Bill Text: MA H3306 | 2009-2010 | 186th General Court | Introduced
Bill Title: That the Highway Department be authorized to evaluate the feasibility of interchange improvements along Route 2 from the city of Gardner to Route 128
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2009-01-20 - Public Hearing date 9/10 at 11:00 AM in Hearing Room B1 [H3306 Detail]
Download: Massachusetts-2009-H3306-Introduced.html
The Commonwealth of Massachusetts
_______________
PRESENTED BY:
Robert L. Rice, Jr.
_______________
To the
Honorable Senate and House of Representatives of the Commonwealth of
Massachusetts in General
Court assembled:
The undersigned legislators and/or citizens respectfully petition for the passage of the accompanying bill:
An Act relative to study of Route 2 improvements .
_______________
PETITION OF:
Name: |
District/Address: |
Robert L. Rice, Jr. |
2nd Worcester |
Jennifer L. Flanagan |
Worcester and Middlesex |
Stephen M. Brewer |
Worcester, Hampden, Hampshire and Franklin |
James B. Eldridge |
Middlesex and Worcester |
Stephen L. DiNatale |
3rd Worcester |
Michael F. Rush |
10th Suffolk |
The Commonwealth of Massachusetts
_______________
In the Year Two Thousand and Nine
_______________
An Act relative to study of Route 2 improvements.
Be it
enacted by the Senate and House of Representatives in General Court assembled,
and by the authority of the same, as follows:
SECTION 1. The Massachusetts Highway Department is hereby authorized and directed to evaluate the feasibility of interchange improvements along Route 2 from the city of Gardner to the Route 2/Route 128 interchange. The study shall include the traffic patterns along the corridor, improvements and or reconstruction of interchanges and upgrades to the acceleration and deceleration lanes. The study shall commence no later than June 1, 2009 and continue for a period of six months, at the end of such time, the Massachusetts Highway Department will submit a report to the House and Senate chairs of the Joint Committee on Transportation detailing the plans for design and construction of the improvement project. This report is due to the committee no later than December 1, 2009.