ||||||
4 | natural gas utility must develop a gas infrastructure plan for | ||||||
5 | meeting the utility's heat decarbonization standard, including | ||||||
6 | 5-year interim milestones from 2025 until 2050. The gas | ||||||
7 | infrastructure plan must take into account the findings of the | ||||||
8 | 2050 Heat Decarbonization Pathways Study. | ||||||
9 | (d) Natural gas utilities shall file biennial gas | ||||||
10 | infrastructure plans that create alignment between gas utility | ||||||
11 | distribution system investments and the utility's heat | ||||||
12 | decarbonization standard obligations at lowest reasonable cost | ||||||
13 | and that consider nonpipeline infrastructure projects that | ||||||
14 | minimize costs over the long term. | ||||||
15 | (e) Before the filing of each biennial gas infrastructure | ||||||
16 | plan, the Office of Decarbonization Planning shall contract | ||||||
17 | for gas demand forecasts for each regulated gas utility in the | ||||||
18 | State from an independent party. Gas utilities must reasonably | ||||||
19 | provide accurate and timely system data to the independent | ||||||
20 | contractor selected to conduct the forecasts. For each | ||||||
21 | regulated gas utility in the State, the third party must | ||||||
22 | produce forecasts for each customer class that consider slow, | ||||||
23 | medium, and rapid acceleration of residential, commercial, and | ||||||
24 | industrial electrification of the end uses that rely upon the | ||||||
25 | direct combustion of natural gas in buildings. The forecasts | ||||||
26 | must include, to the extent possible, the effects of updated |
| |||||||
| |||||||
1 | State and local building codes, changes to the number of gas | ||||||
2 | utility customers, consumer responses to building | ||||||
3 | electrification programs or incentives offered within a gas | ||||||
4 | utility's service territory, the price elasticity of gas | ||||||
5 | demand if rates increase due to reduced gas throughput and the | ||||||
6 | impacts of commodity prices, and any other criteria as | ||||||
7 | stipulated by the Commission. The forecasts shall be due to | ||||||
8 | the Commission and the gas utilities at least 8 months prior to | ||||||
9 | the filing of a gas infrastructure plan. | ||||||
10 | (f) A gas infrastructure plan must: | ||||||
11 | (1) cover the 20 years immediately following the | ||||||
12 | approval of the plan with a 5-year action plan of | ||||||
13 | investments; | ||||||
14 | (2) provide the estimated total cost and annual | ||||||
15 | incremental revenue requirements of the proposed action | ||||||
16 | plan, assuming both conventional depreciation and | ||||||
17 | accelerated depreciation, as applicable; | ||||||
18 | (3) use the various gas demand forecasts provided to | ||||||
19 | it under this article and include a range of possible | ||||||
20 | future scenarios and input sensitivities for the purpose | ||||||
21 | of testing the robustness of the utility's portfolio of | ||||||
22 | planned projects under various parameters; | ||||||
23 | (4) take into account the findings of the 2050 Heat | ||||||
24 | Decarbonization Pathways Study; | ||||||
25 | (5) demonstrate that the utility's infrastructure | ||||||
26 | investment plans align with obligations under the heat |
| |||||||
| |||||||
1 | decarbonization standard; | ||||||
2 | (6) include a list of all proposed system expenditures | ||||||
3 | and investments, including an analysis of infrastructure | ||||||
4 | needs and detailed information on all planned projects | ||||||
5 | within the action plan; | ||||||
6 | (7) include the results of nonpipeline alternative | ||||||
7 | analyses conducted for all planned projects not necessary | ||||||
8 | to mitigate a near-term safety or reliability risk subject | ||||||
9 | to rules by the Commission that include, but are not | ||||||
10 | limited to: | ||||||
11 | (A) a consideration of both supply and demand-side | ||||||
12 | alternatives to traditional capital investments, | ||||||
13 | including gas demand response and electrification; and | ||||||
14 | (B) a cost-benefit analysis of the various options | ||||||
15 | that consider non-energy benefits and the societal | ||||||
16 | value, including health benefits, of reduced carbon | ||||||
17 | emissions and surface-level pollutants, particularly | ||||||
18 | in equity investment eligible communities; | ||||||
19 | (8) minimize rate impacts on customers, particularly | ||||||
20 | low-income households and households within equity | ||||||
21 | investment eligible communities; | ||||||
22 | (9) describe the methodology, criteria, and | ||||||
23 | assumptions used to develop the plan; | ||||||
24 | (10) include one or more system maps indicating | ||||||
25 | locations of individual planned projects, pressure | ||||||
26 | districts served by the individual project, locations of |
| |||||||
| |||||||
1 | equity investment eligible communities, and any other | ||||||
