Bill Text: NE LB20 | 2025-2026 | 109th Legislature | Introduced


Bill Title: Require interconnection for electricity distribution between local distribution systems and agricultural self-generation facilities

Spectrum: Partisan Bill (Nonpartisan 1-0)

Status: (Introduced) 2025-01-15 - Notice of hearing for January 22, 2025 [LB20 Detail]

Download: Nebraska-2025-LB20-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback