Bill Text: MA H3306 | 2009-2010 | 186th General Court | Introduced


Bill Title: That the Highway Department be authorized to evaluate the feasibility of interchange improvements along Route 2 from the city of Gardner to Route 128

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2009-01-20 - Public Hearing date 9/10 at 11:00 AM in Hearing Room B1 [H3306 Detail]

Download: Massachusetts-2009-H3306-Introduced.html

The Commonwealth of Massachusetts

_______________

PRESENTED BY:

Robert L. Rice, Jr.

_______________

To the Honorable Senate and House of Representatives of the Commonwealth of Massachusetts in General
                Court assembled:

                The undersigned legislators and/or citizens respectfully petition for the passage of the accompanying bill:

An Act relative to study of Route 2 improvements .

_______________

PETITION OF:

 

Name:

District/Address:

Robert L. Rice, Jr.

2nd Worcester

Jennifer L. Flanagan

Worcester and Middlesex

Stephen M. Brewer

Worcester, Hampden, Hampshire and Franklin

James B. Eldridge

Middlesex and Worcester

Stephen L. DiNatale

3rd Worcester

Michael F. Rush

10th Suffolk


 

The Commonwealth of Massachusetts

_______________

In the Year Two Thousand and Nine

_______________




An Act relative to study of Route 2 improvements.



                Be it enacted by the Senate and House of Representatives in General Court assembled, and by the authority of the same, as follows:

SECTION 1. The Massachusetts Highway Department is hereby authorized and directed to evaluate the feasibility of interchange improvements along Route 2 from the city of Gardner to the Route 2/Route 128 interchange. The study shall include the traffic patterns along the corridor, improvements and or reconstruction of interchanges and upgrades to the acceleration and deceleration lanes.  The study shall commence no later than June 1, 2009 and continue for a period of six months, at the end of such time, the Massachusetts Highway Department will submit a report to the House and Senate chairs of the Joint Committee on Transportation detailing the plans for design and construction of the improvement project.  This report is due to the committee no later than December 1, 2009.

feedback