HOUSE BILL No. 4401

 

March 9, 2011, Introduced by Rep. Geiss and referred to the Committee on Energy and Technology.

 

     A bill to amend 1994 PA 451, entitled

 

"Natural resources and environmental protection act,"

 

(MCL 324.101 to 324.90106) by adding sections 62715, 62717, 62719,

 

62721, 62723, 62725, 62727, 62729, 62731, 62733, 62735, 62737,

 

62739, 62741, 62743, and 62745.

 

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

 

     Sec. 62715. (1) A sequestration project owner shall maintain

 

financial assurance during the sequestration operation and until

 

the department issues a certificate of completion of the

 

sequestration operation under section 62729.

 

     (2) The financial assurance required under subsection (1)

 

shall meet all of the following requirements:

 

     (a) Apply to all sequestration operations subject to the

 


sequestration order.

 

     (b) Be in an amount determined by the department to be

 

sufficient to cover the cost to administer closure of the

 

sequestration project; to hire a third party to remove surface

 

buildings and equipment utilized in geologic sequestration; to

 

conduct postclosure monitoring; and to implement necessary

 

environmental protection measures, including any necessary

 

remediation of contamination of the soil, surface water, or

 

groundwater caused by the sequestration operation that is in

 

violation of the sequestration order.

 

     (c) Consist of escrow, cash, certificate of deposit,

 

irrevocable letter of credit, surety bond, or any combination

 

thereof; or any other method satisfactory to the department.

 

     (3) Every 3 years, or as the department considers necessary, a

 

sequestration project owner shall adjust the amount of financial

 

assurance as determined by the department to ensure that it is

 

sufficient for the purposes of subsection (2)(b).

 

     (4) If the sequestration project owner fails to maintain

 

financial assurance required under this section, the department may

 

order immediate suspension of the sequestration operation.

 

     (5) The department shall waive financial assurance otherwise

 

required under this part to the extent it duplicates financial

 

assurance required by any federal agency.

 

     Sec. 62717. (1) Before beginning the sequestration operation,

 

a sequestration project owner shall record a certified copy of the

 

sequestration order with the register of deeds of the county or

 

counties in which the sequestration project is to be located.

 


     (2) The sequestration project owner shall notify the

 

department at least 30 days before beginning a sequestration

 

operation, and 5 business days before actual geologic sequestration

 

begins.

 

     Sec. 62719. (1) A person may request the department to amend a

 

sequestration order to name the person as a new sequestration

 

project owner. The request shall be submitted to the department on

 

a form provided by the department. The request shall include an

 

organization report and other relevant information required by the

 

department. The request shall be verified in the same manner as a

 

pleading in a civil action. The department shall approve the

 

request and issue an amended sequestration order if all of the

 

following requirements are met:

 

     (a) The person submitting the request provides financial

 

assurance as required under section 62715.

 

     (b) The person submitting the request accepts the conditions

 

of the existing sequestration order.

 

     (c) If the department determines the current sequestration

 

project owner to be in violation of this part or the rules

 

promulgated under this part at the sequestration project involved

 

in the transfer, the current sequestration project owner has

 

completed the necessary corrective actions or the person submitting

 

the request has entered into a written consent agreement with the

 

department to correct the violation.

 

     (2) Pending the approval of an amended sequestration order

 

under subsection (1), the current sequestration project owner

 

remains responsible for the sequestration operation.

 


     (3) A sequestration order may be amended, for purposes other

 

than naming a new sequestration project owner, as follows:

 

     (a) The sequestration project owner may submit to the

 

department a request to amend the sequestration order to address

 

anticipated changes in the sequestration project.

 

     (b) The department may propose an amendment to a sequestration

 

order if the department determines that the sequestration project

 

or sequestration operation does not support the findings made for

 

the sequestration project pursuant to section 62713(1)(c), (d), or

 

(e), or that the sequestration operation is not adequately

 

achieving geologic sequestration.

