Bill Text: IL SB3980 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Creates the Data Center Construction by Foreign Adversaries Act. Provides that no foreign company may construct or cause to be constructed a data center in the State unless the Illinois Commerce Commission, the Illinois Power Agency, and the Department of Commerce and Economic Opportunity conduct a joint study of the energy consumption of the prospective data center and certify to the Governor and the General Assembly that the energy used by the new data center is a new self-generated load and does not affect the load supply of PJM or MISO. Provides that the term "foreign company" means an entity that (i) is at least 51% owned by a foreign adversary or (ii) is headquartered in a country with a government that is a foreign adversary.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Failed) 2025-01-07 - Session Sine Die [SB3980 Detail]
Download: Illinois-2023-SB3980-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning data centers.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 1. Short title. This Act may be cited as the Data | |||||||||||||||||||
5 | Center Construction by Foreign Adversaries Act.
| |||||||||||||||||||
6 | Section 5. Data center construction by foreign adversaries | |||||||||||||||||||
7 | prohibited. | |||||||||||||||||||
8 | (a) Notwithstanding any other provision of law, on and | |||||||||||||||||||
9 | after the effective date of this Act, no foreign company may | |||||||||||||||||||
10 | construct or cause to be constructed a data center in the State | |||||||||||||||||||
11 | unless the Illinois Commerce Commission, the Illinois Power | |||||||||||||||||||
12 | Agency, and the Department of Commerce and Economic | |||||||||||||||||||
13 | Opportunity conduct a joint study of the energy consumption of | |||||||||||||||||||
14 | the prospective data center and certify to the Governor and | |||||||||||||||||||
15 | the General Assembly that the energy estimated to be used by | |||||||||||||||||||
16 | the data center is a self-generated load and does not affect | |||||||||||||||||||
17 | the load supply of PJM or MISO. | |||||||||||||||||||
18 | (b) As used in this Section: | |||||||||||||||||||
19 | "Company" means a sole proprietorship, organization, | |||||||||||||||||||
20 | association, corporation, partnership, joint venture, limited | |||||||||||||||||||
21 | partnership, limited liability partnership, limited liability | |||||||||||||||||||
22 | company, or other entity or business association, including | |||||||||||||||||||
23 | all wholly owned subsidiaries, majority-owned subsidiaries, |
| |||||||
| |||||||