2 | information as required by the Commission; | ||||||
3 | (11) provide a summary of stakeholder participation | ||||||
4 | and input from a public stakeholder process, and an | ||||||
5 | explanation of how input was incorporated into the plan, | ||||||
6 | including for all projects located within equity | ||||||
7 | investment eligible communities, a description of its | ||||||
8 | outreach to members of that community and findings from | ||||||
9 | those efforts; and | ||||||
10 | (12) requires the utility, to the extent that the | ||||||
11 | utility assumes the use of alternative fuels, such as | ||||||
12 | biomethane or green hydrogen, to meet its obligations | ||||||
13 | under the heat decarbonization standard, to demonstrate a | ||||||
14 | plan to procure firm supply and cost-effectiveness as | ||||||
15 | compared to nonfuel alternatives, inclusive of the costs | ||||||
16 | to retrofit all public and private infrastructure to | ||||||
17 | accommodate the fuels; green hydrogen may only be used for | ||||||
18 | industrial applications; hydrogen blending with methane | ||||||
19 | shall not be part of decarbonization plans. | ||||||
20 | (g) Not later than 12 months before the due date of a plan, | ||||||
21 | the utility must provide a work plan for the Commission to | ||||||
22 | review. The work plan must outline the content of the resource | ||||||
23 | plan to be developed by the utility, the method for assessing | ||||||
24 | potential resources, and the timing and extent of public | ||||||
25 | participation. In addition, the Commission will hear comments | ||||||
26 | on the plan at a minimum of 3 public hearings, held at times |
| |||||||
| |||||||
1 | and locations accessible and convenient to most people, | ||||||
2 | including at least one in an equity investment eligible | ||||||
3 | community, which are scheduled after the utility submits its | ||||||
4 | plan for Commission review. | ||||||
5 | (h) No later than July 1, 2025, gas utilities in this State | ||||||
6 | must file the first gas infrastructure plan application for | ||||||
7 | approval. The Commission may approve, deny, or require | ||||||
8 | modifications to the plan. Once approved, the plan must be | ||||||
9 | incorporated into the utility's next general rate case using | ||||||
10 | the approved ratemaking treatments. Deviations based on | ||||||
11 | unforeseen circumstances must be justified and approved by the | ||||||
12 | Commission. | ||||||
13 | (i) The Commission shall adopt new rules, amend existing | ||||||
14 | rules, as necessary, and dedicate sufficient resources to | ||||||
15 | implement this Section.
| ||||||
16 | (220 ILCS 5/24-111 new) | ||||||
17 | Sec. 24-111. Study on gas utility financial incentive | ||||||
18 | reform. | ||||||
19 | (a) The General Assembly finds that: | ||||||
20 | (1) Improving the alignment of gas utility customer | ||||||
21 | interests, State policy, and company interests is critical | ||||||
22 | to ensuring the expected decline in the use of natural gas | ||||||
23 | is done efficiently, safely, cost-effectively, and | ||||||
24 | transparently. | ||||||
25 | (2) There is urgency around addressing increasing |
| |||||||
| |||||||
1 | threats from climate change and assisting communities that | ||||||
2 | have borne disproportionate impacts from climate change, | ||||||
3 | including air pollution, greenhouse gas emissions, and | ||||||
4 | energy burdens. Addressing this problem requires changes | ||||||
5 | to the energy used to power homes and businesses, and | ||||||
6 | changes to the gas utility business model under which | ||||||
7 | utilities in the State have traditionally functioned. | ||||||
8 | (3) Gas utility ratepayers may face upwardly spiraling | ||||||
9 | bills if steps are not taken to contain costs and | ||||||
10 | strategically prune parts of the gas distribution network. | ||||||
11 | (4) There is a need to encourage gas utilities to | ||||||
12 | innovate and find new lines of business to maintain | ||||||
13 | financial health as their main business, the provision of | ||||||
14 | fossil natural gas, winds down. | ||||||
15 | (5) The current regulatory framework has encouraged | ||||||
16 | infrastructure programs that have been plagued by | ||||||
17 | excessive cost overruns and delays. | ||||||
18 | (6) Discussions of performance incentive mechanisms | ||||||
19 | must always take into account the affordability of | ||||||
20 | customer rates and bills via stakeholder input. | ||||||
21 | The General Assembly, therefore, directs the Commission to | ||||||
22 | reform the gas utility financial incentives structure to | ||||||
23 | further specified goals and objectives related to the | ||||||
24 | provision of clean, affordable heat and the advancement of an | ||||||
25 | equitable distribution of benefits and reduction in harms in | ||||||
26 | equity investment eligible communities and economically |
| |||||||
| |||||||
1 | disadvantaged communities. | ||||||