 

     (c) Within 30 days after receiving a request to amend a

 

sequestration order, or upon a determination by the department

 

under subdivision (b), the department shall determine whether the

 

amendment would constitute a significant substantive change from

 

the conditions of the approved sequestration order.

 

     (d) If the department determines that the amendment would

 

constitute a significant substantive change, then the department

 

shall give notice and conduct an evidentiary hearing on the

 

proposed amendment as provided under section 62711.

 

     (e) If the department determines that the amendment would not

 

constitute a significant substantive change from the conditions of

 

the approved sequestration order, the department shall provide

 

written notice of the determination to the county and to the city

 

or township and, if applicable, village where the sequestration

 

project is located. The department shall also publish notice of the

 

determination in a newspaper of general circulation in the county

 


or counties where the sequestration project is located. The

 

department shall issue a decision on the amendment not more than 14

 

days after publication of the notice and shall notify the

 

sequestration project owner of the decision.

 

     (f) The department shall approve an amended sequestration

 

order if the department determines that the amendments meet the

 

requirements of section 62713(1) with respect to the underlying

 

sequestration order.

 

     (4) If the department denies a request to amend a

 

sequestration order under subsection (1) or (3), the department

 

shall state the reasons for denial in an order provided to the

 

sequestration project owner.

 

     Sec. 62721. (1) A person who owns or has an ownership interest in

 

pore space or oil, gas, or minerals may file a petition asserting that

 

carbon dioxide injected pursuant to a sequestration order has migrated

 

out of the predicted carbon dioxide plume area to occupy pore space in

 

the person's subsurface property and requesting that the sequestration

 

order be amended to expand the legal description of the lands

 

comprising the carbon dioxide plume area and the buffer zone

 

accordingly.

 

     (2) The department shall determine whether the petition is

 

administratively complete, subject to section 62707(6) and (7). If the

 

petition is administratively complete, not more than 30 days after

 

receipt of the petition, the department shall determine if there is a

 

reasonable basis for the petition and shall notify the petitioner in

 

writing of its determination. If there is a reasonable basis for the

 

petition, the department shall grant the petitioner an evidentiary

 


hearing on the petition. Otherwise, the department shall deny the

 

petition.

 

     (3) An evidentiary hearing shall be held not more than 90 days

 

after the department notifies the petitioner under subsection (2) that

 

there is a reasonable basis for the petition. The department shall

 

publish notice of the evidentiary hearing in a newspaper of general

 

circulation in the county or counties in which the sequestration

 

project is located and in an oil and gas industry publication if there

 

are operations for the extraction of oil or gas from the pore space

 

owned by the petitioner into which the carbon dioxide plume is alleged

 

to have migrated. Publication shall occur not less than 45 days before

 

the date of the hearing. The department shall also mail copies of the

 

notice to the county clerk and the clerk of the city or the township

 

and, if applicable, village where the geologic sequestration project

 

is to be located.

 

     (4) If the department determines, after the evidentiary hearing,

 

that carbon dioxide injected pursuant to a sequestration order has

 

migrated out of the approved carbon dioxide plume area to occupy the

 

petitioner's subsurface property, the department shall grant the

 

petition. Otherwise, the department shall deny the petition. If the

 

department grants the petition, both of the following apply:

 

     (a) The project owner shall acquire all of the necessary rights

 

to pore space or oil, gas, or minerals in the petitioner's tract by

 

title conveyance or other contractual arrangement, by eminent domain

 

as provided under section 62723, or as otherwise allowed by statute.

 

     (b) The department may order sequestration operations modified or

 

suspended until the project owner has acquired the rights described in

 


subdivision (a).

 

     (5) The administrative remedy provided by this section is the

 

exclusive remedy available to a person who asserts that the carbon

 

dioxide plume is occupying the pore space in the person's subsurface

 

property located outside the boundary of an approved carbon dioxide

 

plume area.

