HB 1275 - AS INTRODUCED
2016 SESSION
16-2270
06/09
HOUSE BILL 1275
AN ACT relative to net energy metering capacity.
SPONSORS: Rep. Mann, Ches. 2
COMMITTEE: Science, Technology and Energy
-----------------------------------------------------------------
ANALYSIS
This bill raises the cap on net energy metering.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
16-2270
06/09
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Sixteen
AN ACT relative to net energy metering capacity.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Net Energy Metering. Amend RSA 362-A:9, I to read as follows:
I. Standard tariffs providing for net energy metering shall be made available to eligible customer-generators by each electric distribution utility in conformance with net metering rules adopted and orders issued by the commission. Each net energy metering tariff shall be identical, with respect to rates, rate structure, and charges, to the tariff under which a customer-generator would otherwise take default generation supply service from the distribution utility. Such tariffs shall be available on a first-come, first-served basis within each electric utility service area under the jurisdiction of the commission until such time as the total rated generating capacity owned or operated by eligible customer-generators totals a number equal to [50] 100 megawatts multiplied by each such utility's percentage share of the total 2010 annual coincident peak energy demand distributed by all such utilities as determined by the commission. No more than 4 megawatts of such total rated generating capacity shall be from a combined heat and power system as defined in RSA 362-A:1-a, I-d.
2 Effective Date. This act shall take effect 60 days after its passage.