2 | (b) The Commission shall open an investigation to consider | ||||||
3 | performance-based ratemaking tools and other financial | ||||||
4 | mechanisms to advance the goals of affordability, equity, | ||||||
5 | pollution reduction, energy system flexibility and | ||||||
6 | electrification, reliability, safety, customer experience, | ||||||
7 | cost-effectiveness, and the financial health of gas utilities | ||||||
8 | as the gas utilities scale down their core business of | ||||||
9 | delivering fuel-based energy through the distribution network. | ||||||
10 | The investigation shall consider the following mechanisms, in | ||||||
11 | addition to any others that the Commission or stakeholders | ||||||
12 | deem necessary: | ||||||
13 | (1) accelerated and shortened depreciation schedules; | ||||||
14 | (2) performance metrics and benchmarking; | ||||||
15 | (3) revenue decoupling; | ||||||
16 | (4) cost-recovery options for nonpipeline | ||||||
17 | alternatives; | ||||||
18 | (5) electrification; | ||||||
19 | (6) networked geothermal systems; | ||||||
20 | (7) securitization; | ||||||
21 | (8) fuel-cost sharing; | ||||||
22 | (9) multiyear rate plans; | ||||||
23 | (10) performance incentive mechanisms; | ||||||
24 | (11) the equalization of capital and operational | ||||||
25 | expenditures; | ||||||
26 | (12) return on equity levels for different investment |
| |||||||
| |||||||
1 | types; | ||||||
2 | (13) rate designs at the electric and gas nexus; | ||||||
3 | (14) low-income rates; | ||||||
4 | (15) luxury gas rates; and | ||||||
5 | (16) intersectoral cost recovery. | ||||||
6 | (c) The Commission must create a framework to evaluate | ||||||
7 | each mechanism on its own and as part of a set of mechanisms to | ||||||
8 | achieve the policy objectives determined by the General | ||||||
9 | Assembly, stakeholders, and the general public after a minimum | ||||||
10 | of 3 public hearings held at times and locations accessible | ||||||
11 | and convenient to most people, including at least one in an | ||||||
12 | equity investment eligible community. | ||||||
13 | (d) The investigation shall consist of a series of | ||||||
14 | workshops facilitated by an independent consultant that | ||||||
15 | encourages representation from diverse stakeholders, ensures | ||||||
16 | equitable opportunities for participation, and does not | ||||||
17 | require formal intervention or representation by an attorney. | ||||||
18 | (e) Any recommendations at the conclusion of the process | ||||||
19 | must be shared with the General Assembly, and those | ||||||
20 | recommendations already within the Commission's existing | ||||||
21 | authorities must be adopted in the next applicable general | ||||||
22 | rate case or relevant filing.
| ||||||
23 | (220 ILCS 5/24-112 new) | ||||||
24 | Sec. 24-112. Reporting requirements. | ||||||
25 | (a) Each gas utility in the State must report data to the |
| |||||||
| |||||||
1 | Commission in January and July of each year that satisfy | ||||||
2 | metrics that are set by the Commission to assess, on a system, | ||||||
3 | segment, and neighborhood basis, the level of system safety | ||||||
4 | and risk. The metrics must include, but are not limited to, the | ||||||
5 | following: | ||||||
6 | (1) the overall average leak rate of replaced and | ||||||
7 | to-be-replaced mains and leak-prone pipes; | ||||||
8 | (2) the overall average leak rate using only | ||||||
9 | leak-prone pipe and current leaks; | ||||||
10 | (3) the neighborhood average leak rate using only | ||||||
11 | remaining leak-prone pipes and current leaks; and | ||||||
12 | (4) the neighborhood historic average leak rate using | ||||||
13 | leaks on leak-prone pipes for the past 2 years, on a | ||||||
14 | rolling basis, normalized for weather, and incorporating | ||||||
15 | all class 2 leaks except third-party damage. | ||||||
16 | (b) Gas utilities must include in the report an assessment | ||||||
17 | of whether the actions taken in the prior 3 years produced the | ||||||
18 | best value, in terms of risk reduction, for the amounts | ||||||
19 | expended and a prediction of how planned projects will change | ||||||
20 | risk levels on a neighborhood, segment, and system basis. The | ||||||
21 | report filed by Peoples Gas Light and Coke Company must also | ||||||
22 | include updates on steps taken to implement the | ||||||
23 | recommendations of the Final Report on Phase One of an | ||||||
24 | Investigation of Peoples Gas Light and Coke Company's AMRP. | ||||||
25 | The Commission may require any other gas utility to adopt new | ||||||
26 | and revised practices and processes by Peoples Gas Light and |
| |||||||
| |||||||
1 | Coke Company to ensure consistency across utilities. | ||||||
2 | (c) In its review of the data and metrics provided, the | ||||||
3 | Commission may order adjustments in infrastructure replacement | ||||||
4 | plans as it deems necessary to meet an acceptable level of risk | ||||||
5 | at appropriate cost.
| ||||||
6 | (220 ILCS 5/Art. XXV heading new) | ||||||
7 | ARTICLE XXV. STATE NAVIGATOR PROGRAM LAW | ||||||
8 | (220 ILCS 5/25-101 new) | ||||||
9 | Sec. 25-101. Short title. This Article may be cited as the | ||||||
10 | State Navigator Program Law. References in this Article to | ||||||
11 | "this Act" mean this Article.
| ||||||
12 | (220 ILCS 5/25-102 new) | ||||||
13 | Sec. 25-102. Intent. The General Assembly finds that | ||||||
14 | improving the energy efficiency of, and reducing the | ||||||
15 | greenhouse gases from, residential buildings are critical to | ||||||
16 | meeting the State's adopted climate goals in Public Act | ||||||
17 | 102-662. | ||||||
18 | The General Assembly recognizes that making information | ||||||
19 | about energy efficiency and weatherization programs, | ||||||
20 | electrification services, skilled contractors, and federal and | ||||||
21 | State electrification incentives available to State residents | ||||||
22 | will assist obligated parties to comply with the Clean Heat | ||||||
23 | Standard set out in Article XXIII. Further, the General |
| |||||||
| |||||||
1 | Assembly recognizes that establishing a comprehensive | ||||||
2 | statewide navigator program is essential to ensuring equitable | ||||||
3 | access to electrification and energy efficient services. This | ||||||
4 | program requires the Administrator to help State residents | ||||||
5 | combine local, State, federal, and utility services related to | ||||||
6 | electrification, energy efficiency, and the reduction of | ||||||
7 | energy burdens to maximize electrification and energy | ||||||
8 | efficiency in this State, and fill gaps as needed.
| ||||||
9 | (220 ILCS 5/25-103 new) | ||||||
10 | Sec. 25-103. Definitions. As used in this Article: | ||||||
11 | "Administrator" means an entity, including, but not | ||||||
12 | limited to, a nonprofit corporation or community-based | ||||||
13 | organization. "Administrator" does not include an energy | ||||||
14 | utility. | ||||||
15 | "Customers" means residents, businesses, and building | ||||||
16 | owners. | ||||||
17 | "Department" means the Department of Commerce and Economic | ||||||
18 | Opportunity. | ||||||
19 | "Electrification services" includes energy audits, | ||||||
20 | assistance converting to on-site renewable energy, installing | ||||||
21 | electric heat pumps and heat pump water heaters, electric | ||||||
22 | appliance replacement, assistance with paperwork, arranging | ||||||
23 | for financing, energy efficiency, weatherization, health and | ||||||
24 | safety, and any related services and work. | ||||||
25 | "Equity investment eligible communities" has the meaning |
| |||||||
| |||||||
1 | given to that term in Section 5-5 of the Energy Transition Act. | ||||||
2 | "Income-qualified households" means those whose annual | ||||||
3 | incomes are at or below 80% of area median income. | ||||||
4 | "Navigator Working Group" means representatives appointed | ||||||
5 | by the Department who represent members from either the | ||||||
6 | electrician trades, construction industry, community | ||||||
7 | organizations that work in energy burdened communities, | ||||||
8 | community organizations who have experience with | ||||||
9 | weatherization programs, members from equity investment | ||||||
10 | eligible communities or the Illinois Commerce Commission or | ||||||
11 | staff, and electric utilities and obligated parties as | ||||||
12 | indicated in Article XXIII.