 

     Sec. 62723. (1) The legislature finds that geologic

 

sequestration results in long-term storage of CO2, thereby reducing

 

man-made CO2 emissions to the atmosphere and the attendant adverse

 

atmospheric effects of these emissions on natural resources, the

 

environment, and public health and safety. Consequently, a

 

sequestration project is a public use of property. The project owner

 

under a sequestration order may acquire any of the following by

 

exercise of power of eminent domain:

 

     (a) Necessary rights to use the pore space or to oil, gas, or

 

minerals in the sequestration zone.

 

     (b) The right to use property and highway rights-of-way in this

 

state, but only to transport carbon dioxide by a pipeline or

 

pipelines, and to locate, lay, construct, maintain, and operate those

 

pipelines. The pipeline or pipelines shall be used exclusively for the

 

transmission, transportation, and distribution of carbon dioxide

 

within this state.

 

     (2) Eminent domain under this section shall be exercised by

 

condemnation pursuant to the uniform condemnation procedures act of

 

1980, 1980 PA 87, MCL 213.51 to 213.75.

 

     (3) Rights or interests a project owner acquires for a

 

sequestration project by title conveyance or other contractual

 


arrangement are not subject to the exercise of the power of eminent

 

domain under subsection (1) for a different sequestration project.

 

     (4) This section does not alter any power of eminent domain that

 

exists under any other authority.

 

     (5) None of the following may be taken by the exercise of the

 

power of eminent domain granted in this section:

 

     (a) The right of an owner of oil, gas, or minerals or pore space

 

located above or below the sequestration zone to drill a well into

 

strata above or below the sequestration zone if that owner complies

 

with all of the applicable rules and regulations of the department.

 

     (b) The right of the property owner to exercise interests in

 

property not acquired for the sequestration project within the borders

 

of the sequestration project.

 

     (6) Any acquisition of property rights pursuant to this section

 

is a taking of private property for which just compensation is due.

 

Just compensation for property described in subsection (1)(a) is an

 

amount equal to the fair market value of the pore space or of valuable

 

oil, gas, and minerals contained within pore space taken on the date

 

of the exercise of eminent domain authority. In the absence of a

 

demonstration of an actual or reasonably foreseeable alternate use,

 

pore space within a sequestration facility has no compensable value.

 

     (7) An action under this part, or under any rule promulgated or

 

order issued pursuant to this part, does not cause a sequestration

 

project owner to be a common carrier or a public utility for any

 

purpose whatsoever, or to be subject to any duties, obligations, or

 

liabilities as a common carrier or public utility.

 

     (8) The department and its employees are neither necessary nor

 


indispensable parties to any condemnation proceeding under this

 

section, and if named as a party or third party, upon motion, shall be

 

dismissed from the action at the expense of the party who names the

 

department or any employee. The department shall be awarded all costs

 

reasonably incurred to be dismissed from the action, including

 

attorney fees.

 

     Sec. 62725. (1) A sequestration project owner shall do all of

 

the following:

 

     (a) Provide a copy of the contingency plan included in the

 

petition for the sequestration order to each emergency management

 

coordinator having jurisdiction over the surface of the geographic

 

area constituting the sequestration project.

 

     (b) Conduct the sequestration operation in accordance with the

 

approved sequestration order.

 

     (c) Conduct monitoring of the sequestration operation in

 

accordance with the provisions of the plan of operations.

 

     (2) Compliance with the provisions of this part does not

 

relieve a sequestration project owner of the obligation to comply

 

with all other applicable state and federal law and, subject to

 

section 62743(5) and (6), local ordinances.

 

     (3) A sequestration project owner shall monitor the

 

sequestration project for 20 years following permanent cessation of

 

subsurface injection of carbon dioxide. The department may reduce

 

the postclosure monitoring period upon request of the sequestration

 

project owner if the department determines that there is not a

 

significant risk that the sequestered carbon dioxide will endanger

 

natural resources, the environment, or public health and safety by

 


migrating outside the sequestration zone. The request shall be made

 

in writing not less than 6 months before the proposed postclosure

 

monitoring termination date and shall provide the department with

 

technical data and information demonstrating that additional

 

monitoring is not needed to ensure that there is not a significant

 

risk of endangerment of natural resources, the environment, or

 

public health and safety. The department shall give notice and

 

conduct an evidentiary hearing on the request in the same manner as

 

provided under section 62711.

 

     Sec. 62727. (1) A sequestration project owner shall file a

 

biannual geologic sequestration report with the department on or

 

before March 15 and September 15 of each year of the sequestration

 

operation and postclosure monitoring period. The report due on or

 

before March 15 shall cover operations during the preceding July 1

 

to December 31. The report due on or before September 15 shall

 

cover operations during the preceding January 1 to June 30. The

 

geologic sequestration report shall contain all of the following:

 

     (a) A description of the status of the sequestration project.

 

     (b) An update of the contingency plan. The sequestration

 

project owner shall provide a copy of the update to the emergency

 

management coordinator.

 

     (c) A report of monitoring results for the preceding 6-month

 

period.

 

     (d) A report of the total tons of carbon dioxide injected into

 

the sequestration zone for each month of the preceding 6-month

 

period.

 

     (e) A list of all sequestration wells plugged and abandoned

 


during the preceding 6-month period.

 

     (f) A list of all sequestration wells drilled during the

 

preceding 6-month period.

 

     (g) A list of all sequestration wells granted temporary

 

abandoned status under part 625 during the preceding 6-month

 

period.

 

     (h) A list of the notifications under subsection (2) for the

 

preceding calendar year.

 

     (2) A sequestration project owner shall notify the department

 

within 8 hours of learning of any incident, act of nature, or

 

exceedance of a permit standard or condition at a sequestration

 

project that endangers or has a significant risk to endanger

 

natural resources, the environment, or public health and safety.

 

     (3) The sequestration project owner shall preserve records

 

upon which the geologic sequestration reports are based for 3

 

years. However, the project owner shall preserve records upon which

 

notifications under subsection (2) are based until the end of the

 

postclosure monitoring period. Records described in this subsection

 

shall be made available to the department upon request.

 

     Sec. 62729. (1) At the end of the postclosure monitoring

 

period, the department shall inspect the sequestration project and

 

provide notice and hold a public hearing, in the same manner as

 

required under section 62709, on the question of issuing a

 

certificate of completion of the sequestration operation. The

 

department shall issue a certificate of completion of the

 

sequestration operation upon a showing by the sequestration project

 

owner of all of the following:

 


     (a) There is not a significant risk that the sequestered

 

substance will endanger natural resources, the environment, or

 

public health and safety by migrating outside of the sequestration

 

zone.

 

     (b) The sequestration operation has not resulted in any

 

ongoing conditions requiring correction or remediation.

 

     (c) All wells that are part of the sequestration project have

 

been properly plugged and abandoned.

 

     (d) All surface facilities associated with the sequestration

 

project have been removed, all underground pipelines removed or

 

capped, and the land restored to as near its original contours as

 

is reasonably practical, except as otherwise approved by the

 

department pursuant to a written request by the operator.

 

     (2) The department shall publish a copy of the entire

 

certificate of completion in a newspaper of local distribution in

 

the area where the sequestration project is located.

 

     Sec. 62731. (1) After a certificate of completion of the

 

sequestration operation is issued, all of the following apply:

 

     (a) Subject to subsection (2), the sequestration project owner

 

is immune from liability in any civil or administrative action for

 

any damage caused by the sequestration operation to persons,

 

property, natural resources, the environment, or public health and

 

safety occurring after the date of issuance of the certificate of

 

completion.

 

     (b) Any remaining financial assurance shall be released.

 

     (c) The sequestration remediation fund created in section

 

62735 is intended as the sole source of public funding for

 


correction or remediation of conditions caused by the sequestration

 

operation.

 

     (2) Notwithstanding any other provision of this part, a

 

sequestration project owner is liable for any damage from the

 

sequestration operation that is proximately caused by either of the

 

following committed by or on behalf of the sequestration project

 

owner:

 

     (a) Gross negligence.

 

     (b) Intentional concealment or misrepresentation of material

 

facts.

 

     (3) Damages or injunctive relief shall not be awarded to a

 

private claimant for a claim of nuisance or trespass related to the

 

injection into or presence in the sequestration zone of carbon

 

dioxide, or from the release of carbon dioxide from the

 

sequestration zone, unless, subject to subsection (1), the

 

plaintiff has incurred harm in addition to mere occupation of

 

subsurface property, the surface, or airspace above the surface.

 

     Sec. 62733. (1) After a sequestration order becomes effective,

 

the department shall assess a sequestration project owner a

 

sequestration surveillance fee of not more than 15 cents per ton of

 

sequestered substance injected during the calendar year, as

 

reported under section 62727(1)(d), but not less than $50,000.00,

 

for each calendar year in which subsurface injection of carbon

 

dioxide occurs. Surveillance fees collected under this section

 

shall be forwarded to the state treasurer for deposit in the

 

sequestration administration fund created in subsection (6). The

 

surveillance fee rate shall be calculated each year as follows:

 


     (a) The department shall calculate the adjusted appropriation

 

by deducting any unexpended money in the fund at the close of the

 

prior fiscal year from the amount appropriated for the current

 

fiscal year for surveillance, monitoring, administration, and

 

enforcement of this part.

 

     (b) The department shall determine the total tons of carbon

 

dioxide injected by all sequestration operations in this state in

 

the prior calendar year.

 

     (c) The fee rate shall be the ratio, to the nearest 1/100 of

 

1%, of the adjusted appropriation as determined under subdivision

 

(a) to the total tons of sequestered substance as determined under

 

subdivision (b).

 

     (2) The sequestration surveillance fee described in subsection

 

(1) is due by 30 days after the department sends written notice to

 

the sequestration project owner of the amount due.

 

     (3) A fine equal to 2% of the amount due, or $1,000.00,

 

whichever is greater, shall be assessed against the sequestration

 

project owner for a sequestration surveillance fee that is not paid

 

when due, for each full month the payment is overdue. The

 

department may file an action in the circuit court for Ingham

 

county to collect the unpaid fee and fine.

 

     (4) If payment of the sequestration surveillance fee for a

 

sequestration project is overdue by more than 6 months, the

 

department may order the suspension of the sequestration operation

 

until the fee and all fines are paid.

 

     (5) Fines paid pursuant to this section shall be deposited in

 

the sequestration administration fund.

 


     (6) The sequestration administration fund is created within

 

the state treasury. The state treasurer may receive money or other

 

assets from any source for deposit into the sequestration

 

administration fund. The state treasurer shall direct the

 

investment of the sequestration administration fund. The state

 

treasurer shall credit to the sequestration administration fund

 

interest and earnings from sequestration administration fund

 

investments. Money in the sequestration administration fund at the

 

close of the fiscal year shall remain in the sequestration

 

administration fund and shall not lapse to the general fund. The

 

department shall be the sequestration administrator of the

 

sequestration administration fund for auditing purposes.

 

     (7) The department shall expend money from the sequestration

 

administration fund, upon appropriation, only for surveillance,

 

monitoring, administration, and enforcement of this part.

 

     Sec. 62735. (1) The sequestration remediation fund is created

 

within the state treasury.

 

     (2) Fees collected under subsection (5) shall be deposited in

 

the sequestration remediation fund. The state treasurer may receive

 

money or other assets from any source for deposit into the

 

sequestration remediation fund. The state treasurer shall direct

 

the investment of the sequestration remediation fund. The state

 

treasurer shall credit to the a sequestration remediation fund

 

interest and earnings from sequestration remediation fund

 

investments. Money in the sequestration remediation fund at the

 

close of the fiscal year shall remain in the sequestration

 

remediation fund and shall not lapse to the general fund.

 


     (3) The department shall be the administrator of the

 

sequestration remediation fund for auditing purposes.

 

     (4) The department shall expend money from the sequestration

 

remediation fund, upon appropriation, only for correction or

 

remediation of physical conditions caused by a sequestration

 

operation that occur after issuance of the certificate of

 

completion under section 62729. An appropriation under this

 

subsection is an appropriation for a public purpose.

 

     (5) A sequestration project owner shall pay a fee for each ton

 

of a sequestered substance injected after a sequestration order

 

becomes effective. Fees collected under this subsection shall be

 

deposited in the sequestration remediation fund.

 

     (6) As soon as practicable after the date of enactment of this

 

part, the department shall establish by rule the minimum and

 

maximum balance for the sequestration remediation fund, and the

 

amount of the fee required under subsection (5) to maintain a

 

sequestration remediation fund balance in that range, after taking

 

into account the following criteria:

 

     (a) The estimated quantity of carbon dioxide to be injected

 

annually by all sequestration operations in the state.

 

     (b) The likelihood of an incident resulting in liability.

 

     (c) The likely dollar value of any damages relating to an

 

incident.

 

     (d) Other factors relating to the risk of sequestration

 

projects.

 

     (e) The effect of the fee on commercial and economic viability

 

of sequestration of carbon dioxide.

 


     (7) The department shall review and if appropriate adjust the

 

minimum and maximum sequestration remediation fund balance at least

 

every 5 years to ensure that the balance is sufficient to meet the

 

potential need for payments from the remediation fund.

 

     (8) The geologic sequestration advisory board is created

 

within the department. The board shall consist of the following

 

members:

 

     (a) The following members appointed by the governor:

 

     (i) 1 member representing an organization of intrastate gas

 

pipeline operators.

 

     (ii) 1 member that is a carbon sequestration researcher or

 

geologist.

 

     (iii) 1 member representing an environmental protection

 

organization.

 

     (b) The following members appointed by the senate majority

 

leader:

 

     (i) 1 member representing the Michigan oil and gas industry.

 

     (ii) 1 member who is an engineer specializing in carbon

 

sequestration.

 

     (c) The following members appointed by the speaker of the

 

house of representatives:

 

     (i) 1 member representing the natural gas storage industry.

 

     (ii) 1 member who is an actuary.

 

     (d) The following ex officio members:

 

     (i) The director of the department or his or her designee.

 

     (ii) The manager of the operations and wholesale market

 

division, or a successor division, of the Michigan public service

 


commission.

 

     (iii) The state treasurer or his or her designee, as a nonvoting

 

member.

 

     (9) The members first appointed to the geologic sequestration

 

advisory board shall be appointed within 30 days after the

 

effective date of this section. Members of the board shall serve

 

for terms of 4 years or until a successor is appointed, whichever

 

is later, except that the member first appointed under subsection

 

(8)(a)(ii) shall serve for 1 year, the members first appointed under

 

subsection (8)(b)(i) and (c)(i) shall serve for 2 years, and the

 

members first appointed under subsection (8)(b)(ii) and (c)(ii) shall

 

serve for 3 years. If a vacancy occurs on the board, the vacancy

 

shall be filled by appointment for the unexpired term in the same

 

manner as the original appointment. The officer appointing a member

 

of the board may remove the member for incompetency, dereliction of

 

duty, malfeasance, misfeasance, or nonfeasance in office, or any

 

other good cause.