| ||||||
13 | (220 ILCS 5/25-104 new) | ||||||
14 | Sec. 25-104. Creation of State navigator program. | ||||||
15 | (a) The Department may establish and oversee a statewide | ||||||
16 | building energy upgrade navigator program. The purpose of the | ||||||
17 | navigator program is to provide a statewide resource to assist | ||||||
18 | building owners and building renters with accessing | ||||||
19 | electrification services and energy efficiency services and | ||||||
20 | programs, funding, and any other assistance that will result | ||||||
21 | in aiding obligated parties' compliance with the Clean Heat | ||||||
22 | Standard in Article XXIII. This includes, but is not limited | ||||||
23 | to, utility programs, the weatherization assistance program, | ||||||
24 | federal funding, rebates, health and safety funding, and other | ||||||
25 | State and local funding. |
| |||||||
| |||||||
1 | (b) The Department must coordinate and collaborate with | ||||||
2 | the navigator working group on the design, administration, and | ||||||
3 | implementation of the navigator program. | ||||||
4 | (c) The Department must ensure that all State residents | ||||||
5 | have equitable access to the navigator program. | ||||||
6 | (d) The Department may consult with other programs, | ||||||
7 | entities, and stakeholders as the Department determines to be | ||||||
8 | appropriate on the design, administration, and implementation | ||||||
9 | of the navigator program. | ||||||
10 | (e) Third-Party Administrator. | ||||||
11 | (1) The Department may contract out this program to | ||||||
12 | the Administrator. Subject to the following requirements: | ||||||
13 | (A) The Administrator must be selected through a | ||||||
14 | competitive process. | ||||||
15 | (B) The Administrator must have experience with | ||||||
16 | running statewide programs related to energy | ||||||
17 | efficiency, electrification services, or | ||||||
18 | weatherization programs. | ||||||
19 | (C) The Administrator must have experience working | ||||||
20 | with multifamily building owners and renters. | ||||||
21 | (D) The Administrator must have experience | ||||||
22 | assisting people with low incomes or energy burdened | ||||||
23 | households. | ||||||
24 | (E) The Administrator must have experience running | ||||||
25 | programs in both urban and rural parts of the State, | ||||||
26 | including covering a range of geographic and community |
| |||||||
| |||||||
1 | diversity. | ||||||
2 | (2) If the Department decides to hire an | ||||||
3 | Administrator, they must enter into a contract within a | ||||||
4 | year of the effective date of this amendatory Act of the | ||||||
5 | 103rd General Assembly. | ||||||
6 | (3) If the Department decides to hire an | ||||||
7 | Administrator, the contract expires after 4 years. After 4 | ||||||
8 | years, the Department can renew the contract or select a | ||||||
9 | different Administrator. If the Administrator is not | ||||||
10 | meeting the requirements of the program and its | ||||||
11 | participants, the contract may be terminated early, and a | ||||||
12 | new Administrator may be hired. | ||||||
13 | (4) The Administrator shall have the same | ||||||
14 | responsibilities as the Department in creating, | ||||||
15 | overseeing, and implementing the programs in the navigator | ||||||
16 | program. | ||||||
17 | (f) The Department or Administrator of the naviga | ||||||
tor | |||||||
18 | program must: | ||||||
19 | (1) provide outreach and deliver energy services to: | ||||||
20 | (A) owner occupied and rental residences; and | ||||||
21 | (B) single-family and multifamily dwellings; | ||||||
22 | (2) provide coverage for all geographic regions in the | ||||||
23 | State; | ||||||
24 | (3) support energy efficient and emissions reductions | ||||||
25 | alternatives for all types of fuel used in buildings; the | ||||||
26 | Department or Administrator shall ensure funding is used |
| |||||||
| |||||||
1 | for projects that include electrification and energy | ||||||
2 | efficiency work, and any related health and safety, | ||||||
3 | renewable energy, and whole building needs; funding shall | ||||||
4 | not be used for the installation of new natural gas or | ||||||
5 | other fossil fuel equipment; | ||||||
6 | (4) create strategies to ensure that the navigator | ||||||
7 | program prioritizes services in equity investment eligible | ||||||
8 | communities, one of which must include dedicating at least | ||||||
9 | 40% of the total funding for the navigator program to | ||||||
10 | deploy electrification services, energy efficiency | ||||||
11 | measures, renewable energy, health and safety upgrades, | ||||||
12 | and related upgrades in equity investment eligible | ||||||
13 | communities, through; | ||||||
14 | (A) weatherization services, including air sealing | ||||||
15 | and insulation; | ||||||
16 | (B) health and safety improvements; | ||||||
17 | (C) purchase and installation of efficient | ||||||
18 | electric equipment; | ||||||
19 | (D) energy efficiency improvements, as needed; | ||||||
20 | (E) health and safety improvements that aid in | ||||||