 

     (10) The first meeting of the geologic sequestration advisory

 

board shall be called by the director of the department. At the

 

first meeting, the board shall elect from among its members a

 

chairperson and other officers as it considers necessary or

 

appropriate. After the first meeting, the board shall meet at least

 

annually, or more frequently at the call of the chairperson or if

 

requested by 2 or more members. A majority of the members of the

 

board constitute a quorum for the transaction of business at a

 

meeting of the board. A majority of the members present and serving

 

are required for official action of the board.

 


     (11) The business that the geologic sequestration advisory

 

board performs shall be conducted at a public meeting of the board

 

held in compliance with the open meetings act, 1976 PA 267, MCL

 

15.261 to 15.275. A writing prepared, owned, used, in the

 

possession of, or retained by the board in the performance of an

 

official function is subject to the freedom of information act,

 

1976 PA 442, MCL 15.231 to 15.246.

 

     (12) Members of the geologic sequestration advisory board

 

shall serve without compensation. However, members of the board may

 

be reimbursed for their actual and necessary expenses incurred in

 

the performance of their official duties as members of the board.

 

     (13) The geologic sequestration advisory board shall make

 

recommendations to the department on all of the following:

 

     (a) The fees to be established under this section.

 

     (b) The minimum and maximum sequestration remediation fund

 

balance.

 

     (c) Management of the sequestration remediation fund.

 

     (14) The department shall consider the recommendations of the

 

geologic sequestration advisory board and shall explain the reasons

 

in writing if recommendations of the board are not adopted.

 

     Sec. 62737. (1) This part does not apply to the use of carbon

 

dioxide as a part of or in conjunction with any secondary recovery

 

project approved by the department under part 615 or part 617, or

 

both, and any consequential geologic sequestration, if the primary

 

purpose of the project is secondary oil or gas recovery.

 

     (2) The department may promulgate rules to allow conversion or

 

expansion of an existing secondary recovery project approved under

 


part 615 or part 617, or both, into a sequestration project. Upon

 

approval of a conversion or expansion of a secondary recovery

 

project, this part applies to the project.

 

     Sec. 62739. (1) If the department determines that a

 

sequestration project owner has violated this part, a rule

 

promulgated under this part, or a sequestration order issued under

 

this part, the department shall order the sequestration project

 

owner to correct the violation.

 

     (2) If the department determines that the sequestration

 

project owner has violated this part, a rule promulgated under this

 

part, or an order issued under this part, and that the violation is

 

endangering or that there is a significant risk that the violation

 

will endanger natural resources, the environment, or public health

 

and safety, the department shall serve notice by registered mail or

 

in person of this determination, in writing, to the project owner

 

and to any surety executing a bond filed with the department by the

 

project owner. The notice shall specify actions necessary to

 

remediate the violation. If the project owner and surety fail to

 

take the actions described in the notice of determination as soon

 

as practicable but not later than 30 days after the date of

 

service, the department may enter into and upon any private or

 

public property necessary to reach the site of the sequestration

 

project, and take actions necessary to remediate the violation. The

 

project owner and surety are jointly and severally liable for all

 

expenses incurred by the department for remediation under this

 

section. The project owner or surety shall pay within 30 days any

 

claim submitted by the department listing the expenses incurred to

 


remediate the violation. If a claim is not paid within that time,

 

the department may bring a suit against the project owner or

 

surety, jointly or severally, to collect the claim in any court of

 

competent jurisdiction. A person challenging the recovery of costs

 

under this subsection has the burden of establishing that the costs

 

were not reasonably incurred under the circumstances.

 

     (3) This section does not require a surety to pay more than

 

its obligations under the applicable surety instrument.

 

     (4) A finding of significant endangerment under this section

 

does not provide a basis for a finding of an imminent and

 

substantial endangerment or a similar finding under any other

 

provision of law.

 

     (5) If the department finds that emergency action is required

 

to protect natural resources, the environment, or public health and

 

safety, the department may issue an emergency order without a

 

hearing to require a sequestration project owner to suspend the

 

sequestration operation or to take other corrective actions. An

 

emergency order shall remain in force and effect for not more than

 

21 days.

 

     (6) If a sequestration project owner fails to comply with an

 

order under subsection (1), the department may request the attorney

 

general to commence a civil action for appropriate relief,

 

including a permanent or temporary injunction, for a violation of

 

this part, a rule promulgated under this part, or an order issued

 

under this part. An action under this subsection may be brought in

 

the circuit court for the county of Ingham or for the county in

 

which the defendant is located, resides, or is doing business. The

 


court has jurisdiction to restrain the violation and to require

 

compliance. In addition to any other relief granted under this

 

section, the court may impose a civil fine of not less than

 

$2,500.00, and the court may award reasonable attorney fees and

 

costs to the prevailing party. The maximum fine imposed by the

 

court shall be not more than $25,000.00 per day of violation.

 

     (7) The attorney general may file a civil suit in a court of

 

competent jurisdiction to recover, in addition to a fine under

 

subsection (6), the full value of the injuries done to the natural

 

resources of this state and the costs of surveillance and

 

enforcement by this state resulting from the violation.

 

     (8) A civil fine or other civil award imposed under this

 

section is payable to this state and shall be credited to the

 

general fund. The fine constitutes a lien on any property, of any

 

nature or kind, owned by the defendant.

 

     Sec. 62741. A person who intentionally makes a false

 

statement, representation, or certification in a petition for a

 

sequestration project under this part or in a notice or report

 

required under this part or under a sequestration order is guilty

 

of a felony and may be imprisoned for not more than 2 years and

 

shall be fined not less than $2,500.00 or more than $25,000.00 for

 

each violation.

 

     Sec. 62743. (1) The department has jurisdiction and authority

 

over all persons and property necessary to administer and enforce

 

effectively the provisions of this part.

 

     (2) The department may promulgate rules and issue orders as

 

may be necessary to carry out the purposes of this part.

 


     (3) The department may enter at all reasonable times in or

 

upon a sequestration project subject to this part for the purpose

 

of inspecting and investigating operating records, sequestration

 

wells, and facilities of a sequestration project. The department

 

shall conduct an inspection and investigation at least annually.

 

     (4) The department may enter into cooperative agreements with

 

the federal government or other state governments or state

 

government entities to regulate sequestration projects that extend

 

beyond state regulatory authority under this part.

 

     (5) A local unit of government shall not enact, maintain, or

 

enforce an ordinance, regulation, or resolution that duplicates,

 

contradicts, exceeds, or conflicts with a provision of this part,

 

except that an ordinance may regulate aboveground elements of the

 

sequestration operation or sequestration project to protect public

 

health and safety.

 

     (6) A sequestration operation or sequestration project that

 

has been approved by a sequestration project order is not subject

 

to an ordinance adopted under the Michigan zoning enabling act,

 

2006 PA 110, MCL 125.3101 to 125.3702.

 

     (7) A carbon dioxide injection project designed to gather data

 

or as a pilot or feasibility study of geologic sequestration that

 

injects not more than 2,000,000 tons of carbon dioxide is not

 

subject to this part, if the owner or operator of the project

 

complies with all applicable provisions of part 615 and part 625,

 

as appropriate, and pursuant to those parts, obtains the approval

 

of the department for construction and operation of the project.

 

The project may at any time be considered for conversion into a

 


sequestration project subject to this part, on a prospective basis,

 

upon filing a petition pursuant to section 62707.

 

     Sec. 62745. This part shall be construed liberally to

 

effectuate the legislative intent and the purposes as complete and

 

independent authority for each act and thing authorized by this

 

part, and all powers granted shall be broadly interpreted to

 

effectuate the intent and purposes and not as a limitation of

 

powers.

 

     Enacting section 1. This amendatory act does not take effect

 

unless Senate Bill No.____ or House Bill No. 4399(request no.

 

01871'11) of the 96th Legislature is enacted into law.