21 | energy conservation; | ||||||
22 | (F) weatherization services; | ||||||
23 | (G) solar, storage, and renewable energy, as | ||||||
24 | needed; and | ||||||
25 | (G) workforce development programs; | ||||||
26 | (5) create a strategy for how the navigator program |
| |||||||
| |||||||
1 | will equitably assist residents in accessing rebates and | ||||||
2 | incentives in the federal Inflation Reduction Act; | ||||||
3 | (6) create a strategy for how the navigator program | ||||||
4 | will assist customers in accessing State funding | ||||||
5 | opportunities available to access electrification | ||||||
6 | services; | ||||||
7 | (7) create a strategy to stack funding from all | ||||||
8 | available incentives and tax rebates together with the | ||||||
9 | goal of creating a 'one-stop shop' for all weatherization, | ||||||
10 | energy efficiency and electrification services; | ||||||
11 | (8) support the integrated implementation of all | ||||||
12 | relevant clean building programs funded in the State | ||||||
13 | budget, including, but not limited to: | ||||||
14 | (A) the Low Income Home Energy Assistance Program; | ||||||
15 | and | ||||||
16 | (B) the Illinois Home Weatherization Assistance | ||||||
17 | Program; and | ||||||
18 | (9) maintain a recommended contractor list. | ||||||
19 | (220 ILCS 5/25-105 new) | ||||||
20 | Sec. 25-105. Education materials and outreach. The | ||||||
21 | Department or Administrator shall: | ||||||
22 | (1) create educational materials, which must include | ||||||
23 | information about all relevant funds and financial | ||||||
24 | assistance available from federal, State, local, and | ||||||
25 | energy utility programs, including, but not limited to, |
| |||||||
| |||||||
1 | incentives, rebates, tax credits, grants, and loan | ||||||
2 | programs; | ||||||
3 | (2) contract with one or more community-based | ||||||
4 | organizations that demonstrate past success in working | ||||||
5 | with equity investment eligible communities in order to | ||||||
6 | create and distribute educational materials specifically | ||||||
7 | targeted at equity investment eligible communities; | ||||||
8 | (3) support and connect community-based organizations | ||||||
9 | in their region to training programs in areas of | ||||||
10 | electrification, energy efficiency, building envelope, and | ||||||
11 | installation technical assistance, and other relevant | ||||||
12 | areas; and | ||||||
13 | (4) ensure the education and outreach work is | ||||||
14 | coordinated with other State energy efficiency, | ||||||
15 | weatherization, electrification, and related programs and | ||||||
16 | providers.
| ||||||
17 | (220 ILCS 5/25-106 new) | ||||||
18 | Sec. 25-106. Delivered services for equity investment | ||||||
19 | eligible communities. | ||||||
20 | (a) The Department or Administrator must implement the | ||||||
21 | navigator program for income-qualified households, which must | ||||||
22 | include support navigating to existing programs or directly | ||||||
23 | providing and filling gaps related to: | ||||||
24 | (1) energy audits to provide recommendations to | ||||||
25 | customers on a wide range of cost-effective energy and |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | health improvements; | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | (2) weatherization and energy efficiency services, | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | including, but not limited to, | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
adding insulation, sealing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | cracks, and making other changes that reduce heat loss, | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | save money on heating bills, and improve the health and | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6 | safety of buildings; | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | (3) appliance upgrades; | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | (4) electrification services, including installation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | of air-sourced heat pumps, heat pump hot water heaters, | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10 | cooling, and electric panel upgrades and wiring; | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | (5) accessing qualified energy contractors; and | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | (6) securing financing. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13 | (b) Nothing in this Section shall preclude the | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14 | implementation of measures that, in addition to producing | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15 | energy savings, increase electric load by adding building | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | cooling systems where none existed before.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | Section 99. Effective date. This Act takes effect upon | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | becoming law. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|